You are on page 1of 12

1  PENGURUSAN FASILITI SECARA KOMPREHENSIF, OPERASI DAN

PENYELENGGARAAN BAGI KERJA-KERJAKEJURUTERAAN


DD MEKANIKAL,ELEKTRIKAL,AWAM DAN LAIN-LAIN KERJA BERKAITAN DI
KOMPLEKS IMIGRESEN ICQS MUARA SUNGAI MELAKA BAGI TAHUN 2017
DATA DELIMA RESOURCES SDN BHD HINGGA 2020

PENGURUSAN FASILITI SECARA KOMPREHENSIF, OPERASI DAN PENYELENGGARAAN BAGI


KERJA-KERJA KEJURUTERAAN MEKANIKAL,ELEKTRIKAL,AWAM DAN LAIN-LAIN KERJA
BERKAITAN DI KOMPLEKS IMIGRESEN ICQS MUARA SUNGAI MELAKA BAGI TAHUN 2017
HINGGA 2020

PREPARED BY VERIFIED BY

..…………………………………… ..………………………………………..

MOHD AZAHAAR BIN MOHD NASIR AMIRULZAID B. ZULKIFLI

Safety & Health Officer Facility Manager

HSE MONTHLY REPORT (1st JUN 2019 - 30th JUN 2019)


2  PENGURUSAN FASILITI SECARA KOMPREHENSIF, OPERASI DAN
PENYELENGGARAAN BAGI KERJA-KERJAKEJURUTERAAN
DD MEKANIKAL,ELEKTRIKAL,AWAM DAN LAIN-LAIN KERJA BERKAITAN DI
KOMPLEKS IMIGRESEN ICQS MUARA SUNGAI MELAKA BAGI TAHUN 2017
DATA DELIMA RESOURCES SDN BHD HINGGA 2020

TABLE OF CONTENT

SECTION DESCRIPTION PAGE

1 Endorsement 1

2 Table Of Content 2

3 Executive Summary 3

4 Compliance of Legislation 4&5

5 Competence/Designated Person 6

6 Safety & Health Program 7

7 Safety Statistic Record 8

9
8 Consideration

HSE MONTHLY REPORT (1st JUN 2019 - 30th JUN 2019)


3  PENGURUSAN FASILITI SECARA KOMPREHENSIF, OPERASI DAN
PENYELENGGARAAN BAGI KERJA-KERJAKEJURUTERAAN
DD MEKANIKAL,ELEKTRIKAL,AWAM DAN LAIN-LAIN KERJA BERKAITAN DI
KOMPLEKS IMIGRESEN ICQS MUARA SUNGAI MELAKA BAGI TAHUN 2017
DATA DELIMA RESOURCES SDN BHD HINGGA 2020

SECTION 3 : EXECUTIVE SUMMARY

Total man-hours work for the above duration is 6,400hours with averages 32workers employed
in various working trade. There is no LTI recorded and reported for this month. Total cumulative
man-hours up to date are12,800hours with NO LOST TIME INJURIES.

Safety & Health personnel currently available at site are One (1) person.

All others activities such as Safety and Health Tool Box Talks, Daily Site Monitoring,
Housekeeping, Stop Unsafe act & Unsafe Condition are on ongoing. Until to

Dated‘Zero (0) Stop Work Order’ has been issued to any Department.

Note: TO ACHIEVE ONE MILLION MANHOURS WITHOUT LOST TIME INJURY

HSE MONTHLY REPORT (1st JUN 2019 - 30th JUN 2019)


SECTION 4(a) - UNDERSTANDING THE OCCUPATIONAL SAFETY AND HEALTH ACT 1994
4  PENGURUSAN FASILITI SECARA KOMPREHENSIF, OPERASI DAN
PENYELENGGARAAN BAGI KERJA-KERJAKEJURUTERAAN
DD MEKANIKAL,ELEKTRIKAL,AWAM DAN LAIN-LAIN KERJA BERKAITAN DI
KOMPLEKS IMIGRESEN ICQS MUARA SUNGAI MELAKA BAGI TAHUN 2017
DATA DELIMA RESOURCES SDN BHD HINGGA 2020

(OSHA)

PENALTIES
NO TYPE OF OFFENCES SECTION
( Fines or Imprisonment)

Failure to ensure Safety, Health & Welfare at work Up to RM 50, 000 or up to 2 years or
1
place
15 to both

Failure to formulate Safety & Health Policy Up to RM 50, 000 or up to 2 years or


2
Statement
16 to both

Failure to safeguard him and other persons from Up to RM 50, 000 or up to 2 years or
3
risk and provide information
17 to both

