LEBAR BETON BETON BETON
NO STA EXISTIN widening
RENCANA GAMBAR GAMBAR GAMBAR
G
ACBC ACBC L ACWC
a b c
0 + 000 4.80 5.50 0.70 0.70 4.80 5.50

0 + 025 5.00 5.50 0.50 0.50 5.00 5.50

0 + 050 5.00 5.50 0.50 0.50 5.00 5.50

0 + 075 5.00 5.50 0.50 0.50 5.00 5.50

0 + 100 4.70 5.50 0.80 0.80 4.70 5.50

0 + 125 4.80 5.50 0.70 0.70 4.80 5.50

0 + 150 4.35 5.50 1.15 1.15 4.35 5.50

0 + 175 4.85 5.50 0.65 0.65 4.85 5.50

0 + 200 4.60 5.50 0.90 0.90 4.60 5.50

0 + 225 4.40 5.50 1.10 1.10 4.40 5.50

0 + 250 5.00 5.50 0.50 0.50 5.00 5.50

0 + 275 4.50 5.50 1.00 1.00 4.50 5.50

0 + 300 4.60 5.50 0.90 0.90 4.60 5.50

0 + 325 4.60 5.50 0.90 0.90 4.60 5.50

0 + 350 4.50 5.50 1.00 1.00 4.50 5.50

0 + 375 4.20 5.50 1.30 1.30 4.20 5.50

0 + 400 4.28 5.50 1.22 1.22 4.28 5.50

0 + 425 4.20 5.50 1.30 1.30 4.20 5.50

0 + 450 4.50 5.50 1.00 1.00 4.50 5.50

0 + 475 4.46 5.50 1.04 1.04 4.46 5.50

0 + 500 4.55 5.50 0.95 0.95 4.55 5.50


0 + 525 4.35 5.50 1.15 1.15 4.35 5.50

0 + 550 4.30 5.50 1.20 1.20 4.30 5.50

0 + 575 4.80 5.50 0.70 0.70 4.80 5.50

0 + 600 5.00 5.50 0.50 0.50 5.00 5.50

0 + 625 4.60 5.50 0.90 0.90 4.60 5.50

0 + 650 4.40 5.50 1.10 1.10 4.40 5.50

0 + 675 5.30 5.50 0.20 0.20 5.30 5.50

0 + 700 4.40 5.50 1.10 1.10 4.40 5.50

0 + 725 4.57 5.50 0.93 0.93 4.57 5.50

0 + 750 4.30 5.50 1.20 1.20 4.30 5.50

0 + 775 4.10 5.50 1.40 1.40 4.10 5.50

0 + 800 4.10 5.50 1.40 1.40 4.10 5.50

0 + 825 4.40 5.50 1.10 1.10 4.40 5.50

0 + 850 4.45 5.50 1.05 1.05 4.45 5.50

0 + 875 4.45 5.50 1.05 1.05 4.45 5.50

0 + 900 4.65 5.50 0.85 0.85 4.65 5.50

0 + 925 4.95 5.50 0.55 0.55 4.95 5.50

0 + 950 4.90 5.50 0.60 0.60 4.90 5.50

0 + 975 5.00 5.50 0.50 0.50 5.00 5.50


1 + 000 4.77 5.50 0.73 0.73 4.77 5.50

1 + 025 4.50 5.50 1.00 1.00 4.50 5.50

1 + 050 4.40 5.50 1.10 1.10 4.40 5.50

1 + 075 4.97 5.50 0.53 0.53 4.97 5.50

1 + 100 4.70 5.50 0.80 0.80 4.70 5.50

1 + 125 4.50 5.50 1.00 1.00 4.50 5.50

1 + 150 4.80 5.50 0.70 0.70 4.80 5.50

1 + 175 4.55 5.50 0.95 0.95 4.55 5.50

1 + 200 4.46 5.50 1.04 1.04 4.46 5.50

1 + 225 4.80 5.50 0.70 0.70 4.80 5.50

1 + 250 4.60 5.50 0.90 0.90 4.60 5.50

1 + 275 4.50 5.50 1.00 1.00 4.50 5.50

1 + 300 4.30 5.50 1.20 1.20 4.30 5.50

1 + 325 4.45 5.50 1.05 1.05 4.45 5.50

1 + 350 4.50 5.50 1.00 1.00 4.50 5.50

1 + 375 4.60 5.50 0.90 0.90 4.60 5.50

1 + 400 4.50 5.50 1.00 1.00 4.50 5.50

1 + 425 4.50 5.50 1.00 1.00 4.50 5.50

1 + 450 4.40 5.50 1.10 1.10 4.40 5.50

1 + 475 5.00 5.50 0.50 0.50 5.00 5.50

1 + 500 5.10 5.50 0.40 0.40 5.10 5.50


CORE DRILL TEST
PAKET : PENINGKATAN JALAN RUAS JALAN JAMPANG TENGAH - KIARADUA
KM. BDG. 126+500 - KM. BDG. 128+000
PENYEDIA JASA : PT. ANGKASA TEKNIK RAYA HARI KE : 6 ( Enam )
NO/ITEM PEKERJAAN : 6.3(6c) LASTON LAPIS ANTARA ( AC - BC ) LEVELLING STA : 0+00 -0+070(KI)
STA : 0+00 -0+170(KA)
JARAK DARI TEBAL TEBAL
NO TANGGAL STATIONING POSISI KET
TEPI PERKERASAN I II III RATA - RATA DITERIMA
KIRI /1 0.53 4.27 4.47 4.43 4.39 4.39
1 0+011
KIRI /2 2.16 6.63 7.01 6.38 6.67 6.67
KIRI /1 0.72 4.76 5.23 5.22 5.07 5.07
2 0+027
KIRI /2 2.25 4.68 4.60 4.80 4.69 4.69
KIRI /1 0.54 7.01 6.60 6.42 6.68 6.68
3 0+056
KIRI /2 2.4 5.00 5.10 5.00 5.03 5.03
KANAN /1 0.53 6.11 7.07 6.76 6.65 6.65
4 0+028
KANAN/2 2.16 6.79 7.03 6.64 6.82 6.82
KANAN /1 0.72 4.01 4.07 4.32 4.13 4.13
5 0+066
KANAN /2 2.25 6.37 6.35 6.40 6.37 6.37
KANAN /1 0.54 5.00 4.90 5.20 5.03 5.03
6 0+138
KANAN /2 2.71 5.75 5.80 5.90 5.82 5.82

RATA - RATA 5.61 5.61

PENGAWAS LAPANGAN KONSULTAN SUPERVISI PENYEDIA JASA


PT. KARPA Jo. CV. Hendra Co

ASEP JUHARA,ST.M.Si IMAN FIRMAN, ST M. IRZAL FAHLEVI, AM.d


NIP. 1966 1010 2009 01 1 001 Site Engineer Penanggung Jawab Teknik
CORE DRILL TEST
PAKET : PENINGKATAN JALAN RUAS JALAN JAMPANG TENGAH - KIARADUA
KM. BDG. 126+500 - KM. BDG. 128+000
PENYEDIA JASA : PT. ANGKASA TEKNIK RAYA HARI KE : 5 ( Lima )
NO/ITEM PEKERJAAN : 6.3(6c) LASTON LAPIS ANTARA ( AC - BC ) LEVELLING STA : 0+170 -0+540(KA)
STA : 0+070 -0+405(KI)
JARAK DARI TEBAL TEBAL
NO TANGGAL STATIONING POSISI KET
TEPI PERKERASAN I II III RATA - RATA DITERIMA
KANAN /1 0.59 4.21 4.36 4.37 4.31 4.31
1 0+206
KANAN /2 2.34 4.42 4.45 4.46 4.44 4.44
KANAN /1 0.05 6.01 6.00 5.52 5.84 5.84
2 0+283
KANAN /2 1.54 5.50 5.20 5.15 5.28 5.28
KANAN /1 0.56 6.13 6.04 6.20 6.12 6.12
3 0+301
KANAN /2 1.78 6.00 5.57 5.50 5.69 5.69
KANAN /1 0.53 5.49 5.84 5.45 5.59 5.59
4 0+398
KANAN /2 2.16 4.86 4.50 4.36 4.57 4.57
KANAN /1 0.72 4.86 5.00 4.89 4.92 4.92
5 0+436
KANAN /2 2.25 5.00 4.46 4.40 4.62 4.62
KANAN /1 0.54 4.90 5.00 4.85 4.92 4.92
6 0+508
KANAN /2 2.71 5.20 5.00 4.90 5.03 5.03
KIRI /1 0.59 6.60 6.44 6.04 6.36 6.36
7 0+106
KIRI/2 2.34 5.61 5.63 5.40 5.55 5.55
KIRI/1 0.05 8.11 8.05 8.13 8.10 8.10
8 0+183
KIRI /2 1.54 7.50 8.51 8.00 8.00 8.00
KIRI/1 0.56 4.80 4.56 4.65 4.67 4.67
9 0+201
KIRI /2 1.78 8.16 8.10 8.44 8.23 8.23
KIRI/1 0.53 6.28 6.12 5.72 6.04 6.04
10 0+292
KIRI /2 2.16 6.77 7.19 7.03 7.00 7.00
KIRI/1 0.72 5.13 5.15 5.02 5.10 5.10
11 0+323
KIRI /2 2.25 6.07 5.75 6.50 6.11 6.11
KIRI/1 0.54 6.00 5.60 5.82 5.81 5.81
12 0+379
KIRI /2 2.71 4.32 4.20 4.01 4.18 4.18

RATA - RATA 5.69 5.69

PENGAWAS LAPANGAN KONSULTAN SUPERVISI PENYEDIA JASA


PT. KARPA Jo. CV. Hendra Co

ASEP JUHARA,ST.M.Si IMAN FIRMAN, ST M. IRZAL FAHLEVI, AM.d


NIP. 1966 1010 2009 01 1 001 Site Engineer Penanggung Jawab Teknik
CORE DRILL TEST
PAKET : PENINGKATAN JALAN RUAS JALAN JAMPANG TENGAH - KIARADUA
KM. BDG. 126+500 - KM. BDG. 128+000
PENYEDIA JASA : PT. ANGKASA TEKNIK RAYA HARI KE : 4 ( Empat )
NO/ITEM PEKERJAAN : 6.3(6c) LASTON LAPIS ANTARA ( AC - BC ) LEVELLING STA : 0+405 -0+537(KI)
STA : 0+540-1+030(KA)
JARAK DARI TEBAL TEBAL
NO TANGGAL STATIONING POSISI KET
TEPI PERKERASAN I II III RATA - RATA DITERIMA
KIRI /1 0.53 5.73 5.61 5.71 5.68 5.68
1 0+427
KIRI /2 2.16 5.26 5.07 5.29 5.21 5.21
KIRI /1 0.72 5.44 3.69 3.56 4.23 4.23
2 0+456
KIRI /2 2.25 6.44 7.31 7.17 6.97 6.97
KIRI /1 0.54 4.15 4.26 4.97 4.46 4.46
3 0+512
KIRI /2 2.71 5.24 4.55 4.82 4.87 4.87
KANAN /1 0.59 5.82 5.90 5.11 5.61 5.61
4 0+576
KANAN /2 2.34 4.73 5.09 4.80 4.87 4.87
KANAN /1 0.05 4.81 4.82 5.04 4.89 4.89
5 0+653
KANAN /2 1.54 5.04 4.76 5.07 4.96 4.96
KANAN /1 0.56 6.44 6.16 6.36 6.32 6.32
6 0+671
KANAN /2 1.78 4.09 4.14 4.05 4.09 4.09
KANAN /1 1.31 6.08 5.49 5.72 5.76 5.76
7 0+786
KANAN /2 2.17 6.51 6.16 6.06 6.24 6.24
KANAN /1 1.27 6.42 5.90 6.06 6.13 6.13
8 0+865
KANAN /2 1.92 6.04 6.09 6.02 6.05 6.05
KANAN /1 0.72 7.43 7.72 7.21 7.45 7.45
9 0+911
KANAN /2 2.25 5.05 5.60 5.26 5.30 5.30
KANAN /1 1.12 5.85 5.74 5.81 5.80 5.80
10 0+935
KANAN /2 1.4 5.92 5.61 5.28 5.60 5.60
KANAN /1 0.53 5.34 5.31 5.23 5.29 5.29
11 0+955
KANAN /2 2.16 6.06 6.01 6.03 6.03 6.03
KANAN /1 0.54 4.77 5.40 5.03 5.07 5.07
12 0+993
KANAN /2 2.71 7.47 7.60 7.61 7.56 7.56
KANAN /1 0.54 4.70 4.70 4.80 4.73 4.73
13 1+013
KANAN /2 2.71 5.50 5.65 5.60 5.58 5.58
RATA - RATA 5.57 5.57

PENGAWAS LAPANGAN KONSULTAN SUPERVISI PENYEDIA JASA


PT. KARPA Jo. CV. Hendra Co

ASEP JUHARA,ST.M.Si IMAN FIRMAN, ST M. IRZAL FAHLEVI, AM.d


NIP. 1966 1010 2009 01 1 001 Site Engineer Penanggung Jawab Teknik
CORE DRILL TEST
PAKET : PENINGKATAN JALAN RUAS JALAN JAMPANG TENGAH - KIARADUA
KM. BDG. 126+500 - KM. BDG. 128+000
PENYEDIA JASA : PT. ANGKASA TEKNIK RAYA HARI KE : 3 ( Tiga )
NO/ITEM PEKERJAAN : 6.3(6c) LASTON LAPIS ANTARA ( AC - BC ) LEVELLING STA : 0+537 -1+025(K1)
STA : 1+030 -1+300(KA)
JARAK DARI TEBAL TEBAL
NO TANGGAL STATIONING POSISI KET
TEPI PERKERASAN I II III RATA - RATA DITERIMA
KIRI/1 0.59 6.11 6.34 6.39 6.28 6.28
1 0+573
KIRI /2 2.34 5.43 5.01 4.85 5.10 5.10
KIRI/1 0.05 6.17 6.18 6.30 6.22 6.22
2 0+650
KIRI /2 1.54 4.94 5.75 5.53 5.41 5.41
KIRI/1 0.56 5.54 5.69 5.53 5.59 5.59
3 0+668
KIRI /2 1.78 5.14 5.54 5.30 5.33 5.33
KIRI/1 1.31 5.10 4.70 5.05 4.95 4.95
4 0+783
KIRI /2 2.17 5.93 6.31 6.48 6.24 6.24
KIRI/1 1.27 4.24 4.22 4.50 4.32 4.32
5 0+862
KIRI /2 1.92 4.07 3.66 4.09 3.94 3.94
KIRI/1 0.72 6.08 6.13 5.97 6.06 6.06
6 0+911
KIRI /2 2.25 4.07 3.96 4.03 4.02 4.02
KIRI/1 1.12 5.37 5.01 4.98 5.12 5.12
7 0+932
KIRI /2 1.4 5.81 5.54 5.71 5.69 5.69
KIRI/1 0.53 5.01 5.16 5.06 5.08 5.08
8 0+951
KIRI /2 2.16 7.01 7.21 7.30 7.17 7.17
KIRI/1 0.54 9.40 9.60 9.81 9.60 9.60
9 0+989
KIRI /2 2.15 8.00 8.13 8.02 8.05 8.05
KIRI/1 0.54 4.80 4.90 5.00 4.90 4.90
10 1+008
KIRI /2 2.71 5.80 5.70 5.80 5.77 5.77
KANAN/1 0.59 5.69 5.22 5.14 5.35 5.35
11 1+066
KANAN /2 2.34 5.35 5.53 5.81 5.56 5.56
KANAN/1 0.05 5.10 5.06 5.04 5.07 5.07
12 1+143
KANAN /2 1.54 5.84 6.04 5.14 5.67 5.67
KANAN/1 0.56 6.20 6.10 6.10 6.13 6.13
13 1+161
KANAN /2 1.78 5.50 5.70 5.60 5.60 5.60
KANAN/1 0.53 6.00 6.00 6.00 6.00 6.00
14 1+241
KANAN /2 2.16 6.60 6.40 6.30 6.43 6.43
KANAN/1 0.72 6.90 7.00 7.00 6.97 6.97
15 1+257
KANAN /2 2.25 4.60 4.60 4.60 4.60 4.60
KANAN/1 0.54 7.80 7.70 7.70 7.73 7.73
16 1+286
KANAN /2 2.71 6.00 5.70 5.90 5.87 5.87

RATA - RATA 5.81 5.81

PENGAWAS LAPANGAN KONSULTAN SUPERVISI PENYEDIA JASA


PT. KARPA Jo. CV. Hendra Co

ASEP JUHARA,ST.M.Si IMAN FIRMAN, ST M. IRZAL FAHLEVI, AM.d


NIP. 1966 1010 2009 01 1 001 Site Engineer Penanggung Jawab Teknik
CORE DRILL TEST
PAKET : PENINGKATAN JALAN RUAS JALAN JAMPANG TENGAH - KIARADUA
KM. BDG. 126+500 - KM. BDG. 128+000
PENYEDIA JASA : PT. ANGKASA TEKNIK RAYA HARI KE : 2 ( Dua )
NO/ITEM PEKERJAAN : 6.3(6c) LASTON LAPIS ANTARA ( AC - BC ) LEVELLING STA : 1+300 - 1+500(KA)
STA : 1+025 - 1+240(KI)
JARAK DARI TEBAL TEBAL
NO TANGGAL STATIONING POSISI KET
TEPI PERKERASAN I II III RATA - RATA DITERIMA
KANAN/1 0.59 7.60 7.30 7.40 7.43 7.43
1 1+336
KANAN /2 2.34 6.66 6.59 6.48 6.58 6.58
KANAN/1 0.05 5.50 5.60 5.10 5.40 5.40
2 1+413
KANAN /2 1.54 5.01 4.96 5.17 5.05 5.05
KANAN/1 0.56 7.00 7.40 7.10 7.17 7.17
3 1+431
KANAN /2 1.78 5.70 5.40 6.00 5.70 5.70
KIRI/1 0.59 7.58 7.67 8.72 7.99 7.99
4 1+061
KIRI /2 2.34 4.07 4.07 4.30 4.15 4.15
KIRI/1 0.05 6.30 6.00 6.20 6.17 6.17
5 1+138
KIRI /2 1.54 5.40 5.40 5.50 5.43 5.43
KIRI/1 0.56 5.10 5.30 4.60 5.00 5.00
6 1+156
KIRI /2 1.78 5.10 5.10 5.10 5.10 5.10
KIRI/1 0.53 6.30 6.10 5.80 6.07 6.07
7 1+227
KIRI /2 2.16 4.40 4.60 4.40 4.47 4.47
KIRI/1 0.72 5.40 5.60 5.30 5.43 5.43
8 1+230
KIRI /2 2.25 4.90 5.40 5.20 5.17 5.17

RATA - RATA 5.77 5.77

PENGAWAS LAPANGAN KONSULTAN SUPERVISI PENYEDIA JASA


PT. KARPA Jo. CV. Hendra Co

ASEP JUHARA,ST.M.Si IMAN FIRMAN, ST M. IRZAL FAHLEVI, AM.d


NIP. 1966 1010 2009 01 1 001 Site Engineer Penanggung Jawab Teknik
CORE DRILL TEST
PAKET : PENINGKATAN JALAN RUAS JALAN JAMPANG TENGAH - KIARADUA
KM. BDG. 126+500 - KM. BDG. 128+000
PENYEDIA JASA : PT. ANGKASA TEKNIK RAYA HARI KE : 1 ( Satu )
NO/ITEM PEKERJAAN : 6.3(6c) LASTON LAPIS ANTARA ( AC - BC ) LEVELLING STA : 1+240 - 1+500(KI)

JARAK DARI TEBAL TEBAL


NO TANGGAL STATIONING POSISI KET
TEPI PERKERASAN I II III RATA - RATA DITERIMA
KIRI/1 0.59 6.00 7.00 6.90 6.63 6.63
1 1+276
KIRI /2 2.34 4.40 4.40 4.40 4.40 4.40
KIRI/1 0.05 5.80 6.10 6.00 5.97 5.97
2 1+353
KIRI /2 1.54 6.50 6.40 6.00 6.30 6.30

RATA - RATA 5.83 5.83

PENGAWAS LAPANGAN KONSULTAN SUPERVISI PENYEDIA JASA


PT. KARPA Jo. CV. Hendra Co

ASEP JUHARA,ST.M.Si IMAN FIRMAN, ST M. IRZAL FAHLEVI, AM.d


NIP. 1966 1010 2009 01 1 001 Site Engineer Penanggung Jawab Teknik
DATA PENDUKUNG
SKEMA PENGHAMPARAN
Nama Balai : BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II
Nama Kegiatan : PENINGKATAN JALAN DAN JEMBATAN PROVINSI DI BPJ WILAYAH PELAYANAN II
Nama Paket : REHABILITASI JALAN RUAS JALAN JAMPANGTENGAH - KIARADUA ( 1.70 KM )
Lokasi : RUAS JALAN JAMPANGTENGAH - KIARADUA
No. Kontrak : 602/Ktr.19/81/BPJ.W.II
Tgl. Kontrak : 7 Nopember 2013
Penyedia Jasa : CV. DANTI
Jenis Pekerjaan : LASTON LAPIS AUS AC - WC Levelling
STA
0 + 000 0 + 100 0 + 200 0 + 300 0 + 400 0 + 500

0 + 526
STA
0 + 500 0 + 600 0 + 700 0 + 800 0 + 900 1 + 000

2
3
1 + 150
1 + 000 1 + 100 1 + 200 1 + 300 1 + 400 1 + 500

2 1

1 + 500 1 + 600 1 + 700

1 1
CORE DRILL TEST
PAKET : PENINGKATAN JALAN RUAS JALAN JAMPANG TENGAH - KIARADUA
KM. BDG. 126+500 - KM. BDG. 128+000
PENYEDIA JASA : PT. ANGKASA TEKNIK RAYA HARI KE : 6 ( Enam )
NO/ITEM PEKERJAAN : 6.3(6a) LASTON LAPIS ANTARA ( AC - BC ) STA : 0+00 -0+070(KI)
STA : 0+00 -0+170(KA)
JARAK DARI TEBAL TEBAL
NO TANGGAL STATIONING POSISI KET
TEPI PERKERASAN I II III RATA - RATA DITERIMA
1 0+011 KIRI 0.40 4.63 5.02 5.20 4.95 4.95
2 0+027 KIRI 0.40 4.25 4.98 5.40 4.88 4.88
3 0+056 KIRI 0.40 4.57 4.58 4.73 4.63 4.63
4 0+028 KANAN 0.40 4.25 4.68 4.90 4.61 4.61
5 0+066 KANAN 0.40 4.62 4.60 4.60 4.61 4.61

RATA - RATA 4.73 4.73

PENGAWAS LAPANGAN KONSULTAN SUPERVISI PENYEDIA JASA


PT. KARPA Jo. CV. Hendra Co

ASEP JUHARA,ST.M.Si IMAN FIRMAN, ST M. IRZAL FAHLEVI, AM.d


NIP. 1966 1010 2009 01 1 001 Site Engineer Penanggung Jawab Teknik
CORE DRILL TEST
PAKET : PENINGKATAN JALAN RUAS JALAN JAMPANG TENGAH - KIARADUA
KM. BDG. 126+500 - KM. BDG. 128+000
PENYEDIA JASA : PT. ANGKASA TEKNIK RAYA HARI KE : 5 ( Lima )
NO/ITEM PEKERJAAN : 6.3(6a) LASTON LAPIS ANTARA ( AC - BC ) STA : 0+170 -0+540(KA)
STA : 0+070 -0+405(KI)
JARAK DARI TEBAL TEBAL
NO TANGGAL STATIONING POSISI KET
TEPI PERKERASAN I II III RATA - RATA DITERIMA
1 0+206 KANAN 0.40 4.62 4.76 4.77 4.72 4.72
2 0+283 KANAN 0.40 4.70 4.60 4.80 4.70 4.70
3 0+301 KANAN 0.40 4.65 4.70 4.80 4.72 4.72
4 0+398 KANAN 0.40 4.70 4.74 4.82 4.75 4.75
5 0+436 KANAN 0.40 3.90 4.73 5.19 4.61 4.61
6 0+106 KIRI 0.40 4.65 4.70 4.82 4.72 4.72
7 0+183 KIRI 0.40 4.68 4.77 4.80 4.75 4.75
8 0+201 KIRI 0.40 4.73 4.70 4.84 4.76 4.76
9 0+292 KIRI 0.40 4.77 4.70 4.80 4.76 4.76
10 0+323 KIRI 0.40 4.69 4.70 4.86 4.75 4.75
11 0+379 KIRI 0.40 4.72 4.69 4.80 4.74 4.74

RATA - RATA 4.72 4.72

PENGAWAS LAPANGAN KONSULTAN SUPERVISI PENYEDIA JASA


PT. KARPA Jo. CV. Hendra Co

ASEP JUHARA,ST.M.Si IMAN FIRMAN, ST M. IRZAL FAHLEVI, AM.d


NIP. 1966 1010 2009 01 1 001 Site Engineer Penanggung Jawab Teknik
CORE DRILL TEST
PAKET : PENINGKATAN JALAN RUAS JALAN JAMPANG TENGAH - KIARADUA
KM. BDG. 126+500 - KM. BDG. 128+000
PENYEDIA JASA : PT. ANGKASA TEKNIK RAYA HARI KE : 4 ( Empat )
NO/ITEM PEKERJAAN : 6.3(6a) LASTON LAPIS ANTARA ( AC - BC ) STA : 0+405 -0+537(KI)
STA : 0+540-1+030(KA)
JARAK DARI TEBAL TEBAL
NO TANGGAL STATIONING POSISI KETERANGAN
TEPI PERKERASAN I II III RATA - RATA DITERIMA
1 0+427 KIRI /1 0.40 4.70 4.75 4.80 4.75 4.75
2 0+456 KIRI /1 0.40 4.70 4.70 4.80 4.73 4.73
3 0+512 KIRI /1 0.40 4.94 4.73 5.01 4.89 4.89
4 0+576 KANAN /1 0.40 4.70 4.70 4.80 4.73 4.73
5 0+671 KANAN /1 0.40 4.83 4.92 4.95 4.90 4.90
6 0+786 KANAN /1 0.40 4.70 4.70 4.80 4.73 4.73
7 0+865 KANAN /1 0.40 4.64 4.59 4.57 4.60 4.60
0+911 KANAN /1 0.40 4.67 4.59 4.60 4.62 4.62
8 0+935 KANAN /1 0.40 5.85 5.74 5.81 5.80 5.40
9 0+955 KANAN /1 0.40 4.85 5.03 5.22 5.03 5.03
10 0+993 KANAN /1 0.40 4.77 4.85 4.65 4.76 4.76
11 1+013 KANAN /1 0.40 4.70 4.70 4.80 4.73 4.73
RATA - RATA 4.86 4.82

PENGAWAS LAPANGAN KONSULTAN SUPERVISI PENYEDIA JASA


PT. KARPA Jo. CV. Hendra Co

ASEP JUHARA,ST.M.Si IMAN FIRMAN, ST M. IRZAL FAHLEVI, AM.d


NIP. 1966 1010 2009 01 1 001 Site Engineer Penanggung Jawab Teknik
CORE DRILL TEST
PAKET : PENINGKATAN JALAN RUAS JALAN JAMPANG TENGAH - KIARADUA
KM. BDG. 126+500 - KM. BDG. 128+000
PENYEDIA JASA : PT. ANGKASA TEKNIK RAYA HARI KE : 3 ( Tiga )
NO/ITEM PEKERJAAN : 6.3(6a) LASTON LAPIS ANTARA ( AC - BC ) STA : 0+537 -1+025(K1)
STA : 1+030 -1+300(KA)
JARAK DARI TEBAL TEBAL
NO TANGGAL STATIONING POSISI KET
TEPI PERKERASAN I II III RATA - RATA DITERIMA
1 0+573 KIRI/1 0.40 4.93 4.64 4.59 4.72 4.72
2 0+650 KIRI/1 0.40 4.60 4.75 4.69 4.68 4.68
3 0+668 KIRI/1 0.40 4.64 4.69 4.67 4.67 4.67
4 0+783 KIRI/1 0.40 4.60 4.71 4.69 4.67 4.67
5 0+862 KIRI/1 0.40 4.66 4.69 4.65 4.67 4.67
6 0+911 KIRI/1 0.40 4.77 5.08 4.04 4.63 4.63
7 0+932 KIRI/1 0.40 4.62 4.75 4.70 4.69 4.69
8 0+951 KIRI/1 0.40 5.43 5.36 5.03 5.27 5.27
9 0+989 KIRI/1 0.40 4.63 4.72 5.00 4.78 4.78
10 1+008 KIRI/1 0.40 4.67 4.66 4.45 4.59 4.59
11 1+066 KANAN/1 0.40 4.63 4.69 4.65 4.66 4.66
12 1+143 KANAN/1 0.40 4.70 4.76 4.70 4.72 4.72
13 1+161 KANAN/1 0.40 4.82 4.66 4.55 4.68 4.68
14 1+241 KANAN/1 0.40 5.20 5.40 4.60 5.07 5.07
15 1+257 KANAN/1 0.40 5.70 5.65 5.60 5.65 5.40
16 1+286 KANAN/1 0.40 5.00 4.63 4.68 4.77 4.77

RATA - RATA 4.81 4.79

PENGAWAS LAPANGAN KONSULTAN SUPERVISI PENYEDIA JASA


PT. KARPA Jo. CV. Hendra Co

ASEP JUHARA,ST.M.Si IMAN FIRMAN, ST M. IRZAL FAHLEVI, AM.d


NIP. 1966 1010 2009 01 1 001 Site Engineer Penanggung Jawab Teknik
CORE DRILL TEST
PAKET : PENINGKATAN JALAN RUAS JALAN JAMPANG TENGAH - KIARADUA
KM. BDG. 126+500 - KM. BDG. 128+000
PENYEDIA JASA : PT. ANGKASA TEKNIK RAYA HARI KE : 2 ( Dua )
NO/ITEM PEKERJAAN : 6.3(6a) LASTON LAPIS ANTARA ( AC - BC ) STA : 1+300 - 1+500(KA)
STA : 1+025 - 1+240(KI)
JARAK DARI TEBAL TEBAL
NO TANGGAL STATIONING POSISI KET
TEPI PERKERASAN I II III RATA - RATA DITERIMA
1 1+336 KANAN/1 0.40 4.60 4.75 4.65 4.67 4.67
2 1+413 KANAN/1 0.40 4.67 4.66 4.49 4.61 4.61
3 1+431 KANAN/1 0.40 4.77 4.65 4.80 4.74 4.74
4 1+061 KIRI/1 0.40 4.62 4.75 4.65 4.67 4.67
5 1+138 KIRI/1 0.40 4.68 4.55 4.57 4.60 4.60
6 1+156 KIRI/1 0.40 4.60 4.60 4.60 4.60 4.60
7 1+227 KIRI/1 0.40 4.70 4.74 4.62 4.69 4.69
8 1+230 KIRI/1 0.40 4.85 4.70 4.67 4.74 4.74

RATA - RATA 4.66 4.66

PENGAWAS LAPANGAN KONSULTAN SUPERVISI PENYEDIA JASA


PT. KARPA Jo. CV. Hendra Co

ASEP JUHARA,ST.M.Si IMAN FIRMAN, ST M. IRZAL FAHLEVI, AM.d


NIP. 1966 1010 2009 01 1 001 Site Engineer Penanggung Jawab Teknik
CORE DRILL TEST
PAKET : PENINGKATAN JALAN RUAS JALAN JAMPANG TENGAH - KIARADUA
KM. BDG. 126+500 - KM. BDG. 128+000
PENYEDIA JASA : PT. ANGKASA TEKNIK RAYA HARI KE : 1 ( Satu )
NO/ITEM PEKERJAAN : 6.3(6a) LASTON LAPIS ANTARA ( AC - BC ) STA : 1+240 - 1+500(KI)

JARAK DARI TEBAL TEBAL


NO TANGGAL STATIONING POSISI KET
TEPI PERKERASAN I II III RATA - RATA DITERIMA
1 1+276 KIRI 0.40 5.20 4.60 4.50 4.77 4.77
2 1+353 KIRI 0.40 4.66 4.60 4.90 4.72 4.72

RATA - RATA 4.74 4.74

PENGAWAS LAPANGAN KONSULTAN SUPERVISI PENYEDIA JASA


PT. KARPA Jo. CV. Hendra Co

ASEP JUHARA,ST.M.Si IMAN FIRMAN, ST M. IRZAL FAHLEVI, AM.d


NIP. 1966 1010 2009 01 1 001 Site Engineer Penanggung Jawab Teknik
DATA PENDUKUNG
HASIL PERHITUNGAN LUAS HAMPARAN

Nama Balai : BALAI PENGELOLAAN JALAN WILAYAH P


Nama Kegiatan : REHABILITASI JALAN DAN JEMBATAN P
Nama Paket : REHABILITASI JALAN RUAS JALAN CIKEM
Lokasi : RUAS JALAN CIKEMBAR - CIKEMBANG
No. Kontrak : 602/Ktr.27/ 209/BPJ.WIL.PEL.II
Tgl. Kontrak : 28 JULI 2015
Penyedia Jasa : CV. LEMBANG JAYA
Konsultan Pengawas : Laston Lapis Aus ( AC -WC) LEVELLING Segmen
Jenis Pekerjaan : 11 -19 September 2013 STA Awal : 0+000
Tanggal Penghamparan : 0 STA Akhir : 1+000
Panjang Segmen : 3.75 km
Tebal Rencana : 4,30 cm

1/2 Lebar Lebar Rata - rata Panjang Luas


No. TANGGAL STA POSISI Keterangan
(m) (m) (m) (m2)

