ABP) s=sligliigM cLizl silts Apts
‘Bashaer Al Benoo Contracting Company
a} th
LEAVE APPLICATION,
BY EMPLOYEE
maa eT ry
Date (re atlas gh al
Position TBS Department: #9) | Nationality ar
{Se cab HA ty Say ae yee
1 6) 2021/1209 ‘2021 /12 104: 65.09 Hy Ga | (Sa pad A bal) Sa Es!
No. Of Leave days Leave End Date | Leave Start Date Type of leave
5 >= aE ae
sss024947 Contact Address During Vacation:
phd) yt in| ALS Jaa AL alo g ASA Gye ph dasha 5a Ge ity any lee pen ll ly lish abil! Uh agacl
abl on chayas ded Oe Sp
Applicant's Signatare =... “ a ll gt
Date: / ru) ) s&s
ex CO es LT Tonal
Replacement
Not Required Required
Replacement Name... An oaga Replacement Name + da pa
Signature.
Taare OEE Saas
Cle agiaaally Atha Sy! alaied
SP pt ts yh ag Sy ase ed oil dase
Director Manager Name IR Manager NAME
one waa Tesatigall
Signature
Signature Signature
Signature ..,