Woe S39 FT
Equipment: CO2LASER ve
oe
Manufacturer Luu
Model : ACUPULSE 40 Cege CAO
Teat doo: Ned poses modes san BEER
SINO. TASK ) STATUS "AS NEEDED ]
| (PASS/FAIL)
| | External/Internal Visual
| | Insect ova |
L t I 4
| _ Inspect the systems exterior ;
| sarfaces for damage: Oey: [Se dorag
2 rors, power eable and
okey.
L 7 sey:
| 4 Heat exchanger clean =
Tex; Yeon
x Bacteriological filter — replaced
Geon, okay.
6 Air fiter lean x
= | Vea, ono |
Electrieal/Optical Checks V
est
Pox,
‘Aiming Beam output stable
SS oe
|
|
| Electrical Safety
|
|
Scanned with CamScanner3 Compressed aitcontinuns fle
wn Ready Mey, Oke:
4 Date and time A 4
y
{ 1 IA, OMe:
i S| Laser emission indicator flash an 4
Ready, on when lasing
6 Max Power in CW (service
moder M
7] May. Power in SP mode
%, * Internal Power Meter
_ Calibration veriied 5
9, Mignment check «CW \
| passer (laser moder Vey, Posy
0 Calibrations, Alignments and
Tees : Seo
Ww Mignment check - Pulser @
LL may power (lascrmode) Peas.
12 Alignment check SP a mas
- | power daser made)
Re Remote interloel
i is Coolant flow
15. 1
6 Lmergency lasing stop switch
17. | Delivery Arm tran
7 18, ‘ Far “N ar check (lasing) | Pasa
Ww Jouch-Sereen calibration a. as,
bree eer
| sek oe Memock
[SO vd 2A-Frontk
Fema
bod Su RE
Scanned with CamScanner