1 31 Agustus 2013 0+000 KI 3.50


- 3.53 25.00 88.13
2 0+025 KI 3.55 -
- 3.58 25.00 89.38
3 0+050 KI 3.60 -
- 3.60 25.00 90.00
4 0+075 KI 3.60 -
- 3.60 25.00 90.00
5 0+100 KI 3.60 -
- 3.58 25.00 89.38
6 0+125 KI 3.55 -
- 3.55 25.00 88.75
7 0+150 KI 3.55 -
- 3.55 25.00 88.75
8 0+175 KI 3.55 -
- 3.58 25.00 89.38
9 0+200 KI 3.60 -
- 3.60 25.00 90.00
10 0+225 KI 3.60 -
- 3.58 25.00 89.38
11 0+250 KI 3.55 -
- 3.55 25.00 88.75
12 0+275 KI 3.55 -
- 3.58 25.00 89.38
13 0+300 KI 3.60 -
- 3.58 25.00 89.38
14 0+325 KI 3.55 -
- 3.55 25.00 88.75
15 0+350 KI 3.55 -
- 3.58 22.00 78.65
16 0+372 KI 3.60 -
- 1,328.03
1/2 Lebar Lebar Rata - rata Panjang Luas
No. TANGGAL STA POSISI Keterangan
(m) (m) (m) (m2)
1 1 September 2013 0+000 KA 3.50 -
- 3.53 25.00 88.13
2 0+025 KA 3.55 -
- 3.58 25.00 89.38
3 0+050 KA 3.60 -
- 3.60 25.00 90.00
4 0+075 KA 3.60 -
- 3.60 25.00 90.00
5 0+100 KA 3.60 -
- 3.58 25.00 89.38
6 0+125 KA 3.55 -
- 3.55 25.00 88.75
7 0+150 KA 3.55 -
- 3.55 25.00 88.75
8 0+175 KA 3.55 -
- 3.58 25.00 89.38
9 0+200 KA 3.60 -
- 3.60 25.00 90.00
10 0+225 KA 3.60 -
- 3.58 25.00 89.38
11 0+250 KA 3.55 -
- 3.55 25.00 88.75
12 0+275 KA 3.55 -
- 3.58 25.00 89.38
13 0+300 KA 3.60 -
- 3.58 25.00 89.38
14 0+325 KA 3.55 -
- 3.55 25.00 88.75
15 0+350 KA 3.55 -
- 3.58 22.00 78.65
16 0+372 KA 3.60 -
- 1,328.03
1/2 Lebar Lebar Rata - rata Panjang Luas
No. TANGGAL STA POSISI Keterangan
(m) (m) (m) (m2)
1 6 September 2013 0+372 KI 3.60 -
- 3.60 3.00 10.80
2 0+375 KI 3.60 -
- 3.68 25.00 91.88
3 0+400 KI 3.75 -
- 3.68 25.00 91.88
4 0+425 KI 3.60 -
- 3.63 25.00 90.63
5 0+450 KI 3.65 -
- 3.63 25.00 90.63
6 0+475 KI 3.60 -
- 3.55 25.00 88.75
7 0+500 KI 3.50 -
- 3.53 25.00 88.13
8 0+525 KI 3.55 -
- 3.58 25.00 89.38
9 0+550 KI 3.60 -
3.58 12.00 42.90
10 0+562 KI 3.55
- 684.95
11 6 September 2013 0+372 KA 3.60
3.60 3.00 10.80
12 0+375 KA 3.60
3.68 25.00 91.88
13 0+400 KA 3.75
3.68 25.00 91.88
14 0+425 KA 3.60
3.63 25.00 90.63
15 0+450 KA 3.65
3.63 25.00 90.63
16 0+475 KA 3.60
3.55 25.00 88.75
17 0+500 KA 3.50
3.53 25.00 88.13
18 0+525 KA 3.55
3.58 25.00 89.38
19 0+550 KA 3.60
3.60 7.00 25.20
20 0+557 KA 3.60
- 667.25
- 1,352.20
1/2 Lebar Lebar Rata - rata Panjang Luas
No. TANGGAL STA POSISI Keterangan
(m) (m) (m) (m2)
1 7 September 2013 0+562 KI 3.55
3.55 13.00 46.15
2 0+575 KI 3.55
3.50 25.00 87.50
3 0+600 KI 3.45
3.48 25.00 86.88
4 0+625 KI 3.50
3.50 25.00 87.50
5 0+650 KI 3.50
3.53 25.00 88.13
6 0+675 KI 3.55
3.40 25.00 85.00
7 0+700 KI 3.25
3.40 25.00 85.00
8 0+725 KI 3.55
3.55 25.00 88.75
9 0+750 KI 3.55
3.55 25.00 88.75
10 0+775 KI 3.55
3.55 4.00 14.20
11 0+779 KI 3.55
- 757.85
12 7 SEPTEMBER 2013 0+557 KA 3.60
3.58 18.00 64.35
13 0+575 KA 3.55
3.50 25.00 87.50
14 0+600 KA 3.45
3.48 25.00 86.88
15 0+625 KA 3.50
3.50 25.00 87.50
16 0+650 KA 3.50
3.53 25.00 88.13
17 0+675 KA 3.55
3.40 25.00 85.00
18 0+700 KA 3.25
3.40 25.00 85.00
19 0+725 KA 3.55
3.55 25.00 88.75
20 0+750 KA 3.55
3.55 9.00 31.95
21 0+759 KA 3.55
- 705.05
- 1,462.90
1/2 Lebar Lebar Rata - rata Panjang Luas
No. TANGGAL STA POSISI Keterangan
(m) (m) (m) (m2)
1 8 September 2013 0+779 KI 3.55
3.58 21.00 75.08
2 0+800 KI 3.60
3.60 25.00 90.00
3 0+825 KI 3.60
3.58 25.00 89.38
4 0+850 KI 3.55
3.53 25.00 88.13
5 0+875 KI 3.50
3.48 25.00 86.88
6 0+900 KI 3.45
3.58 25.00 89.38
7 0+925 KI 3.70
3.58 25.00 89.38
8 0+950 KI 3.45
3.48 25.00 86.88
9 0+975 KI 3.50
3.50 25.00 87.50
10 1+000 KI 3.50
- 782.58
11 8 SEPTEMBER 2013 0+759 KA 3.55
3.55 16.00 56.80
12 0+775 KA 3.55
3.58 25.00 89.38
13 0+800 KA 3.60
3.60 25.00 90.00
14 0+825 KA 3.60
3.58 25.00 89.38
15 0+850 KA 3.55
3.53 25.00 88.13
16 0+875 KA 3.50
3.48 25.00 86.88
17 0+900 KA 3.45
3.58 25.00 89.38
18 0+925 KA 3.70
3.58 25.00 89.38
19 0+950 KA 3.45
3.48 25.00 86.88
20 0+975 KA 3.50
3.50 25.00 87.50
21 1+000 KA 3.50
853.68
1,636.25

Disetujui oleh : Dibuat oleh :


Pengawas Lapangan Penyedia Jasa
PT. ARIESTA KARYA

DADAN SUPARMAN HENDRA GUNAWAN, ST


NIP. 19800113 200801 1 003 Penanggung Jawab Teknik
DATA PENDUKUNG
HASIL PERHITUNGAN LUAS HAMPARAN

Nama Balai : BALAI PENGELOLAAN JALAN WILAYAH P


Nama Kegiatan : REHABILITASI JALAN DAN JEMBATAN P
Nama Paket : REHABILITASI JALAN RUAS JALAN CIKEM
Lokasi : RUAS JALAN CIKEMBAR - CIKEMBANG
No. Kontrak : 602/Ktr.27/ 209/BPJ.WIL.PEL.II
Tgl. Kontrak : 28 JULI 2015
Penyedia Jasa : CV. LEMBANG JAYA
Konsultan Pengawas : Laston Lapis Aus ( AC -WC) LEVELLING Segmen
Jenis Pekerjaan : 11 -19 September 2013 STA Awal : 0+000
Tanggal Penghamparan : 0 STA Akhir : 1+000
Panjang Segmen : 3.75 km
Tebal Rencana : 4,30 cm

1/2 Lebar Lebar Rata - rata Panjang Luas


No. TANGGAL STA POSISI Keterangan
(m) (m) (m) (m2)

1 31 Agustus 2013 0+000 KI 3.50


- 3.53 25.00 88.13
2 0+025 KI 3.55 -
- 3.58 25.00 89.38
3 0+050 KI 3.60 -
- 3.60 25.00 90.00
4 0+075 KI 3.60 -
- 3.60 25.00 90.00
5 0+100 KI 3.60 -
- 3.58 25.00 89.38
6 0+125 KI 3.55 -
- 3.55 25.00 88.75
7 0+150 KI 3.55 -
- 3.55 25.00 88.75
8 0+175 KI 3.55 -
- 3.58 25.00 89.38
9 0+200 KI 3.60 -
- 3.60 25.00 90.00
10 0+225 KI 3.60 -
- 3.58 25.00 89.38
11 0+250 KI 3.55 -
- 3.55 25.00 88.75
12 0+275 KI 3.55 -
- 3.58 25.00 89.38
13 0+300 KI 3.60 -
- 3.58 25.00 89.38
14 0+325 KI 3.55 -
- 3.55 25.00 88.75
15 0+350 KI 3.55 -
- 3.58 22.00 78.65
16 0+372 KI 3.60 -
- 1,328.03
1/2 Lebar Lebar Rata - rata Panjang Luas
No. TANGGAL STA POSISI Keterangan
(m) (m) (m) (m2)
1 1 September 2013 0+000 KA 3.50 -
- 3.53 25.00 88.13
2 0+025 KA 3.55 -
- 3.58 25.00 89.38
3 0+050 KA 3.60 -
- 3.60 25.00 90.00
4 0+075 KA 3.60 -
- 3.60 25.00 90.00
5 0+100 KA 3.60 -
- 3.58 25.00 89.38
6 0+125 KA 3.55 -
- 3.55 25.00 88.75
7 0+150 KA 3.55 -
- 3.55 25.00 88.75
8 0+175 KA 3.55 -
- 3.58 25.00 89.38
9 0+200 KA 3.60 -
- 3.60 25.00 90.00
10 0+225 KA 3.60 -
- 3.58 25.00 89.38
11 0+250 KA 3.55 -
- 3.55 25.00 88.75
12 0+275 KA 3.55 -
- 3.58 25.00 89.38
13 0+300 KA 3.60 -
- 3.58 25.00 89.38
14 0+325 KA 3.55 -
- 3.55 25.00 88.75
15 0+350 KA 3.55 -
- 3.58 22.00 78.65
16 0+372 KA 3.60 -
- 1,328.03
1/2 Lebar Lebar Rata - rata Panjang Luas
No. TANGGAL STA POSISI Keterangan
(m) (m) (m) (m2)
1 6 September 2013 0+372 KI 3.60 -
- 3.60 3.00 10.80
2 0+375 KI 3.60 -
- 3.68 25.00 91.88
3 0+400 KI 3.75 -
- 3.68 25.00 91.88
4 0+425 KI 3.60 -
- 3.63 25.00 90.63
5 0+450 KI 3.65 -
- 3.63 25.00 90.63
6 0+475 KI 3.60 -
- 3.55 25.00 88.75
7 0+500 KI 3.50 -
- 3.53 25.00 88.13
8 0+525 KI 3.55 -
- 3.58 25.00 89.38
9 0+550 KI 3.60 -
3.58 12.00 42.90
10 0+562 KI 3.55
- 684.95
11 6 September 2013 0+372 KA 3.60
3.60 3.00 10.80
12 0+375 KA 3.60
3.68 25.00 91.88
13 0+400 KA 3.75
3.68 25.00 91.88
14 0+425 KA 3.60
3.63 25.00 90.63
15 0+450 KA 3.65
3.63 25.00 90.63
16 0+475 KA 3.60
3.55 25.00 88.75
17 0+500 KA 3.50
3.53 25.00 88.13
18 0+525 KA 3.55
3.58 25.00 89.38
19 0+550 KA 3.60
3.60 7.00 25.20
20 0+557 KA 3.60
- 667.25
- 1,352.20
1/2 Lebar Lebar Rata - rata Panjang Luas
No. TANGGAL STA POSISI Keterangan
(m) (m) (m) (m2)
1 7 September 2013 0+562 KI 3.55
3.55 13.00 46.15
2 0+575 KI 3.55
3.50 25.00 87.50
3 0+600 KI 3.45
3.48 25.00 86.88
4 0+625 KI 3.50
3.50 25.00 87.50
5 0+650 KI 3.50
3.53 25.00 88.13
6 0+675 KI 3.55
3.40 25.00 85.00
7 0+700 KI 3.25
3.40 25.00 85.00
8 0+725 KI 3.55
3.55 25.00 88.75
9 0+750 KI 3.55
3.55 25.00 88.75
10 0+775 KI 3.55
3.55 4.00 14.20
11 0+779 KI 3.55
- 757.85
12 7 SEPTEMBER 2013 0+557 KA 3.60
3.58 18.00 64.35
13 0+575 KA 3.55
3.50 25.00 87.50
14 0+600 KA 3.45
3.48 25.00 86.88
15 0+625 KA 3.50
3.50 25.00 87.50
16 0+650 KA 3.50
3.53 25.00 88.13
17 0+675 KA 3.55
3.40 25.00 85.00
18 0+700 KA 3.25
3.40 25.00 85.00
19 0+725 KA 3.55
3.55 25.00 88.75
20 0+750 KA 3.55
3.55 9.00 31.95
21 0+759 KA 3.55
- 705.05
- 1,462.90
1/2 Lebar Lebar Rata - rata Panjang Luas
No. TANGGAL STA POSISI Keterangan
(m) (m) (m) (m2)
1 8 September 2013 0+779 KI 3.55
3.58 21.00 75.08
2 0+800 KI 3.60
3.60 25.00 90.00
3 0+825 KI 3.60
3.58 25.00 89.38
4 0+850 KI 3.55
3.53 25.00 88.13
5 0+875 KI 3.50
3.48 25.00 86.88
6 0+900 KI 3.45
3.58 25.00 89.38
7 0+925 KI 3.70
3.58 25.00 89.38
8 0+950 KI 3.45
3.48 25.00 86.88
9 0+975 KI 3.50
3.50 25.00 87.50
10 1+000 KI 3.50
- 782.58
11 8 SEPTEMBER 2013 0+759 KA 3.55
3.55 16.00 56.80
12 0+775 KA 3.55
3.58 25.00 89.38
13 0+800 KA 3.60
3.60 25.00 90.00
14 0+825 KA 3.60
3.58 25.00 89.38
15 0+850 KA 3.55
3.53 25.00 88.13
16 0+875 KA 3.50
3.48 25.00 86.88
17 0+900 KA 3.45
3.58 25.00 89.38
18 0+925 KA 3.70
3.58 25.00 89.38
19 0+950 KA 3.45
3.48 25.00 86.88
20 0+975 KA 3.50
3.50 25.00 87.50
21 1+000 KA 3.50
853.68
1,636.25

Disetujui oleh : Dibuat oleh :


Pengawas Lapangan Penyedia Jasa
PT. ARIESTA KARYA

DADAN SUPARMAN HENDRA GUNAWAN, ST


NIP. 19800113 200801 1 003 Penanggung Jawab Teknik
DATA PENDUKUNG
HASIL PERHITUNGAN KETEBALAN LAPANGAN

PAKET : REHABILITASI JALAN RUAS JALAN CIKEMBAR - CIKEMBANG ( 1,00 KM )


PENYEDIA JASA : CV. LEMBANG JAYA

JARAK DARI TEBAL


NO TANGGAL STA STA CORING POSISI
TEPI
1 2 3 RATA RATA

1 30 September 2014 1+240 - 1+500(KI) 1+175 Ki.1 0.60 4.10 3.70 4.00 3.93

Ki.2 2.00 5.50 5.40 5.30 5.40

1+176 Ka.1 0.60 4.00 4.10 4.10 4.07

Ka.2 2.00 3.70 3.80 4.00 3.83

2 1+250 Ki.1 0.60 4.20 4.00 3.90 4.03

1+251 Ki.2 2.00 4.70 4.50 4.00 4.40

1+250 Ka.1 0.60 5.50 5.70 5.50 5.57

Ka.2 2.00 5.10 5.10 5.20 5.13

3 1+275 Ki.1 0.60 3.80 3.80 4.00 3.87

Ki.2 2.00 5.90 5.80 5.90 5.87

Ka.1 0.60 4.30 4.20 4.50 4.33

Ka.2 2.00 5.50 5.70 5.80 5.67

4 1+400 Ki.1 0.60 6.30 6.00 6.10 6.13

Ki.2 2.00 5.00 4.90 5.10 5.00

Ka.1 0.60 6.50 6.80 6.70 6.67

Ka.2 2.00 6.50 6.70 6.50 6.57

5 1+475 Ki.1 0.60 6.00 5.90 6.20 6.03

Ki.2 2.00 5.20 5.00 5.20 5.13

Ka.1 0.60 4.40 4.70 4.80 4.63

Ka.2 2.00 5.10 5.00 5.00 5.03

6 1+550 Ki.1 0.60 6.10 6.40 6.20 6.23

Ki.2 2.00 5.50 5.70 5.40 5.53

Ka.1 0.60 4.60 4.50 4.60 4.57

Ka.2 2.00 5.30 4.60 4.90 4.93

7 1+575 Ki.1 0.60 6.90 6.70 6.90 6.83

Ki.2 2.00 4.70 5.00 4.90 4.87

Ka.1 0.60 5.50 5.80 5.60 5.63

Ka.2 2.00 3.00 3.10 3.00 3.03

8 1+600 Ki.1 0.60 4.50 4.50 4.60 4.53

Ki.2 2.00 4.80 5.00 4.90 4.90

1+599 Ka.1 0.60 4.10 4.40 3.90 4.13

Ka.2 2.00 4.50 4.40 4.50 4.47

9 1+675 Ki.1 0.60 4.00 4.00 4.60 4.20

Ki.2 2.00 3.70 4.00 4.10 3.93


JARAK DARI TEBAL
NO TANGGAL STA STA CORING POSISI
TEPI
1 2 3 RATA RATA

Ka.1 0.60 5.70 5.20 5.50 5.47

1+676 Ka.2 2.00 3.50 3.00 3.20 3.23

1 1 Oktober 2014 1+300 - 1+500(KA) 0+551 Ki.1 0.60 5.60 5.30 5.20 5.37

Ki.2 2.00 4.00 4.20 4.30 4.17

Ka.1 0.60 6.10 6.30 6.20 6.20

Ka.2 2.00 4.70 4.30 4.20 4.40

2 0+626 Ki.1 0.60 4.80 4.50 4.90 4.73

Ki.2 2.00 4.10 3.80 3.60 3.83

Ka.1 0.60 5.70 5.40 6.00 5.70

Ka.2 2.00 3.80 3.30 3.90 3.67

3 0+651 Ki.1 0.60 3.80 3.70 4.50 4.00

Ki.2 2.00 5.10 5.90 4.80 5.27

Ka.1 0.60 5.80 6.50 4.20 5.50

Ka.2 2.00 4.90 4.50 4.50 4.63

4 0+775 Ki.1 0.60 6.40 6.00 6.00 6.13

Ki.2 2.00 4.90 5.40 5.50 5.27

Ka.1 0.60 6.50 6.40 6.30 6.40

Ka.2 2.00 6.30 5.90 6.40 6.20

5 0+851 Ki.1 0.60 3.90 3.90 3.70 3.83

0+850,30 Ki.2 2.00 3.00 3.10 2.90 3.00

0+850,30 Ka.1 0.60 4.50 4.80 4.40 4.57

0+850 Ka.2 2.00 4.50 4.40 4.60 4.50

6 0+924 Ki.1 0.60 5.00 5.40 5.00 5.13

Ki.2 2.00 6.40 6.60 6.50 6.50

Ka.1 0.60 7.40 7.30 7.70 7.47

Ka.2 2.00 7.40 6.80 6.60 6.93

7 0+999 Ki.1 0.60 6.50 6.50 6.60 6.53

Ki.2 2.00 5.50 5.70 5.90 5.70

Ka.1 0.60 6.00 6.10 5.80 5.97

Ka.2 2.00 6.10 6.00 6.30 6.13

8 1+024 Ki.1 0.60 5.70 5.60 5.60 5.63

Ki.2 2.00 6.00 5.90 5.80 5.90

Ka.1 0.60 5.40 5.00 5.30 5.23

Ka.2 2.00 5.60 5.70 5.50 5.60

9 1+101 Ki.1 0.60 6.10 6.00 6.00 6.03

Ki.2 2.00 5.90 5.90 5.80 5.87

Ka.1 0.80 5.50 5.30 5.80 5.53


JARAK DARI TEBAL
NO TANGGAL STA STA CORING POSISI
TEPI
1 2 3 RATA RATA

Ka.2 2.00 5.10 6.00 5.80 5.63

10 1+125 Ki.1 0.60 3.40 3.60 3.10 3.37

1+126 Ki.2 2.00 5.20 5.70 4.90 5.27

1+126 Ka.1 0.60 4.50 4.60 4.40 4.50

1+126 Ka.2 2.00 4.80 4.50 4.60 4.63

11 1+149 Ki.1 0.60 5.00 4.80 4.90 4.90

Ki.2 2.00 5.90 5.80 6.00 5.90

Ka.1 0.60 4.20 4.00 3.50 3.90

Ka.2 2.00 5.60 5.80 5.90 5.77

3 2 Oktober 2014 1+030 -1+300(KA) 0+025 Ki.1 1.00 4.10 3.80 4.00 3.97

Ki.2 1.90 5.70 6.00 6.10 5.93

Ka.1 0.70 6.00 6.00 6.10 6.03

Ka.2 1.80 4.80 4.60 4.70 4.70

0+101 Ki.1 0.60 5.10 5.40 5.20 5.23

Ki.2 1.80 4.30 5.90 4.50 4.90

Ka.1 0.60 6.10 5.80 6.00 5.97

Ka.2 1.90 4.10 3.80 3.80 3.90

0+126 Ki.1 0.60 5.10 5.00 5.40 5.17

Ki.2 1.80 5.80 6.20 6.40 6.13

Ka.1 0.70 5.60 5.40 5.50 5.50

Ka.2 1.90 5.10 4.80 4.60 4.83

0+249 Ki.1 0.60 6.50 5.50 5.50 5.83

Ki.2 1.90 5.10 4.80 4.90 4.93

Ka.1 0.70 6.40 6.00 6.10 6.17

Ka.2 1.80 4.90 4.70 4.80 4.80

0+325 Ki.1 0.70 6.00 6.20 6.30 6.17

Ki.2 1.80 6.40 6.50 6.50 6.47

Ka.1 0.60 5.50 5.30 5.30 5.37

Ka.2 1.80 6.10 6.00 6.10 6.07

0+400 Ki.1 0.60 5.70 6.30 6.40 6.13

Ki.2 1.90 5.60 5.80 5.20 5.53

Ka.1 0.60 5.30 5.50 5.40 5.40

Ka.2 1.90 5.00 5.60 5.50 5.37

0+424 Ki.1 0.60 5.10 5.00 4.90 5.00

Ki.2 2.00 5.90 5.70 6.20 5.93

Ka.1 0.70 5.20 5.10 5.20 5.17

Ka.2 1.80 7.50 7.00 7.20 7.23


JARAK DARI TEBAL
NO TANGGAL STA STA CORING POSISI
TEPI
1 2 3 RATA RATA

0+449 Ki.1 0.60 5.30 5.40 5.30 5.33

Ki.2 2.10 6.00 6.20 6.00 6.07

Ka.1 0.60 5.80 5.40 5.40 5.53

Ka.2 2.00 4.70 4.90 4.80 4.80

0+501 Ki.1 0.60 3.80 3.90 3.90 3.87

Ki.2 2.00 3.60 4.30 4.80 4.23

Ka.1 0.60 5.10 4.80 4.80 4.90

Ka.2 2.00 4.90 5.20 5.00 5.03

BINA MARGA
PENGAWAS LAPANGAN
BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II

DADAN SUPARMAN
NIP. 19800113 200801 1 003
TEBAL TEBAL
KET
diterima RATA-RATA

3.93

5.40

4.07

3.83

4.03

4.40

5.57

5.13

3.87

5.87

4.33

5.67

6.13

5.00

6.67

6.57

6.03

5.13

4.63

5.03

6.23

5.53

4.57

4.93

6.83

4.87

5.63

3.03

4.53

4.90

4.13

4.47

4.20

3.93
TEBAL TEBAL
KET
diterima RATA-RATA

5.47

3.23

4.94

5.37

4.17

6.20

4.40

4.73

3.83

5.70

3.67

4.00

5.27

5.50

4.63

6.13

5.27

6.40

6.20

3.83

3.00

4.57

4.50

5.13

6.50

7.47

6.93

6.53

5.70

5.97

6.13

5.63

5.90

5.23

5.60

6.03

5.87

5.53
TEBAL TEBAL
KET
diterima RATA-RATA

5.63

3.37

5.27

4.50

4.63

4.90

5.90

3.90

5.77

5.26

3.97

5.93

6.03

4.70

5.23

4.90

5.97

3.90

5.17

6.13

5.50

4.83

5.83

4.93

6.17

4.80

6.17

6.47

5.37

6.07

6.13

5.53

5.40

5.37

5.00

5.93

5.17

7.23
TEBAL TEBAL
KET
diterima RATA-RATA

5.33

6.07

5.53

4.80

3.87

4.23

4.90

5.03

5.38

Penyedia Jasa
CV. LEMBANG JAYA

HENDRA GUNAWAN, ST
Penanggung Jawab Teknis
HASIL PERHITUNGAN KETEBALAN LAPANGAN

PAKET : REHABILITASI JALAN RUAS JALAN CIKEMBAR - CIKEMBANG ( 1,00 KM )

PENYEDIA JASA : CV. LEMBANG JAYA

JARAK DARI TEBAL


NO STA STA CORING POSISI KET
TEPI
1 2 3 RATA RATA
DATA PENDUKUNG
HASIL PERHITUNGAN LEBAR HAMPARAN

Nama Balai : BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II


Nama Kegiatan : REHABILITASI JALAN DAN JEMBATAN PROVINSI BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II
Nama Paket : REHABILITASI JALAN RUAS JALAN CIKEMBAR - CIKEMBANG ( 1,00 KM )
Lokasi : RUAS JALAN CIKEMBAR - CIKEMBANG
No. Kontrak : 602/Ktr.27/ 209/BPJ.WIL.PEL.II
Tgl. Kontrak : 28 JULI 2015
Penyedia Jasa : CV. LEMBANG JAYA
Jenis Pekerjaan : LASTON LAPIS ANTARA AC - BC LEVELLING
Tanggal Penghamparan : 30 september-5 Oktober 2014
Panjang Segmen : 1,50 Km
Tebal Rencana rata-rata : 5,5 Cm

Lebar Luas
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) Segmen
(m) (m) (m2)
1 30 September 2014 1+240 KI Err:509
1+240 - 1+500(KI) - 10.00 -
2 1+250 KI Err:509 -
- 25.00 -
3 1+275 KI Err:509 -
- 25.00 -
4 1+300 KI Err:509 -
- 25.00 -
5 1+325 KI Err:508 -
- 25.00 -
6 1+350 KI Err:509 -
- 25.00 -
7 1+375 KI Err:509 -
- 25.00 -
8 1+400 KI Err:509 -
- 25.00 -
9 1+425 KI Err:509 -
- 25.00 -
10 1+450 KI Err:509 -
- 25.00 -
11 1+475 KI Err:509 -
- 25.00 -
12 1+500 KI Err:509

260.00 -
Lebar Luas
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) Segmen
(m) (m) (m2)
1 1 Oktober 2014 1+300 KA Err:509 -
1+300 - 1+500(KA) - 25.00 -
2 1+325 KA Err:509 -
- 25.00 -
3 1+350 KA Err:509 -
- 25.00 -
4 1+375 KA Err:509 -
- 25.00 -
5 1+400 KA Err:509 -
- 25.00 -
6 1+425 KA Err:509 -
- 25.00 -
7 1+450 KA Err:509 -
- 25.00 -
8 1+475 KA Err:509 -
- 25.00 -
9 1+500 KA Err:509 -

200.00 -
1 1 Oktober 2014 1+025 KI 2.25 -
1+025 - 1+240(KI) - 25.00 -
2 1+050 KI Err:509 -
- 25.00 -
3 1+075 KI Err:509 -
- 25.00 -
4 1+100 KI Err:509 -
- 25.00 -
5 1+125 KI Err:509 -
- 25.00 -
6 1+150 KI Err:509 -
- 25.00 -
7 1+175 KI Err:509 -
- 25.00 -
8 1+200 KI Err:509 -
- 25.00 -
9 1+225 KI Err:509 -
- 15.00 -
10 1+240 KI Err:509 -

215.00 -
415.00 -
1 2 Oktober 2014 0+537 KI 2.25
0+537 -1+025(K1) 2.20 13.00 28.60
2 1+030 -1+300(KA) 0+550 KI 2.15 -
2.28 25.00 56.88
3 0+575 KI 2.40 -
2.45 25.00 61.25
4 0+600 KI 2.50 -
2.40 25.00 60.00
5 0+625 KI 2.30 -
2.25 25.00 56.25
6 0+650 KI 2.20 -
2.43 25.00 60.63
7 0+675 KI 2.65 -
2.43 25.00 60.63
8 0+700 KI 2.20
2.24 25.00 56.00
9 0+725 KI 2.28
2.22 25.00 55.38
10 0+750 KI 2.15
2.10 25.00 52.50
Lebar Luas
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) Segmen
(m) (m) (m2)
11 0+775 KI 2.05
2.05 25.00 51.25
12 0+800 KI 2.05
12 0+800 KI 2.05
2.13 25.00 53.13
13 0+825 KI 2.20
2.21 25.00 55.25
14 0+850 KI 2.22
2.22 25.00 55.50
15 0+875 KI 2.22
2.27 25.00 56.75
16 0+900 KI 2.32
2.40 25.00 59.88
17 0+925 KI 2.47
2.46 25.00 61.50
18 0+950 KI 2.45
2.48 25.00 61.88
19 0+975 KI 2.50
2.44 25.00 61.00
20 1+000 KI 2.38
2.32 25.00 57.88
21 1+025 KI 2.25

488.00 1,122.10
Lebar Luas
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) Segmen
(m) (m) (m2)
1 2 Oktober 2014 1+030 KA 2.25 -
1+030 -1+300(KA) - 20.00 -
2 1+050 KA Err:509 -
- 25.00 -
3 1+075 KA Err:508 -
- 25.00 -
4 1+100 KA Err:509 -
- 25.00 -
5 1+125 KA Err:509 -
- 25.00 -
6 1+150 KA Err:509 -
- 25.00 -
7 1+175 KA Err:508 -
- 25.00 -
8 1+200 KA Err:509 -
- 25.00 -
9 1+225 KA Err:509 -
- 25.00 -
10 1+250 KA Err:509 -
- 25.00 -
11 1+275 KA Err:509 -
- 25.00 -
12 1+300 KA Err:509 -
270.00 -
758.00 -
3 Oktober 2014
1 0+405 -0+537(KI) 0+405 KI 2.14 -
2.12 20.00 42.40
2 0+425 KI 2.10 -
2.18 25.00 54.38
3 0+450 KI 2.25 -
2.24 25.00 56.00
4 0+475 KI 2.23 -
2.25 25.00 56.25
5 0+500 KI 2.27 -
2.22 25.00 55.50
6 0+525 KI 2.17 -
2.21 12.00 26.52
7 0+537 KI 2.25 -
132.00 291.05
1 3 Oktober 2014 0+540 KA 2.25
0+540-1+030(KA) 2.20 10.00 22.00
2 0+550 KA 2.15 -
2.28 25.00 56.88
3 0+575 KA 2.40 -
2.45 25.00 61.25
4 0+600 KA 2.50
2.40 25.00 60.00
5 0+625 KA 2.30
2.25 25.00 56.25
6 0+650 KA 2.20
2.43 25.00 60.63
7 0+675 KA 2.65
2.43 25.00 60.63
8 0+700 KA 2.20
2.25 25.00 56.13
9 0+725 KA 2.29
2.22 25.00 55.50
10 0+750 KA 2.15
2.10 25.00 52.50
11 0+775 KA 2.05
Lebar Luas
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) Segmen
(m) (m) (m2)
2.05 25.00 51.25
12 0+800 KA
Lebar Luas
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) Segmen
(m) (m) (m2)
12 0+800 KA 2.05
2.13 25.00 53.13
13 0+825 KA 2.20
2.22 25.00 55.38
14 0+850 KA 2.23
2.23 25.00 55.75
15 0+875 KA 2.23
2.28 25.00 57.00
16 0+900 KA 2.33
2.41 25.00 60.13
17 0+925 KA 2.48
2.47 25.00 61.63
18 0+950 KA 2.45
2.48 25.00 61.88
19 0+975 KA 2.50
2.45 25.00 61.13
20 1+000 KA 2.39
2.32 25.00 58.00
21 1+025 KA 2.25
2.25 5.00 11.25
22 1+030 KA 2.25
490.00 1,128.25
622.00 1,419.30
1 4 Oktober 2014 0+170 KA 2.30
0+170 -0+540(KA) 2.36 5.00 11.80
2 0+175 KA 2.42
2.36 25.00 59.00
3 0+200 KA 2.30
2.25 25.00 56.25
4 0+225 KA 2.20
2.35 25.00 58.75
5 0+250 KA 2.50
2.38 25.00 59.38
6 0+275 KA 2.25
2.28 25.00 56.88
7 0+300 KA 2.30
2.30 25.00 57.50
8 0+325 KA 2.30
2.28 25.00 56.88
9 0+350 KA 2.25
2.18 25.00 54.38
10 0+375 KA 2.10
2.12 25.00 53.00
11 0+400 KA 2.14
2.12 25.00 53.00
12 0+425 KA 2.10
2.18 25.00 54.38
13 0+450 KA 2.25
2.24 25.00 56.00
14 0+475 KA 2.23
2.26 25.00 56.38
15 0+500 KA 2.28
2.23 25.00 55.75
16 0+525 KA 2.18
2.22 15.00 33.23
17 0+540 KA 2.25
370.00 832.53
1 4 Oktober 2014 0+070 KI 2.50
0+070 -0+405(KI) 2.50 5.00 12.50
2 0+075 KI 2.50
2.43 25.00 60.63
Lebar Luas
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) Segmen
(m) (m) (m2)
3 0+100 KI 2.35
2.38 25.00 59.38
4 0+125 KI
4 0+125 KI 2.40
2.29 25.00 57.13
5 0+150 KI 2.17
2.30 25.00 57.50
6 0+175 KI 2.43
2.37 25.00 59.13
7 0+200 KI 2.30
2.25 25.00 56.25
8 0+225 KI 2.20
2.35 25.00 58.75
9 0+250 KI 2.50
2.38 25.00 59.38
10 0+275 KI 2.25
2.28 25.00 56.88
11 0+300 KI 2.30
2.30 25.00 57.50
12 0+325 KI 2.30
2.28 25.00 56.88
13 0+350 KI 2.25
2.18 25.00 54.38
14 0+375 KI 2.10
2.12 25.00 53.00
15 0+400 KI 2.14
2.14 5.00 10.70
16 0+405 KI 2.14
335.00 769.95
705.00 1,602.48
1 5 Oktober 2014 0+000 KI 2.40
0+00 -0+070(KI) 2.45 25.00 61.25
2 0+025 KI 2.50
2.50 25.00 62.50
3 0+050 KI 2.50
2.50 20.00 50.00
4 0+070 KI 2.50
70.00 173.75
5 Oktober 2014
1 0+00 -0+170(KA) 0+000 KA 2.40
2.45 25.00 61.25
2 0+025 KA 2.50
2.50 25.00 62.50
3 0+050 KA 2.50
2.50 25.00 62.50
4 0+075 KA 2.50
2.43 25.00 60.63
5 0+100 KA 2.35
2.38 25.00 59.38
6 0+125 KA 2.40
2.29 25.00 57.25
7 0+150 KA 2.18
2.24 20.00 44.80
8 0+170 KA 2.30
170.00 408.30
240.00 582.05
TOTAL 3,000.00 -

