KABUPATEN : KOTABARU
PROPINSI : KALIMANTAN SELATAN
B. HARGA BAHAN
1 Tanah Urug M3 129,700.00
2 Pasir urug M3 171,800.00
3 Batu Gunung/Batu Kali M3 216,200.00
4 Pasir Cor/Pasang M3 171,800.00
5 Kerikil M3 218,800.00
6 Semen Indocement Zak 85,800.00
7 Semen Warna Kg 17,500.00
8 Batu Bata Bj 1,400.00
9 Keramik Lantai 40x40 M2 70,000.00
10 Besi Beton Kg 14,500.00
11 Kawat Bindrat Kg 31,900.00
12 Balok Meranti M3 2,750,000.00
13 Balok Ulin M3 7,000,000.00
14 Papan Meranti Panjang 4 m M3 2,750,000.00
15 Paku Rupa-rupa Kg 20,000.00
16 Kayu Bekisting M3 2,200,000.00
17 Minyak Bekisting Ltr 15,000.00
18 Lem kayu Kg 20,000.00
19 Paku Sumbat Bj 100.00
20 Engsel Merk Nylon Jendela 3" Psg 15,000.00
21 Engsel Merk Metasa Pintu 5" Psg 25,000.00
22 Grendel Jendela Bh 10,000.00
23 Grendel Pintu Bh 35,000.00
24 Kait Angin Bj 22,100.00
25 Kunci Tanam 2 Slaag Bh 115,000.00
26 Pegangan Jendela Bh 8,500.00
27 Cat Dasar Kg 27,500.00
28 Cat Menie Kg 27,500.00
29 Plamir Kg 27,500.00
30 Cat Kilap Kg 62,000.00
31 Minyak Cat (tinner B) Ltr 25,000.00
32 Kuas Bh 27,000.00
33 Amplas Lbr 3,500.00
34 Teer Ltr 15,000.00
35 Cat Tembok Kg 36,000.00
36 Atap Genteng Metal 0,25 M2 70,000.00
37 Pemuung Genteng Metal U M' 26,000.00
38 Closet Jongkok Bh 318,500.00
39 Zakering 3 A Bh 50,000.00
40 Shaklar Tunggal Bh 26,300.00
41 Shaklar Ganda Bh 35,000.00
42 Stop Kontak Melamine Bh 25,000.00
43 Lampu XL 9 Watt Bh 55,000.00
44 Lampu TL 40 Watt Bh 150,000.00
45 Floor Drain Bh 30,000.00
46 Kayu siku profil 5 cm M' 7,500.00
47 Calsiboard 3,5 mm Lbr 108,200.00
48 Keran air Bh 25,000.00
ANALISA HARGA SATUAN
KABUPATEN : KOTABARU
PROPINSI : KALIMANTAN SELATAN
No. Analisa URAIAN PEKERJAAN HARGA SATUAN UPAH KERJA HARGA BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
A.2.2.1.4. 1 M' Pengukuran dan Pemasangan Bouplank
0.1000 Pekerja 88,000.00 8,800.00 8,800.00
0.0050 Mandor 119,000.00 595.00 595.00
0.1000 Tukang Kayu 100,000.00 10,000.00 10,000.00
0.0100 Kepala Tukang 119,000.00 1,190.00 1,190.00
0.0120 M3 Balok Meranti 5/7 2,750,000.00 33,000.00 33,000.00
0.0070 M3 Papan Meranti 3/20 2,750,000.00 19,250.00 19,250.00
0.0200 Kg Paku 20,000.00 400.00 400.00
11,190.00 52,650.00 73,235.00
Overhead 5% 559.50 2,632.50 3,661.75
Total 11,749.50 55,282.50 76,896.75
PEK. TANAH/PASIR
1 2 3 4 5 6 7
I PEKERJAAN PERSIAPAN
1 Media Informasi - 1.00 Bh 350,000.00 350,000.00
2 Pembersihan Lokasi - 1.00 Bh 500,000.00 500,000.00
3 Pasangan Bowplank A.2.2.1.4. 46.00 M 76,896.75 3,537,250.50
4,387,250.50
II PEKERJAAN TANAH/PONDASI
1 Galian tanah pondasi A.2.3.1.1 8.23 M3 79,321.25 652,417.28
2 Menguruk kembali dipadatkan A.2.3.1.9 2.74 M3 56,350.00 154,492.92
3 Urugan Tanah A.2.3.1.14 36.16 M3 207,707.25 7,510,694.16
4 Pasir Bawah lantai A.2.3.1.11 4.40 M3 268,812.50 1,182,775.00
5 Cor Bawah Lantai beton mutu f'c =7,4 Mpa (K100), A.4.1.1.4. 4.40 M3 926,709.02 4,077,519.69
6 Pasangan batu pondasi camp. 1:4 A.3.2.1.2.3 9.99 M3 932,793.98 9,316,279.88
22,894,178.93
III PEKERJAAN BETON
1 Sloof 15/20 A.4.1.1.29. 1.02 M3 6,351,553.50 6,478,584.57
2 Kolom Praktis 11/11 A.4.1.1.35. 53.08 M 95,478.18 5,067,981.53
3 Ringbalk 10/15 A.4.1.1.36. 51.00 M 131,183.03 6,690,334.53
4 Pasangan bata 1:4 A.4.4.1.10. 126.85 M2 74,781.00 9,486,194.19
