[2:30 PM] Kirker, Ian

The vendor shall design the temporary works to support the steam drum/soot
blower structure adjacent to the CO Boiler bank, impacted by the removal (and
replacement) of the boiler modules as part of the capital maintenance works. As
part of this temporary condition work scope only, vendor shall provide the STAAD
structural analysis / calculation report and files in accordance with the latest
code/standards including the GA and detail drawings, and the method statements.
[2:32 PM] Kirker, Ian
The seismic assessment scope is "just" for the RCC structure
[3:20 PM] Kirker, Ian
add ASCE 360
[3:21 PM] Ali, Faizi (Civil / Structural Engineer)
AISC 360 for steel design
[3:30 PM] Kirker, Ian
5. ... (for strengthening of beams, columns, braces, connections, any
additional members and interfaces with stacks and equipment)