Disetujui Oleh : Diperiksa oleh : Penyedia Jasa


Pengawas Lapangan Konsultan Supervisi CV. LEMBANG JAYA
PT. KARPA Jo. CV. Hendra Co
-
Lebar Luas
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) Segmen
(m) (m) (m2)
-

ASEP JUHARA,ST.M.Si IMAN FIRMAN, ST M. IRZAL FAHLEVI, AM.d


NIP. 1966 1010 2009 01 1 001 Site Engineer Penanggung Jawab Teknik
DATA PENDUKUNG
HASIL PERHITUNGAN LEBAR, TEBAL DAN KEPADATAN

Nama Balai : BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II


Nama Kegiatan : REHABILITASI JALAN DAN JEMBATAN PROVINSI BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II
Nama Paket : REHABILITASI JALAN RUAS JALAN CIKEMBAR - CIKEMBANG ( 1,00 KM )
Lokasi : RUAS JALAN CIKEMBAR - CIKEMBANG
No. Kontrak : 602/Ktr.27/ 209/BPJ.WIL.PEL.II
Tgl. Kontrak : 28 JULI 2015
Penyedia Jasa : CV. LEMBANG JAYA
Jenis Pekerjaan : Laston Lapis Aus ( AC -WC) LEVELLING
Tanggal Penghamparan : 11-13 Desember 2013
Panjang Segmen : 1,70 Km
Tebal Rencana : 4,5 Cm

Lebar PEMAKAIAN Luas


Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) RATA-RATA/HARI Segmen
(m) (m) ( LITER ) (m2)
1 30 September 2014 1+240 KI Err:509
1+240 - 1+500(KI) - 10.00 0.341 -
2 1+250 KI Err:509 -
- 25.00 0.341 -
3 1+275 KI Err:509 -
- 25.00 0.341 -
4 1+300 KI Err:509 -
- 25.00 0.341 -
5 1+325 KI Err:508 -
- 25.00 0.341 -
6 1+350 KI Err:509 -
- 25.00 0.341 -
7 1+375 KI Err:509 -
- 25.00 0.341 -
8 1+400 KI Err:509 -
- 25.00 0.341 -
9 1+425 KI Err:509 -
- 25.00 0.341 -
10 1+450 KI Err:509 -
- 25.00 0.341 -
11 1+475 KI Err:509 -
- 25.00 0.341 -
12 1+500 KI Err:509

260.00 -
Lebar PEMAKAIAN Luas
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) RATA-RATA/HARI Segmen
(m) (m) ( LITER ) (m2)
1 1 Oktober 2014 1+300 KA Err:509 -
1+300 - 1+500(KA) - 25.00 0.329 -
2 1+325 KA Err:509 -
- 25.00 0.329 -
3 1+350 KA Err:509 -
- 25.00 0.329 -
4 1+375 KA Err:509 -
- 25.00 0.329 -
5 1+400 KA Err:509 -
- 25.00 0.329 -
6 1+425 KA Err:509 -
- 25.00 0.329 -
7 1+450 KA Err:509 -
- 25.00 0.329 -
8 1+475 KA Err:509 -
- 25.00 0.329 -
9 1+500 KA Err:509 -

200.00 -
1 1 Oktober 2014 1+025 KI 2.2500 -
1+025 - 1+240(KI) - 25.00 0.329 -
2 1+050 KI Err:509 -
- 25.00 0.329 -
3 1+075 KI Err:509 -
- 25.00 0.329 -
4 1+100 KI Err:509 -
- 25.00 0.329 -
5 1+125 KI Err:509 -
- 25.00 0.329 -
6 1+150 KI Err:509 -
- 25.00 0.329 -
7 1+175 KI Err:509 -
- 25.00 0.329 -
8 1+200 KI Err:509 -
- 25.00 0.329 -
9 1+225 KI Err:509 -
- 15.00 0.329 -
10 1+240 KI Err:509 -

215.00 -
415.00 -
1 2 Oktober 2014 0+537 KI 2.2500
0+537 -1+025(K1) 2.20 13.00 0.305 8.72
2 1+030 -1+300(KA) 0+550 KI 2.1500 -
2.28 25.00 0.305 17.35
3 0+575 KI 2.4000 -
2.45 25.00 0.305 18.68
4 0+600 KI 2.5000 -
2.40 25.00 0.305 18.30
5 0+625 KI 2.3000 -
2.25 25.00 0.305 17.16
6 0+650 KI 2.2000 -
2.43 25.00 0.305 18.49
7 0+675 KI 2.6500 -
2.43 25.00 0.305 18.49
8 0+700 KI 2.2000
2.24 25.00 0.305 17.08
9 0+725 KI 2.2800
2.22 25.00 0.305 16.89
10 0+750 KI 2.1500
2.10 25.00 0.305 16.01
11 0+775 KI 2.0500
2.05 25.00 0.305 15.63
12 0+800 KI 2.0500
2.13 25.00 0.305 16.20
13 0+825 KI 2.2000
2.21 25.00 0.305 16.85
14 0+850 KI 2.2200
2.22 25.00 0.305 16.93
15 0+875 KI 2.2200
2.27 25.00 0.305 17.31
16 0+900 KI 2.3200
2.40 25.00 0.305 18.26
17 0+925 KI 2.4700
2.46 25.00 0.305 18.76
18 0+950 KI 2.4500
2.48 25.00 0.305 18.87
19 0+975 KI 2.5000
2.44 25.00 0.305 18.61
20 1+000 KI 2.3800
2.32 25.00 0.305 17.65
21 1+025 KI 2.2500

488.00 342.24
Lebar PEMAKAIAN Luas
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) RATA-RATA/HARI Segmen
(m) (m) ( LITER ) (m2)
1 2 Oktober 2014 1+030 KA 2.2500 -
1+030 -1+300(KA) - 20.00 0.305 -
2 1+050 KA Err:509 -
- 25.00 0.305 -
3 1+075 KA Err:508 -
- 25.00 0.305 -
4 1+100 KA Err:509 -
- 25.00 0.305 -
5 1+125 KA Err:509 -
- 25.00 0.305 -
6 1+150 KA Err:509 -
- 25.00 0.305 -
7 1+175 KA Err:508 -
- 25.00 0.305 -
8 1+200 KA Err:509 -
- 25.00 0.305 -
9 1+225 KA Err:509 -
- 25.00 0.305 -
10 1+250 KA Err:509 -
- 25.00 0.305 -
11 1+275 KA Err:509 -
- 25.00 0.305 -
12 1+300 KA Err:509 -
270.00 -
758.00 -
3 Oktober 2014
1 0+405 -0+537(KI) 0+405 KI 2.1400 -
2.12 20.00 0.332 14.08
2 0+425 KI 2.1000 -
2.18 25.00 0.332 18.05
3 0+450 KI 2.2500 -
2.24 25.00 0.332 18.59
4 0+475 KI 2.2300 -
2.25 25.00 0.332 18.68
5 0+500 KI 2.2700 -
2.22 25.00 0.332 18.43
6 0+525 KI 2.1700 -
2.21 12.00 0.332 8.80
7 0+537 KI 2.2500 -
132.00 96.63
1 3 Oktober 2014 0+540 KA 2.2500
0+540-1+030(KA) 2.20 10.00 0.332 7.30
2 0+550 KA 2.1500 -
2.28 25.00 0.332 18.88
3 0+575 KA 2.4000 -
2.45 25.00 0.332 20.34
4 0+600 KA 2.5000
2.40 25.00 0.332 19.92
5 0+625 KA 2.3000
2.25 25.00 0.332 18.68
6 0+650 KA 2.2000
2.43 25.00 0.332 20.13
7 0+675 KA 2.6500
2.43 25.00 0.332 20.13
8 0+700 KA 2.2000
2.25 25.00 0.332 18.63
9 0+725 KA 2.2900
2.22 25.00 0.332 18.43
10 0+750 KA 2.1500
2.10 25.00 0.332 17.43
11 0+775 KA 2.0500
2.05 25.00 0.332 17.02
12 0+800 KA 2.0500
2.13 25.00 0.332 17.64
13 0+825 KA 2.2000
2.22 25.00 0.332 18.38
14 0+850 KA 2.2300
2.23 25.00 0.332 18.51
15 0+875 KA 2.2300
2.28 25.00 0.332 18.92
16 0+900 KA 2.3300
2.41 25.00 0.332 19.96
17 0+925 KA 2.4800
2.47 25.00 0.332 20.46
18 0+950 KA 2.4500
2.48 25.00 0.332 20.54
19 0+975 KA 2.5000
2.45 25.00 0.332 20.29
20 1+000 KA 2.3900
2.32 25.00 0.332 19.26
21 1+025 KA 2.2500
2.25 5.00 0.332 3.74
22 1+030 KA 2.2500
490.00 374.58
622.00 471.21
1 4 Oktober 2014 0+170 KA 2.3000
0+170 -0+540(KA) 2.36 5.00 0.340 4.01
2 0+175 KA 2.4200
2.36 25.00 0.340 20.06
Lebar PEMAKAIAN Luas
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) RATA-RATA/HARI Segmen
(m) (m) ( LITER ) (m2)
3 0+200 KA 2.3000
2.25 25.00 0.340 19.13
4 0+225 KA 2.2000
2.35 25.00 0.340 19.98
5 0+250 KA 2.5000
2.38 25.00 0.340 20.19
6 0+275 KA 2.2500
2.28 25.00 0.340 19.34
7 0+300 KA 2.3000
2.30 25.00 0.340 19.55
8 0+325 KA 2.3000
2.28 25.00 0.340 19.34
9 0+350 KA 2.2500
2.18 25.00 0.340 18.49
10 0+375 KA 2.1000
2.12 25.00 0.340 18.02
11 0+400 KA 2.1400
2.12 25.00 0.340 18.02
12 0+425 KA 2.1000
2.18 25.00 0.340 18.49
13 0+450 KA 2.2500
2.24 25.00 0.340 19.04
14 0+475 KA 2.2300
2.26 25.00 0.340 19.17
15 0+500 KA 2.2800
2.23 25.00 0.340 18.96
16 0+525 KA 2.1800
2.22 15.00 0.340 11.30
17 0+540 KA 2.2500
370.00 283.06
1 4 Oktober 2014 0+070 KI 2.5000
0+070 -0+405(KI) 2.50 5.00 0.340 4.25
2 0+075 KI 2.5000
2.43 25.00 0.340 20.61
3 0+100 KI 2.3500
2.38 25.00 0.340 20.19
4 0+125 KI 2.4000
2.29 25.00 0.340 19.42
5 0+150 KI 2.1700
2.30 25.00 0.340 19.55
6 0+175 KI 2.4300
2.37 25.00 0.340 20.10
7 0+200 KI 2.3000
2.25 25.00 0.340 19.13
8 0+225 KI 2.2000
2.35 25.00 0.340 19.98
9 0+250 KI 2.5000
2.38 25.00 0.340 20.19
10 0+275 KI 2.2500
2.28 25.00 0.340 19.34
11 0+300 KI 2.3000
2.30 25.00 0.340 19.55
12 0+325 KI 2.3000
2.28 25.00 0.340 19.34
13 0+350 KI 2.2500
2.18 25.00 0.340 18.49
14 0+375 KI 2.1000
2.12 25.00 0.340 18.02
15 0+400 KI 2.1400
2.14 5.00 0.340 3.64
16 0+405 KI 2.1400
335.00 261.78
705.00 544.84
1 5 Oktober 2014 0+000 KI 2.4000
0+00 -0+070(KI) 2.45 25.00 0.318 19.48
2 0+025 KI 2.5000
2.50 25.00 0.318 19.88
3 0+050 KI 2.5000
2.50 20.00 0.318 15.90
4 0+070 KI 2.5000
70.00 55.25
5 Oktober 2014
1 0+00 -0+170(KA) 0+000 KA 2.4000
2.45 25.00 0.318 19.48
2 0+025 KA 2.5000
2.50 25.00 0.318 19.88
3 0+050 KA 2.5000
2.50 25.00 0.318 19.88
4 0+075 KA 2.5000
2.43 25.00 0.318 19.28
5 0+100 KA 2.3500
2.38 25.00 0.318 18.88
6 0+125 KA 2.4000
2.29 25.00 0.318 18.21
7 0+150 KA 2.1800
2.24 20.00 0.318 14.25
8 0+170 KA 2.3000
170.00 129.84
240.00 185.09
TOTAL 3,000.00 -
Lebar PEMAKAIAN Luas
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) RATA-RATA/HARI Segmen
(m) (m) ( LITER ) (m2)

Disetujui Oleh : Diperiksa oleh : Penyedia Jasa


Pengawas Lapangan Konsultan Supervisi CV. LEMBANG JAYA
PT. KARPA Jo. CV. Hendra Co

ASEP JUHARA,ST.M.Si IMAN FIRMAN, ST M. IRZAL FAHLEVI, AM.d


NIP. 1966 1010 2009 01 1 001 Site Engineer Penanggung Jawab Teknik
DATA PENDUKUNG
SERTIFIKAT BULANAN N0 - 02

KEGIATAN : REHABILITASI JALAN DAN JEMBATAN PROVINSI DI BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II
PEKERJAAN : REHABILITASI JALAN RUAS JALAN CIKEMBAR - CIKEMBANG ( 1,00 KM )
LOKASI : RUAS JALAN CIKEMBAR - CIKEMBANG
NOMOR ITEM PEKERJAAN : 6.3 (6c)
ITEM PEKERJAAN : Laston Lapis Antara (AC-BC) Leveling
SATUAN : Ton

Lokasi Kontrol Berat


Tebal Hasil Berat Isi Berat Hasil Kadar Tebal Kadar Berat Isi Tebal Volume Volume
Segmen Luas Hasil Core Berat Hasil Kepadatan Volume Diterima Koreksi Ket.
No. Tanggal Dari Ke Core Drill Drill Tiket Selisih Aspal Maksimum Aspal JMF JSD Diterima Terukur Terbayar
Perhitungan Kadar Aspal
Ki/Ka M2 Cm Gr/Cm3 Ton Ton % % % Cm % Gr/Cm3 Cm Ton Ton Ton
a b c d e f g h i j=(fxgxh)/(100) k=(i-j)/j l m n o p q=min(g,n) r=(fxqxh)/(100) s=min(i,r) t=l/o t=sxt u

1 30 September 2014 1+240 1+500 KI - 5.83 2.180 - - - 5.82 98.73 12.50 5.80 2.208 5.83 - - 1.000 -
2 1 Oktober 2014 1+025 1+240 KI - 5.77 2.177 - - - 5.81 98.60 12.50 5.80 2.208 5.77 - - 1.000 -
1+300 1+500 KA
3 2 Oktober 2014 0+537 1+025 KI - 5.81 2.182 - - - 5.87 98.82 12.50 5.80 2.208 5.81 - - 1.000 -
1+030 1+300 KA
4 3 Oktober 2014 0+405 0+537 KI 1,419.30 5.57 2.177 173.00 172.10 0.005 5.86 98.60 12.50 5.80 2.208 5.57 172.10 172.10 1.000 172.10
0+540 1+030 KA
5 4 Oktober 2014 0+070 0+405 KI 1,602.48 5.69 2.179 200.00 198.68 0.007 5.85 98.69 12.50 5.80 2.208 5.69 198.68 198.68 1.000 198.68
0+170 0+540 KA
6 5 Oktober 2014 0+000 0+070 KI 582.05 5.61 2.175 72.00 71.02 0.014 5.85 98.51 12.50 5.80 2.208 5.61 71.02 71.02 1.000 71.02
0+000 0+170 KA

- 0.00 0.00 -
BULAN INI - 0.00 - -
S/D BULAN LALU - -
S/D BULAN INI -

Disetujui Oleh : Diperiksa oleh : Penyedia Jasa


Pengawas Lapangan Konsultan Supervisi CV. LEMBANG JAYA
PT. KARPA Jo. CV. Hendra Co

ASEP JUHARA,ST.M.Si IMAN FIRMAN, ST M. IRZAL FAHLEVI, AM.d


NIP. 1966 1010 2009 01 1 001 Site Engineer Penanggung Jawab Teknik
DATA PENDUKUNG
HASIL PERHITUNGAN LEBAR HAMPARAN

Nama Balai : BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II


Nama Kegiatan : REHABILITASI JALAN DAN JEMBATAN PROVINSI BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II
Nama Paket : REHABILITASI JALAN RUAS JALAN CIKEMBAR - CIKEMBANG ( 1,00 KM )
Lokasi : RUAS JALAN CIKEMBAR - CIKEMBANG
No. Kontrak : 602/Ktr.27/ 209/BPJ.WIL.PEL.II
Tgl. Kontrak : 28 JULI 2015
Penyedia Jasa : CV. LEMBANG JAYA
Jenis Pekerjaan : LASTON LAPIS ANTARA AC - BC
Tanggal Penghamparan : 30 september-5 Oktober 2014
Panjang Segmen : 1,50 Km
Tebal Rencana : 5 Cm

Lebar Luas
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) Segmen
(m) (m) (m2)
1 30 September 2014 1+240 KI 0.60
1+240 - 1+500(KI) 0.60 10.00 6.00
2 1+250 KI 0.60 -
0.60 25.00 15.00
3 1+275 KI 0.60 -
0.65 25.00 16.25
4 1+300 KI 0.70 -
0.75 25.00 18.75
5 1+325 KI 0.80 -
0.75 25.00 18.75
6 1+350 KI 0.70 -
0.70 25.00 17.50
7 1+375 KI 0.70 -
0.65 25.00 16.25
8 1+400 KI 0.60 -
0.63 25.00 15.63
9 1+425 KI 0.65 -
0.65 25.00 16.25
10 1+450 KI 0.65 -
0.53 25.00 13.13
11 1+475 KI 0.40 -
0.35 25.00 8.75
12 1+500 KI 0.30

260.00 162.25
Lebar Luas
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) Segmen
(m) (m) (m2)
1 1 Oktober 2014 1+300 KA 0.60 -
1+300 - 1+500(KA) 0.63 25.00 15.63
2 1+325 KA 0.65 -
0.73 25.00 18.13
3 1+350 KA 0.80 -
0.75 25.00 18.75
4 1+375 KA 0.70 -
0.65 25.00 16.25
5 1+400 KA 0.60 -
0.58 25.00 14.38
6 1+425 KA 0.55 -
0.80 25.00 20.00
7 1+450 KA 1.05 -
0.78 25.00 19.38
8 1+475 KA 0.50 -
0.40 25.00 10.00
9 1+500 KA 0.30 -

200.00 132.50
1 1 Oktober 2014 1+025 KI 0.65 -
1+025 - 1+240(KI) 0.73 25.00 18.13
2 1+050 KI 0.80 -
0.60 25.00 15.00
3 1+075 KI 0.40 -
0.50 25.00 12.50
4 1+100 KI 0.60 -
0.70 25.00 17.50
5 1+125 KI 0.80 -
0.65 25.00 16.25
6 1+150 KI 0.50 -
0.60 25.00 15.00
7 1+175 KI 0.70 -
0.70 25.00 17.50
8 1+200 KI 0.70 -
0.65 25.00 16.25
9 1+225 KI 0.60 -
0.60 15.00 9.00
10 1+240 KI 0.60 -

215.00 137.13
415.00 269.63
1 2 Oktober 2014 0+537 KI 0.55
0+537 -1+025(K1) 0.55 13.00 7.15
2 1+030 -1+300(KA) 0+550 KI 0.55 -
0.53 25.00 13.13
3 0+575 KI 0.50 -
0.50 25.00 12.50
4 0+600 KI 0.50 -
0.55 25.00 13.75
5 0+625 KI 0.60 -
0.65 25.00 16.25
6 0+650 KI 0.70 -
0.43 25.00 10.63
7 0+675 KI 0.15 -
0.40 25.00 10.00
8 0+700 KI 0.65
0.61 25.00 15.13
9 0+725 KI 0.56
0.61 25.00 15.13
10 0+750 KI 0.65
0.63 25.00 15.63
11 0+775 KI 0.60
0.60 25.00 15.00
12 0+800 KI 0.60
Lebar Luas
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) Segmen
(m) (m) (m2)
12 0+800 KI 0.60
0.60 25.00 15.00
13 0+825 KI 0.60
0.57 25.00 14.13
14 0+850 KI 0.53
0.67 25.00 16.63
15 0+875 KI 0.80
0.64 25.00 16.00
16 0+900 KI 0.48
0.44 25.00 11.00
17 0+925 KI 0.40
0.48 25.00 11.88
18 0+950 KI 0.55
0.53 25.00 13.13
19 0+975 KI 0.50
0.60 25.00 15.00
20 1+000 KI 0.70
0.68 25.00 16.88
21 1+025 KI 0.65

488.00 273.90
Lebar Luas
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) Segmen
(m) (m) (m2)
1 2 Oktober 2014 1+030 KA 0.80 -
1+030 -1+300(KA) 0.55 20.00 11.00
2 1+050 KA 0.30 -
0.57 25.00 14.13
3 1+075 KA 0.83 -
0.82 25.00 20.38
4 1+100 KA 0.80 -
0.70 25.00 17.50
5 1+125 KA 0.60 -
0.60 25.00 15.00
6 1+150 KA 0.60 -
0.63 25.00 15.63
7 1+175 KA 0.65 -
0.60 25.00 14.88
8 1+200 KA 0.54 -
0.42 25.00 10.50
9 1+225 KA 0.30 -
0.35 25.00 8.75
10 1+250 KA 0.40 -
0.50 25.00 12.50
11 1+275 KA 0.60 -
0.60 25.00 15.00
12 1+300 KA 0.60 -
270.00 155.25
758.00 429.15
3 Oktober 2014
1 0+405 -0+537(KI) 0+405 KI 0.60 -
0.60 20.00 12.00
2 0+425 KI 0.60 -
0.59 25.00 14.75
3 0+450 KI 0.58 -
0.58 25.00 14.50
4 0+475 KI 0.58 -
0.54 25.00 13.50
5 0+500 KI 0.50 -
0.55 25.00 13.75
6 0+525 KI 0.60 -
0.58 12.00 6.90
7 0+537 KI 0.55 -
132.00 75.40
1 3 Oktober 2014 0+540 KA 0.55
0+540-1+030(KA) 0.65 10.00 6.50
2 0+550 KA 0.75 -
0.53 25.00 13.13
3 0+575 KA 0.30 -
0.20 25.00 5.00
4 0+600 KA 0.10
0.15 25.00 3.75
5 0+625 KA 0.20
0.35 25.00 8.75
6 0+650 KA 0.50
0.33 25.00 8.12
7 0+675 KA 0.15
0.40 25.00 10.00
8 0+700 KA 0.65
0.56 25.00 14.00
9 0+725 KA 0.47
0.51 25.00 12.75
10 0+750 KA 0.55
0.73 25.00 18.13
11 0+775 KA 0.90
0.90 25.00 22.50
12 0+800 KA 0.90
0.75 25.00 18.75
Lebar Luas
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) Segmen
(m) (m) (m2)
13 0+825 KA 0.60
Lebar Luas
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) Segmen
(m) (m) (m2)
13 0+825 KA 0.60
0.56 25.00 14.00
14 0+850 KA 0.52
0.44 25.00 10.88
15 0+875 KA 0.35
0.41 25.00 10.25
16 0+900 KA 0.47
0.36 25.00 9.00
17 0+925 KA 0.25
0.25 25.00 6.25
18 0+950 KA 0.25
0.23 25.00 5.63
19 0+975 KA 0.20
0.42 25.00 10.38
20 1+000 KA 0.63
0.89 25.00 22.25
21 1+025 KA 1.15
0.73 5.00 3.63
22 1+030 KA 0.30
490.00 233.63
622.00 309.03
1 4 Oktober 2014 0+170 KA 0.25
0+170 -0+540(KA) 0.25 5.00 1.25
2 0+175 KA 0.25
0.33 25.00 8.13
3 0+200 KA 0.40
0.43 25.00 10.63
4 0+225 KA 0.45
0.53 25.00 13.13
5 0+250 KA 0.60
0.60 25.00 15.00
6 0+275 KA 0.60
0.55 25.00 13.75
7 0+300 KA 0.50
0.47 25.00 11.63
8 0+325 KA 0.43
0.62 25.00 15.38
9 0+350 KA 0.80
0.86 25.00 21.50
10 0+375 KA 0.92
0.86 25.00 21.50
11 0+400 KA 0.80
0.61 25.00 15.25
12 0+425 KA 0.42
0.49 25.00 12.25
13 0+450 KA 0.56
0.46 25.00 11.38
14 0+475 KA 0.35
0.45 25.00 11.25
15 0+500 KA 0.55
0.65 25.00 16.25
16 0+525 KA 0.75
0.65 15.00 9.75
17 0+540 KA 0.55
370.00 208.00
1 4 Oktober 2014 0+070 KI 0.40
0+070 -0+405(KI) 0.40 5.00 2.00
2 0+075 KI 0.40
0.50 25.00 12.50
3 0+100 KI 0.60
0.60 25.00 15.00
4 0+125 KI 0.60
0.60 25.00 15.00
5 0+150 KI 0.60
Lebar Luas
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) Segmen
(m) (m) (m2)
0.60 25.00 15.00
6 0+175 KI 0.60
Lebar Luas
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) Segmen
(m) (m) (m2)
6 0+175 KI 0.60
0.60 25.00 15.00
7 0+200 KI 0.60
0.58 25.00 14.38
8 0+225 KI 0.55
0.55 25.00 13.75
9 0+250 KI 0.55
0.58 25.00 14.38
10 0+275 KI 0.60
0.60 25.00 15.00
11 0+300 KI 0.60
0.55 25.00 13.75
12 0+325 KI 0.50
0.54 25.00 13.38
13 0+350 KI 0.57
0.54 25.00 13.38
14 0+375 KI 0.50
0.55 25.00 13.75
15 0+400 KI 0.60
0.60 5.00 3.00
16 0+405 KI 0.60
335.00 189.25
705.00 397.25
1 5 Oktober 2014 0+000 KI 0.40
0+00 -0+070(KI) 0.40 25.00 10.00
2 0+025 KI 0.40
0.35 25.00 8.75
3 0+050 KI 0.30
0.35 20.00 7.00
4 0+070 KI 0.40
70.00 25.75
5 Oktober 2014
1 0+00 -0+170(KA) 0+000 KA 0.20
0.20 25.00 5.00
2 0+025 KA 0.20
0.20 25.00 5.00
3 0+050 KA 0.20
0.40 25.00 10.00
4 0+075 KA 0.60
0.40 25.00 10.00
5 0+100 KA 0.20
0.20 25.00 5.00
6 0+125 KA 0.20
0.43 25.00 10.63
7 0+150 KA 0.65
0.45 20.00 9.00
8 0+170 KA 0.25
170.00 54.63
240.00 80.38
TOTAL 3,000.00 1,647.69

Disetujui Oleh : Diperiksa oleh : Penyedia Jasa


Pengawas Lapangan Konsultan Supervisi CV. LEMBANG JAYA
PT. KARPA Jo. CV. Hendra Co

ASEP JUHARA,ST.M.Si IMAN FIRMAN, ST M. IRZAL FAHLEVI, AM.d


NIP. 1966 1010 2009 01 1 001 Site Engineer Penanggung Jawab Teknik
DATA PENDUKUNG
HASIL PERHITUNGAN LEBAR, TEBAL DAN KEPADATAN

Nama Balai : BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II


Nama Kegiatan : REHABILITASI JALAN DAN JEMBATAN PROVINSI BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II
Nama Paket : REHABILITASI JALAN RUAS JALAN CIKEMBAR - CIKEMBANG ( 1,00 KM )
Lokasi : RUAS JALAN CIKEMBAR - CIKEMBANG
No. Kontrak : 602/Ktr.27/ 209/BPJ.WIL.PEL.II
Tgl. Kontrak : 28 JULI 2015
Penyedia Jasa : CV. LEMBANG JAYA
Jenis Pekerjaan : LASTON LAPIS ANTARA AC - BC LEVELLING
Tanggal Penghamparan : 30 september-5 Oktober 2014
Panjang Segmen : 1,50 Km
Tebal Rencana : 5,5 Cm

Lebar PEMAKAIAN Luas


Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) RATA-RATA/HARI Segmen
(m) (m) ( LITER ) (m2)
1 30 September 2014 1+240 KI 0.6000
1+240 - 1+500(KI) 0.60 10.00 0.341 2.05
2 1+250 KI 0.6000 -
0.60 25.00 0.341 5.12
3 1+275 KI 0.6000 -
0.65 25.00 0.341 5.54
4 1+300 KI 0.7000 -
0.75 25.00 0.341 6.39
5 1+325 KI 0.8000 -
0.75 25.00 0.341 6.39
6 1+350 KI 0.7000 -
0.70 25.00 0.341 5.97
7 1+375 KI 0.7000 -
0.65 25.00 0.341 5.54
8 1+400 KI 0.6000 -
0.63 25.00 0.341 5.33
9 1+425 KI 0.6500 -
0.65 25.00 0.341 5.54
10 1+450 KI 0.6500 -
0.53 25.00 0.341 4.48
11 1+475 KI 0.4000 -
0.35 25.00 0.341 2.98
12 1+500 KI 0.3000

260.00 55.33
Lebar PEMAKAIAN Luas
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) RATA-RATA/HARI Segmen
(m) (m) ( LITER ) (m2)
1 1 Oktober 2014 1+300 KA 0.6000 -
1+300 - 1+500(KA) 0.63 25.00 0.329 5.14
2 1+325 KA 0.6500 -
0.73 25.00 0.329 5.96
3 1+350 KA 0.8000 -
0.75 25.00 0.329 6.17
4 1+375 KA 0.7000 -
0.65 25.00 0.329 5.35
5 1+400 KA 0.6000 -
0.58 25.00 0.329 4.73
6 1+425 KA 0.5500 -
0.80 25.00 0.329 6.58
7 1+450 KA 1.0500 -
0.78 25.00 0.329 6.37
8 1+475 KA 0.5000 -
0.40 25.00 0.329 3.29
9 1+500 KA 0.3000 -

200.00 43.59
1 1 Oktober 2014 1+025 KI 0.6500 -
1+025 - 1+240(KI) 0.73 25.00 0.329 5.96
2 1+050 KI 0.8000 -
0.60 25.00 0.329 4.94
3 1+075 KI 0.4000 -
0.50 25.00 0.329 4.11
4 1+100 KI 0.6000 -
0.70 25.00 0.329 5.76
5 1+125 KI 0.8000 -
0.65 25.00 0.329 5.35
6 1+150 KI 0.5000 -
0.60 25.00 0.329 4.94
7 1+175 KI 0.7000 -
0.70 25.00 0.329 5.76
8 1+200 KI 0.7000 -
0.65 25.00 0.329 5.35
9 1+225 KI 0.6000 -
0.60 15.00 0.329 2.96
10 1+240 KI 0.6000 -