Failure of Occupier to take measures to safeguard Up to RM 20, 000 or up to 2 years or


4
other person’s safety &health
18 to both

General duties of Designers, Manufactures and Up to RM 50, 000 or up to 2 years or


5
Suppliers – plant for use at work
20 to both

General duties of Designers, Manufactures and


Suppliers – substance for use at work Up to RM 50, 000 or up to 2 years or
6 21 to both

Up to RM 1, 000 or up to 3 months or
7 Failure to comply with General duties of 24 to both
Employees
4

Up to RM 20, 000 or up to 2 years or


8 Person misusing things provided 25 to both
5  PENGURUSAN FASILITI SECARA KOMPREHENSIF, OPERASI DAN
PENYELENGGARAAN BAGI KERJA-KERJAKEJURUTERAAN
DD MEKANIKAL,ELEKTRIKAL,AWAM DAN LAIN-LAIN KERJA BERKAITAN DI
KOMPLEKS IMIGRESEN ICQS MUARA SUNGAI MELAKA BAGI TAHUN 2017
DATA DELIMA RESOURCES SDN BHD HINGGA 2020

Employer / Trade Union discriminates Employers /


27 Up to RM 10, 000 or up to 1 years or
9 to both & order on Compensation &
Members
(1) & (2) Reinstatement of job

Failure to conduct Medical Surveillance & Medical Up to RM 5, 000 or up to 6 months or


10
Examination
28 to both

Up to RM 5, 000 or up to 6 months or
11 Occupier fails to employ Safety & Health Officer 29 to both

Up to RM 5, 000 or up to 6 months or
12 Failure to establish Safety & Health Committee 30 to both

Up to RM 10, 000 or up to 1 years or


13 Failure to cooperate during inspection 47 to both

Up to RM 50, 000 or up to 5 years or


Failure to comply with IMPROVEMENT or
14
PROHIBITION NOTICES
48 / 49 to both – CONTINUOUS OFFENCE =
RM 500.00 / day

Other Contraventions Up to RM 10, 000 or up to 1 years or


15 51 to both – CONTINUOUS OFFENCE =
RM 1, 000 / day

HSE MONTHLY REPORT (1st JUN 2019 - 30th5JUN 2019)


SECTION 4(b) - OCCUPATIONAL SAFETY AND HEALTH
(SAFETY AND HEALTH OFFICER)ORDER 1997)
6  PENGURUSAN FASILITI SECARA KOMPREHENSIF, OPERASI DAN
PENYELENGGARAAN BAGI KERJA-KERJAKEJURUTERAAN
DD MEKANIKAL,ELEKTRIKAL,AWAM DAN LAIN-LAIN KERJA BERKAITAN DI
KOMPLEKS IMIGRESEN ICQS MUARA SUNGAI MELAKA BAGI TAHUN 2017
DATA DELIMA RESOURCES SDN BHD HINGGA 2020

IT IS MANDATORY FOR EMPLOYERS IN THE FOLLOWING INDUSTRIES TO EMPLOY


SAFETY AND HEALTH OFFICER

 Any building operation where the total contract price of the projects exceeds RM 20 (Twenty) Million
Ringgit

 Any engineering construction work where the total contract price of the project exceeds RM 20
(Twenty) Million Ringgit

 Any shipbuilding employing at the peak of the work more than 100 (one hundred) employees

 Any gas processing activities or petrochemical industries employing more that 100 (one hundred)
employees

 Any chemical and allied industry employing more that 100 (one hundred) employees

 Any boiler and pressure vessel manufacturing activities employing more that 100 (one hundred)
employees

 Any metal industry where there are canning, stamping, blanking, shearing or bending operations
and employing more that 100 (one hundred) employees

 Any wood working industry where there is cutting, sawing, planning, moulding, sanding, peeling or
any combination of the above, and employing more that 100 (one hundred) employees

 Any cement manufacturing activities employing more that 100 (one hundred) employees

 Any manufacturing activities other than the above specified activities employing more than 500 (five
hundred) employees

Note: -

No person shall act as a Safety & Health Officer unless he/she is registered with

Director General of Department of Occupational Safety & Health (DOSH)

6
HSE MONTHLY REPORT (1st JUN 2019 - 30th JUN 2019)
SECTION 5 : DESIGNATED PERSONS
(Competent person appointed by an employer to carry out any supervision or inspection or to perform any tasks or duty)

