You are on page 1of 2

Kate R.

Galanida
BSA 3.1A

Laboratory 03

1.

x P(x) x*P(x) x-µ (x-µ)^2 (x-µ)^2* P(x)


0 0.1 0 -1.3 1.69 0.169
1 0.5 0.5 -0.3 0.09 0.045
2 0.4 0.8 0.7 0.49 0.196
1.3 0.41

a.
Mean= 1.3 Cost=10
Mean Cost= 13

Variance= 0.41 Cost=10


Variance Cost= 4.1

b. Interpretation
- The total mean cost is equal to 13 since the mean is 1.3 then the cost was 10
and if you are going to multiply it the result is equal to 13. So the expected value of
the daily cost for the total usage of tools is P13.

- The total variance cost is equal to 4.1 since the variance is 0.41 then the cost
was 10 and if you are going to multiply it the result is 4.1. So the expected value of
the daily cost for the total usage of tools is 4.1.

2.

a.

Mean:

μ= E ( x )= ∫ x ∗ f ( x ) dx
−∞

1
μ= E ( x )=∫1 x ∗ ( 2 −2 x ) dx
μ= E ( x )=∫0 ¿¿
0
2 x2 2 x3 1
μ= E ( x )= [
2
2

3 0 ]
μ= E ( x )=1 −
3
1
μ= E ( x )=
3
Variance:


E( x 2 )= ∫ x 2 ∗ f ( x ) dx
−1 ∞

E( x )=∫ x 2 ∗ ( 2− 2 x ) dx
2

10
2
E( x )=∫ ( 2 −2 x ) dx
0
2 x3 2 x4 1
2
E( x )=
2
[
2 1
3

4 0 ]
E ( x )= −
3 2
2 1
E ( x )=
6

b Interpretation
-The density function of a sheet-metal stamping machine being down for
maintenance or repairs mean is 1/3. So it means that the 1/3 of the proportions time
has been taken.
-The density function of a sheet-metal stamping machine being down for
maintenance or repairs variance is 1/6. So it means that the 1/6 of the proportions time
has been taken.

You might also like