215.00 45.11
415.00 88.70
1 2 Oktober 2014 0+537 KI 0.5500
0+537 -1+025(K1) 0.55 13.00 0.305 2.18
2 1+030 -1+300(KA) 0+550 KI 0.5500 -
0.53 25.00 0.305 4.00
3 0+575 KI 0.5000 -
0.50 25.00 0.305 3.81
4 0+600 KI 0.5000 -
0.55 25.00 0.305 4.19
5 0+625 KI 0.6000 -
0.65 25.00 0.305 4.96
6 0+650 KI 0.7000 -
0.43 25.00 0.305 3.24
7 0+675 KI 0.1500 -
0.40 25.00 0.305 3.05
8 0+700 KI 0.6500
0.61 25.00 0.305 4.61
9 0+725 KI 0.5600
0.61 25.00 0.305 4.61
10 0+750 KI 0.6500
0.63 25.00 0.305 4.77
11 0+775 KI 0.6000
0.60 25.00 0.305 4.58
12 0+800 KI 0.6000
0.60 25.00 0.305 4.58
13 0+825 KI 0.6000
0.57 25.00 0.305 4.31
14 0+850 KI 0.5300
0.67 25.00 0.305 5.07
15 0+875 KI 0.8000
0.64 25.00 0.305 4.88
16 0+900 KI 0.4800
0.44 25.00 0.305 3.36
17 0+925 KI 0.4000
0.48 25.00 0.305 3.62
18 0+950 KI 0.5500
0.53 25.00 0.305 4.00
19 0+975 KI 0.5000
0.60 25.00 0.305 4.58
20 1+000 KI 0.7000
0.68 25.00 0.305 5.15
21 1+025 KI 0.6500

488.00 83.54
Lebar PEMAKAIAN Luas
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) RATA-RATA/HARI Segmen
(m) (m) ( LITER ) (m2)
1 2 Oktober 2014 1+030 KA 0.8000 -
1+030 -1+300(KA) 0.55 20.00 0.305 3.36
2 1+050 KA 0.3000 -
0.57 25.00 0.305 4.31
3 1+075 KA 0.8300 -
0.82 25.00 0.305 6.21
4 1+100 KA 0.8000 -
0.70 25.00 0.305 5.34
5 1+125 KA 0.6000 -
0.60 25.00 0.305 4.58
6 1+150 KA 0.6000 -
0.63 25.00 0.305 4.77
7 1+175 KA 0.6500 -
0.60 25.00 0.305 4.54
8 1+200 KA 0.5400 -
0.42 25.00 0.305 3.20
9 1+225 KA 0.3000 -
0.35 25.00 0.305 2.67
10 1+250 KA 0.4000 -
0.50 25.00 0.305 3.81
11 1+275 KA 0.6000 -
0.60 25.00 0.305 4.58
12 1+300 KA 0.6000 -
270.00 47.35
758.00 130.89
3 Oktober 2014
1 0+405 -0+537(KI) 0+405 KI 0.6000 -
0.60 20.00 0.332 3.98
2 0+425 KI 0.6000 -
0.59 25.00 0.332 4.90
3 0+450 KI 0.5800 -
0.58 25.00 0.332 4.81
4 0+475 KI 0.5800 -
0.54 25.00 0.332 4.48
5 0+500 KI 0.5000 -
0.55 25.00 0.332 4.57
6 0+525 KI 0.6000 -
0.58 12.00 0.332 2.29
7 0+537 KI 0.5500 -
132.00 25.03
1 3 Oktober 2014 0+540 KA 0.5500
0+540-1+030(KA) 0.65 10.00 0.332 2.16
2 0+550 KA 0.7500 -
0.53 25.00 0.332 4.36
3 0+575 KA 0.3000 -
0.20 25.00 0.332 1.66
4 0+600 KA 0.1000
0.15 25.00 0.332 1.25
5 0+625 KA 0.2000
0.35 25.00 0.332 2.91
6 0+650 KA 0.5000
0.33 25.00 0.332 2.70
7 0+675 KA 0.1500
0.40 25.00 0.332 3.32
8 0+700 KA 0.6500
0.56 25.00 0.332 4.65
9 0+725 KA 0.4700
0.51 25.00 0.332 4.23
10 0+750 KA 0.5500
0.73 25.00 0.332 6.02
11 0+775 KA 0.9000
0.90 25.00 0.332 7.47
12 0+800 KA 0.9000
0.75 25.00 0.332 6.23
13 0+825 KA 0.6000
0.56 25.00 0.332 4.65
14 0+850 KA 0.5200
0.44 25.00 0.332 3.61
15 0+875 KA 0.3500
0.41 25.00 0.332 3.40
16 0+900 KA 0.4700
0.36 25.00 0.332 2.99
17 0+925 KA 0.2500
0.25 25.00 0.332 2.08
18 0+950 KA 0.2500
0.23 25.00 0.332 1.87
19 0+975 KA 0.2000
0.42 25.00 0.332 3.44
20 1+000 KA 0.6300
0.89 25.00 0.332 7.39
21 1+025 KA 1.1500
0.73 5.00 0.332 1.20
22 1+030 KA 0.3000
490.00 77.56
622.00 102.59
1 4 Oktober 2014 0+170 KA 0.2500
0+170 -0+540(KA) 0.25 5.00 0.340 0.43
2 0+175 KA 0.2500
0.33 25.00 0.340 2.76
Lebar PEMAKAIAN Luas
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) RATA-RATA/HARI Segmen
(m) (m) ( LITER ) (m2)
3 0+200 KA 0.4000
0.43 25.00 0.340 3.61
4 0+225 KA 0.4500
0.53 25.00 0.340 4.46
5 0+250 KA 0.6000
0.60 25.00 0.340 5.10
6 0+275 KA 0.6000
0.55 25.00 0.340 4.68
7 0+300 KA 0.5000
0.47 25.00 0.340 3.95
8 0+325 KA 0.4300
0.62 25.00 0.340 5.23
9 0+350 KA 0.8000
0.86 25.00 0.340 7.31
10 0+375 KA 0.9200
0.86 25.00 0.340 7.31
11 0+400 KA 0.8000
0.61 25.00 0.340 5.19
12 0+425 KA 0.4200
0.49 25.00 0.340 4.17
13 0+450 KA 0.5600
0.46 25.00 0.340 3.87
14 0+475 KA 0.3500
0.45 25.00 0.340 3.83
15 0+500 KA 0.5500
0.65 25.00 0.340 5.53
16 0+525 KA 0.7500
0.65 15.00 0.340 3.32
17 0+540 KA 0.5500
370.00 70.72
1 4 Oktober 2014 0+070 KI 0.4000
0+070 -0+405(KI) 0.40 5.00 0.340 0.68
2 0+075 KI 0.4000
0.50 25.00 0.340 4.25
3 0+100 KI 0.6000
0.60 25.00 0.340 5.10
4 0+125 KI 0.6000
0.60 25.00 0.340 5.10
5 0+150 KI 0.6000
0.60 25.00 0.340 5.10
6 0+175 KI 0.6000
0.60 25.00 0.340 5.10
7 0+200 KI 0.6000
0.58 25.00 0.340 4.89
8 0+225 KI 0.5500
0.55 25.00 0.340 4.68
9 0+250 KI 0.5500
0.58 25.00 0.340 4.89
10 0+275 KI 0.6000
0.60 25.00 0.340 5.10
11 0+300 KI 0.6000
0.55 25.00 0.340 4.68
12 0+325 KI 0.5000
0.54 25.00 0.340 4.55
13 0+350 KI 0.5700
0.54 25.00 0.340 4.55
14 0+375 KI 0.5000
0.55 25.00 0.340 4.68
15 0+400 KI 0.6000
0.60 5.00 0.340 1.02
16 0+405 KI 0.6000
335.00 64.35
705.00 135.07
1 5 Oktober 2014 0+000 KI 0.4000
0+00 -0+070(KI) 0.40 25.00 0.318 3.18
2 0+025 KI 0.4000
0.35 25.00 0.318 2.78
3 0+050 KI 0.3000
0.35 20.00 0.318 2.23
4 0+070 KI 0.4000
70.00 8.19
5 Oktober 2014
1 0+00 -0+170(KA) 0+000 KA 0.2000
0.20 25.00 0.318 1.59
2 0+025 KA 0.2000
0.20 25.00 0.318 1.59
3 0+050 KA 0.2000
0.40 25.00 0.318 3.18
4 0+075 KA 0.6000
0.40 25.00 0.318 3.18
5 0+100 KA 0.2000
0.20 25.00 0.318 1.59
6 0+125 KA 0.2000
0.43 25.00 0.318 3.38
7 0+150 KA 0.6500
0.45 20.00 0.318 2.86
8 0+170 KA 0.2500
170.00 17.37
240.00 25.56
TOTAL 3,000.00 538.14
Lebar PEMAKAIAN Luas
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) RATA-RATA/HARI Segmen
(m) (m) ( LITER ) (m2)
-
Disetujui Oleh : Diperiksa oleh : Penyedia Jasa
Pengawas Lapangan Konsultan Supervisi CV. LEMBANG JAYA
PT. KARPA Jo. CV. Hendra Co

ASEP JUHARA,ST.M.Si IMAN FIRMAN, ST M. IRZAL FAHLEVI, AM.d


NIP. 1966 1010 2009 01 1 001 Site Engineer Penanggung Jawab Teknik
PERHITUNGAN KUANTITAS
Nama Kegiatan : REHABILITASI JALAN DAN JEMBATAN PROVINSI BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II
Nama Paket : REHABILITASI JALAN RUAS JALAN CIKEMBAR - CIKEMBANG ( 1,00 KM )
Lokasi : RUAS JALAN CIKEMBAR - CIKEMBANG
No. Kontrak : 602/Ktr.27/ 209/BPJ.WIL.PEL.II
Tgl. Kontrak : 28 JULI 2015
Penyedia Jasa : CV. LEMBANG JAYA
Jenis Pekerjaan : LASTON LAPIS ANTARA AC - BC MC No. :
Periode Bulan :

Lokasi Tebal Berat Isi Kontrol Berat


Berat Tebal Kadar Aspal Tebal Koreksi
No. Tanggal Segmen Luas Hasil Core Hasil Core Hasil Tiket Berat Hasil Kadar Aspal Kepadatan Rencana JMF Diterima Kadar Aspal Volume Terbayar Ket.
Dari Ke Drill Drill Perhitungan Selisih

Ki/Ka M2 Cm Gr/Cm3 Ton Ton % % % Cm % Cm M3


a b c d e f g h i j=(fxg)/(100xh) k=(i-j)/j l m n o p=min(g,n) q=l/o r=(fxp)/(100xq) s

1 30 September 2014 1+240 1+500 KI 162.25 4.74 2.20 4.00 3.50 0.14 5.82 5.00 5.80 4.74 1.00 7.69
2 1 Oktober 2014 1+025 1+240 KI 269.63 4.66 2.20 6.00 5.71 0.05 5.81 5.00 5.80 4.66 1.00 12.56
1+300 1+500 KA
3 2 Oktober 2014 0+537 1+025 KI 429.15 4.79 2.20 10.00 9.34 0.07 5.87 5.00 5.80 4.79 1.00 20.56
1+030 1+300 KA
4 3 Oktober 2014 0+405 0+537 KI 309.03 4.82 2.20 7.00 6.77 0.03 5.86 5.00 5.80 4.82 1.00 14.90
0+540 1+030 KA
5 4 Oktober 2014 0+070 0+405 KI 397.25 4.72 2.20 9.00 8.52 0.06 5.85 5.00 5.80 4.72 1.00 18.75
0+170 0+540 KA
6 5 Oktober 2014 0+000 0+070 KI 80.38 4.73 2.20 2.00 1.73 0.16 5.85 5.00 5.80 4.73 1.00 3.80
0+000 0+170 KA
1,647.69 38.00 35.57 78.26
1,647.69

Disetujui Oleh : Diperiksa oleh : Dibuat oleh :


Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PT. KARPA Jo. CV. Hendra Co PT. Angkasa Teknik Raya

ASEP JUHARA,ST.M.Si IMAN FIRMAN, ST M. IRZAL FAHLEVI, AM.d


NIP. 1966 1010 2009 01 1 001 Site Engineer Penanggung Jawab Teknik
PERHITUNGAN KUANTITAS
Nama Kegiatan : REHABILITASI JALAN DAN JEMBATAN PROVINSI BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II
Nama Paket : REHABILITASI JALAN RUAS JALAN CIKEMBAR - CIKEMBANG ( 1,00 KM )
Lokasi : RUAS JALAN CIKEMBAR - CIKEMBANG
No. Kontrak : 602/Ktr.27/ 209/BPJ.WIL.PEL.II
Tgl. Kontrak : 28 JULI 2015
Penyedia Jasa : CV. LEMBANG JAYA
Jenis Pekerjaan : laston Lapis Aus AC - WC MC No. :
Periode Bulan :

Lokasi Tebal Berat Isi Berat Hasil Kontrol Berat Koreksi


Kadar Tebal Kadar Koreksi Luas
No. Tanggal Segmen Luas Hasil Core Hasil Core Tiket Berat Hasil Aspal Kepadatan Rencana Aspal JMF Tebal Kadar Terbayar Keterangan
Dari Ke Drill Drill Selisih Aspal
Perhitungan

Ki/Ka M2 Cm Gr/Cm3 Ton Ton % % % Cm % M2


a b c d e f g h i j=(fxgXH)/(100) k=(i-j)/j l m n o p=n/g q=l/o r=fxpxq s

1 22 Oktober 2015 0+000 0+450 ki Err:509 4.78 2.175 - - - 6.15 2.203 4.80 6.10 1.00 1.00 -

0+000 0+450 ka

2 23 Oktober 2015 0+395 1+050 Ki 1,427.50 4.49 2.170 140.00 139.09 0.007 6.15 4.80 6.10 0.94 1.00 1,335.31

3 24 Oktober 2015 0+321 1+050 Ka 1,056.50 4.59 2.170 106.00 105.23 0.007 6.13 4.80 6.10 0.96 1.00 1,010.28

4 25 Oktober 2015 0+000 0+395 ki Err:509 4.83 2.169 - - - 6.12 4.80 6.10 1.00 1.00 -

0+000 0+321 ka

5 26 Oktober 2015 0+000 0+525 ki Err:509 4.88 2.170 - - - 6.14 4.80 6.10 1.00 1.00 -

6 27 Oktober 2015 0+000 0+525 ka 721.50 4.60 2.170 73.00 72.02 0.014 6.11 4.80 6.10 0.96 1.00 691.44
- - - -
-
Disetujui Oleh : Diperiksa oleh : Dibuat oleh :
Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PT. KARPA Jo. CV. Hendra Co PT. Angkasa Teknik Raya

ASEP JUHARA,ST.M.Si IMAN FIRMAN, ST M. IRZAL FAHLEVI, AM.d


NIP. 1966 1010 2009 01 1 001 Site Engineer Penanggung Jawab Teknik
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang -
DIREKTORAT JENDERAL BINA MARGA Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawa: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksa : PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 02
Pekerjaan : AC-BASE
Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan
No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
S t r i p M a p
Lokasi : Sta 0+86+250~87+250

Lokasi Kontrol Berat


Tebal Hasil Berat Isi Hasil Berat Hasil Kadar Tebal Kadar Berat Isi Tebal Volume Volume
Posisi Luas Berat Hasil Kepadatan Volume Diterima Koreksi Ket.
No. Tanggal Dari Ke Core Drill Core Drill Tiket Selisih Aspal Rencana Aspal JMF JSD Diterima Terukur Terbayar
Perhitungan Kadar Aspal
Ki/Ka M2 Cm Gr/Cm3 Ton Ton % % % Cm % Gr/Cm3 Cm Ton Ton Ton
a b c d e f g h i j=(fxgxh)/(100) k=(i-j)/j l m n o p q=min(g,n) r=(fxqxh)/(100) s=min(i,j) t=l/o t=sxt u

1 14 Agustus 2021 0+028 0+053 L1 89.25 9.2 2.206 19.00 18.04 0.053 98.30 7.00 2.244 7.0 13.78 18.04 18.04
0+053 0+078 L1 90.88 8.4 2.234 18.00 17.08 0.054 4.61 99.55 7.00 4.60 2.244 7.0 14.21 17.08 1.000 17.08
0+078 0+091 L1 47.45 8.3 2.250 9.00 8.82 0.020 100.25 7.00 2.244 7.0 7.47 8.82 8.82

2 16 Agustus 2021 0+091 0+200 L1 396.22 6.8 2.224 60.00 59.48 0.009 99.12 7.00 2.244 6.8 59.48 59.48 59.48
4.61 4.60 1.000
0+200 0+350 L1 572.25 6.9 2.234 89.00 88.64 0.004 99.57 7.00 2.244 6.9 88.64 88.64 88.64

3 18 Agustus 2021 0+350 0+450 L1 389.50 7.0 2.238 62.00 61.02 0.016 99.75 7.00 2.244 7.0 61.02 61.02 61.02
4.62 4.60 1.000
0+450 0+600 L1 556.50 7.0 2.234 88.00 87.02 0.011 99.55 7.00 2.244 7.0 87.02 87.02 87.02

18 Agustus 2021 0+028 0+100 L2 263.88 7.1 2.228 42.00 41.45 0.013 99.30 7.00 2.244 7.0 41.16 41.45 41.45
0+100 0+200 L2 356.50 7.1 2.233 57.00 56.11 0.016 99.50 7.00 2.244 7.0 55.71 56.11 56.11
0+200 0+300 L2 338.50 7.0 2.245 54.00 53.19 0.015 4.62 100.05 7.00 4.60 2.244 7.0 53.19 53.19 1.000 53.19
0+300 0+400 L2 338.50 6.7 2.240 52.00 51.04 0.019 99.80 7.00 2.244 6.7 51.04 51.04 51.04
0+400 0+500 L2 347.00 6.9 2.240 54.00 53.62 0.007 99.80 7.00 2.244 6.9 53.62 53.62 53.62

4 19 Agustus 2021 0+600 0+700 L1 366.00 6.7 2.232 56.00 54.99 0.018 99.45 7.00 2.244 6.7 54.99 54.99 54.99
0+700 0+800 L1 358.50 7.2 2.236 58.00 57.45 0.010 99.65 7.00 2.244 7.0 56.11 57.45 57.45
4.60 4.60 1.000
0+800 0+900 L1 346.50 7.1 2.234 56.00 54.95 0.019 99.55 7.00 2.244 7.0 54.18 54.95 54.95
0+900 1+000 L1 356.50 7.2 2.235 58.00 57.63 0.006 99.60 7.00 2.244 7.0 55.77 57.63 57.63
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang -
DIREKTORAT JENDERAL BINA MARGA Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawa: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksa : PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 02
Pekerjaan : AC-BASE
Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan
No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
S t r i p M a p
Lokasi : Sta 0+86+250~87+250

Lokasi Kontrol Berat


Tebal Hasil Berat Isi Hasil Berat Hasil Kadar Tebal Kadar Berat Isi Tebal Volume Volume
Posisi Luas Berat Hasil Kepadatan Volume Diterima Koreksi Ket.
No. Tanggal Dari Ke Core Drill Core Drill Tiket Selisih Aspal Rencana Aspal JMF JSD Diterima Terukur Terbayar
Perhitungan Kadar Aspal
Ki/Ka M2 Cm Gr/Cm3 Ton Ton % % % Cm % Gr/Cm3 Cm Ton Ton Ton
a b c d e f g h i j=(fxgxh)/(100) k=(i-j)/j l m n o p q=min(g,n) r=(fxqxh)/(100) s=min(i,j) t=l/o t=sxt u
5 20 Agustus 2021 0+500 0+600 L2 343.00 6.8 2.225 52.00 51.52 0.009 99.18 7.00 2.244 6.8 51.52 51.52 51.52
0+600 0+700 L2 349.50 7.4 2.229 58.00 57.76 0.004 4.61 99.35 7.00 4.60 2.244 7.0 54.54 57.76 1.000 57.76
0+700 0+800 L2 364.00 7.6 2.229 62.00 61.26 0.012 99.35 7.00 2.244 7.0 56.80 61.26 61.26

6 21 Agustus 2021 0+800 0+900 L2 372.50 7.0 2.229 59.00 58.13 0.015 99.35 7.00 2.244 7.0 58.13 58.13 58.13
4.60 4.60 1.000
0+900 1+000 L2 362.50 6.9 2.233 56.00 55.84 0.003 99.50 7.00 2.244 6.9 55.84 55.84 55.84

B JUMLAH 7,005.42 1,105.04 1,084.22 1,105.04 1,105.04


C 1,108.46
Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,
PELAKSANA TEKNIK ( Koor. PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. BARKAH HIDAYAT ST. SUSI FEBRIANA


NIP. 19680101 200701 1008 Quantity Engineer Quantity Surveyor
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo -
DIREKTORAT JENDERAL BINA MARGA Lohbener - Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana: PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1 6.3.(a) Laston Lapis Antara (AC_BC)

BACK UP MC-3
Lokasi : KM 146+150~146+600

SUMARY QUANTITY
1 AC-BC
VOLUME DIBAYAR
NO STA STA KI KA PANJANG
(TON) (TON) KETERANGAN
1 0+122 0+550 KA 1 428.00 192.48
2 0+550 0+512 KA 2 38.00 13.75
3 0+512 0+130 KA 2 382.00 132.43

TOTAL 338.66 338.66

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK ( Koor. PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

SENDY REZA DAVIAN, ST. MT. BARKAH HIDAYAT ST. MOCHAMAD RONDI
NIP. 1986 1122 201012 1 004 Quantity Engineer SEM
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksan : PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 03
Pekerjaan : AC-BC
Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan
No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
S t r i p M a p
Lokasi : KM 146+150~146+600
4.8

Perhitungan CORE DRILL Kadar Kadar Koreksi TONASE


Lokasi Tingkat
Tebal Volume Aspal Aspal Kadar Dihampar Tiket Dibayar
Tebal BJ. LAP BJ JMF
NO Tanggal Posisi Panjang Lebar Luas Hasil Core Diterima Lap. JMF Aspal
Dari Ke Rencana Kepadatan AC-BC AC-BC AC-BC
Drill Terukur
(M) (M) (M2) (CM) (CM) (CM) (Ton) (gr/Cm3) (gr/Cm3) (%) (%) (%) (TON) (TON) (TON)
0 1 2 3 4 5 6 8 =5x6 9 10 11 12=(11*8*13)/100 13 14 15 16 17=15/16 18 19=(8*11*13)/100 20.00 21=min(19,20)
1 13 September 2021 0+122 0+200 KA 1 78.00 4.00 312.00 5.3 5.00 5.00 34.78 2.230 2.232 4.80 4.80 1.00 99.89 34.78
0+200 0+300 KA 1 100.00 4.00 400.00 5.5 5.00 5.00 44.47 2.224 2.232 4.80 4.80 1.00 99.62 44.47
0+300 0+400 KA 1 100.00 4.00 400.00 5.3 5.00 5.00 44.30 2.215 2.232 4.80 4.80 1.00 99.25 44.30
0+400 0+550 KA 1 150.00 4.00 600.00 5.4 5.00 5.00 66.70 2.223 2.232 4.80 4.80 1.00 99.61 66.70
Transisi 2.23
SUB TOTAL 1 192.48 193.40 192.48
2 14 September 2021 0+550 0+512 KA 2 38.00 3.25 123.50 6.6 5.00 5.00 13.75 2.227 2.232 4.81 4.80 1.00 99.75 13.75
SUB TOTAL 2 13.75 13.77 13.75
3 16 September 2021 0+512 0+400 KA 2 112.00 3.25 364.00 4.7 5.00 4.68 37.79 2.217 2.232 4.81 4.80 1.00 99.32 37.79
0+400 0+300 KA 2 100.00 3.25 325.00 4.6 5.00 4.62 33.48 2.231 2.232 4.81 4.80 1.00 99.96 33.48
0+300 0+200 KA 2 100.00 3.25 325.00 5.1 5.00 5.00 35.91 2.210 2.232 4.81 4.80 1.00 99.00 35.91
0+200 0+130 KA 2 70.00 3.25 227.50 5.6 5.00 5.00 25.25 2.220 2.232 4.81 4.80 1.00 99.46 25.25
SUB TOTAL 3 132.43 132.58 132.43
TOTAL 338.66 339.75 338.66

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK (PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. SUNARYO SUSI FEBRIANA


NIP. 19680101 200701 1008 Inspektor 1 Quantity Surveyor
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo -
DIREKTORAT JENDERAL BINA MARGA Lohbener - Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana: PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1 6.3.(a) Laston Lapis Antara (AC_BC)

BACK UP MC-3
Lokasi : KM 147+020~148+000

SUMARY QUANTITY
1 AC-BC
NO STA STA KI KA PANJANG VOLUME (TON) KETERANGAN
1 0+980 0+273 KA 1 707.00
484.75
2 0+980 0+415 KA 2 565.00
3 0+273 0+000 KA 1 273.00
271.05
4 0+415 0+000 KA 2 415.00

TOTAL 755.80

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK ( Koor. PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

SENDY REZA DAVIAN, ST. MT. BARKAH HIDAYAT ST. MOCHAMAD RONDI
NIP. 1986 1122 201012 1 004 Quantity Engineer SEM
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang -
DIREKTORAT JENDERAL BINA MARGA Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana: PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 03
Pekerjaan : AC-BC
Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan
No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
S t r i p M a p
Lokasi : KM 147+020~148+000

Perhitungan CORE DRILL Kadar Kadar Koreksi TONASE


Lokasi Tingkat
Tebal Volume Aspal Aspal Kadar Di terima Tiket Dibayar
Tebal BJ. LAP BJ JMF
NO Tanggal Posisi Panjang Lebar Luas Hasil Core Diterima Lap. JMF Aspal
Dari Ke Rencana Kepadatan AC-BC AC-BC AC-BC
Drill Terukur
(M) (M) (M2) (CM) (CM) (CM) (Ton) (gr/Cm3) (gr/Cm3) (%) (%) (%) (TON) (TON) (TON)
0 1 2 3 4 5 6 8 =5x6 9 10 11 12=(11*8*13)/100 13 14 15 16 17=15/16 18 19=(8*11*13)/100 20 21=min(19,20)
1 12 September 2021 0+980 0+900 KA 1 80.00 4.00 320.00 4.5 5.00 4.50 31.66 2.198 2.232 4.81 4.80 1.00 98.50 31.66
0+900 0+800 KA 1 100.00 4.00 400.00 4.5 5.00 4.46 39.08 2.192 2.232 4.81 4.80 1.00 98.19 39.08
0+800 0+700 KA 1 100.00 4.00 400.00 4.7 5.00 4.65 40.80 2.194 2.232 4.81 4.80 1.00 98.29 40.80
0+700 0+600 KA 1 100.00 4.00 400.00 4.3 5.00 4.27 37.40 2.192 2.232 4.81 4.80 1.00 98.19 37.40
0+600 0+500 KA 1 100.00 4.00 400.00 4.6 5.00 4.57 40.32 2.207 2.232 4.81 4.80 1.00 98.89 40.32
0+500 0+400 KA 1 100.00 4.00 400.00 4.6 5.00 4.62 40.68 2.203 2.232 4.81 4.80 1.00 98.70 40.68
0+400 0+300 KA 1 100.00 4.00 400.00 4.4 5.00 4.35 38.15 2.193 2.232 4.81 4.80 1.00 98.23 38.15
0+300 0+273 KA 1 27.00 4.00 108.00 4.7 5.00 4.67 11.10 2.203 2.232 4.81 4.80 1.00 98.69 11.10
Transisi 5.54
SUB TOTAL 1 284.73
0+980 0+900 KA 2 80.00 3.25 260.00 5.25 5.00 5.00 28.62 2.202 2.232 4.81 4.80 1.00 98.64 28.62
0+900 0+800 KA 2 100.00 3.25 325.00 5.3 5.00 5.00 35.61 2.192 2.232 4.81 4.80 1.00 98.19 35.61
0+800 0+700 KA 2 100.00 3.25 325.00 5.0 5.00 4.97 35.37 2.191 2.232 4.81 4.80 1.00 98.18 35.37
0+700 0+600 KA 2 100.00 3.25 325.00 5.4 5.00 5.00 35.65 2.194 2.232 4.81 4.80 1.00 98.30 35.65
0+600 0+500 KA 2 100.00 3.25 325.00 5.4 5.00 5.00 35.63 2.193 2.232 4.81 4.80 1.00 98.24 35.63
0+500 0+415 KA 2 85.00 3.25 276.25 4.8 5.00 4.82 29.14 2.190 2.232 4.81 4.80 1.00 98.11 29.14
SUB TOTAL 2 200.02
SUB TOTAL 1+2 484.75 485.33 484.75
Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,
PELAKSANA TEKNIK (PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. SUNARYO SUSI FEBRIANA


KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang -
DIREKTORAT JENDERAL BINA MARGA Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana: PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 03
Pekerjaan : AC-BC
Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan
No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
S t r i p M a p
Lokasi : KM 147+020~148+000

Perhitungan CORE DRILL Kadar Kadar Koreksi TONASE


Lokasi Tingkat
Tebal Volume Aspal Aspal Kadar Di terima Tiket Dibayar
Tebal BJ. LAP BJ JMF
NO Tanggal Posisi Panjang Lebar Luas Hasil Core Diterima Lap. JMF Aspal
Dari Ke Rencana Kepadatan AC-BC AC-BC AC-BC
Drill Terukur
(M) (M) (M2) (CM) (CM) (CM) (Ton) (gr/Cm3) (gr/Cm3) (%) (%) (%) (TON) (TON) (TON)
0 1 2 3 4 5 6 8 =5x6 9 10 11 12=(11*8*13)/100 13 14 15 16 17=15/16 18 19=(8*11*13)/100 20 21=min(19,20)

NIP. 19680101 200701 1008 Inspektor 1 Quantity Surveyor


KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang -
DIREKTORAT JENDERAL BINA MARGA Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana: PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 03
Pekerjaan : AC-BC
Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan
No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
S t r i p M a p
Lokasi : KM 147+020~148+000

Perhitungan CORE DRILL Kadar Kadar Koreksi TONASE


Lokasi Tingkat
Tebal Volume Aspal Aspal Kadar Di terima Tiket Dibayar
Tebal BJ. LAP BJ JMF
NO Tanggal Posisi Panjang Lebar Luas Hasil Core Diterima Lap. JMF Aspal
Dari Ke Rencana Kepadatan AC-BC AC-BC AC-BC
Drill Terukur
(M) (M) (M2) (CM) (CM) (CM) (Ton) (gr/Cm3) (gr/Cm3) (%) (%) (%) (TON) (TON) (TON)
0 1 2 3 4 5 6 8 =5x6 9 10 11 12=(11*8*13)/100 13 14 15 16 17=15/16 18 19=(8*11*13)/100 20 21=min(19,20)
2 13 September 2021 0+273 0+100 KA 1 173.00 4.00 692.00 5.6 5.00 5.00 77.09 2.228 2.232 4.80 4.80 1.00 99.82 77.09
0+100 0+000 KA 1 100.00 4.00 400.00 5.1 5.00 5.00 44.40 2.220 2.232 4.80 4.80 1.00 99.45 44.40
SUB TOTAL 3 121.49
0+415 0+300 KA 2 115.00 3.25 373.75 5.03 5.00 5.00 41.55 2.223 2.232 4.80 4.80 1.00 99.62 41.55
0+300 0+200 KA 2 100.00 3.25 325.00 5.15 5.00 5.00 36.27 2.232 2.232 4.80 4.80 1.00 100.00 36.27
0+200 0+100 KA 2 100.00 3.25 325.00 4.7 5.00 4.72 34.06 2.222 2.232 4.80 4.80 1.00 99.54 34.06
0+100 0+000 KA 2 100.00 3.25 325.00 5.4 5.00 5.00 36.23 2.229 2.232 4.80 4.80 1.00 99.88 36.23
SUB TOTAL 4 148.11
TRANSISI 1.45
SUB TOTAL 3+4 271.05 271.40 271.05
TOTAL 755.80 756.73 755.80
Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,
PELAKSANA TEKNIK (PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. SUNARYO SUSI FEBRIANA


NIP. 19680101 200701 1008 Inspektor 1 Quantity Surveyor
MC 03
AC BC PEN DEV TIKET-MC ACWC MOD DEV TIKET- AC-BASE DEV TIKET-MC
URAIAN TIKET TIKET UP ACBC MOD RENC TIKET TIKET UP DEV TIKET-MC 03 TIKET TIKET UP TIKET TIKET UP
RENC 03 RENC MC 03 RENC 03

KM 146+150~146+600 338.66 318.89 339.75 -19.77


KM 147+020~148+000 755.80 738.48 756.73 -17.32 0.00 31.33 0.00 0.00
KM 151+850~153+750 (SEGMEN 3) 0.00 0.00 0.00 0.00 0.00 29.42 0.00 0.00
KM 91+750 ~ 90+400 (SEGMEN 4) 1749.32 Err:509 1752.92 0.00 0.00
KM 80+100~79+550 937.20 8.55 938.47 0.00 95.98 88.35 96.22 -7.63 68.86 75.82 69.00 0.00
KM 51 +655 ~ 49+750 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509 0.00
TOTAL 0.0000 0.00 0.00 0.00 0.0000 0.00 0.00 0.00 0.0000 0.00 0.00 0.00 0.0000 0.00 0.00 0.00
MC 02
TIKET AC-BC TIKET AC-WC TIKET
URAIAN AC BASE MOD DEV DEV DEV
ASLI MOD ASLI MOD ASLI
KM 87+250~86+250 1108.46 1087.33 21.13 1131.23 1037.06 94.17 810.02 760.27 49.75
TOTAL 1108.456 1087.330 21.126 1131.233 1037.060 94.173 810.018 760.270 49.748
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksan : PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 03
Pekerjaan : AC-BC MOD
Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan
No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
S t r i p M a p
Lokasi : KM 147+020~148+000

