Professional Documents
Culture Documents
Contents
1 • Company Introduction
2 • Facilities and Fabrication
3 • Transportation
4 • Foundation Projects
5 • Substation Platform
Company Introduction 上海振华重工
Netherlands Branch
Russia Joint Venture
UK Branch
Germany Branch
Mediterranea
n Branch
Spain Branch US Branch
Korea Branch
India Branch
Vietnam Branch
Australia Branch
South Africa Branch
Company Introduction 上海振华重工
Main Certificates
ISO 9001:2015
EN 1090 EXC4
HSE OHSAS 18001
ISO 3834
DIN 18800-7
AISC
CWB
Company Introduction 上海振华重工
Subcontractor
Company Introduction 上海振华重工
上海振华重工
HVDC/HVAC
Jack-up vessel
Installation Vessel
Sea transportation and Crane Substation Supply Foundation Supply
Building and EPC
ZPMC Offshore Windfarm Project Presentation 上海振华重工
上海振华重工
Contents
1 • Company Introduction
2 • Facilities and Fabrication
3 • Transportation
4 • Foundation Projects
5 • Substation Platform
Facilities and Fabrication 上海振华重工
上海振华重工
ZPMC Nantong Yard covers an area of 2.3 million square meters, and has 1,000 meter coastline.
Facilities and Fabrication 上海振华重工
400 m
120 m
Jacket / Tripod
MP& TP
MP& TP storage area
MP& TP
120 m
CNC cutting
600 m
Facilities and Fabrication 上海振华重工
Facilities and Fabrication 上海振华重工
MP/TP Fabrication
Jacket Fabrication
Middle Section Center Can Fabrication Middle Section welding Middle Section Flange Installation Middle Section after coating
Main Tube Connection Main Tube Coating Intersecting Line Cutting Cross Fabrication
Facilities and Fabrication 上海振华重工
1. CNC Cutting 2. Adjust position 3. Preheatment 4. Tack Weld 5. Weld (after preheatment)
Advantages
Manufacturing Capacity
1st one delivery Output/ Monthly
MP &TP 45 Days 15 Sets
Jacket 90 Days 8 Sets
Substation 6-8 Months 0.5
ZPMC Offshore Windfarm Project Presentation 上海振华重工
上海振华重工
Contents
1 • Company Introduction
2 • Facilities and Fabrication
3 • Transportation
4 • Reference Projects
5 • Substation Platform
Transportation 上海振华重工
Tripod Foundation (12 ) Monopile &TP Foundation (15-21 ) Jacket Foundation (11)
Semi-submersible Transportation
ZPMC Offshore Windfarm Project Presentation 上海振华重工
上海振华重工
Contents
1 • Company Introduction
2 • Facilities and Fabrication
3 • Transportation
4 • Foundation Projects
5 • Substation Platform
Foundation Projects 上海振华重工
Contents
1 • Company Introduction
2 • Facilities and Fabrication
3 • Transportation
4 • Foundation Projects
5 • Substation Platform
Substation Platform 上海振华重工
Sanxia Dafeng
300MW
Substation Platform 上海振华重工
Yuedian
Jinwan
300MW
Substation Platform 上海振华重工
Weight
Project Name Item Quantity Capacity Voltage Including
Transformer equipment
Zhongguanghe Rudong Substation 1 150MW 110kV 1200t
Substation: 21 sets Huaneng Rudong Substation+Foundation 2 300MW 110kV 2350t
Total Capacity:5.5GW Datang Binhai Substation 1 300MW 220kV 2850t
Longyuan Dafeng Substation+Foundation 1 200MW 220kV 2850t
全国第一座整体式海上升压站 Longyuan Jiangjiasha Substation+Foundation 1 300MW 220kV 3190t
全国第一座分体式海上升压站 Guodian Zhoushan Substation 1 252MW 220kV 2680t
Sanxia Rudong
AC-DC Converter
Platform
Substation Platform 上海振华重工
Sanxia Rudong
AC-DC Converter
Platform
THANK YOU