1 Endorsement 1
2 Table Of Content 2
3 Executive Summary 3
5 Competence/Designated Person 6
9
8 Consideration
Total man-hours work for the above duration is 6,400hours with averages 32workers employed
in various working trade. There is no LTI recorded and reported for this month. Total cumulative
man-hours up to date are12,800hours with NO LOST TIME INJURIES.
Safety & Health personnel currently available at site are One (1) person.
All others activities such as Safety and Health Tool Box Talks, Daily Site Monitoring,
Housekeeping, Stop Unsafe act & Unsafe Condition are on ongoing. Until to
Dated‘Zero (0) Stop Work Order’ has been issued to any Department.
(OSHA)
PENALTIES
NO TYPE OF OFFENCES SECTION
( Fines or Imprisonment)
Failure to ensure Safety, Health & Welfare at work Up to RM 50, 000 or up to 2 years or
1
place
15 to both
Failure to safeguard him and other persons from Up to RM 50, 000 or up to 2 years or
3
risk and provide information
17 to both
Up to RM 1, 000 or up to 3 months or
7 Failure to comply with General duties of 24 to both
Employees
4
Up to RM 5, 000 or up to 6 months or
11 Occupier fails to employ Safety & Health Officer 29 to both
Up to RM 5, 000 or up to 6 months or
12 Failure to establish Safety & Health Committee 30 to both
Any building operation where the total contract price of the projects exceeds RM 20 (Twenty) Million
Ringgit
Any engineering construction work where the total contract price of the project exceeds RM 20
(Twenty) Million Ringgit
Any shipbuilding employing at the peak of the work more than 100 (one hundred) employees
Any gas processing activities or petrochemical industries employing more that 100 (one hundred)
employees
Any chemical and allied industry employing more that 100 (one hundred) employees
Any boiler and pressure vessel manufacturing activities employing more that 100 (one hundred)
employees
Any metal industry where there are canning, stamping, blanking, shearing or bending operations
and employing more that 100 (one hundred) employees
Any wood working industry where there is cutting, sawing, planning, moulding, sanding, peeling or
any combination of the above, and employing more that 100 (one hundred) employees
Any cement manufacturing activities employing more that 100 (one hundred) employees
Any manufacturing activities other than the above specified activities employing more than 500 (five
hundred) employees
Note: -
No person shall act as a Safety & Health Officer unless he/she is registered with
6
HSE MONTHLY REPORT (1st JUN 2019 - 30th JUN 2019)
SECTION 5 : DESIGNATED PERSONS
(Competent person appointed by an employer to carry out any supervision or inspection or to perform any tasks or duty)
COMPETENCY
COPE OF WORK NAME NRIC VALIDITY
CERTIFICATE
BACHELOR OF
FACILITIES MANAGER AMIRULZAID BIN ZULKIFLI 901102-05-5255
MECHANICAL ENGINEERING
MECHANICAL ENGINEER
BACHELOR OF ELECTRICAL
RAFSHAN SYARIFF B MOHD
ELECTRICAL ENGINEER 940828-03-6303 & ELECTRONIC
JILANI
ENGINEERING
COMPETENT PERSON – Person have such practical and theoretical knowledge and actual experience of the type machinery or plant which he/his has to
examine as will enable him to detect defects or weakness which it is the purpose of the examination to discover and assess their importance in relation to
the strength and functions of the machinery or plant
Dept Supervisor/Rep
Tool Box Meeting Monthly 22/06/2019
All Staff & Workers at site
Housekeeping
Daily Daily
HAZARD IDENTIFICATION,
ACCIDENT PREVENTION General Workers / Every Contractor
AND CORRECTIVE ACTION
Daily Daily
Cleanliness
TO DATE
Fatality 0
-
Permanent Total / Partial Disability 0
-
Lost Workday Case 0
-
Prepared By :- Verified By :-
Following are several items / areas to be consider by the management for improvement: -
C. Supervisor/Management to ensure all workers are wearing suitable PPE when doing their tasks.
D. To ensure every workers that work in height (above 3 meter) using Scissor Lift should be operated by well-trained
worker and provided with suitable PPE (Safety Harness). Supplier to conduct training on safe use of Scissor Lift.
E. The Danger Zone around the structure should be adequately fenced off and warning signed posted.
G. Pavement/OKU ramps that damaged need to be repaired immediately and to provided hand railing.
L. All Supervisor and Management must ensure that there is no open burning at work area all the
times.
MATTER TO CONSIDERATION
None