AC-BC MOD

Perhitungan CORE DRILL Kadar Kadar Koreksi TONASE


Lokasi Tingkat
Tebal Volume Aspal Aspal Kadar Di terima Tiket Dibayar
Tebal BJ. LAP BJ JMF
NO Tanggal Posisi Panjang Lebar Luas Hasil Core Diterima Lap. JMF Aspal
Dari Ke Rencana Kepadatan AC-BC mod AC-BC mod AC-BC mod
Drill Terukur
(M) (M) (M2) (CM) (CM) (CM) (Ton) (gr/Cm3) (gr/Cm3) (%) (%) (%) (TON) (TON) (TON)
0 1 2 3 4 5 6 8 =5x6 9 10 11 12=(11*8*13)/100 13 14 15 16 17=15/16 18 19=(8*11*13)/100 20.00 21=min(19,20)
1 25 September 2021
TRANSISI 1 0+000 0+015 15.00 3.65 11.57 14.17 11.57
TRANSISI 2 0+980 0+965 15.00 3.65 11.57 17.16 11.57

TOTAL 0.00 0.00 0.00


Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,
PELAKSANA TEKNIK (PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. BARKAH HIDAYAT ST. SUSI FEBRIANA


NIP. 19680101 200701 1008 Quantity Engineer Quantity Surveyor
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo -
DIREKTORAT JENDERAL BINA MARGA Lohbener - Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana: PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1 AC-WC MOD

BACK UP MC-4
Lokasi : KM 146+150~146+600 (SEGMEN 1)

SUMARY QUANTITY
1 AC-WC MOD
NO STA STA KI KA PANJANG VOLUME (TON) KETERANGAN
1 0+127 0+130 1 1.21
2 0+545 0+548 1 1.22
12.17
3 0+115 0+127 1 4.86
4 0+548 0+560 1 4.87

TOTAL 12.17

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK ( Koor. PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

SENDY REZA DAVIAN, ST. MT. BARKAH HIDAYAT ST. MOCHAMAD RONDI
NIP. 1986 1122 201012 1 004 Quantity Engineer SEM
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksan : PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 04
Pekerjaan : AC-WC MOD
Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan
No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
S t r i p M a p
Lokasi : KM 146+150~146+600 (SEGMEN 1)

Perhitungan CORE DRILL Kadar Kadar Koreksi TONASE


Lokasi Tingkat
Tebal Volume Aspal Aspal Kadar Di terima Tiket Dibayar
Tebal BJ. LAP BJ JMF
NO Tanggal Posisi Panjang Lebar Luas Hasil Core Diterima Lap. JMF Aspal AC-WC
Dari Ke Rencana Kepadatan AC-WC mod AC-WC mod
Drill Terukur mod
(M) (M) (M2) (CM) (CM) (CM) (Ton) (gr/Cm3) (gr/Cm3) (%) (%) (%) (TON) (TON) (TON)
0 1 2 3 4 5 6 8 =5x6 9 10 11 12=(11*8*13)/100 13 14 15 16 17=15/16 18 19=(8*11*13)/100 20.00 21=min(19,20)
1 26 September 2021
TRANSISI 1 0+127 0+130 KA 1 3.00 3.65 10.95 5.00 5.00 5.00 1.21 2.219 2.230 4.81 4.80 1.00 99.51 1.21
TRANSISI 2 0+545 0+548 KA 1 3.00 3.65 10.95 5.00 5.00 5.00 1.22 2.220 2.230 4.81 4.80 1.00 99.55 1.22

TRANSISI 1 0+115 0+127 KA 1 12.00 3.65 43.80 5.00 5.00 5.00 4.86 2.220 2.230 4.81 4.80 1.00 99.55 4.86
TRANSISI 2 0+548 0+560 KA 1 12.00 3.65 43.80 5.00 5.00 5.00 4.87 2.225 2.230 4.81 4.80 1.00 99.78 4.87

TOTAL 12.17 12.19 12.17


Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,
PELAKSANA TEKNIK (PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. SUNARYO SUSI FEBRIANA


NIP. 19680101 200701 1008 Inspektor 1 Quantity Surveyor
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo -
DIREKTORAT JENDERAL BINA MARGA Lohbener - Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana: PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1 AC-BC MOD

BACK UP MC-4
Lokasi : KM 146+150~146+600 (SEGMEN 1)

SUMARY QUANTITY
1 AC-BC MOD
NO STA STA KI KA PANJANG VOLUME (TON) KETERANGAN
1 0+118 0+127 1 9.00 14.55
2 0+548 0+557 1 9.00

TOTAL 14.55

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK ( Koor. PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

SENDY REZA DAVIAN, ST. MT. BARKAH HIDAYAT ST. MOCHAMAD RONDI
NIP. 1986 1122 201012 1 004 Quantity Engineer SEM
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksan : PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 04
Pekerjaan : AC-BC MOD
Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan
No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
S t r i p M a p
Lokasi : KM 146+150~146+600 (SEGMEN 1)

Perhitungan CORE DRILL Kadar Kadar Koreksi TONASE


Lokasi Tingkat
Tebal Volume Aspal Aspal Kadar Di terima Tiket Dibayar
Tebal BJ. LAP BJ JMF
NO Tanggal Posisi Panjang Lebar Luas Hasil Core Diterima Lap. JMF Aspal
Dari Ke Rencana Kepadatan AC-BC mod AC-BC mod AC-BC mod
Drill Terukur
(M) (M) (M2) (CM) (CM) (CM) (Ton) (gr/Cm3) (gr/Cm3) (%) (%) (%) (TON) (TON) (TON)
0 1 2 3 4 5 6 8 =5x6 9 10 11 12=(11*8*13)/100 13 14 15 16 17=15/16 18 19=(8*11*13)/100 20.00 21=min(19,20)
1 26 September 2021
TRANSISI 1 0+118 0+127 KA 1 9.00 3.65 32.85 20.00 20.00 20.00 14.55 2.215 2.234 4.81 4.80 1.00 99.15 7.28
TRANSISI 2 0+548 0+557 KA 1 9.00 3.65 32.85 20.00 20.00 20.00 14.54 2.213 2.234 4.81 4.80 1.00 99.06 7.27

TOTAL 14.55 14.76 14.55


Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,
PELAKSANA TEKNIK (PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. SUNARYO SUSI FEBRIANA


NIP. 19680101 200701 1008 Inspektor 1 Quantity Surveyor
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo -
DIREKTORAT JENDERAL BINA MARGA Lohbener - Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana: PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1 AC-WC MOD

BACK UP MC-4
Lokasi : KM 147+020~148+000 (SEGMEN 2)

SUMARY QUANTITY
1 AC-WC MOD
NO STA STA KI KA PANJANG VOLUME (TON) KETERANGAN
1 0+012 0+015 1 3.00
2 0+970 0+973 1 3.00

3 0+000 0+012 1 12.00 18.16


4 0+970 0+982 1 12.00

5 0+970 0+973 2 3.00


6 0+970 0+982 2 12.00

TOTAL 18.16

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK ( Koor. PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

SENDY REZA DAVIAN, ST. MT. BARKAH HIDAYAT ST. MOCHAMAD RONDI
NIP. 1986 1122 201012 1 004 Quantity Engineer SEM
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksan : PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 04
Pekerjaan : AC-WC MOD
Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan
No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
S t r i p M a p
Lokasi : KM 147+020~148+000 (SEGMEN 2)

Perhitungan CORE DRILL Kadar Kadar Koreksi TONASE


Lokasi Tingkat
Tebal Volume Aspal Aspal Kadar Di terima Tiket Dibayar
Tebal BJ. LAP BJ JMF
NO Tanggal Posisi Panjang Lebar Luas Hasil Core Diterima Lap. JMF Aspal AC-WC
Dari Ke Rencana Kepadatan AC-WC mod AC-WC mod
Drill Terukur mod
(M) (M) (M2) (CM) (CM) (CM) (Ton) (gr/Cm3) (gr/Cm3) (%) (%) (%) (TON) (TON) (TON)
0 1 2 3 4 5 6 8 =5x6 9 10 11 12=(11*8*13)/100 13 14 15 16 17=15/16 18 19=(8*11*13)/100 20.00 21=min(19,20)
1 26 September 2021
TRANSISI 1 0+012 0+015 KA 1 3.00 3.65 10.95 5.00 5.00 5.00 1.21 2.217 2.230 4.81 4.80 1.00 99.42 1.21
TRANSISI 2 0+970 0+973 KA 1 3.00 3.65 10.95 5.00 5.00 5.00 1.21 2.211 2.230 4.81 4.80 1.00 99.15 1.21
TRANSISI 1 0+000 0+012 KA 1 12.00 3.65 43.80 5.00 5.00 5.00 4.84 2.210 2.230 4.81 4.80 1.00 99.10 4.84
TRANSISI 2 0+970 0+982 KA 1 12.00 3.65 43.80 5.00 5.00 5.00 4.85 2.213 2.230 4.81 4.80 1.00 99.24 4.85
TOTAL 12.11 12.13 12.11
2 24 Oktober 2021
TRANSISI 2 0+970 0+973 KA 2 3.00 3.65 10.95 5.00 5.00 5.00 1.21 2.210 2.230 4.81 4.80 1.00 99.10 1.21
TRANSISI 2 0+970 0+982 KA 2 12.00 3.65 43.80 5.00 5.00 5.00 4.84 2.212 2.230 4.81 4.80 1.00 99.19 4.84
TOTAL 6.05 6.07 6.05
TOTAL 18.16 18.20 18.16
Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,
PELAKSANA TEKNIK (PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. SUNARYO SUSI FEBRIANA


NIP. 19680101 200701 1008 Inspektor 1 Quantity Surveyor
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo -
DIREKTORAT JENDERAL BINA MARGA Lohbener - Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana: PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1 AC-BC MOD

BACK UP MC-4
Lokasi : KM 147+020~148+000 (SEGMEN 2)

SUMARY QUANTITY
1 AC-BC MOD
NO STA STA KI KA PANJANG VOLUME (TON) KETERANGAN
1 0+003 0+012 1 9.00
2 0+970 0+979 1 9.00
36.23
3 0+970 0+979 1 9.00

TOTAL 36.23

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK ( Koor. PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

SENDY REZA DAVIAN, ST. MT. BARKAH HIDAYAT ST. MOCHAMAD RONDI
NIP. 1986 1122 201012 1 004 Quantity Engineer SEM
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksan : PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 04
Pekerjaan : AC-BC MOD
Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan
No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
S t r i p M a p
Lokasi : KM 147+020~148+000 (SEGMEN 2)

Perhitungan CORE DRILL Kadar Kadar Koreksi TONASE


Lokasi Tingkat
Tebal Volume Aspal Aspal Kadar Di terima Tiket Dibayar
Tebal BJ. LAP BJ JMF
NO Tanggal Posisi Panjang Lebar Luas Hasil Core Diterima Lap. JMF Aspal
Dari Ke Rencana Kepadatan AC-BC mod AC-BC mod AC-BC mod
Drill Terukur
(M) (M) (M2) (CM) (CM) (CM) (Ton) (gr/Cm3) (gr/Cm3) (%) (%) (%) (TON) (TON) (TON)
0 1 2 3 4 5 6 8 =5x6 9 10 11 12=(11*8*13)/100 13 14 15 16 17=15/16 18 19=(8*11*13)/100 20.00 21=min(19,20)
1 26 September 2021
TRANSISI 1 0+003 0+012 KA 1 9.00 3.65 32.85 20.00 20.00 20.00 14.52 2.210 2.230 4.81 4.80 1.00 99.10 7.26
TRANSISI 2 0+970 0+979 KA 1 9.00 3.65 32.85 20.00 20.00 20.00 14.54 2.213 2.230 4.81 4.80 1.00 99.24 7.27
TOTAL 14.53 14.57 14.53
2 24 Oktober 2021
TRANSISI 2 0+970 0+979 KA 2 9.00 3.60 32.40 20.00 20.00 20.00 14.33 2.212 2.230 4.81 4.80 1.00 99.19 7.17
TOTAL 29.06 29.12 29.06

TOTAL 36.23 36.30 36.23


Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,
PELAKSANA TEKNIK (PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. SUNARYO SUSI FEBRIANA


NIP. 19680101 200701 1008 Inspektor 1 Quantity Surveyor
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo -
DIREKTORAT JENDERAL BINA MARGA Lohbener - Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana: PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1 6.3.(7b) Laston Lapis Antara Modifikasi (AC-BC MOD)

BACK UP MC-4
Lokasi : KM 151+850~153+750 (SEGMEN 3)

SUMARY QUANTITY
1 AC-BC MOD
NO STA STA KI KA PANJANG VOLUME (TON) KETERANGAN
1 0+000 0+000 0 0.00
0.00
2 0+000 0+000 0 0.00
3 0+000 0+000 0 0.00 0.00
4 0+000 0+000 0 0.00
0.00
5 0+000 0+000 0 0.00

TOTAL 0.00

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK ( Koor. PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

SENDY REZA DAVIAN, ST. MT. BARKAH HIDAYAT ST. MOCHAMAD RONDI
NIP. 1986 1122 201012 1 004 Quantity Engineer SEM
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksan : PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 03
Pekerjaan : AC-BC MOD
Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan
No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
S t r i p M a p
Lokasi : KM 151+850~153+750 (SEGMEN 3)

Perhitungan CORE DRILL Kadar Kadar Koreksi TONASE


Lokasi Tingkat
Tebal Volume Aspal Aspal Kadar Di terima Tiket Dibayar
Tebal BJ. LAP BJ JMF
NO Tanggal Posisi Panjang Lebar Luas Hasil Core Diterima Lap. JMF Aspal
Dari Ke Rencana Kepadatan AC-BC mod AC-BC mod AC-BC mod
Drill Terukur
(M) (M) (M2) (CM) (CM) (CM) (Ton) (gr/Cm3) (gr/Cm3) (%) (%) (%) (TON) (TON) (TON)
0 1 2 3 4 5 6 8 =5x6 9 10 11 12=(11*8*13)/100 13 14 15 16 17=15/16 18 19=(8*11*13)/100 20.00 21=min(19,20)
1 22 September 2021
TRANSISI 1 0+000 0+015 15.00 3.65 11.57 13.98 11.57
TRANSISI 2 1+900 1+885 15.00 3.65 11.57 15.44 11.57

07 Oktober 2021
TRANSISI 1 0+000 0+015
TRANSISI 2 1+900 1+885

TOTAL 0.00 0.00 0.00


Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,
PELAKSANA TEKNIK (PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. SUNARYO SUSI FEBRIANA


NIP. 19680101 200701 1008 Inspektor 1 Quantity Surveyor
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo -
DIREKTORAT JENDERAL BINA MARGA Lohbener - Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana: PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1 AC-WC MOD

BACK UP MC-4
Lokasi : KM 151+850-153+750 (SEGMEN 3)

SUMARY QUANTITY
1 AC-WC MOD
NO STA STA KI KA PANJANG VOLUME (TON) KETERANGAN
1 -0+003 0+000 1 3.00
2 1+895 1+898 1 3.00

3 -0+015 -0+003 1 12.00


4 1+898 1+910 1 12.00
24.02
5 -0+003 0+000 2 3.00
6 1+895 1+898 2 3.00

7 -0+015 -0+003 2 12.00


8 1+898 1+910 2 12.00

TOTAL 24.02

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK ( Koor. PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

SENDY REZA DAVIAN, ST. MT. BARKAH HIDAYAT ST. MOCHAMAD RONDI
NIP. 1986 1122 201012 1 004 Quantity Engineer SEM
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksan : PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 04
Pekerjaan : AC-WC MOD
Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan
No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
S t r i p M a p
Lokasi : KM 151+850-153+750 (SEGMEN 3)

Perhitungan CORE DRILL Kadar Kadar Koreksi TONASE


Lokasi Tingkat
Tebal Volume Aspal Aspal Kadar Di terima Tiket Dibayar
Tebal BJ. LAP BJ JMF
NO Tanggal Posisi Panjang Lebar Luas Hasil Core Diterima Lap. JMF Aspal AC-WC
Dari Ke Rencana Kepadatan AC-WC mod AC-WC mod
Drill Terukur mod
(M) (M) (M2) (CM) (CM) (CM) (Ton) (gr/Cm3) (gr/Cm3) (%) (%) (%) (TON) (TON) (TON)
0 1 2 3 4 5 6 8 =5x6 9 10 11 12=(11*8*13)/100 13 14 15 16 17=15/16 18 19=(8*11*13)/100 20.00 21=min(19,20)
1 26 September 2021
TRANSISI 1 -0+003 0+000 KA 1 3.00 3.65 10.95 5.00 5.00 5.00 1.21 2.215 2.230 5.00 5.10 1.00 99.33 1.21
TRANSISI 2 1+895 1+898 KA 1 3.00 3.65 10.95 5.00 5.00 5.00 1.21 2.210 2.230 5.00 5.10 1.00 99.10 1.21

TRANSISI 1 -0+015 -0+003 KA 1 12.00 3.65 43.80 5.00 5.00 5.00 4.84 2.209 2.230 5.00 5.10 1.00 99.06 4.84
TRANSISI 2 1+898 1+910 KA 1 12.00 3.65 43.80 5.00 5.00 5.00 4.82 2.200 2.230 5.00 5.10 1.00 98.65 4.82

2 26 September 2021
TRANSISI 1 -0+003 0+000 KA 2 3.00 3.60 10.80 5.00 5.00 5.00 1.19 2.210 2.230 5.00 5.10 1.00 99.10 1.19
TRANSISI 2 1+895 1+898 KA 2 3.00 3.60 10.80 5.00 5.00 5.00 1.19 2.211 2.230 5.00 5.10 1.00 99.15 1.19

TRANSISI 1 -0+015 -0+003 KA 2 12.00 3.6 43.20 5.00 5.00 5.00 4.78 2.215 2.230 5.00 5.10 1.00 99.33 4.78
TRANSISI 2 1+898 1+910 KA 2 12.00 3.60 43.20 5.00 5.00 5.00 4.78 2.212 2.230 5.00 5.10 1.00 99.19 4.78

TOTAL 24.02 24.06 24.02


Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,
PELAKSANA TEKNIK (PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. SUNARYO SUSI FEBRIANA


NIP. 19680101 200701 1008 Inspektor 1 Quantity Surveyor
KONTRAKTOR
KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo -
DIREKTORAT JENDERAL BINA MARGA Lohbener - Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana: PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1 6.3.(7b) Laston Lapis Antara Modifikasi (AC-BC MOD)

BACK UP MC-4
Lokasi : KM 151+850-153+750 (SEGMEN 3)

SUMARY QUANTITY
1 AC-BC MOD
VOLUME
NO STA STA KI KA PANJANG KETERANGAN
(TON)
1 -0+012 -0+003 1 9.00
2 1+898 1+907 1 9.00
28.83
3 -0+012 -0+003 2 9.00
4 1+898 1+907 2 9.00

TOTAL 28.83

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK ( Koor. PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

SENDY REZA DAVIAN, ST. MT. BARKAH HIDAYAT ST. MOCHAMAD RONDI
NIP. 1986 1122 201012 1 004 Quantity Engineer SEM
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksan : PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 04
Pekerjaan : AC-BC MOD
Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan
No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
S t r i p M a p
Lokasi : KM 151+850-153+750 (SEGMEN 3)

Perhitungan CORE DRILL Kadar Kadar Koreksi TONASE


Lokasi Tingkat
Tebal Volume Aspal Aspal Kadar Di terima Tiket Dibayar
Tebal BJ. LAP BJ JMF
NO Tanggal Posisi Panjang Lebar Luas Hasil Core Diterima Lap. JMF Aspal
Dari Ke Rencana Kepadatan AC-BC mod AC-BC mod AC-BC mod
Drill Terukur
(M) (M) (M2) (CM) (CM) (CM) (Ton) (gr/Cm3) (gr/Cm3) (%) (%) (%) (TON) (TON) (TON)
0 1 2 3 4 5 6 8 =5x6 9 10 11 12=(11*8*13)/100 13 14 15 16 17=15/16 18 19=(8*11*13)/100 20.00 21=min(19,20)
1 26 September 2021
TRANSISI 1 -0+012 -0+003 KA 1 9.00 3.65 32.85 20.00 20.00 20.00 7.26 2.209 2.234 4.80 4.80 1.00 98.88 7.26
TRANSISI 2 1+898 1+907 KA 1 9.00 3.65 32.85 20.00 20.00 20.00 7.23 2.200 2.234 4.80 4.80 1.00 98.48 7.23

2 24 Oktober 2021
TRANSISI 1 -0+012 -0+003 KA 2 9.00 3.6 32.40 20.00 20.00 20.00 7.18 2.215 2.234 4.80 4.80 1.00 99.15 7.18
TRANSISI 2 1+898 1+907 KA 2 9.00 3.60 32.40 20.00 20.00 20.00 7.17 2.212 2.234 4.80 4.80 1.00 99.02 7.17

TOTAL 28.83 28.87 28.83


Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,
PELAKSANA TEKNIK (PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. SUNARYO SUSI FEBRIANA


NIP. 19680101 200701 1008 Inspektor 1 Quantity Surveyor
KONTRAKTOR
KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo -
DIREKTORAT JENDERAL BINA MARGA Lohbener - Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana: PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1 6.3.(a) Laston Lapis Antara (AC_BC)

BACK UP MC-4
Lokasi : KM 151+850-153+750 (SEGMEN 3)

SUMARY QUANTITY
1 AC-BC
VOLUME
NO STA STA KI KA PANJANG KETERANGAN
(TON)
1 0+956 0+010 1 946.00 430.07
2 0+956 1+103 1 147.00
239.40
3 0+010 0+505 2 495.00
4 0+505 1+104 2 599.00
702.05
5 1+090 0+005 1 1085.00
6 1+090 0+005 2 1085.00 377.80

TOTAL 1749.32

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK ( Koor. PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

SENDY REZA DAVIAN, ST. MT. BARKAH HIDAYAT ST. MOCHAMAD RONDI
NIP. 1986 1122 201012 1 004 Quantity Engineer SEM
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksan : PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 04
Pekerjaan : AC-BC
Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan
No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
S t r i p M a p
Lokasi : KM 77+650 ~ 76+550 (SEGMEN 7)

Perhitungan CORE DRILL Kadar Kadar Koreksi TONASE


Lokasi Tingkat
Tebal Volume Aspal Aspal Kadar Dihampar Tiket Dibayar
Tebal BJ. LAP BJ JMF
NO Tanggal Posisi Panjang Lebar Luas Hasil Core Diterima Lap. JMF Aspal
Dari Ke Rencana Kepadatan AC-BC AC-BC AC-BC
Drill Terukur
(M) (M) (M2) (CM) (CM) (CM) (Ton) (gr/Cm3) (gr/Cm3) (%) (%) (%) (TON) (TON) (TON)
0 1 2 3 4 5 6 8 =5x6 9 10 11 12=(11*8*13)/100 13 14 15 16 17=15/16 18 19=(8*11*13)/100 20.00 21=min(19,20)
1 26-Sep-21 0+956 0+900 KI 1 56.00 4.10 229.60 5.4 5.0 5.0 25.41 2.214 2.232 4.81 4.80 1.00 99.17 25.41
0+900 0+800 KI 1 100.00 4.10 410.00 5.3 5.0 5.0 45.35 2.212 2.232 4.81 4.80 1.00 99.11 45.35
0+800 0+700 KI 1 100.00 4.10 410.00 5.0 5.0 5.0 45.53 2.221 2.232 4.81 4.80 1.00 99.51 45.53
0+700 0+600 KI 1 100.00 4.10 410.00 5.5 5.0 5.0 45.55 2.222 2.232 4.81 4.80 1.00 99.55 45.55
0+600 0+500 KI 1 100.00 4.10 410.00 5.4 5.0 5.0 45.57 2.223 2.232 4.81 4.80 1.00 99.60 45.57
0+500 0+400 KI 1 100.00 4.10 410.00 5.0 5.0 5.0 45.49 2.219 2.232 4.81 4.80 1.00 99.42 45.49
0+400 0+300 KI 1 100.00 4.10 410.00 5.4 5.0 5.0 45.47 2.218 2.232 4.81 4.80 1.00 99.37 45.47
0+300 0+200 KI 1 100.00 4.10 410.00 5.7 5.0 5.0 45.51 2.220 2.232 4.81 4.80 1.00 99.46 45.51
0+200 0+100 KI 1 100.00 4.10 410.00 5.3 5.0 5.0 45.37 2.213 2.232 4.81 4.80 1.00 99.15 45.37
0+100 0+010 KI 1 90.00 4.10 369.00 5.4 5.0 5.0 40.82 2.212 2.232 4.81 4.80 1.00 99.12 40.82
SUB TOTAL 1 430.07 431.36 430.07
Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,
PELAKSANA TEKNIK (PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. SUNARYO SUSI FEBRIANA


NIP. 19680101 200701 1008 Inspektor 1 Quantity Surveyor
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksan : PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 04
Pekerjaan : AC-BC
Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan
No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
S t r i p M a p
Lokasi : KM 77+650 ~ 76+550 (SEGMEN 7)

Perhitungan CORE DRILL Kadar Kadar Koreksi TONASE


Lokasi Tingkat
Tebal Volume Aspal Aspal Kadar Dihampar Tiket Dibayar
Tebal BJ. LAP BJ JMF
NO Tanggal Posisi Panjang Lebar Luas Hasil Core Diterima Lap. JMF Aspal
Dari Ke Rencana Kepadatan AC-BC AC-BC AC-BC
Drill Terukur
(M) (M) (M2) (CM) (CM) (CM) (Ton) (gr/Cm3) (gr/Cm3) (%) (%) (%) (TON) (TON) (TON)
0 1 2 3 4 5 6 8 =5x6 9 10 11 12=(11*8*13)/100 13 14 15 16 17=15/16 18 19=(8*11*13)/100 20.00 21=min(19,20)
2 27-Sep-21 0+956 1+103 KI 1 147.00 4.10 602.70 5.0 5.0 5.0 66.69 2.213 2.232 4.80 4.80 1.00 99.15 66.69

0+010 0+100 KI 2 90.00 3.15 283.50 5.2 5.0 5.0 31.32 2.210 2.232 4.80 4.80 1.00 99.00 31.32
0+100 0+200 KI 2 100.00 3.15 315.00 5.8 5.0 5.0 34.98 2.221 2.232 4.80 4.80 1.00 99.51 34.98
0+200 0+300 KI 2 100.00 3.15 315.00 5.0 5.0 5.0 34.79 2.209 2.232 4.80 4.80 1.00 98.97 34.79
0+300 0+400 KI 2 100.00 3.15 315.00 5.0 5.0 5.0 34.82 2.211 2.232 4.80 4.80 1.00 99.06 34.82
0+400 0+505 KI 2 105.00 3.15 330.75 5.6 5.0 5.0 36.80 2.225 2.232 4.80 4.80 1.00 99.69 36.80
SUB TOTAL 2 239.40 239.88 239.40
Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,
PELAKSANA TEKNIK (PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. SUNARYO SUSI FEBRIANA


NIP. 19680101 200701 1008 Inspektor 1 Quantity Surveyor
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksan : PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 04
Pekerjaan : AC-BC
Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan
No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
S t r i p M a p
Lokasi : KM 77+650 ~ 76+550 (SEGMEN 7)

Perhitungan CORE DRILL Kadar Kadar Koreksi TONASE


Lokasi Tingkat
Tebal Volume Aspal Aspal Kadar Dihampar Tiket Dibayar
Tebal BJ. LAP BJ JMF
NO Tanggal Posisi Panjang Lebar Luas Hasil Core Diterima Lap. JMF Aspal
Dari Ke Rencana Kepadatan AC-BC AC-BC AC-BC
Drill Terukur
(M) (M) (M2) (CM) (CM) (CM) (Ton) (gr/Cm3) (gr/Cm3) (%) (%) (%) (TON) (TON) (TON)
0 1 2 3 4 5 6 8 =5x6 9 10 11 12=(11*8*13)/100 13 14 15 16 17=15/16 18 19=(8*11*13)/100 20.00 21=min(19,20)
3 29-Sep-21 0+505 0+600 KI 2 95.00 3.15 299.25 6.0 5.0 5.0 33.22 2.220 2.232 4.80 4.80 1.00 99.46 33.22
0+600 0+700 KI 2 100.00 3.15 315.00 5.0 5.0 5.0 34.89 2.215 2.232 4.80 4.80 1.00 99.24 34.89
0+700 0+800 KI 2 100.00 3.15 315.00 5.3 5.0 5.0 34.87 2.214 2.232 4.80 4.80 1.00 99.19 34.87
0+800 0+900 KI 2 100.00 3.15 315.00 5.0 5.0 5.0 34.76 2.207 2.232 4.80 4.80 1.00 98.87 34.76
0+900 1+000 KI 2 100.00 3.15 315.00 5.0 5.0 5.0 34.97 2.220 2.232 4.80 4.80 1.00 99.46 34.97
1+000 1+104 KI 2 104.00 3.15 327.60 5.1 5.0 5.0 36.15 2.207 2.232 4.80 4.80 1.00 98.87 36.15
SUB TOTAL 3 208.86
Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,
PELAKSANA TEKNIK (PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. SUNARYO SUSI FEBRIANA


NIP. 19680101 200701 1008 Inspektor 1 Quantity Surveyor
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksan : PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 04
Pekerjaan : AC-BC
Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan
No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
S t r i p M a p
Lokasi : KM 77+650 ~ 76+550 (SEGMEN 7)

Perhitungan CORE DRILL Kadar Kadar Koreksi TONASE


Lokasi Tingkat
Tebal Volume Aspal Aspal Kadar Dihampar Tiket Dibayar
Tebal BJ. LAP BJ JMF
NO Tanggal Posisi Panjang Lebar Luas Hasil Core Diterima Lap. JMF Aspal
Dari Ke Rencana Kepadatan AC-BC AC-BC AC-BC
Drill Terukur
(M) (M) (M2) (CM) (CM) (CM) (Ton) (gr/Cm3) (gr/Cm3) (%) (%) (%) (TON) (TON) (TON)
0 1 2 3 4 5 6 8 =5x6 9 10 11 12=(11*8*13)/100 13 14 15 16 17=15/16 18 19=(8*11*13)/100 20.00 21=min(19,20)
1+090 1+000 KA 1 90.00 4.10 369.00 5.3 5.0 5.0 40.79 2.211 2.232 4.80 4.80 1.00 99.06 40.79
1+000 0+900 KA 1 100.00 4.10 410.00 5.4 5.0 5.0 45.37 2.213 2.232 4.80 4.80 1.00 99.17 45.37
0+900 0+800 KA 1 100.00 4.10 410.00 5.2 5.0 5.0 45.51 2.220 2.232 4.80 4.80 1.00 99.46 45.51
0+800 0+700 KA 1 100.00 4.10 410.00 5.3 5.0 5.0 45.57 2.223 2.232 4.80 4.80 1.00 99.60 45.57
0+700 0+600 KA 1 100.00 4.10 410.00 5.0 5.0 5.0 45.53 2.221 2.232 4.80 4.80 1.00 99.51 45.53
0+600 0+500 KA 1 100.00 4.10 410.00 5.8 5.0 5.0 45.53 2.221 2.232 4.80 4.80 1.00 99.51 45.53
0+500 0+400 KA 1 100.00 4.10 410.00 5.0 5.0 5.0 45.49 2.219 2.232 4.80 4.80 1.00 99.42 45.49
0+400 0+300 KA 1 100.00 4.10 410.00 5.1 5.0 5.0 45.51 2.220 2.232 4.80 4.80 1.00 99.46 45.51
0+300 0+200 KA 1 100.00 4.10 410.00 5.2 5.0 5.0 45.36 2.213 2.232 4.80 4.80 1.00 99.14 45.36
0+200 0+100 KA 1 100.00 4.10 410.00 5.1 5.0 5.0 45.26 2.208 2.232 4.80 4.80 1.00 98.92 45.26
0+100 0+005 KA 1 95.00 4.10 389.50 5.2 5.0 5.0 43.27 2.222 2.232 4.80 4.80 1.00 99.55 43.27
SUB TOTAL 4 493.19
SUB TOTAL 3+4 702.05 703.31 702.05
Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,
PELAKSANA TEKNIK (PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. SUNARYO SUSI FEBRIANA


NIP. 19680101 200701 1008 Inspektor 1 Quantity Surveyor
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksan : PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 04
Pekerjaan : AC-BC
Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan
No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
S t r i p M a p
Lokasi : KM 77+650 ~ 76+550 (SEGMEN 7)

Perhitungan CORE DRILL Kadar Kadar Koreksi TONASE


Lokasi Tingkat
Tebal Volume Aspal Aspal Kadar Dihampar Tiket Dibayar
Tebal BJ. LAP BJ JMF
NO Tanggal Posisi Panjang Lebar Luas Hasil Core Diterima Lap. JMF Aspal
Dari Ke Rencana Kepadatan AC-BC AC-BC AC-BC
Drill Terukur
(M) (M) (M2) (CM) (CM) (CM) (Ton) (gr/Cm3) (gr/Cm3) (%) (%) (%) (TON) (TON) (TON)
0 1 2 3 4 5 6 8 =5x6 9 10 11 12=(11*8*13)/100 13 14 15 16 17=15/16 18 19=(8*11*13)/100 20.00 21=min(19,20)
4 1-Oct-21 1+090 1+000 KA 2 90.00 3.15 283.50 5.0 5.0 5.0 31.54 2.225 2.232 4.81 4.80 1.00 99.69 31.54
1+000 0+900 KA 2 100.00 3.15 315.00 5.1 5.0 5.0 34.82 2.211 2.232 4.81 4.80 1.00 99.05 34.82
0+900 0+800 KA 2 100.00 3.15 315.00 5.0 5.0 5.0 35.09 2.228 2.232 4.81 4.80 1.00 99.82 35.09
0+800 0+700 KA 2 100.00 3.15 315.00 5.0 5.0 5.0 34.93 2.218 2.232 4.81 4.80 1.00 99.37 34.93
0+700 0+600 KA 2 100.00 3.15 315.00 5.1 5.0 5.0 35.09 2.228 2.232 4.81 4.80 1.00 99.82 35.09
0+600 0+500 KA 2 100.00 3.15 315.00 5.0 5.0 5.0 34.83 2.211 2.232 4.81 4.80 1.00 99.08 34.83
0+500 0+400 KA 2 100.00 3.15 315.00 5.0 5.0 5.0 35.08 2.227 2.232 4.81 4.80 1.00 99.78 35.08
0+400 0+300 KA 2 100.00 3.15 315.00 4.9 5.0 4.9 34.45 2.217 2.232 4.81 4.80 1.00 99.33 34.45
0+300 0+200 KA 2 100.00 3.15 315.00 5.0 5.0 5.0 34.97 2.220 2.232 4.81 4.80 1.00 99.46 34.97
0+200 0+100 KA 2 100.00 3.15 315.00 4.9 5.0 4.9 33.91 2.212 2.232 4.81 4.80 1.00 99.10 33.91
0+100 0+005 KA 2 95.00 3.15 299.25 5.1 5.0 5.0 33.09 2.211 2.232 4.81 4.80 1.00 99.07 33.09
SUB TOTAL 4 377.80 378.37 377.80
TOTAL 1749.32 1752.92 1749.32
Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,
PELAKSANA TEKNIK (PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. SUNARYO SUSI FEBRIANA


