Case Study on the longest post-tensioned
CFRP Plate: Audi plant in Györ (Hungary)
Longest post-tensioned CFRP-plate used
29 m post-tensioned Sika® CarboDur® CF
Project
Motor Car Manufacturing Plant, (Györ/ Hungary)
Post-tensioning of an existing concrete base.
Problem
New machine
In the course of internal re-organisation, a hall which had been used
as a logistics area was to be fitted with fabrication machinery. The
existing reinforced concrete base plate, which is divided by contraction Contraction joints
joints into several sections was not compliant with the required layout.
Displacement and consequential forces onto the base plate, caused by
temperature change would exceed the production tolerances
Solution
Rigid joints
Securing of several base sections together using post-tensioned
Sika® CarboDur® CFRP plates, with the Sika® - StressHead Contraction joints
System, to produce a united base without joints. The CFRP plates were
then encapsulated into the concrete base. Movable joints
3 Hydraulic jack
4 Post-tensioning process
Conclusion
With the Sika® - StressHead post-tensioning system, 3 x 200 kN of post-tensioning force can be transmitted into the
concrete to unite the several base sections for their future use. Each tendon is 29m long and is buried into the concrete with
no maintenance anticipated.
Advantages: slender tendons, ease of application on site, high forces, quality assurance due to pre-fabricated tendons and end-
anchorage.
Packaging
Further Sika-Documents
for Structural Strengthening
Construction
Construction
bers are
s
Sika® CarboDur®
Structural Strengthening with
Structural Strengthening Systems Prestressed Sika® CarboDur® CFRP Plate
Systems
® ®
Sika Services AG
Corporate Construction
CH-8048 Zürich
Switzerland
Corporate Construction 02.04 / 04 / 4 / ar
Phone+41 44 436 40 40
Fax +41 44 436 46 86
www.sika-construction.com