You are on page 1of 1
Project Status Report for Week Ending: Project Name: Program Name: Project Manager: Prepared By Weekly Project Summary: “Enter a verybrif summary of the aJBcT stats, nog ary Key eae Yor Re WeeK. Comment an malar Cavers Comarca, Imilestones reached and percent complete. Is project on time and within budget? Example: Fst draft functional specication signed of by R. Atkinson, Team startedproducing detaled design docurrens, Fasources rom the XYZ teamw ilo be avaiable tl March This couki delay the projectby 4waeks F addtional staff ae not located by manth end, Project Performance Rating (Red/Yellow/Green) Also known ae Project Health ‘Schedule ‘Gualy ‘Se0pe Ee Key Milestones: Shou rele to mgor deiverables tor WBS and Miestone Cher io Tile ‘Gighal pane congo | Ouro forecat [Reka conplotar die tis datesheuld et | _—_corpeon te change) 7_[Deseripton Samy aT mmm Description Sy Seer dein Key Accomplishments: [ Provide abriefist ofkey accomplsTmvenis Tor The past wok, Tis codd be ir theTorm of a balled It ‘Top Priorities for the coming week (2-5 items): erly F Th Top 5 Risks for this Period Liste curenthigh isk issues, andidentty them as type: Qualiy, Schedlte, or Cast. FBT] Fisk Type ‘Description ‘Change Request History: List curentchangerequesis fo date and their resuling consensus and status CR] Tie or Description schedule change (7 | Slalus ine, ren Is any) greed, withdravn) Miscellaneous: ‘Briely document oifer Bsus Thal requre axon Or aaron (request Tor SAR Tonal reSOUCeS,[OGSICAT IMVATAROR, SpESaT Comments, use of contingency funding, ok.) Note: Attach or make reference to a high level Gantt Chart. A hyperlink is often effective,

You might also like