NIP. 19680101 200701 1008 Inspektor 1 Quantity Surveyor
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo -
DIREKTORAT JENDERAL BINA MARGA Lohbener - Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana: PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1 6.3.(a) Laston Lapis Antara (AC_BC)

BACK UP MC-4
Lokasi : KM 74+690~74+100

SUMARY QUANTITY
1 AC-BC
VOLUME
NO STA STA KI KA PANJANG KETERANGAN
(TON)
1 0+590 0+008 KI 2 582.00
468.02
2 0+590 0+008 KI 1 582.00
3 0+590 0+008 KA 1 582.00
449.64
4 0+590 0+060 KA 2 530.00
5 0+060 0+008 KA 2 52.00 19.54

TOTAL 937.20

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK ( Koor. PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

SENDY REZA DAVIAN, ST. MT. BARKAH HIDAYAT ST. MOCHAMAD RONDI
NIP. 1986 1122 201012 1 004 Quantity Engineer SEM
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang -
DIREKTORAT JENDERAL BINA MARGA Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana: PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 04
Pekerjaan : AC-BC

Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan


No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
S t r i p M a p
Lokasi : KM 74+690~74+100 (SEGMEN 8)

Perhitungan CORE DRILL Kadar Kadar Koreksi TONASE


Lokasi Tingkat
Tebal Volume Aspal Aspal Kadar Dihampar Tiket Dibayar
Tebal BJ. LAP BJ JMF
NO Tanggal Posisi Panjang Lebar Luas Hasil Core Diterima Lap. JMF Aspal
Dari Ke Rencana Kepadatan AC-BC AC-BC AC-BC
Drill Terukur
(M) (M) (M2) (CM) (CM) (CM) (Ton) (gr/Cm3) (gr/Cm3) (%) (%) (%) (TON) (TON) (TON)
0 1 2 3 4 5 6 8 =5x6 9 10 11 12=(11*8*13)/100 13 14 15 16 17=15/16 18 19=(8*11*13)/100 20.00 21=min(19,20)
1 2 Oktober 2021 0+590 0+500 KI 2 90.00 3.15 283.50 5.0 5.0 5.0 31.53 2.224 2.232 4.81 4.80 1.00 99.64 31.53
0+500 0+400 KI 2 100.00 3.15 315.00 5.0 5.0 5.0 34.95 2.219 2.232 4.81 4.80 1.00 99.42 34.95
0+400 0+300 KI 2 100.00 3.15 315.00 5.1 5.0 5.0 34.82 2.211 2.232 4.81 4.80 1.00 99.04 34.82
0+300 0+200 KI 2 100.00 3.15 315.00 5.0 5.0 5.0 34.81 2.210 2.232 4.81 4.80 1.00 99.02 34.81
0+200 0+100 KI 2 100.00 3.15 315.00 5.1 5.0 5.0 34.89 2.215 2.232 4.81 4.80 1.00 99.24 34.89
0+100 0+008 KI 2 92.00 3.15 289.80 5.1 5.0 5.0 32.04 2.211 2.232 4.81 4.80 1.00 99.06 32.04
SUB TOTAL 1 203.04
0+590 0+500 KI 1 90.00 4.10 369.00 5.0 5.0 5.0 41.11 2.228 2.232 4.81 4.80 1.00 99.82 41.11
0+500 0+400 KI 1 100.00 4.10 410.00 5.2 5.0 5.0 45.49 2.219 2.232 4.81 4.80 1.00 99.42 45.49
0+400 0+300 KI 1 100.00 4.10 410.00 5.0 5.0 5.0 45.30 2.210 2.232 4.81 3.80 1.00 98.99 45.30
0+300 0+200 KI 1 100.00 4.10 410.00 5.2 5.0 5.0 45.47 2.218 2.232 4.81 4.80 1.00 99.37 45.47
0+200 0+100 KI 1 100.00 4.10 410.00 5.0 5.0 5.0 45.61 2.225 2.232 4.81 4.80 1.00 99.69 45.61
0+100 0+008 KI 1 92.00 4.10 377.20 5.0 5.0 5.0 42.00 2.227 2.232 4.81 4.80 1.00 99.78 42.00
SUB TOTAL 2 264.98
SUB TOTAL 1+2 468.02 468.82 468.02
Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,
PELAKSANA TEKNIK (PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. SUNARYO SUSI FEBRIANA


NIP. 19680101 200701 1008 Inspektor 1 Quantity Surveyor
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang -
DIREKTORAT JENDERAL BINA MARGA Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana: PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 04
Pekerjaan : AC-BC

Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan


No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
S t r i p M a p
Lokasi : KM 74+690~74+100 (SEGMEN 8)

Perhitungan CORE DRILL Kadar Kadar Koreksi TONASE


Lokasi Tingkat
Tebal Volume Aspal Aspal Kadar Dihampar Tiket Dibayar
Tebal BJ. LAP BJ JMF
NO Tanggal Posisi Panjang Lebar Luas Hasil Core Diterima Lap. JMF Aspal
Dari Ke Rencana Kepadatan AC-BC AC-BC AC-BC
Drill Terukur
(M) (M) (M2) (CM) (CM) (CM) (Ton) (gr/Cm3) (gr/Cm3) (%) (%) (%) (TON) (TON) (TON)
0 1 2 3 4 5 6 8 =5x6 9 10 11 12=(11*8*13)/100 13 14 15 16 17=15/16 18 19=(8*11*13)/100 20.00 21=min(19,20)
2 3 Oktober 2021 0+590 0+500 KA 1 90.00 4.10 369.00 5.0 5.0 5.0 40.83 2.213 2.232 4.81 4.80 1.00 99.15 40.83
0+500 0+400 KA 1 100.00 4.10 410.00 5.3 5.0 5.0 45.42 2.216 2.232 4.81 4.80 1.00 99.27 45.42
0+400 0+300 KA 1 100.00 4.10 410.00 5.3 5.0 5.0 45.35 2.212 2.232 4.81 4.80 1.00 99.11 45.35
0+300 0+200 KA 1 100.00 4.10 410.00 5.1 5.0 5.0 45.53 2.221 2.232 4.81 4.80 1.00 99.51 45.53
0+200 0+100 KA 1 100.00 4.10 410.00 5.1 5.0 5.0 45.61 2.225 2.232 4.81 4.80 1.00 99.69 45.61
0+100 0+008 KA 1 92.00 4.10 377.20 5.0 5.0 5.0 41.94 2.224 2.232 4.81 4.80 1.00 99.64 41.94
SUB TOTAL 3 264.68
0+590 0+500 KA 2 90.00 3.15 283.50 5.2 5.0 5.0 31.44 2.218 2.232 4.81 4.80 1.00 99.37 31.44
0+500 0+400 KA 2 100.00 3.15 315.00 5.4 5.0 5.0 34.80 2.210 2.232 4.81 4.80 1.00 99.00 34.80
0+400 0+300 KA 2 100.00 3.15 315.00 5.0 5.0 5.0 34.95 2.219 2.232 4.81 3.80 1.00 99.42 34.95
0+300 0+200 KA 2 100.00 3.15 315.00 5.2 5.0 5.0 35.04 2.225 2.232 4.81 4.80 1.00 99.69 35.04
0+200 0+100 KA 2 100.00 3.15 315.00 5.0 5.0 5.0 34.83 2.211 2.232 4.81 4.80 1.00 99.07 34.83
0+100 0+060 KA 2 40.00 3.15 126.00 5.0 5.0 5.0 13.90 2.206 2.232 4.81 4.80 1.00 98.86 13.90
SUB TOTAL 3+4 449.64 450.09 449.64
3 4 Oktober 2021 0+060 0+008 KA 2 52.00 3.15 163.80 5.0 5.0 5.0 18.13 2.214 2.232 4.81 4.80 1.00 99.18 18.13
TRANSISI 1.41
SUB TOTAL 5 19.54 19.57 19.54
TOTAL 937.20 938.47 937.20
Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,
PELAKSANA TEKNIK (PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. SUNARYO SUSI FEBRIANA


KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang -
DIREKTORAT JENDERAL BINA MARGA Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana: PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 04
Pekerjaan : AC-BC

Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan


No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
S t r i p M a p
Lokasi : KM 74+690~74+100 (SEGMEN 8)

Perhitungan CORE DRILL Kadar Kadar Koreksi TONASE


Lokasi Tingkat
Tebal Volume Aspal Aspal Kadar Dihampar Tiket Dibayar
Tebal BJ. LAP BJ JMF
NO Tanggal Posisi Panjang Lebar Luas Hasil Core Diterima Lap. JMF Aspal
Dari Ke Rencana Kepadatan AC-BC AC-BC AC-BC
Drill Terukur
(M) (M) (M2) (CM) (CM) (CM) (Ton) (gr/Cm3) (gr/Cm3) (%) (%) (%) (TON) (TON) (TON)
0 1 2 3 4 5 6 8 =5x6 9 10 11 12=(11*8*13)/100 13 14 15 16 17=15/16 18 19=(8*11*13)/100 20.00 21=min(19,20)

NIP. 19680101 200701 1008 Inspektor 1 Quantity Surveyor


AC-BASE MOD AC-BC MOD AC-WC MOD AC-BC PEN
SF RY SF RY SF RY SF RY
S1 T 14.55 14.72 12.17 11.97
S2 36.23 21.98 18.16 17.87
S3 28.83 29.23 24.02 23.77
S7 1749.32 1762.57134 ###
S8 937.20 943.19856 ###
S9 801.23 807.0912 ###
S11 427.33 431.35 422.44 428.799283 304.36 307.5866875

427.33000 431.34561 502.04000 494.72853 358.70000 361.18362 3487.75000 3512.86110###


KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo -
DIREKTORAT JENDERAL BINA MARGA Lohbener - Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana: PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1 6.3.(7b) Laston Lapis Fondasi Modifikasi (AC-base Mod)

BACK UP MC-4
Lokasi : KM 86+250 ~ 85+875

AC-BASE MOD

SUMARY QUANTITY
1 AC-Base Mod
VOLUME
NO STA STA KI KA PANJANG KETERANGAN
(TON)
1 0+000 0+375 KI 375.00
316.44
2 0+000 0+150 KI 150.00
3 0+150 0+375 KI 225.00 110.89

TOTAL 427.33

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK ( Koor. PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

SENDY REZA DAVIAN, ST. MT. BARKAH HIDAYAT ST. MOCHAMAD RONDI
NIP. 1986 1122 201012 1 004 Quantity Engineer SEM
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang
DIREKTORAT JENDERAL BINA MARGA - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawa: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksa: PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 04
Pekerjaan : AC-BASE MOD
Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan
No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
S t r i p M a p
Lokasi : KM 86+250 ~ 85+875 (SEGMEN 11)

AC-BASE MOD

Lokasi Perhitungan CORE DRILL Kadar Kadar Koreksi Tingkat TONASE


Lebar Tebal Volume Aspal Aspal Kadar Dihampar Tiket Dibayar
NO Tanggal Posisi Hasil Core BJ. LAP BJ JMF Lap. JMF Aspal
Dari Ke Panjang Diterima Luas Tebal Rata Diterima Kepadatan AC-Base Mod AC-Base Mod AC-Base Mod
Drill Terukur
(M) (M) (M2) (CM) (CM) (CM) (Ton) (gr/Cm3) (gr/Cm3) (%) (%) (%) (TON) (TON) (TON)
0 1 2 3 4 5 6 8 =5x6 9 10 11=min (9/10) 12=(11*8*13)/100 13 14 15 16 17=15/16 18 19=(8*11*13)/100 20 21=min(19,20)
1 5 Oktober 2021 0+000 0+100 KI1 100.00 4.10 410.00 7.3 7.0 7.0 64.00 2.230 2.244 4.61 4.60 1.00 99.38 64.00
0+100 0+200 KI1 100.00 4.10 410.00 7.2 7.0 7.0 63.91 2.227 2.244 4.61 4.60 1.00 99.24 63.91
0+200 0+300 KI1 100.00 4.10 410.00 7.2 7.0 7.0 63.58 2.216 2.244 4.61 4.60 1.00 98.73 63.58
0+300 0+375 KI1 75.00 4.10 307.50 7.0 7.0 7.0 47.90 2.225 2.244 4.61 4.60 1.00 99.17 47.90
SUB TOTAL 1 239.39
0+000 0+100 KI2 100.00 3.15 315.00 7.3 7.0 7.0 49.02 2.223 2.244 4.61 4.60 1.00 99.06 49.02
0+100 0+150 KI2 50.00 3.15 157.50 7.0 7.0 7.0 24.49 2.222 2.244 4.61 4.60 1.00 99.00 24.49
Transisi 3.54
SUB TOTAL 1+2 316.44 316.92 316.44
2 6 Oktober 2021 0+150 0+250 KI 2 100.00 3.15 315.00 7.5 7.0 7.0 48.91 2.218 2.244 4.61 4.60 1.00 98.84 48.91
0+250 0+375 KI 2 125.00 3.15 393.75 7.3 7.0 7.0 61.24 2.222 2.244 4.61 4.60 1.00 99.02 61.24
Transisi 0.74
SUB TOTAL 3 110.89 111.11 110.89
TOTAL 427.33 428.03 427.33
Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,
PELAKSANA TEKNIK ( PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. SUNARYO SUSI FEBRIANA


NIP. 19680101 200701 1008 Inspektor 1 Quantity Surveyor
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo -
DIREKTORAT JENDERAL BINA MARGA Lohbener - Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana: PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1 6.3.(7b) Laston Lapis Antara Modifikasi (AC-BC MOD)

BACK UP MC-4
Lokasi : KM 86+250 ~ 85+875

AC-BC MOD

SUMARY QUANTITY
1 AC-BC mod
VOLUME
NO STA STA KI KA PANJANG KETERANGAN
(TON)
1 0+000 0+240 KI 1 240.00 152.97
2 0+240 0+375 KI 1 135.00
252.33
3 0+000 0+340 KI 2 340.00
4 0+340 0+375 KI 2 35.00 17.14

TOTAL 422.44

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK ( Koor. PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

SENDY REZA DAVIAN, ST. MT. BARKAH HIDAYAT ST. MOCHAMAD RONDI
NIP. 1986 1122 201012 1 004 Quantity Engineer SEM
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksan : PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 04
Pekerjaan : AC-BC MOD
Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan
No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
S t r i p M a p
Lokasi : KM 86+250 ~ 85+875 (SEGMEN 11)
4.8

AC-BC MOD

Perhitungan CORE DRILL Kadar Kadar Koreksi TONASE


Lokasi Tingkat
Tebal Volume Aspal Aspal Kadar Dihampar Tiket Dibayar
Tebal BJ. LAP BJ JMF
NO Tanggal Posisi Panjang Lebar Luas Hasil Core Diterima Lap. JMF Aspal
Dari Ke Rencana Kepadatan AC-BC mod AC-BC mod AC-BC mod
Drill Terukur
(M) (M) (M2) (CM) (CM) (CM) (Ton) (gr/Cm3) (gr/Cm3) (%) (%) (%) (TON) (TON) (TON)
0 1 2 3 4 5 6 8 =5x6 9 10 11 12=(11*8*13)/100 13 14 15 16 17=15/16 18 19=(8*11*13)/100 20.00 21=min(19,20)
1 6 Oktober 2021 0+000 0+100 KI 1 100.00 4.10 410.00 7.3 7.0 7.0 63.57 2.215 2.234 4.81 4.80 1.00 99.15 63.57
0+100 0+240 KI 1 140.00 4.10 574.00 7.1 7.0 7.0 88.76 2.209 2.234 4.81 4.80 1.00 98.88 88.76
transisi 0.64
SUB TOTAL 1 152.97 153.43 152.97
2 7 Oktober 2021 0+240 0+300 KI 1 60.00 4.10 246.00 7.2 7.0 7.0 38.25 2.221 2.234 4.80 4.80 1.00 99.42 38.25
0+300 0+375 KI 1 75.00 4.10 307.50 7.2 7.0 7.0 47.89 2.225 2.234 4.80 4.80 1.00 99.60 47.89
SUB TOTAL 2 86.14
0+000 0+100 KI 2 100.00 3.15 315.00 7.0 7.0 7.0 48.72 2.210 2.234 4.80 4.80 1.00 98.91 48.72
0+100 0+200 KI 2 100.00 3.15 315.00 7.0 7.0 7.0 49.06 2.225 2.234 4.80 4.80 1.00 99.60 49.06
0+200 0+340 KI 2 140.00 3.15 441.00 7.0 7.0 7.0 68.41 2.216 2.234 4.80 4.80 1.00 99.19 68.41
SUB TOTAL 2+3 252.33 253.09 252.33
3 8 Oktober 2021 0+340 0+375 KI 2 35.00 3.15 110.25 7.0 7.0 7.0 17.14 2.221 2.234 4.81 4.80 1.00 99.42 17.14
SUB TOTAL 4 17.14 17.17 17.14
TOTAL 422.44 423.69 422.44
PELAKSANA TEKNIK (PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. SUNARYO SUSI FEBRIANA


NIP. 19680101 200701 1008 Inspektor 1 Quantity Surveyor
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo -
DIREKTORAT JENDERAL BINA MARGA Lohbener - Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana: PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1 6.3.(5b) Laston Lapis Aus Modifikasi (AC-WC Mod)

BACK UP MC-4
Lokasi : KM 86+250 ~ 85+875

AC-WC MOD

SUMARY QUANTITY
1 AC-WC Mod
NO STA STA KI KA PANJANG VOLUME (TON) KETERANGAN
1 0+375 0+000 1 375.00 169.62
2 0+375 0+000 1 375.00 134.74

TOTAL 304.36

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK ( Koor. PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

SENDY REZA DAVIAN, ST. MT. BARKAH HIDAYAT ST. MOCHAMAD RONDI
NIP. 1986 1122 201012 1 004 Quantity Engineer SEM
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 04
Pekerjaan : AC-WC MOD
Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan
No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
S t r i p M a p
Lokasi : KM 86+250 ~ 85+875 (SEGMEN 11)

AC-WC MOD

Perhitungan CORE DRILL Kadar Kadar Koreksi TONASE


Lokasi Tingkat
Lebar Tebal Volume Aspal Aspal Kadar Dihampar Tiket Dibayar
Tebal BJ. LAP BJ JMF
NO Tanggal Posisi Panjang Luas Hasil Core Diterima Lap. JMF Aspal
Dari Ke Diterima Rencana Kepadatan AC-WC Mod AC-WC Mod AC-WC Mod
Drill Terukur
(M) (M) (M2) (CM) (CM) (CM) (Ton) (gr/Cm3) (gr/Cm3) (%) (%) (%) (TON) (TON) (TON)
0 1 2 3 4 5 6 8 =5x6 9 10 11 12=(11*8*13)/100 13 14 15 16 17=15/16 18 19=(8*9*13)/100 20 21=min(19,20)
1 8 Oktober 2021 0+375 0+200 Ki 1 175.00 4.10 717.50 5.0 5.0 5.0 79.18 2.207 2.230 5.110 5.10 1.00 98.98 79.18
0+200 0+100 Ki 1 100.00 4.10 410.00 5.0 5.0 5.0 45.20 2.205 2.230 5.110 5.10 1.00 98.87 45.20
0+100 0+000 Ki 1 100.00 4.10 410.00 5.1 5.0 5.0 45.24 2.207 2.230 5.110 5.10 1.00 98.96 45.24
SUB TOTAL 1 169.62
0+375 0+300 Ki 2 75.00 3.15 236.25 5.0 5.0 5.0 26.09 2.209 2.230 5.110 5.10 1.00 99.04 26.09
0+300 0+200 Ki 2 100.00 3.15 315.00 5.1 5.0 5.0 34.77 2.207 2.230 5.110 5.10 1.00 98.98 34.77
0+200 0+100 Ki 2 100.00 3.15 315.00 5.1 5.0 5.0 34.76 2.207 2.230 5.110 5.10 1.00 98.96 34.76
0+100 0+000 Ki 2 100.00 3.15 315.00 5.2 5.0 5.0 34.67 2.201 2.230 5.110 5.10 1.00 98.72 34.67
Transisi 4.45
SUB TOTAL 2 134.74
TOTAL 304.36 304.96 304.36
Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,
PELAKSANA TEKNIK (PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. SUNARYO SUSI FEBRIANA


NIP. 19680101 200701 1008 Inspektor 1 Quantity Surveyor
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo -
DIREKTORAT JENDERAL BINA MARGA Lohbener - Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana: PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1 6.3.(a) Laston Lapis Antara (AC_BC)

BACK UP MC-4
Lokasi : KM 70+925 ~ 68+800 (SEGMEN 9)

SUMARY QUANTITY
1 AC-BC
NO STA STA KI KA PANJANG VOLUME (TON) KETERANGAN
1 0+005 0+325 1 320.00
2 0+005 0+325 2 320.00 430.03
3 0+225 0+615 1 390.00
4 0+615 1+453 1 838.00 371.20

TOTAL 801.23

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK ( Koor. PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

SENDY REZA DAVIAN, ST. MT. BARKAH HIDAYAT ST. MOCHAMAD RONDI
NIP. 1986 1122 201012 1 004 Quantity Engineer SEM
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang
DIREKTORAT JENDERAL BINA MARGA - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksan : PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 04
Pekerjaan : AC-BC

Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan


No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
S t r i p M a p
Lokasi : KM 70+925 ~ 68+800 (SEGMEN 9)

Perhitungan CORE DRILL Kadar Kadar Koreksi TONASE


Lokasi Tingkat
Tebal Volume Aspal Aspal Kadar Dihampar Tiket Dibayar
Tebal BJ. LAP BJ JMF
NO Tanggal Posisi Panjang Lebar Luas Hasil Core Diterima Lap. JMF Aspal
Dari Ke Rencana Kepadatan AC-BC AC-BC AC-BC
Drill Terukur
(M) (M) (M2) (CM) (CM) (CM) (Ton) (gr/Cm3) (gr/Cm3) (%) (%) (%) (TON) (TON) (TON)
0 1 2 3 4 5 6 8 =5x6 9 10 11 12=(11*8*13)/100 13 14 15 16 17=15/16 18 19=(8*11*13)/100 20.00 21=min(19,20)
1 24 Oktober 2021 0+005 0+100 KI 2 95.00 3.25 308.75 5.0 5.0 5.0 34.24 2.218 2.232 4.80 4.80 1.00 99.37 34.24
0+100 0+200 KI 2 100.00 3.25 325.00 5.3 5.0 5.0 35.99 2.215 2.232 4.80 4.80 1.00 99.23 35.99
0+200 0+325 KI 2 125.00 3.25 406.25 5.4 5.0 5.0 45.09 2.220 2.232 4.80 4.80 1.00 99.46 45.09
SUB TOTAL 1 115.32
0+005 0+100 KI 1 95.00 4.00 380.00 5.0 5.0 5.0 42.08 2.215 2.232 4.80 4.80 1.00 99.23 42.08
0+100 0+200 KI 1 100.00 4.00 400.00 5.0 5.0 5.0 44.42 2.221 2.232 4.80 4.80 1.00 99.51 44.42
0+200 0+325 KI 1 125.00 4.00 500.00 5.4 5.0 5.0 55.26 2.210 2.232 4.80 4.80 1.00 99.03 55.26
SUB TOTAL 2 141.76
0+225 0+300 KI 1 75.00 4.00 300.00 5.5 5.0 5.0 33.14 2.210 2.232 4.80 4.80 1.00 99.00 33.14
0+300 0+400 KI 1 100.00 4.00 400.00 5.4 5.0 5.0 44.50 2.225 2.232 4.80 4.80 1.00 99.69 44.50
0+400 0+500 KI 1 100.00 4.00 400.00 5.3 5.0 5.0 44.30 2.215 2.232 4.80 4.80 1.00 99.23 44.30
0+500 0+615 KI 1 115.00 4.00 460.00 5.5 5.0 5.0 51.01 2.218 2.232 4.80 4.80 1.00 99.37 51.01
SUB TOTAL 3 172.95
TOTAL 1+2+3 430.03 430.68 430.03
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang
DIREKTORAT JENDERAL BINA MARGA - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksan : PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 04
Pekerjaan : AC-BC

Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan


No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
S t r i p M a p
Lokasi : KM 70+925 ~ 68+800 (SEGMEN 9)

Perhitungan CORE DRILL Kadar Kadar Koreksi TONASE


Lokasi Tingkat
Tebal Volume Aspal Aspal Kadar Dihampar Tiket Dibayar
Tebal BJ. LAP BJ JMF
NO Tanggal Posisi Panjang Lebar Luas Hasil Core Diterima Lap. JMF Aspal
Dari Ke Rencana Kepadatan AC-BC AC-BC AC-BC
Drill Terukur
(M) (M) (M2) (CM) (CM) (CM) (Ton) (gr/Cm3) (gr/Cm3) (%) (%) (%) (TON) (TON) (TON)
0 1 2 3 4 5 6 8 =5x6 9 10 11 12=(11*8*13)/100 13 14 15 16 17=15/16 18 19=(8*11*13)/100 20.00 21=min(19,20)
2 25 Oktober 2021 0+615 0+700 KI 1 85.00 4.00 340.00 5.0 5.0 5.0 37.57 2.210 2.232 4.80 4.80 1.00 99.00 37.57
0+700 0+800 KI 1 100.00 4.00 400.00 5.0 5.0 5.0 44.40 2.220 2.232 4.80 4.80 1.00 99.46 44.40
0+800 0+900 KI 1 100.00 4.00 400.00 5.0 5.0 5.0 44.17 2.208 2.232 4.80 4.80 1.00 98.94 44.17
0+900 1+000 KI 1 100.00 4.00 400.00 5.0 5.0 5.0 44.23 2.211 2.232 4.80 4.80 1.00 99.07 44.23
1+000 1+100 KI 1 100.00 4.00 400.00 5.0 5.0 5.0 44.40 2.220 2.232 4.80 4.80 1.00 99.46 44.40
1+100 1+200 KI 1 100.00 4.00 400.00 5.0 5.0 5.0 44.15 2.208 2.232 4.80 4.80 1.00 98.91 44.15
1+200 1+300 KI 1 100.00 4.00 400.00 5.1 5.0 5.0 44.42 2.221 2.232 4.80 4.80 1.00 99.51 44.42
1+300 1+400 KI 1 100.00 4.00 400.00 5.0 5.0 5.0 44.34 2.217 2.232 4.80 4.80 1.00 99.33 44.34
1+400 1+453 KI 1 53.00 4.00 212.00 5.0 5.0 5.0 23.52 2.219 2.232 4.80 4.80 1.00 99.42 23.52
SUB TOTAL 4 371.20 371.57 371.20
TOTAL 801.23 802.25 801.23
Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,
PELAKSANA TEKNIK (PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. SUNARYO SUSI FEBRIANA


NIP. 19680101 200701 1008 Inspektor 1 Quantity Surveyor
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo -
DIREKTORAT JENDERAL BINA MARGA Lohbener - Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana: PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1 6.3.(7b) Laston Lapis Antara Modifikasi (AC-BC MOD)

BACK UP MC-3
Lokasi : KM 80+100~79+550

SUMARY QUANTITY
1 : AC-BC MOD
NO STA STA KI KA PANJANG VOLUME (TON) KETERANGAN
1 0+452 0+538 KA 1 86.00 54.08
2 0+452 0+538 KA 2 86.00 41.74
3 transisi 0.16

TOTAL 95.98

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK ( Koor. PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

SENDY REZA DAVIAN, ST. MT. BARKAH HIDAYAT ST. MOCHAMAD RONDI
NIP. 1986 1122 201012 1 004 Quantity Engineer SEM
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksan : PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 03
Pekerjaan : AC-BC MOD
Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan
No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
S t r i p M a p
Lokasi : KM 80+100~ 79+550
4.8

Perhitungan CORE DRILL Kadar Kadar Koreksi TONASE


Lokasi Tingkat
Tebal Volume Aspal Aspal Kadar Diterima Tiket Dibayar
Tebal BJ. LAP BJ JMF
NO Tanggal Posisi Panjang Lebar Luas Hasil Core Diterima Lap. JMF Aspal
Dari Ke Rencana Kepadatan AC-BC mod AC-BC mod AC-BC mod
Drill Terukur
(M) (M) (M2) (CM) (CM) (CM) (Ton) (gr/Cm3) (gr/Cm3) (%) (%) (%) (TON) (TON) (TON)
0 1 2 3 4 5 6 8 =5x6 9 10 11 12=(11*8*13)/100 13 14 15 16 17=15/16 18 19=(8*11*13)/100 20.00 21=min(19,20)
1 11 September 2021 0+452 0+538 KA 1 86.00 4.10 352.60 6.9 7.00 6.88 54.08 2.228 2.234 4.80 4.80 1.00 99.74 54.08

0+452 0+538 KA 2 86.00 3.15 270.90 7.0 7.00 6.95 41.74 2.217 2.234 4.81 4.80 1.00 99.24 41.74
Transisi 0.16
TOTAL 95.98 96.22 95.98

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK (PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. SUNARYO SUSI FEBRIANA


NIP. 19680101 200701 1008 Inspektor 1 Quantity Surveyor
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo -
DIREKTORAT JENDERAL BINA MARGA Lohbener - Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana: PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1 6.3.(5b) Laston Lapis Aus Modifikasi (AC-WC Mod)

BACK UP MC-3
Lokasi : KM 80+100~79+550

SUMARY QUANTITY
1 : AC-WC MOD
NO STA STA KI KA PANJANG VOLUME (TON) KETERANGAN
1 0+457 0+540 KA 1 83.00 37.84
2 0+457 0+540 KA 2 83.00 29.07
3 transisi 1.95

TOTAL 68.86

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK ( Koor. PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

SENDY REZA DAVIAN, ST. MT. BARKAH HIDAYAT ST. MOCHAMAD RONDI
NIP. 1986 1122 201012 1 004 Quantity Engineer SEM
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 03
Pekerjaan : AC-WC MOD
Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan
No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
S t r i p M a p
Lokasi : KM 80 (STA 0+450 ~ 0+550)

AC-WC MOD

Perhitungan CORE DRILL Kadar Kadar Koreksi TONASE


Lokasi Tingkat
Lebar Tebal Volume Aspal Aspal Kadar Dihampar Tiket Dibayar
Tebal BJ. LAP BJ JMF
NO Tanggal Posisi Panjang Luas Hasil Core Diterima Lap. JMF Aspal
Dari Ke Diterima Rencana Kepadatan AC-WC mod AC-WC mod AC-WC mod
Drill Terukur
(M) (M) (M2) (CM) (CM) (CM) (Ton) (gr/Cm3) (gr/Cm3) (%) (%) (%) (TON) (TON) (TON)
0 1 2 3 4 5 6 8 =5x6 9 10 11 12=(11*8*13)/100 13 14 15 16 17=15/16 18 19=(8*9*13)/100 20 21=min(19,20)
1 11 September 2021 0+457 0+540 KA 1 83.00 4.10 340.30 5.1 5.00 5.00 37.84 2.224 2.230 5.000 5.10 1.00 99.74 37.84

0+457 0+540 KA 2 83.00 3.15 261.45 5.22 5.00 5.00 29.07 2.224 2.230 5.000 5.10 1.00 99.73 29.07
Transisi 1.95

68.86 69.00 68.86


TOTAL 68.86
Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,
PELAKSANA TEKNIK (PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. SUNARYO SUSI FEBRIANA


KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 03
Pekerjaan : AC-WC MOD
Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan
No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
S t r i p M a p
Lokasi : KM 80 (STA 0+450 ~ 0+550)

AC-WC MOD

Perhitungan CORE DRILL Kadar Kadar Koreksi TONASE


Lokasi Tingkat
Lebar Tebal Volume Aspal Aspal Kadar Dihampar Tiket Dibayar
Tebal BJ. LAP BJ JMF
NO Tanggal Posisi Panjang Luas Hasil Core Diterima Lap. JMF Aspal
Dari Ke Diterima Rencana Kepadatan AC-WC mod AC-WC mod AC-WC mod
Drill Terukur
(M) (M) (M2) (CM) (CM) (CM) (Ton) (gr/Cm3) (gr/Cm3) (%) (%) (%) (TON) (TON) (TON)
0 1 2 3 4 5 6 8 =5x6 9 10 11 12=(11*8*13)/100 13 14 15 16 17=15/16 18 19=(8*9*13)/100 20 21=min(19,20)
NIP. 19680101 200701 1008 Inspektor 1 Quantity Surveyor
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang -
DIREKTORAT JENDERAL BINA MARGA Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawa: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksa: PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 02
Pekerjaan : AC-BC MOD
Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan
No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
Lokasi : Sta 0+86+250~87+250

