You are on page 1of 2
THE AGA KHAN UNIVERSITY HOSPITAL BIO-MEDICAL WORK INSTRUCTION APPROVED BY: Danni Joba Mite * WORK INSTRCUTION = BM.0150 Manager, Bio Metis ISSUE DATE gious ISsuEDBY : Shales 17 | Revision Date 1 Rev. No.0 InshargeTL AMES PAGE abot. Woe S39 FT Equipment: CO2LASER ve oe Manufacturer Luu Model : ACUPULSE 40 Cege CAO Teat doo: Ned poses modes san BEER SINO. TASK ) STATUS "AS NEEDED ] | (PASS/FAIL) | | External/Internal Visual | | Insect ova | L t I 4 | _ Inspect the systems exterior ; | sarfaces for damage: Oey: [Se dorag 2 rors, power eable and okey. L 7 sey: | 4 Heat exchanger clean = Tex; Yeon x Bacteriological filter — replaced Geon, okay. 6 Air fiter lean x = | Vea, ono | Electrieal/Optical Checks V est Pox, ‘Aiming Beam output stable SS oe | | | Electrical Safety | | Scanned with CamScanner 3 Compressed aitcontinuns fle wn Ready Mey, Oke: 4 Date and time A 4 y { 1 IA, OMe: i S| Laser emission indicator flash an 4 Ready, on when lasing 6 Max Power in CW (service moder M 7] May. Power in SP mode %, * Internal Power Meter _ Calibration veriied 5 9, Mignment check «CW \ | passer (laser moder Vey, Posy 0 Calibrations, Alignments and Tees : Seo Ww Mignment check - Pulser @ LL may power (lascrmode) Peas. 12 Alignment check SP a mas - | power daser made) Re Remote interloel i is Coolant flow 15. 1 6 Lmergency lasing stop switch 17. | Delivery Arm tran 7 18, ‘ Far “N ar check (lasing) | Pasa Ww Jouch-Sereen calibration a. as, bree eer | sek oe Memock [SO vd 2A-Frontk Fema bod Su RE Scanned with CamScanner

You might also like