5 Plesteran Camp. 1:4 t. 1,5 cm A.4.4.2.4 233.23 M2 68,771.20 16,039,230.96
6 Pekerjaan Acian A.4.4.2.27 233.23 M2 40,890.55 9,536,739.41
7 Pasangan lantai keramik 40 x 40 A.4.4.3.35 22.80 M2 265,479.80 6,052,939.44
59,352,004.63
IV PEKERJAAN ATAP
1 Atap Genteng Metal 0,25 + rangka atap baja ringan - 155.21 M2 255,000.00 39,578,040.00
2 Pemuung Genteng Metal U A.4.5.2.36 11.15 M' 79,277.55 883,944.68
3 Calsiplank - 50.14 M' 25,000.00 1,253,500.00
4 Rangka plafond A.4.6.1.20 133.97 M2 117,512.75 15,742,948.09
5 Plafond Calsiboard (dalam) A.4.5.1.5 72.00 M2 71,024.00 5,113,728.00
6 Plafond Kisi-kisi Calsiboard A.4.5.1.5 61.97 M2 71,024.00 4,401,215.23
66,973,376.01
V PEKERJAAN KAYU
1 Kusen ulin A.4.6.1.1 0.38 M3 12,313,682.50 4,687,203.24
2 Jalusi Pintu dan jendela A.4.6.1.7 2.52 M2 701,839.25 1,770,740.43
3 Pintu Type P1 - 1.00 Psg 1,800,000.00 1,800,000.00
4 Daun jendela + Kaca - 15.00 Bh 500,000.00 7,500,000.00
5 Kaca mati terpasang - 15.00 Bh 200,850.00 3,012,750.00
18,770,693.67
VI PEKERJAAN KUNCI/PENGGANTUNG
1 Engsel pintu - 2.00 Psg 45,000.00 90,000.00
2 Grendel pintu - 2.00 Bh 50,000.00 100,000.00
3 Engsel jendela - 15.00 Psg 20,000.00 300,000.00
4 Grendel jendela - 15.00 Bh 15,000.00 225,000.00
5 Pegangan jendela - 15.00 Bh 13,500.00 202,500.00
6 Kait angin kuningan - 15.00 Psg 10,000.00 150,000.00
7 Kunci tanam 2 slaag - 2.00 Bh 130,000.00 260,000.00
1,327,500.00
VII PEKERJAAN LISTRIK
1 Instalasi - 7.00 Ttk 250,000.00 1,750,000.00
2 Lampu XL 9 Watt - 6.00 Bh 55,000.00 330,000.00
3 Zakering 3 A - 1.00 Bh 150,000.00 150,000.00
4 Shaklar Ganda - 1.00 Bh 35,000.00 35,000.00
5 Stop Kontak Melamine - 1.00 Bh 25,000.00 25,000.00
2,290,000.00
VIII PEKERJAAN CAT-CATAN
1 Cat tembok A.4.7.1.10 295.19 M2 27,630.71 8,156,418.33
2 Cat kilap A.4.7.1.4 33.45 M2 46,311.65 1,549,008.91
9,705,427.25
JUMLAH 185,700,430.98
NO URAIAN JUMLAH
JUMLAH 185,700,430.98
PPN 10 % 18,570,043.10
TOTAL 204,270,474.08
DIBULATKAN 204,270,000.00
T E R B I LA N G : Dua Ratus Empat Juta Dua Ratus Tujuh Puluh Ribu Rupiah
Disetujui,
KUASA PENGGUNA ANGGARAN
BIDANG SMA DAN KEJURUAN DISDIKBUD KAB. KOTABARU
Drs. H. JOHANSYAH, MM
NIP. 19580404 198603 1 021
BECK UP VOLUME
LUAS BANGUNAN
88 M2
Pasangan Bowplank
Panjang lebar jlh Total
11 12 2 46
Urugan Tanah
Urugan Tanah = (Luas Bangunan penambahan x tinggi rata2 urugan)+(luas panggung x 0,1)
=180x0,4 +(1,2x4*0,1)= 36.16
Urugan Pasir
Urugan Pasir = Luas Cor lantai x 0.05
= 88 x 0.05 = 4.4
BETON
Beton Sloof
Lebar Tinggi Panjang Volume
0.15 0.2 34 1.02
Beton Ringbalk
Type - - Panjang Tot
R1 0 0 51 51
51
Kolom Praktis
Type - - Tinggi Jumlah Panjang
K1 0 0 3.65 12 43.8 5.3
K2 0 0 2.32 4 9.28 5.3
53.08
Beton Plat Lantai
Lantai Luas Tebal Volume
Utama 72 0.05 3.6
Teras 18 0.05 0.9
4.5
KERAMIK
Pasangan Kramik
Posisi Panjang Lebar Jumlah Luas
Utama 9 8 1 72
Teras 9 2 1 18
90
JALUSI
Tipe Tinggi Melbr Jumlah L Tot
P1 0.31 1.5 1 0.465
J1 0.21 1.96 5 2.058
2.523
PASANGAN BATA
Posisi Panjang Tinggi L Kotor
Utama 34 3.65 124.1
Panggung 6.4 0.2 1.28
Layar 8 2.4 19.2
Jumlah 144.58
Pengurang Kusen 17.727
Bersih 126.853
PLESTER
Plester = 2 x luas bersih Pasangan Bata utama + dindng layar+panngung
= 233.226