Lokasi Kontrol Berat


Posisi Luas Tebal Hasil Berat Isi Hasil Berat Hasil Kadar Kepadatan Tebal Kadar Berat Isi Tebal Volume Volume Diterima
No. Tanggal Dari Ke Core Drill Core Drill Tiket Berat Hasil Selisih Aspal Rencana Aspal JMF JSD Diterima Terukur Koreksi Volume Terbayar Ket.
Perhitungan Kadar Aspal
Ki/Ka M2 Cm Gr/Cm3 Ton Ton % % % Cm % Gr/Cm3 Cm Ton Ton Ton
a b c d e f g h i j=(fxgxh)/(100) k=(i-j)/j l m n o p q=min(g,n) r=(fxqxh)/(100) s=min(i,J) t=l/o t=sxt u
1 19 Agustus 2021 0+400 0+425 L1 92.75 7.2 2.204 15.00 14.78 0.015 98.7 7.00 2.234 7.00 14.30 14.78 14.78
0+425 0+450 L1 93.00 7.2 2.227 15.00 14.92 0.005 4.83 99.7 7.00 4.80 2.234 7.00 14.50 14.92 1.000 14.92
0+450 0+500 L1 187.75 7.6 2.240 32.00 31.81 0.006 100.3 7.00 2.234 7.00 29.43 31.81 31.81

2 21 Agustus 2021 0+028 0+100 L1 258.12 7.3 2.224 42.00 41.61 0.009 99.55 7.00 2.234 7.00 40.18 41.61 41.61
0+100 0+200 L1 363.50 7.3 2.228 59.00 58.72 0.005 99.75 7.00 2.234 7.00 56.70 58.72 58.72
4.82 4.80 1.000
0+200 0+300 L1 375.50 7.1 2.228 60.00 59.39 0.010 99.73 7.00 2.234 7.00 58.55 59.39 59.39
0+300 0+400 L1 382.50 7.0 2.224 60.00 59.69 0.005 99.56 7.00 2.234 7.00 59.55 59.69 59.69

3 22 Agustus 2021 0+500 0+600 L1 369.50 7.0 2.224 58.00 57.52 0.008 99.55 7.00 2.234 7.00 57.52 57.52 57.52
0+600 0+700 L1 366.00 7.3 2.218 59.00 58.86 0.002 99.30 7.00 2.234 7.00 56.83 58.86 58.86
0+700 0+800 L1 358.50 7.0 2.221 56.00 55.85 0.003 4.81 99.40 7.00 4.80 2.234 7.00 55.72 55.85 1.000 55.85
0+800 0+900 L1 346.50 7.4 2.221 58.00 56.94 0.019 99.42 7.00 2.234 7.00 53.87 56.94 56.94
0+900 1+000 L1 356.50 7.0 2.223 56.00 55.07 0.017 99.50 7.00 2.234 6.95 55.07 55.07 55.07

4 22 Agustus 2021 0+028 0+100 L2 263.88 7.2 2.223 43.00 41.93 0.026 99.50 7.00 2.234 7.00 41.05 41.93 41.93
0+100 0+200 L2 356.50 7.2 2.224 58.00 57.08 0.016 99.55 7.00 2.234 7.00 55.49 57.08 57.08
0+200 0+300 L2 338.50 7.0 2.216 53.00 52.51 0.009 99.20 7.00 2.234 7.00 52.51 52.51 52.51
0+300 0+400 L2 338.50 7.2 2.221 55.00 54.12 0.016 4.81 99.40 7.00 4.80 2.234 7.00 52.61 54.12 1.000 54.12
0+400 0+500 L2 347.00 7.0 2.223 55.00 53.99 0.019 99.50 7.00 2.234 7.00 53.99 53.99 53.99
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang -
DIREKTORAT JENDERAL BINA MARGA Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawa: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksa: PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 02
Pekerjaan : AC-BC MOD
Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan
No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
Lokasi : Sta 0+86+250~87+250

Lokasi Kontrol Berat


Posisi Luas Tebal Hasil Berat Isi Hasil Berat Hasil Kadar Kepadatan Tebal Kadar Berat Isi Tebal Volume Volume Diterima
No. Tanggal Dari Ke Core Drill Core Drill Tiket Berat Hasil Selisih Aspal Rencana Aspal JMF JSD Diterima Terukur Koreksi Volume Terbayar Ket.
Perhitungan Kadar Aspal
Ki/Ka M2 Cm Gr/Cm3 Ton Ton % %4.81 % Cm %4.80 Gr/Cm3 Cm Ton Ton 1.000 Ton
a b c d e f g h i j=(fxgxh)/(100) k=(i-j)/j l m n o p q=min(g,n) r=(fxqxh)/(100) s=min(i,J) t=l/o t=sxt u
0+500 0+600 L2 343.00 7.2 2.219 55.00 54.81 0.003 99.35 7.00 2.234 7.00 53.28 54.81 54.81
0+600 0+700 L2 349.50 7.2 2.222 57.00 55.90 0.020 99.45 7.00 2.234 7.00 54.35 55.90 55.90

6 23 Agustus 2021 0+700 0+800 L2 364.00 7.3 2.224 60.00 59.09 0.015 99.55 7.00 2.234 7.00 56.66 59.09 59.09
0+800 0+900 L2 372.50 7.1 2.226 59.00 58.87 0.002 4.80 99.65 7.00 4.80 2.234 7.00 58.04 58.87 1.000 58.87
0+900 1+000 L2 362.50 7.3 2.225 59.00 58.54 0.008 99.60 7.00 2.234 7.00 56.46 58.54 58.54

B JUMLAH 1,112.00 1,112.00 1,112.00


C 1,131.23
(19.23)
Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,
PELAKSANA TEKNIK ( Koor. PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. BARKAH HIDAYAT ST. SUSI FEBRIANA


NIP. 19680101 200701 1008 Quantity Engineer Quantity Surveyor
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1 6.3.(7b)Laston Lapis Fondasi Modifikasi (AC-BASE Mod)

BACK UP MC-3
Lokasi : KM 51 +655 ~ 49+750

SUMARY QUANTITY
1 AC-BASE MOD LEVELING
NO STA STA KI KA PANJANG VOLUME (TON) KETERANGAN
1 0+000 Err:509 KIRI 1 - 0.00 Err:509
2 0+150 Err:509 KIRI 2 - 0.00 Err:509

TOTAL 0.00

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK ( Koor. PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

SENDY REZA DAVIAN, ST. MT. BARKAH HIDAYAT ST. MOCHAMAD RONDI S
NIP. 1986 1122 201012 1 004 Quantity Engineer SEM
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo -
DIREKTORAT JENDERAL BINA MARGA Lohbener - Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana: PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1 6.3.(a) Laston Lapis Antara (AC_BC)

BACK UP MC-2
Lokasi : KM 86+250~87+250 (SEGMEN 5)

SUMARY QUANTITY
1 AC-BC MOD
NO STA STA KI KA PANJANG VOLUME (TON) KETERANGAN
1 0+000 0+000 KIRI - 0.00 0.00
2 0+000 0+000 KIRI - 0.00 0.00

TOTAL 0.00

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK ( Koor. PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

SENDY REZA DAVIAN, ST. MT. BARKAH HIDAYAT ST. MOCHAMAD RONDI S
NIP. 1986 1122 201012 1 004 Quantity Engineer SEM
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo -
DIREKTORAT JENDERAL BINA MARGA Lohbener - Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana: PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1 6.3.(a) Laston Lapis Antara (AC_BC)

BACK UP MC-3
Lokasi : KM 86+250~87+250 (SEGMEN 5)

SUMARY QUANTITY
1 AC-BC
NO STA STA KI KA PANJANG VOLUME (TON) KETERANGAN
1 0+000 0+450 KIRI 1 - 450.00 Err:509
2 0+000 0+450 KIRI 2 - 450.00 Err:509
3 0+000 0+450 KANAN 1 450.00 Err:509
4 0+000 0+450 KANAN 2 450.00 Err:509

TOTAL 0.00

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK ( Koor. PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

SENDY REZA DAVIAN, ST. MT. BARKAH HIDAYAT ST. MOCHAMAD RONDI S
NIP. 1986 1122 201012 1 004 Quantity Engineer SEM
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo -
DIREKTORAT JENDERAL BINA MARGA Lohbener - Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana: PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1 6.3.(a) Laston Lapis Antara (AC_BC)

BACK UP MC-3
Lokasi : KM 86+250~87+250 (SEGMEN 5)

SUMARY QUANTITY
1 AC-BC
NO STA STA KI KA PANJANG VOLUME (TON) KETERANGAN
3 0+000 0+984 KANAN 1 984.00 Err:509
4 0+000 0+984 KANAN 2 984.00 Err:509

TOTAL 0.00

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK ( Koor. PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

SENDY REZA DAVIAN, ST. MT. BARKAH HIDAYAT ST. MOCHAMAD RONDI S
NIP. 1986 1122 201012 1 004 Quantity Engineer SEM
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo -
DIREKTORAT JENDERAL BINA MARGA Lohbener - Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana: PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1 6.3.(a) Laston Lapis Antara (AC_BC)

BACK UP MC-3
Lokasi : KM 86+250~87+250 (SEGMEN 5)

SUMARY QUANTITY
1 AC-BC
NO STA STA KI KA PANJANG VOLUME (TON) KETERANGAN
3 0+122 0+984 KANAN 1 Err:509 Err:509
4 0+512 0+984 KANAN 2 472.00 Err:509

TOTAL 0.00

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK ( Koor. PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

SENDY REZA DAVIAN, ST. MT. BARKAH HIDAYAT ST. MOCHAMAD RONDI S
NIP. 1986 1122 201012 1 004 Quantity Engineer SEM
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang -
DIREKTORAT JENDERAL BINA MARGA Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawa: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksa: PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 02
Pekerjaan : AC-WC
Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan
No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
Lokasi : Sta 0+86+250~87+250

Lokasi Kontrol Berat


Tebal Hasil Berat Isi Hasil Berat Hasil Kadar Tebal Kadar Berat Isi Tebal Volume Volume
Posisi Luas Berat Hasil Kepadatan Volume Diterima Koreksi Ket.
No. Tanggal Dari Ke Core Drill Core Drill Tiket Selisih Aspal Rencana Aspal JMF JSD Diterima Terukur Terbayar
Perhitungan Kadar Aspal
Ki/Ka M2 Cm Gr/Cm3 Ton Ton % % % Cm % Gr/Cm3 Cm Ton Ton Ton
a b c d e f g h i j=(fxgxh)/(100) k=(i-j)/j l m n o p q=min(g,n) r=(fxqxh)/(100) s=min(i,j) t=l/o t=sxt u

1 23 Agustus 2021 0+028 0+050 L1 78.54 5.1 2.216 9.00 8.81 0.022 99.39 5.00 2.230 5.0 8.70 8.81 8.81
5.11 5.10 1.0
0+050 0+100 L1 182.25 4.8 2.239 20.00 19.77 0.012 100.42 5.00 2.230 4.8 19.77 19.77 19.77

2 24 Agustus 2021 0+100 0+200 L1 363.50 4.9 2.212 40.00 39.40 0.015 99.20 5.00 2.230 4.9 39.40 39.40 39.40
0+200 0+300 L1 375.50 5.4 2.219 46.00 45.33 0.015 99.50 5.00 2.230 5.0 41.65 45.33 45.33
0+300 0+400 L1 382.50 4.9 2.212 42.00 41.60 0.010 99.20 5.00 2.230 4.9 41.60 41.60 41.60
0+400 0+500 L1 374.50 5.1 2.220 43.00 42.12 0.021 99.55 5.00 2.230 5.0 41.56 42.12 42.12
0+500 0+600 L1 369.50 5.3 2.219 44.00 43.17 0.019 5.13 99.50 5.00 5.10 2.230 5.0 40.99 43.17 1.0 43.17
0+600 0+700 L1 366.00 5.4 2.218 44.00 43.83 0.004 99.45 5.00 2.230 5.0 40.58 43.83 43.83
0+700 0+800 L1 358.50 5.0 2.219 41.00 40.03 0.024 99.50 5.00 2.230 5.0 39.77 40.03 40.03
0+800 0+900 L1 346.50 5.2 2.213 40.00 39.75 0.006 99.25 5.00 2.230 5.0 38.34 39.75 39.75
0+900 1+000 L1 356.50 5.1 2.220 41.00 39.96 0.026 99.55 5.00 2.230 5.0 39.57 39.96 39.96
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang -
DIREKTORAT JENDERAL BINA MARGA Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawa: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksa: PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 02
Pekerjaan : AC-WC
Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan
No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
Lokasi : Sta 0+86+250~87+250

Lokasi Kontrol Berat


Tebal Hasil Berat Isi Hasil Berat Hasil Kadar Tebal Kadar Berat Isi Tebal Volume Volume
Posisi Luas Berat Hasil Kepadatan Volume Diterima Koreksi Ket.
No. Tanggal Dari Ke Core Drill Core Drill Tiket Selisih Aspal Rencana Aspal JMF JSD Diterima Terukur Terbayar
Perhitungan Kadar Aspal
Ki/Ka M2 Cm Gr/Cm3 Ton Ton % % % Cm % Gr/Cm3 Cm Ton Ton Ton
a b c d e f g h i j=(fxgxh)/(100) k=(i-j)/j l m n o p q=min(g,n) r=(fxqxh)/(100) s=min(i,j) t=l/o t=sxt u
3 25 Agustus 2021 0+028 0+100 L2 263.88 5.0 2.218 30.00 29.45 0.019 99.45 5.00 2.230 5.0 29.26 29.45 29.45
0+100 0+200 L2 356.50 5.1 2.221 41.00 40.11 0.022 99.60 5.00 2.230 5.0 39.59 40.11 40.11
0+200 0+300 L2 338.50 5.0 2.219 38.00 37.55 0.012 99.50 5.00 2.230 5.0 37.55 37.55 37.55
0+300 0+400 L2 338.50 5.0 2.217 38.00 37.26 0.020 99.40 5.00 2.230 5.0 37.26 37.26 37.26
0+400 0+500 L2 347.00 5.0 2.216 39.00 38.43 0.015 99.35 5.00 2.230 5.0 38.43 38.43 38.43
5.12 5.10 1.0
0+500 0+600 L2 343.00 5.2 2.219 40.00 39.32 0.017 99.50 5.00 2.230 5.0 38.05 39.32 39.32
0+600 0+700 L2 349.50 5.1 2.221 40.00 39.20 0.020 99.60 5.00 2.230 5.0 38.81 39.20 39.20
0+700 0+800 L2 364.00 5.4 2.216 44.00 43.14 0.020 99.35 5.00 2.230 5.0 40.32 43.14 43.14
0+800 0+900 L2 372.50 5.1 2.219 43.00 42.01 0.024 99.50 5.00 2.230 5.0 41.32 42.01 42.01
0+900 1+000 L2 362.50 5.1 2.221 41.00 40.65 0.009 99.60 5.00 2.230 5.0 40.25 40.65 40.65
B JUMLAH 790.89 790.89 790.89
C 810.02
(19.13)
Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,
PELAKSANA TEKNIK ( Koor. PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. BARKAH HIDAYAT ST. SUSI FEBRIANA


KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang -
DIREKTORAT JENDERAL BINA MARGA Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawa: PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksa: PT. PP Presisi Tbk.
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 02
Pekerjaan : AC-WC
Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener - Jatibarang - Palimanan
No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.
Lokasi : Sta 0+86+250~87+250

Lokasi Kontrol Berat


Tebal Hasil Berat Isi Hasil Berat Hasil Kadar Tebal Kadar Berat Isi Tebal Volume Volume
Posisi Luas Berat Hasil Kepadatan Volume Diterima Koreksi Ket.
No. Tanggal Dari Ke Core Drill Core Drill Tiket Selisih Aspal Rencana Aspal JMF JSD Diterima Terukur Terbayar
Perhitungan Kadar Aspal
Ki/Ka M2 Cm Gr/Cm3 Ton Ton % % % Cm % Gr/Cm3 Cm Ton Ton Ton
a b c d e f g h i j=(fxgxh)/(100) k=(i-j)/j l m n o p q=min(g,n) r=(fxqxh)/(100) s=min(i,j) t=l/o t=sxt u
NIP. 19680101 200701 1008 Quantity Engineer Quantity Surveyor
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1 6.3.(5b) Laston Lapis Aus Modifikasi (AC-WC Mod)

BACK UP MC-2
Lokasi : KM 86+250~87+250 (SEGMEN 5)

SUMARY QUANTITY
1 AC-WC MOD
NO STA STA KI KA PANJANG VOLUME (TON) KETERANGAN
1 0+028 1+000 KIRI - 972 Err:509
2 0+457 0+540 KIRI - 83.00 0.00
3 0+000 0+000 KIRI - 0.00 0.00
4 0+000 0+000 KIRI - 0.00 0.00

TOTAL 0.00

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK ( Koor. PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.
SENDY REZA DAVIAN, ST. MT. BARKAH HIDAYAT ST. MOCHAMAD RONDI S
NIP. 1986 1122 201012 1 004 Quantity Engineer SEM
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1. 3.1.(7) Galian Perkerasan dengan Cold Milling
BACK UP MC-2

Lokasi : KM 151+850~153+750

P e r h i t u n g a n

COLD MILLING MACHINE


LEBAR
VOLUME
Sta PANJANG (M) KI/KA AREA (M2) Keterangan
L1 L2 JUMLAH (M3)

0+000 -
25.00 KA
0+025 0
25.00 KA 0.00
0+050 0
25.00 KA 0.00
0+075 0
25.00 KA 0.00
0+100 0
25.00 KA 0.00
0+125 0
25.00 KA 0.00
0+150 0
25.00 KA 0.00
0+175 0
25.00 KA 0.00
0+200 0
25.00 KA 0.00
0+225 0
25.00 KA 0.00
0+250 0
25.00 KA 0.00
0+275 0
25.00 KA 0.00
0+300 0
25.00 KA 0.00
0+325 0
25.00 KA 0.00
0+350 0
25.00 KA 0.00
0+375 0
25.00 KA 0.00
0+400 0
25.00 KA 0.00
0+425 0
25.00 KA 0.00
0+450 0
25.00 KA 0.00
0+475 0
25.00 KA 0.00
0+500 0
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1. 3.1.(7) Galian Perkerasan dengan Cold Milling
BACK UP MC-2

Lokasi : KM 151+850~153+750

P e r h i t u n g a n

COLD MILLING MACHINE


LEBAR
VOLUME
Sta PANJANG (M) KI/KA AREA (M2) Keterangan
L1 L2 JUMLAH (M3)

25.00 KA 0.00
0+525 0
25.00 KA 0.00
0+550 0
25.00 KA 0.00
0+575 0
25.00 KA 0.00
0+600 0
25.00 KA 0.00
0+625 0
25.00 KA 0.00
0+650 0
25.00 KA 0.00
0+675 0
25.00 KA 0.00
0+700 0
25.00 KA 0.00
0+725 0
25.00 KA 0.00
0+750 0
25.00 KA 0.00
0+775 0
25.00 KA 0.00
0+800 0
25.00 KA 0.00
0+825 0
25.00 KA 0.00
0+850 0
25.00 KA 0.00
0+875 0
25.00 KA 0.00
0+900 0
25.00 KA 0.00
0+925 0
25.00 KA 0.00
0+950 0
25.00 KA 0.00
0+975 0
-975.00 KA 0.00
1+000
25.00 KA
1+025
25.00 KA
1+050
25.00 KA
1+075
25.00 KA
1+100
25.00 KA
1+125
25.00 KA
1+150
25.00 KA
1+175
25.00 KA
1+200
25.00 KA
1+225
25.00 KA
1+250
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1. 3.1.(7) Galian Perkerasan dengan Cold Milling
BACK UP MC-2

Lokasi : KM 151+850~153+750

P e r h i t u n g a n

COLD MILLING MACHINE


LEBAR
VOLUME
Sta PANJANG (M) KI/KA AREA (M2) Keterangan
L1 L2 JUMLAH (M3)

25.00 KA
1+275
25.00 KA
1+300
25.00 KA
1+325
25.00 KA
1+350
25.00 KA
1+375
25.00 KA
1+400
25.00 KA
1+425
25.00 KA
1+450
25.00 KA
1+475
25.00 KA
1+500
25.00 KA
1+525
25.00 KA
1+550
25.00 KA
1+575
25.00 KA
1+600
25.00 KA
1+625
25.00 KA
1+650
25.00 KA
1+675
25.00 KA
1+700
25.00 KA
1+725
25.00 KA
1+750
25.00 KA
1+775
25.00 KA
1+800
25.00 KA
1+825
25.00 KA
1+850
25.00 KA
1+875
25.00 KA
1+900
25.00 KA
1+925
25.00 KA
1+950
25.00 KA
1+975
0
SUB TOTAL 1 -
Total M3
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1. 3.1.(7) Galian Perkerasan dengan Cold Milling
BACK UP MC-2

Lokasi : KM 151+850~153+750

P e r h i t u n g a n

COLD MILLING MACHINE


LEBAR
VOLUME
Sta PANJANG (M) KI/KA AREA (M2) Keterangan
L1 L2 JUMLAH (M3)

Total SUB TOTAL 2 - M3


TOTAL -

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK (PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. BARKAH HIDAYAT ST. SUSI FEBRIANA


NIP. 19680101 200701 1008 Quantity Engineer Quantity Surveyor
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I JAWA BARAT
JAWA BARAT Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1 3.1.(7) Galian Perkerasan dengan Cold Milling

BACK UP MC-2
Lokasi : KM 80+100 ~ 79+550

SUMARY QUANTITY
1 COLD MILLING MACHINE
NO STA STA KI KA PANJANG VOLUME (M3) KETERANGAN
1 0+028 1+000 KIRI - 972 362.61

TOTAL 362.61

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK ( Koor. PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

SENDY REZA DAVIAN, ST. MT. BARKAH HIDAYAT ST. MOCHAMAD RONDI S
NIP. 1986 1122 201012 1 004 Quantity Engineer SEM
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I.2 JAWA BARAT
JAWA BARAT Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1. 3.1.(7) Galian Perkerasan dengan Cold Milling
BACK UP MC-3

Lokasi : KM 80+100~79+550

P e r h i t u n g a n

COLD MILLING MACHINE


LEBAR
PANJANG VOLUME
Sta KI/KA AREA (M2) Keterangan
(M) L1 L2 JUMLAH (M3)

0+000 0.0 0.38


25.00 KI
0+025 0.0 0.37
25.00 KI
0+050 0.0 0.37
25.00 KI
0+075 0.0 0.32
25.00 KI
0+100 0.0 0.40
25.00 KI
0+125 0.0 0.38
25.00 KI
0+150 0.0 0.35
25.00 KI
0+175 0.0 0.34
25.00 KI
0+200 0.0 0.50
25.00 KI
0+225 0.0 0.44
25.00 KI
0+250 0.0 0.38
25.00 KI
0+275 0.0 0.36
25.00 KI
0+300 0.0 0.40
25.00 KI
0+325 0.0 0.40
25.00 KI
0+350 0.0 0.40
25.00 KI
0+375 0.0 0.39
25.00 KI
0+400 0.0 0.41
SUB TOTAL 1 0.00
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I.2 JAWA BARAT
JAWA BARAT Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1. 3.1.(7) Galian Perkerasan dengan Cold Milling
BACK UP MC-3

Lokasi : KM 80+100~79+550

P e r h i t u n g a n

COLD MILLING MACHINE


LEBAR
PANJANG VOLUME
Sta KI/KA AREA (M2) Keterangan
(M) L1 L2 JUMLAH (M3)
25.00 KI
0+425 0.0 0.39
25.00 KI
0+450 0.0 0.37
25.00 KI
0+475 0.0 0.39
25.00 KI
0+500 0.0 0.36
25.00 KI
0+525 0.0 0.40
25.00 KI
0+550 0.0 0.37
25.00 KI
0+575 0.0 0.32
25.00 KI
0+600 0.0 0.36
25.00 KI
0+625 0.0 0.37
25.00 KI
0+650 0.0 0.35
25.00 KI
0+675 0.0 0.38
25.00 KI
0+700 0.0 0.38
25.00 KI
0+725 0.0 0.38
25.00 KI
0+750 0.0 0.39
25.00 KI
0+775 0.0 0.40
25.00 KI
0+800 0.0 0.44
25.00 KI
0+825 0.0 0.39
25.00 KI
SUB TOTAL 2 0.00

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK ( PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. BARKAH HIDAYAT ST. SUSI FEBRIANA


NIP. 19680101 200701 1008 Quantity Engineer Quantity Surveyor
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I.2 JAWA BARAT
JAWA BARAT Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1. 3.1.(7) Galian Perkerasan dengan Cold Milling
BACK UP MC-3

Lokasi : KM 80+100~79+550

P e r h i t u n g a n

COLD MILLING MACHINE


LEBAR
PANJANG VOLUME
Sta KI/KA AREA (M2) Keterangan
(M) L1 L2 JUMLAH (M3)
0+850 0.0 0.39
25.00 KI
0+875 0.0 0.38
25.00 KI
0+900 0.0 0.37
25.00 KI
0+925 0.0 0.40
25.00 KI
0+950 0.0 0.39
25.00 KI
0+975 0.0 0.39
25.00 KI
1+000 0.0 0.38
25.00 KI
1+025 0.0 0.39
25.00 KI
1+050 0.0 0.38
25.00 KI
1+075 0.0 0.37
25.00 KI
1+100 0.0 0.39
25.00 KI
1+125 0.0 0.37
25.00 KI
1+150 0.0 0.37
25.00 KI
1+175 0.0 0.37
25.00 KI
1+200 0.0 0.38
25.00 KI
1+225 0.0 0.36
25.00 KI
1+250 0.0 0.38
SUB TOTAL 3 0.00

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK ( PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. BARKAH HIDAYAT ST. SUSI FEBRIANA


NIP. 19680101 200701 1008 Quantity Engineer Quantity Surveyor
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I.2 Pemilik Proyek : SATKER PJN WILAYAH I.2 JAWA BARAT
JAWA BARAT Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1. 3.1.(7) Galian Perkerasan dengan Cold Milling
BACK UP MC-3

Lokasi : KM 80+100~79+550

P e r h i t u n g a n

COLD MILLING MACHINE


LEBAR
PANJANG VOLUME
Sta KI/KA AREA (M2) Keterangan
(M) L1 L2 JUMLAH (M3)
25.00 KI
1+275 0.0 0.38
25.00 KI
1+300 0.0 0.40
25.00 KI
1+325 0.0 0.38
25.00 KI
1+350 0.0 0.32
25.00 KI
1+375 0.0 0.38
SUB TOTAL 1 0.00
SUB TOTAL 2 0.00
SUB TOTAL 3 0.00
SUB TOTAL 4 0.00
Total - M3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK ( PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH I.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

BY. SURAU, S.T. BARKAH HIDAYAT ST. SUSI FEBRIANA


NIP. 19680101 200701 1008 Quantity Engineer Quantity Surveyor
KONTRAKTOR KONSULTAN SUPERVISI :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Nama Paket : RehabilitasI Jalan Pamanukan - Sewo - Lohbener -
DIREKTORAT JENDERAL BINA MARGA Jatibarang - Palimanan
BALAI BESAR PELAKSANAAN JALAN NASIONAL No. Kontrak : HK.02.03/SPK-KTR/PPK 1.2 PJN I JBR/2021/02
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH 1.2 Pemilik Proyek : SATKER PJN WILAYAH 1.2 JAWA BARAT
JAWA BARAT Konsultan Pengawas : PT. Surya Praga. PT Nasuma Putra (KSO)
Kontraktor Pelaksana : PT. PP Presisi Tbk.

Item Pembayaran :
Referensi :
1 3.1.(7) Galian Perkerasan dengan Cold Milling

BACK UP MC-2
Lokasi : KM 80+100~79+550

SUMARY QUANTITY
1 COLD MILLING MACHINE
NO STA STA KI KA PANJANG VOLUME (M3) KETERANGAN
1 0+000 1+375 KIRI - 1375 524.38

TOTAL 524.38

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


PELAKSANA TEKNIK ( Koor. PENGAWAS LAPANGAN) KONSULTAN PENGAWAS KONTRAKTOR
WILAYAH 1.2 PROVINSI JAWA BARAT PT. SURYA PRAGA, PT NASUMA PUTRA (KSO) PT. PP PRESISI Tbk.

SENDY REZA DAVIAN, ST. MT. BARKAH HIDAYAT ST. MOCHAMAD RONDI S
NIP. 1986 1122 201012 1 004 Quantity Engineer SEM
DATA PENDUKUNG
HASIL PERHITUNGAN LEBAR, TEBAL DAN KEPADATAN

Nama Balai : BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II


Nama Kegiatan : REHABILITASI JALAN DAN JEMBATAN PROVINSI BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II
Nama Paket : REHABILITASI JALAN RUAS JALAN CIKEMBAR - CIKEMBANG ( 1,00 KM )
Lokasi : RUAS JALAN CIKEMBAR - CIKEMBANG
No. Kontrak : 602/Ktr.27/ 209/BPJ.WIL.PEL.II
Tgl. Kontrak : 28 JULI 2015
Penyedia Jasa : CV. LEMBANG JAYA
Jenis Pekerjaan : LASTON LAPIS ANTARA AC - BC LEVELLING
Tanggal Penghamparan : 30 september-5 Oktober 2014
Panjang Segmen : 1,50 Km
Tebal Rencana : 5,5 Cm

Lebar Luas PEMAKAIAN


Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) Segmen RATA-RATA/HARI KUANTITAS
(m) (m) (m2) ( LITER ) ( LITER )
1 22 Oktober 2015 0+000 KA 2.8000
0+000 - 1+040(KA) 2.70 25.00 67.50 0.15 10.13
2 0+025 KA 2.6000 -
2.73 25.00 68.13 0.15 10.22
3 0+050 KA 2.8500 -
2.85 25.00 71.25 0.15 10.69
4 0+075 KA 2.8500 -
2.85 25.00 71.25 0.15 10.69
5 0+100 KA 2.8500 -
2.83 25.00 70.63 0.15 10.59
6 0+125 KA 2.8000 -
2.83 25.00 70.63 0.15 10.59
7 0+150 KA 2.8500 -
3.05 25.00 76.25 0.15 11.44
8 0+175 KA 3.2500 -
2.93 25.00 73.13 0.15 10.97
9 0+200 KA 2.6000 -
2.75 25.00 68.75 0.15 10.31
10 0+225 KA 2.9000 -
2.95 25.00 73.75 0.15 11.06
11 0+250 KA 3.0000 -
2.88 25.00 71.88 0.15 10.78
12 0+275 KA 2.7500 -
2.83 25.00 70.63 0.15 10.59
0+300 KA 2.9000 -
2.85 25.00 71.25 0.15 10.69
0+325 KA 2.8000 -
2.83 25.00 70.63 0.15 10.59
0+350 KA 2.8500 -
2.85 25.00 71.25 0.15 10.69
0+375 KA 2.8500 -
2.83 25.00 70.63 0.15 10.59
0+400 KA 2.8000 -
2.88 25.00 71.88 0.15 10.78
0+425 KA 2.9500 -
2.93 25.00 73.13 0.15 10.97
0+450 KA 2.9000 -
2.93 25.00 73.13 0.15 10.97
0+475 KA 2.9500 -
3.00 25.00 75.00 0.15 11.25
0+500 KA 3.0500 -
2.95 25.00 73.75 0.15 11.06
0+525 KA 2.8500 -
2.85 25.00 71.25 0.15 10.69
0+550 KA 2.8500 -
2.95 25.00 73.75 0.15 11.06
0+575 KA 3.0500 -
3.05 25.00 76.25 0.15 11.44
0+600 KA 3.0500 -
3.05 25.00 76.25 0.15 11.44
0+625 KA 3.0500 -
2.98 25.00 74.38 0.15 11.16
0+650 KA 2.9000 -
2.93 25.00 73.13 0.15 10.97
0+675 KA 2.9500 -
2.93 25.00 73.13 0.15 10.97
0+700 KA 2.9000 -
2.90 25.00 72.50 0.15 10.88
0+725 KA 2.9000 -
2.90 25.00 72.50 0.15 10.88
0+750 KA 2.9000 -
2.85 25.00 71.25 0.15 10.69
0+775 KA 2.8000 -
3.08 25.00 76.88 0.15 11.53
0+800 KA 3.3500 -
3.18 25.00 79.38 0.15 11.91
0+825 KA 3.0000 -
2.95 25.00 73.75 0.15 11.06
0+850 KA 2.9000 -
2.83 25.00 70.63 0.15 10.59
0+875 KA 2.7500 -
2.83 25.00 70.63 0.15 10.59
0+900 KA 2.9000 -
2.83 25.00 70.63 0.15 10.59
0+925 KA 2.7500 -
2.83 25.00 70.63 0.15 10.59
0+950 KA 2.9000 -
2.88 25.00 71.88 0.15 10.78
0+975 KA 2.8500 -
2.85 25.00 71.25 0.15 10.69
1+000 KA 2.8500 -
2.88 25.00 71.88 0.15 10.78
1+025 KA 2.9000 -
- 15.00 - 0.15 -
1+040 KA Err:509 -

