ORDINANCE FACTORY KHAMRIYA JABALPUR S UB - TELEPHONE CABLE LAYING WORK FROM TELEPHONE QUOTATION FOR EXCHANGE MAIN DP TO OFIL & REVA BHAVAN WITH REFERENCE YOUR QUERY FOR ABOVE WORK IN REVA BHAVAN COMPETITIVELY RATE FOR FOLLOWING WORK SI DESCRIPTION OF WORK UNIT QTY AMOUNT AMOUNT REMARK NO. 1 EXCATING IN TRENCHES NOT RM 145 138475 EXCEEDING 0.3 M WIDE & 0.60 M 955 DEPTH AND GETTING IT OUT IN HARD/DENSE SOIL FOR LAYING OF U/G CABLE 2 RETURING FILLING IN INCLUDING RM 15 14325 SPREADING,LEVELLING,WATERING 955 AND WELL RAMMINGIN LAYERS NOT EXCEDING 25 CM 3 S & L STEEL WATER TUBINDG (GI RM 100 4100 PIPE) LIGHT GRADE 100 mm DIA 41 WITH ALL FITINGS LEID IN TRENCHES WITH M&L 4 BORING HORINZONTAL HOLES RM 600 24600 AUGARING NOT EXCSSDING 150 mm 41 DIA 1m DEEP FOR PASSING HT/LT UNDERGROUND CABLE ACROSS THE ROAD/GENTRY 5 LAYING ONLY OF TELEPHONE CABLE RM 10 23500 50 PAIR IN TENCH CABLE WILL BE 2350 SUPPLIED/PROVIDED BY OFK 205000 CGST@9% (205000*9%) 18450 SGST@9% (205000*9%) 18450 TOTAL 241900