COMPETENCY
COPE OF WORK NAME NRIC VALIDITY
CERTIFICATE

BACHELOR OF
FACILITIES MANAGER AMIRULZAID BIN ZULKIFLI 901102-05-5255
MECHANICAL ENGINEERING

MOHD AZAHAAR BIN MOHD


870202-01-5577 SSS 3545-S 02/02/2021
NASIR
SAFETY & HEALTH OFFICER

MECHANICAL ENGINEER

BACHELOR OF ELECTRICAL
RAFSHAN SYARIFF B MOHD
ELECTRICAL ENGINEER 940828-03-6303 & ELECTRONIC
JILANI
ENGINEERING

FIRST AIDER (ERT PERSON) AMIRULZAID BIN ZULKIFLI 901102-05-5255

COMPETENT PERSON – Person have such practical and theoretical knowledge and actual experience of the type machinery or plant which he/his has to
examine as will enable him to detect defects or weakness which it is the purpose of the examination to discover and assess their importance in relation to
the strength and functions of the machinery or plant

HSE MONTHLY REPORT (1st JUN 2019 - 30th JUN 2019)


SECTION 6 : HSE PLAN & PROGRAM
OBJECTIVE To promote safety awareness among management, staff and workers.

HSE PROGRAM CONDUCTED BY/ TARGET GROUP PLAN ACHIEVEMENT

Safety &Health Manager/Rep


Safety Induction Monthly -TBA-
New Comer/Workers at site
SAFETY TRAINING

Dept Supervisor/Rep
Tool Box Meeting Monthly 22/06/2019
All Staff & Workers at site

Site management/ Dept Supervisor Daily Daily


Site Safety Monitoring

Housekeeping
Daily Daily
HAZARD IDENTIFICATION,
ACCIDENT PREVENTION General Workers / Every Contractor
AND CORRECTIVE ACTION

Daily Daily
Cleanliness

Safety & Health Manager/Rep Monthly 22/06/2019


Safety Audit/Inspection

Fortnightly LATEST = 24/06/2019


Fogging , Houseflies Control PERFECTION PEST CONTROL SDN
HEALTH PROGRAM
BHD
Weekly LATEST = 24/06/2019
Larvaciding
HSE MONTHLY REPORT (1st JUN 2019 - 30th JUN 2019)
SECTION 7 : Performance Report – Occupational Accident / Incident Statistic Records

SAFETY STATISTIC RECORDS

PROJECT TITLE: ICQS MUARA SUNGAI MELAKA

TYPE OF ACCIDENT/INCIDENT CUMULATIVE

TO DATE

1.1 Lost Time Injuries

Fatality 0
-
Permanent Total / Partial Disability 0
-
Lost Workday Case 0
-

1.2 Non-Lost Time Injuries 0


Restricted Workday Case 0
Medical Treatment Case 0
First Aid Case
-

1.3 Non Injurious Incident - 0


Property Damage
0
Dangerous Occurrence

TOTAL NUMBER OF ACCIDENT 0 0

1.4 Unsafe Act & Unsafe Condition 4 12

Average Workers / Day At Site 33/26

TOTAL MANHOURS WORKED 12,800 Hours

Prepared By :- Verified By :-

Name : Mohd Azahaar B. Mohd Nasir Name : Amirulzaid B. Zulkifli

Position : Safety & Health Officer Position : Facility Manager Signature


:

HSE MONTHLY REPORT (1st JUN 2019 - 30th JUN 2019)


SECTION 8 : Performance Report – Occupational Accident / Incident Statistic Records

Following are several items / areas to be consider by the management for improvement: -

A. Safety program will be compulsory for all parties.

B. Management to supply/provide suitable PPE for every workers and recorded.

C. Supervisor/Management to ensure all workers are wearing suitable PPE when doing their tasks.

D. To ensure every workers that work in height (above 3 meter) using Scissor Lift should be operated by well-trained
worker and provided with suitable PPE (Safety Harness). Supplier to conduct training on safe use of Scissor Lift.

E. The Danger Zone around the structure should be adequately fenced off and warning signed posted.

F. Warning signed with already worn-out need to be replace.

G. Pavement/OKU ramps that damaged need to be repaired immediately and to provided hand railing.

H. Tempered glass that crack need to be changed immediately.

To ensure every EMERGENCY DOOR not locked and obstructed.

J. Road devider that is tarnished need to re-painted.

K. All Supervisor and Management must show good example to workers.

L. All Supervisor and Management must ensure that there is no open burning at work area all the
times.