1,040.00 - -
Lebar Luas PEMAKAIAN
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) Segmen RATA-RATA/HARI KUANTITAS
(m) (m) (m2) ( LITER ) ( LITER )
1 23 Oktober 2015 0+000 KI 2.8000 -
0+000 - 0+565(KI) 2.70 25.00 67.50 0.15 10.13
2 0+025 KI 2.6000 -
2.73 25.00 68.13 0.15 10.22
3 0+050 KI 2.8500 -
2.85 25.00 71.25 0.15 10.69
4 0+075 KI 2.8500 -
2.85 25.00 71.25 0.15 10.69
5 0+100 KI 2.8500 -
2.83 25.00 70.63 0.15 10.59
6 0+125 KI 2.8000 -
2.83 25.00 70.63 0.15 10.59
7 0+150 KI 2.8500 -
3.05 25.00 76.25 0.15 11.44
8 0+175 KI 3.2500 -
2.93 25.00 73.13 0.15 10.97
9 0+200 KI 2.6000 -
2.75 25.00 68.75 0.15 10.31
0+225 KI 2.9000 -
2.95 25.00 73.75 0.15 11.06
0+250 KI 3.0000 -
2.88 25.00 71.88 0.15 10.78
0+275 KI 2.7500 -
2.83 25.00 70.63 0.15 10.59
0+300 KI 2.9000 -
2.85 25.00 71.25 0.15 10.69
0+325 KI 2.8000 -
2.83 25.00 70.63 0.15 10.59
0+350 KI 2.8500 -
2.85 25.00 71.25 0.15 10.69
0+375 KI 2.8500 -
2.83 25.00 70.63 0.15 10.59
0+400 KI 2.8000 -
2.88 25.00 71.88 0.15 10.78
0+425 KI 2.9500 -
2.93 25.00 73.13 0.15 10.97
0+450 KI 2.9000 -
2.93 25.00 73.13 0.15 10.97
0+475 KI 2.9500 -
3.00 25.00 75.00 0.15 11.25
0+500 KI 3.0500 -
2.95 25.00 73.75 0.15 11.06
0+525 KI 2.8500 -
2.85 25.00 71.25 0.15 10.69
0+550 KI 2.8500 -
2.95 15.00 44.25 0.15 6.64
0+565 KI 3.0500 -

565.00 1,619.88 3.45 242.98


1 Err:509 0+565 KI 3.0500 -
0+565 - 1+500(KI) 3.05 10.00 30.50 0.15 4.58
2 0+575 KI 3.0500 -
3.05 25.00 76.25 0.15 11.44
3 0+600 KI 3.0500 -
3.05 25.00 76.25 0.15 11.44
4 0+625 KI 3.0500 -
2.98 25.00 74.38 0.15 11.16
5 0+650 KI 2.9000 -
2.93 25.00 73.13 0.15 10.97
6 0+675 KI 2.9500 -
2.93 25.00 73.13 0.15 10.97
7 0+700 KI 2.9000 -
2.90 25.00 72.50 0.15 10.88
8 0+725 KI 2.9000 -
2.90 25.00 72.50 0.15 10.88
9 0+750 KI 2.9000 -
2.85 25.00 71.25 0.15 10.69
10 0+775 KI 2.8000 -
3.08 25.00 76.88 0.15 11.53
0+800 KI 3.3500 -
3.18 25.00 79.38 0.15 11.91
0+825 KI 3.0000 -
2.95 25.00 73.75 0.15 11.06
0+850 KI 2.9000 -
2.83 25.00 70.63 0.15 10.59
0+875 KI 2.7500 -
2.83 25.00 70.63 0.15 10.59
0+900 KI 2.9000 -
2.83 25.00 70.63 0.15 10.59
0+925 KI 2.7500 -
2.83 25.00 70.63 0.15 10.59
0+950 KI 2.9000 -
2.88 25.00 71.88 0.15 10.78
0+975 KI 2.8500 -
2.85 25.00 71.25 0.15 10.69
1+000 KI 2.8500 -
2.88 25.00 71.88 0.15 10.78
1+025 KI 2.9000 -
- 25.00 - 0.15 -
1+050 KI Err:509 -
- 25.00 - 0.15 -
1+075 KI Err:509 -
- 25.00 - 0.15 -
1+100 KI Err:509 -
- 25.00 - 0.15 -
1+125 KI Err:509 -
- 25.00 - 0.15 -
1+150 KI Err:509 -
- 25.00 - 0.15 -
1+175 KI Err:509 -
Lebar Luas PEMAKAIAN
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) Segmen RATA-RATA/HARI KUANTITAS
(m) (m) (m2) ( LITER ) ( LITER )
- 25.00 - 0.15 -
1+200 KI Err:509 -
- 25.00 - 0.15 -
1+225 KI Err:509 -
- 25.00 - 0.15 -
1+250 KI Err:509 -
- 25.00 - 0.15 -
1+275 KI Err:509 -
- 25.00 - 0.15 -
1+300 KI Err:509 -
- 25.00 - 0.15 -
1+325 KI Err:509 -
- 25.00 - 0.15 -
1+350 KI Err:509 -
- 25.00 - 0.15 -
1+375 KI Err:509 -
- 25.00 - 0.15 -
1+400 KI Err:509 -
- 25.00 - 0.15 -
1+425 KI Err:509 -
- 25.00 - 0.15 -
1+450 KI Err:509 -
- 25.00 - 0.15 -
1+475 KI Err:509 -
- 25.00 - 0.15 -
1+500 KI Err:509 -

935.00 - -
1 30-Dec-99 1+040 KA Err:509
1+040 -1+500(KA) - 10.00 - 0.15 -
2 1+050 KA Err:509 -
- 25.00 - 0.15 -
3 1+075 KA Err:509 -
- 25.00 - 0.15 -
4 1+100 KA Err:509 -
- 25.00 - 0.15 -
5 1+125 KA Err:509 -
- 25.00 - 0.15 -
6 1+150 KA Err:509 -
- 25.00 - 0.15 -
7 1+175 KA Err:509 -
- 25.00 - 0.15 -
8 1+200 KA Err:509
- 25.00 - 0.15 -
9 1+225 KA Err:509
- 25.00 - 0.15 -
10 1+250 KA Err:509
- 25.00 - 0.15 -
11 1+275 KA Err:509
- 25.00 - 0.15 -
12 1+300 KA Err:509
- 25.00 - 0.15 -
13 1+325 KA Err:509
- 25.00 - 0.15 -
14 1+350 KA Err:509
- 25.00 - 0.15 -
15 1+375 KA Err:509
- 25.00 - 0.15 -
16 1+400 KA Err:509
- 25.00 - 0.15 -
17 1+425 KA Err:509
- 25.00 - 0.15 -
18 1+450 KA Err:509
- 25.00 - 0.15 -
19 1+475 KA Err:509
- 25.00 - 0.15 -
20 1+500 KA Err:509

460.00 - -
1,395.00 - -
TOTAL 3,000.00 - -
-
Disetujui Oleh : Diperiksa oleh : Penyedia Jasa
Pengawas Lapangan Konsultan Supervisi CV. LEMBANG JAYA
PT. KARPA Jo. CV. Hendra Co
-
-

ASEP JUHARA,ST.M.Si IMAN FIRMAN, ST M. IRZAL FAHLEVI, AM.d


NIP. 1966 1010 2009 01 1 001 Site Engineer Penanggung Jawab Teknik
PENYEDIA JASA : CV. DANTI
PAKET : REHABILITASI JALAN RUAS JALAN JAMPANGTENGAH -
PENGUJIAN KEPADATAN LAPANGAN Segmen : 1 ( Satu ) KIARADUA ( 1.70 KM )
Lokasi : 1 +150 - 1 +700 ( FULL ) JENIS : LASTON LAPIS AUS AC - WC Levelling
Tgl Penghamparan : 11 - 12 - 2013 TANGGAL UJI : 16 - 12 - 2013
Berat Density Persen
No Stasion STA UJI Tebal Diterima Di udara Di Air SSD Volume Lap JMF Kepadatan Keterangan
Cm Gram Gram Gram Cm3 Gr/cc Gr/cc %
1 1 +150 - 1 +700 ( FULL ) 1+175 3.93 688.8 383.2 692.8 309.6 2.225 2.262 98.36
4.40 770.5 428.4 774.5 346.1 2.226 2.262 98.41
1+176 4.07 712.1 396.9 716.1 319.2 2.231 2.262 98.63
3.83 671.3 373.5 675.3 301.8 2.224 2.262 98.32
2 1+250 4.03 706.3 393.7 710.3 316.6 2.231 2.262 98.63
1+251 4.40 770.5 429.1 774.5 345.4 2.231 2.262 98.63
1+250 4.57 799.7 445.6 803.7 358.1 2.233 2.262 98.72
4.13 723.8 402.4 727.8 325.4 2.224 2.262 98.32
3 1+275 3.87 677.1 377.3 681.1 303.8 2.229 2.262 98.54
4.87 852.2 474.6 856.2 381.6 2.233 2.262 98.72
4.33 758.8 421.6 762.8 341.2 2.224 2.262 98.32
4.67 817.2 454.6 821.2 366.6 2.229 2.262 98.54
4 1+400 5.13 898.9 500.0 902.9 402.9 2.231 2.262 98.63
5.00 875.5 487.4 879.5 392.1 2.233 2.262 98.72
5.17 904.7 505.9 908.7 402.8 2.246 2.262 99.29
5.07 887.2 495.7 891.2 395.5 2.243 2.262 99.16
5 1+475 4.53 793.8 442.3 797.8 355.5 2.233 2.262 98.72
5.13 898.9 498.0 902.9 404.9 2.220 2.262 98.14
4.63 811.3 449.5 815.3 365.8 2.218 2.262 98.05
5.03 881.4 488.7 885.4 396.7 2.222 2.262 98.23
6 1+550 6.23 1,091.5 604.7 1,095.5 490.8 2.224 2.262 98.32
5.53 968.9 536.5 972.9 436.4 2.220 2.262 98.14
4.57 799.7 445.6 803.7 358.1 2.233 2.262 98.72
4.93 863.9 479.5 867.9 388.4 2.224 2.262 98.32
7 1+575 6.43 1,126.5 625.1 1,130.5 505.4 2.229 2.262 98.54
4.87 852.2 472.3 856.2 383.9 2.220 2.262 98.14
5.63 986.4 546.9 990.4 443.5 2.224 2.262 98.32
0.00 531.2 296.7 535.2 238.5 2.227 2.262 98.44

PENYEDIA JASA TIM SUPERVISI PENGAWAS LAPANGAN

EDI SUPYADI HARRY KUSWIAN, ST, MT ASEP JUHARA,ST.M.Si


PENANGGUNG JAWAB TEKNIS NIP. 1974 0331 2008 01 1 002 NIP. 1966 1010 2009 01 1 001
PENYEDIA JASA : CV. DANTI
PAKET : REHABILITASI JALAN RUAS JALAN JAMPANGTENGAH -
PENGUJIAN KEPADATAN LAPANGAN Lokasi : 1 +150 - 1 +700 ( FULL ) KIARADUA ( 1.70 KM )
JENIS : LASTON LAPIS AUS AC - WC Levelling
Tgl Penghamparan : 11 - 12 - 2013 TANGGAL : 16 - 12 - 2013
Berat Density Persen
No Stasion STA UJI Tebal Diterima Di udara Di Air SSD Volume Lap JMF Kepadatan Keterangan
Cm Gram Gram Gram Cm3 Gr/cc Gr/cc %
8 1+600 4.53 793.8 441.7 797.8 356.1 2.229 2.262 98.54
4.90 858.0 477.8 862.0 384.2 2.233 2.262 98.72
1+599 4.13 723.8 402.4 727.8 325.4 2.224 2.262 98.32
4.47 782.2 435.3 786.2 350.9 2.229 2.262 98.54
1+675 4.20 735.5 409.8 739.5 329.7 2.231 2.262 98.63
3.93 688.8 384.3 692.8 308.5 2.233 2.262 98.72
5.47 957.3 533.2 961.3 428.1 2.236 2.262 98.85
1+676 0.00 566.2 316.4 570.2 253.8 2.231 2.262 98.63

RATA - RATA 4.46 2.229 2.262 98.53


PENYEDIA JASA TIM SUPERVISI PENGAWAS LAPANGAN

EDI SUPYADI HARRY KUSWIAN, ST, MT ASEP JUHARA,ST.M.Si


PENANGGUNG JAWAB TEKNIS NIP. 1974 0331 2008 01 1 002 NIP. 1966 1010 2009 01 1 001
PENYEDIA JASA : CV. DANTI
PAKET : REHABILITASI JALAN RUAS JALAN JAMPANGTENGAH -
PENGUJIAN KEPADATAN LAPANGAN Lokasi : 0 + 526 - 1 + 150 (FULL ) KIARADUA ( 1.70 KM )
JENIS : LASTON LAPIS AUS AC - WC Levelling
Tgl Penghamparan : 12 - 12 - 2013 TANGGAL : 16 - 12 - 2013
Berat Density Persen
No Stasion STA UJI Tebal Diterima Di udara Di Air SSD Volume Lap JMF Kepadatan Keterangan
Cm Gram Gram Gram Cm3 Gr/cc Gr/cc %
1 0+526-1+150 0+551 5.37 939.8 521.2 943.8 422.6 2.224 2.262 98.32
4.17 729.6 406.3 733.6 327.3 2.229 2.262 98.54
5.70 998.1 554.7 1,002.1 447.4 2.231 2.262 98.63
4.40 770.5 429.4 774.5 345.1 2.233 2.262 98.72
2 0+626 4.73 828.9 459.5 832.9 373.4 2.220 2.262 98.14
3.83 671.3 375.1 675.3 300.2 2.236 2.262 98.85
5.57 974.8 541.5 978.8 437.3 2.229 2.262 98.54
0.00 642.1 358.3 646.1 287.8 2.231 2.262 98.63
3 0+651 4.00 700.4 390.7 704.4 313.7 2.233 2.262 98.72
5.27 922.2 513.8 926.2 412.4 2.236 2.262 98.85
5.00 875.5 487.1 879.5 392.4 2.231 2.262 98.63
4.63 811.3 450.0 815.3 365.3 2.221 2.262 98.19
4 0+775 5.63 986.4 546.5 990.4 443.9 2.222 2.262 98.23
5.27 922.2 511.9 926.2 414.3 2.226 2.262 98.41
5.90 1,033.1 573.4 1,037.1 463.7 2.228 2.262 98.50
5.70 998.1 552.3 1,002.1 449.8 2.219 2.262 98.10
5 0+851 3.83 671.3 373.9 675.3 301.4 2.227 2.262 98.45
0+850,30 0.00 525.3 293.5 529.3 235.8 2.228 2.262 98.50
0+850,30 4.57 799.7 444.0 803.7 359.7 2.223 2.262 98.28
0+850 4.50 788.0 437.5 792.0 354.5 2.223 2.262 98.28
6 0+924 5.13 898.9 498.9 902.9 404.0 2.225 2.262 98.36
5.10 893.1 496.1 897.1 401.0 2.227 2.262 98.45
5.97 1,044.8 579.6 1,048.8 469.2 2.227 2.262 98.45
5.43 951.4 528.8 955.4 426.6 2.230 2.262 98.59
7 0+999 5.53 968.9 537.0 972.9 435.9 2.223 2.262 98.28
4.70 823.0 456.9 827.0 370.1 2.224 2.262 98.32
4.97 869.7 482.8 873.7 390.9 2.225 2.262 98.36
5.13 898.9 499.1 902.9 403.8 2.226 2.262 98.41

PENYEDIA JASA TIM SUPERVISI PENGAWAS LAPANGAN

EDI SUPYADI HARRY KUSWIAN, ST, MT ASEP JUHARA,ST.M.Si


PENANGGUNG JAWAB TEKNIS NIP. 1974 0331 2008 01 1 002 NIP. 1966 1010 2009 01 1 001
PENYEDIA JASA : CV. DANTI
PAKET : REHABILITASI JALAN RUAS JALAN JAMPANGTENGAH -
PENGUJIAN KEPADATAN LAPANGAN Lokasi : 0 + 526 - 1 + 150 (FULL ) KIARADUA ( 1.70 KM )
Tgl Penghamparan : 12 - 12 - 2013 JENIS : LASTON LAPIS AUS AC - WC Levelling
TANGGAL : 16 - 12 - 2013
Berat Density Persen
No Stasion STA UJI Tebal Diterima Di udara Di Air SSD Volume Lap JMF Kepadatan Keterangan
Cm Gram Gram Gram Cm3 Gr/cc Gr/cc %
8 1+024 4.63 811.3 454.0 815.3 361.3 2.246 2.262 99.28
4.90 858.0 479.4 862.0 382.6 2.243 2.262 99.15
4.23 741.3 413.3 745.3 332.0 2.233 2.262 98.70
4.60 805.5 446.7 809.5 362.8 2.220 2.262 98.16
9 1+101 5.03 881.4 488.1 885.4 397.3 2.218 2.262 98.07
4.87 852.2 472.6 856.2 383.6 2.221 2.262 98.21
4.43 776.3 431.2 780.3 349.1 2.223 2.262 98.30
4.10 718.0 398.6 722.0 323.4 2.220 2.262 98.16
10 1+125 0.00 589.6 329.5 593.6 264.1 2.233 2.262 98.70
1+126 4.33 758.8 422.8 762.8 340.0 2.232 2.262 98.65
1+126 4.50 788.0 439.0 792.0 353.0 2.233 2.262 98.70
1+126 4.63 811.3 450.6 815.3 364.7 2.224 2.262 98.34
11 1+149 4.90 858.0 477.0 862.0 385.0 2.229 2.262 98.52
4.90 858.0 479.9 862.0 382.1 2.246 2.262 99.28
3.90 682.9 382.4 686.9 304.5 2.243 2.262 99.15
4.77 834.7 464.8 838.7 373.9 2.233 2.262 98.70

RATA - RATA 4.52 2.228 2.262 98.52


PENYEDIA JASA TIM SUPERVISI PENGAWAS LAPANGAN

EDI SUPYADI HARRY KUSWIAN, ST, MT ASEP JUHARA,ST.M.Si


PENANGGUNG JAWAB TEKNIS NIP. 1974 0331 2008 01 1 002 NIP. 1966 1010 2009 01 1 001
Lokasi : 0 + 000 - 0 + 526 ( FULL ) PENYEDIA JASA : CV. DANTI
PAKET : REHABILITASI JALAN RUAS JALAN JAMPANGTENGAH -
PENGUJIAN KEPADATAN LAPANGAN KIARADUA ( 1.70 KM )
Tgl Penghamparan : 13 - 12 - 2013 JENIS : LASTON LAPIS AUS AC - WC Levelling
TANGGAL : 16 - 12 - 2013
Berat Density Persen
No Stasion STA UJI Tebal Diterima Di udara Di Air SSD Volume Lap JMF Kepadatan Keterangan
Cm Gram Gram Gram Cm3 Gr/cc Gr/cc %
1 0+000-0+526 0+025 3.97 694.6 387.2 698.6 311.4 2.231 2.262 98.61
4.93 863.9 482.4 867.9 385.5 2.241 2.262 99.06
2 5.03 881.4 490.3 885.4 395.1 2.231 2.262 98.61
4.70 823.0 457.7 827.0 369.3 2.229 2.262 98.52
3 0+101 5.23 916.4 509.9 920.4 410.5 2.233 2.262 98.70
4.90 858.0 475.6 862.0 386.4 2.220 2.262 98.16
4 4.97 869.7 481.7 873.7 392.0 2.218 2.262 98.07
3.90 682.9 379.5 686.9 307.4 2.221 2.262 98.21
5 0+126 5.17 904.7 501.8 908.7 406.9 2.223 2.262 98.30
4.87 852.2 472.4 856.2 383.8 2.220 2.262 98.16
6 4.50 788.0 439.0 792.0 353.0 2.233 2.262 98.70
4.83 846.4 471.5 850.4 378.9 2.234 2.262 98.74
7 0+249 4.50 788.0 439.0 792.0 353.0 2.233 2.262 98.70
4.93 863.9 480.6 867.9 387.3 2.231 2.262 98.61
8 6.17 1,079.8 598.2 1,083.8 485.6 2.223 2.262 98.30
4.80 840.5 467.7 844.5 376.8 2.231 2.262 98.61
9 0+325 5.17 904.7 500.9 908.7 407.8 2.218 2.262 98.07
5.10 893.1 494.9 897.1 402.2 2.220 2.262 98.16
10 5.37 939.8 522.9 943.8 420.9 2.233 2.262 98.70
5.07 887.2 496.1 891.2 395.1 2.246 2.262 99.28
11 0+400 4.80 840.5 467.7 844.5 376.8 2.231 2.262 98.61
4.53 793.8 441.8 797.8 356.0 2.230 2.262 98.57
12 4.40 770.5 428.8 774.5 345.7 2.229 2.262 98.52
4.10 718.0 400.1 722.0 321.9 2.231 2.262 98.61
13 0+424 4.03 706.3 392.2 710.3 318.1 2.220 2.262 98.16
5.93 1,039.0 574.6 1,043.0 468.4 2.218 2.262 98.07
14 5.17 904.7 501.4 908.7 407.3 2.221 2.262 98.21
4.67 817.2 453.7 821.2 367.5 2.223 2.262 98.30

PENYEDIA JASA TIM SUPERVISI PENGAWAS LAPANGAN

EDI SUPYADI HARRY KUSWIAN, ST, MT ASEP JUHARA,ST.M.Si


PENANGGUNG JAWAB TEKNIS NIP. 1974 0331 2008 01 1 002 NIP. 1966 1010 2009 01 1 001
Lokasi : 0 + 000 - 0 + 526 ( FULL ) PENYEDIA JASA : CV. DANTI
PAKET : REHABILITASI JALAN RUAS JALAN JAMPANGTENGAH -
PENGUJIAN KEPADATAN LAPANGAN KIARADUA ( 1.70 KM )
Tgl Penghamparan : 13 - 12 - 2013 JENIS : LASTON LAPIS AUS AC - WC Levelling
TANGGAL : 16 - 12 - 2013
Berat Density Persen
No Stasion STA UJI Tebal Diterima Di udara Di Air SSD Volume Lap JMF Kepadatan Keterangan
Cm Gram Gram Gram Cm3 Gr/cc Gr/cc %
15 0+449 4.60 805.5 448.4 809.5 361.1 2.231 2.262 98.61
4.97 869.7 485.6 873.7 388.1 2.241 2.262 99.06
5.10 893.1 496.7 897.1 400.4 2.231 2.262 98.61
4.80 840.5 467.3 844.5 377.2 2.229 2.262 98.52
16 0+501 3.87 677.1 377.8 681.1 303.3 2.233 2.262 98.70
4.23 741.3 411.4 745.3 333.9 2.220 2.262 98.16
4.90 858.0 475.2 862.0 386.8 2.218 2.262 98.07
5.03 881.4 488.6 885.4 396.8 2.221 2.262 98.21

RATA - RATA 4.81 2.228 2.262 98.48


PENYEDIA JASA TIM SUPERVISI PENGAWAS LAPANGAN

EDI SUPYADI HARRY KUSWIAN, ST, MT ASEP JUHARA,ST.M.Si


PENANGGUNG JAWAB TEKNIS NIP. 1974 0331 2008 01 1 002 NIP. 1966 1010 2009 01 1 001
DATA PENDUKUNG
HASIL PERHITUNGAN KETEBALAN LAPANGAN

PAKET : REHABILITASI JALAN RUAS JALAN CIKEMBAR - CIKEMBANG ( 1,00 KM )


PENYEDIA JASA : CV. LEMBANG JAYA

JARAK DARI TEBAL TEBAL TEBAL


NO TANGGAL STA STA CORING POSISI KET
TEPI
1 2 3 RATA RATA diterima RATA-RATA

1 30 September 2014 1+240 - 1+500(KI) 1+175 Ki.1 0.60 4.10 3.70 4.00 3.93 3.93

Ki.2 2.00 4.50 4.40 4.30 4.40 4.40

1+176 Ka.1 0.60 4.00 4.10 4.10 4.07 4.07

Ka.2 2.00 3.70 3.80 4.00 3.83 3.83

2 1+250 Ki.1 0.60 4.20 4.00 3.90 4.03 4.03

1+251 Ki.2 2.00 4.70 4.50 4.00 4.40 4.40

1+250 Ka.1 0.60 4.50 4.70 4.50 4.57 4.57

Ka.2 2.00 4.10 4.10 4.20 4.13 4.13

3 1+275 Ki.1 0.60 3.80 3.80 4.00 3.87 3.87

Ki.2 2.00 4.90 4.80 4.90 4.87 4.87

Ka.1 0.60 4.30 4.20 4.50 4.33 4.33

Ka.2 2.00 4.50 4.70 4.80 4.67 4.67

4 1+400 Ki.1 0.60 5.30 5.00 5.10 5.13 5.13

Ki.2 2.00 5.00 4.90 5.10 5.00 5.00

Ka.1 0.60 5.00 5.30 5.20 5.17 5.17

Ka.2 2.00 5.00 5.20 5.00 5.07 5.07

5 1+475 Ki.1 0.60 4.50 4.40 4.70 4.53 4.53

Ki.2 2.00 5.20 5.00 5.20 5.13 5.13

Ka.1 0.60 4.40 4.70 4.80 4.63 4.63

Ka.2 2.00 5.10 5.00 5.00 5.03 5.03

6 1+550 Ki.1 0.60 6.10 6.40 6.20 6.23 6.23

Ki.2 2.00 5.50 5.70 5.40 5.53 5.53

Ka.1 0.60 4.60 4.50 4.60 4.57 4.57

Ka.2 2.00 5.30 4.60 4.90 4.93 4.93

7 1+575 Ki.1 0.60 6.50 6.30 6.50 6.43 6.43

Ki.2 2.00 4.70 5.00 4.90 4.87 4.87

Ka.1 0.60 5.50 5.80 5.60 5.63 5.63

Ka.2 2.00 3.00 3.10 3.00 3.03 -

8 1+600 Ki.1 0.60 4.50 4.50 4.60 4.53 4.53

Ki.2 2.00 4.80 5.00 4.90 4.90 4.90

1+599 Ka.1 0.60 4.10 4.40 3.90 4.13 4.13

Ka.2 2.00 4.50 4.40 4.50 4.47 4.47

9 1+675 Ki.1 0.60 4.00 4.00 4.60 4.20 4.20

Ki.2 2.00 3.70 4.00 4.10 3.93 3.93

Ka.1 0.60 5.70 5.20 5.50 5.47 5.47

1+676 Ka.2 2.00 3.50 3.00 3.20 3.23 -

4.46
JARAK DARI TEBAL TEBAL TEBAL
NO TANGGAL STA STA CORING POSISI KET
TEPI
1 2 3 RATA RATA diterima RATA-RATA

1 1 Oktober 2014 1+300 - 1+500(KA) 0+551 Ki.1 0.60 5.60 5.30 5.20 5.37 5.37

Ki.2 2.00 4.00 4.20 4.30 4.17 4.17

Ka.1 0.60 5.60 5.80 5.70 5.70 5.70

Ka.2 2.00 4.70 4.30 4.20 4.40 4.40

2 0+626 Ki.1 0.60 4.80 4.50 4.90 4.73 4.73

Ki.2 2.00 4.10 3.80 3.60 3.83 3.83

Ka.1 0.60 5.70 5.40 5.60 5.57 5.57

Ka.2 2.00 3.80 3.30 3.90 3.67 -

3 0+651 Ki.1 0.60 3.80 3.70 4.50 4.00 4.00

Ki.2 2.00 5.10 5.90 4.80 5.27 5.27

Ka.1 0.60 5.30 5.50 4.20 5.00 5.00

Ka.2 2.00 4.90 4.50 4.50 4.63 4.63

4 0+775 Ki.1 0.60 5.90 5.50 5.50 5.63 5.63

Ki.2 2.00 4.90 5.40 5.50 5.27 5.27

Ka.1 0.60 6.00 5.90 5.80 5.90 5.90

Ka.2 2.00 5.80 5.40 5.90 5.70 5.70

5 0+851 Ki.1 0.60 3.90 3.90 3.70 3.83 3.83

0+850,30 Ki.2 2.00 3.00 3.10 2.90 3.00 -

0+850,30 Ka.1 0.60 4.50 4.80 4.40 4.57 4.57

0+850 Ka.2 2.00 4.50 4.40 4.60 4.50 4.50

6 0+924 Ki.1 0.60 5.00 5.40 5.00 5.13 5.13

Ki.2 2.00 5.00 5.20 5.10 5.10 5.10

Ka.1 0.60 5.90 5.80 6.20 5.97 5.97

Ka.2 2.00 5.90 5.30 5.10 5.43 5.43

7 0+999 Ki.1 0.60 5.50 5.50 5.60 5.53 5.53

Ki.2 2.00 4.50 4.70 4.90 4.70 4.70

Ka.1 0.60 5.00 5.10 4.80 4.97 4.97

Ka.2 2.00 5.10 5.00 5.30 5.13 5.13

8 1+024 Ki.1 0.60 4.70 4.60 4.60 4.63 4.63

Ki.2 2.00 5.00 4.90 4.80 4.90 4.90

Ka.1 0.60 4.40 4.00 4.30 4.23 4.23

Ka.2 2.00 4.60 4.70 4.50 4.60 4.60

9 1+101 Ki.1 0.60 5.10 5.00 5.00 5.03 5.03

Ki.2 2.00 4.90 4.90 4.80 4.87 4.87

Ka.1 0.80 4.50 4.30 4.50 4.43 4.43

Ka.2 2.00 4.10 4.00 4.20 4.10 4.10

10 1+125 Ki.1 0.60 3.40 3.60 3.10 3.37 -

1+126 Ki.2 2.00 4.20 4.30 4.50 4.33 4.33

1+126 Ka.1 0.60 4.50 4.60 4.40 4.50 4.50

1+126 Ka.2 2.00 4.80 4.50 4.60 4.63 4.63

11 1+149 Ki.1 0.60 5.00 4.80 4.90 4.90 4.90

Ki.2 2.00 4.90 4.80 5.00 4.90 4.90

Ka.1 0.60 4.20 4.00 3.50 3.90 3.90

Ka.2 2.00 4.60 4.80 4.90 4.77 4.77

4.52
JARAK DARI TEBAL TEBAL TEBAL
NO TANGGAL STA STA CORING POSISI KET
TEPI
1 2 3 RATA RATA diterima RATA-RATA

3 2 Oktober 2014 1+030 -1+300(KA) 0+025 Ki.1 1.00 4.10 3.80 4.00 3.97 3.97

Ki.2 1.90 4.70 5.00 5.10 4.93 4.93

Ka.1 0.70 5.00 5.00 5.10 5.03 5.03

Ka.2 1.80 4.80 4.60 4.70 4.70 4.70

0+101 Ki.1 0.60 5.10 5.40 5.20 5.23 5.23

Ki.2 1.80 4.30 5.90 4.50 4.90 4.90

Ka.1 0.60 5.10 4.80 5.00 4.97 4.97

Ka.2 1.90 4.10 3.80 3.80 3.90 3.90

0+126 Ki.1 0.60 5.10 5.00 5.40 5.17 5.17

Ki.2 1.80 4.80 4.90 4.90 4.87 4.87

Ka.1 0.70 4.60 4.40 4.50 4.50 4.50

Ka.2 1.90 5.10 4.80 4.60 4.83 4.83

0+249 Ki.1 0.60 4.50 4.50 4.50 4.50 4.50

Ki.2 1.90 5.10 4.80 4.90 4.93 4.93

Ka.1 0.70 6.40 6.00 6.10 6.17 6.17

Ka.2 1.80 4.90 4.70 4.80 4.80 4.80

0+325 Ki.1 0.70 5.00 5.20 5.30 5.17 5.17

Ki.2 1.80 5.00 5.30 5.00 5.10 5.10

Ka.1 0.60 5.50 5.30 5.30 5.37 5.37

Ka.2 1.80 5.10 5.00 5.10 5.07 5.07

0+400 Ki.1 0.60 4.70 4.80 4.90 4.80 4.80

Ki.2 1.90 4.60 4.80 4.20 4.53 4.53

Ka.1 0.60 4.30 4.50 4.40 4.40 4.40

Ka.2 1.90 4.00 4.20 4.10 4.10 4.10

0+424 Ki.1 0.60 4.10 4.00 4.00 4.03 4.03

Ki.2 2.00 5.90 5.70 6.20 5.93 5.93

Ka.1 0.70 5.20 5.10 5.20 5.17 5.17

Ka.2 1.80 5.00 4.40 4.60 4.67 4.67

0+449 Ki.1 0.60 4.70 4.50 4.60 4.60 4.60

Ki.2 2.10 5.00 4.90 5.00 4.97 4.97

Ka.1 0.60 5.10 5.20 5.00 5.10 5.10

Ka.2 2.00 4.70 4.90 4.80 4.80 4.80

0+501 Ki.1 0.60 3.80 3.90 3.90 3.87 3.87

Ki.2 2.00 3.60 4.30 4.80 4.23 4.23

Ka.1 0.60 5.10 4.80 4.80 4.90 4.90

Ka.2 2.00 4.90 5.20 5.00 5.03 5.03

4.81

PENGAWAS LAPANGAN TIM SUPERVISI PENYEDIA JASA

ASEP JUHARA,ST.M.Si HARRY KUSWIAN, ST, MT EDI SUPYADI


NIP. 1966 1010 2009 01 1 001 NIP. 1974 0331 2008 01 1 002 PENANGGUNG JAWAB TEKNIS
DATA PENDUKUNG
HASIL PERHITUNGAN LUAS PENGHAMPARAN

Nama Balai : BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II


Nama Kegiatan : REHABILITASI JALAN DAN JEMBATAN PROVINSI BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II
Nama Paket : REHABILITASI JALAN RUAS JALAN CIKEMBAR - CIKEMBANG ( 1,00 KM )
Lokasi : RUAS JALAN CIKEMBAR - CIKEMBANG
No. Kontrak : 602/Ktr.27/ 209/BPJ.WIL.PEL.II
Tgl. Kontrak : 28 JULI 2015
Penyedia Jasa : CV. LEMBANG JAYA
Jenis Pekerjaan : Laston Lapis Aus ( AC -WC) LEVELLING
Tanggal Penghamparan : 11-13 Desember 2013
Panjang Segmen : 1,70 Km
Tebal Rencana : 4,5 Cm

Lebar Luas
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) Segmen
(m) (m) (m2)
1 11 Desember 2013 1+150 Full 4.20
1+150-1+700 4.10 25.00 102.50
2 1+175 Full 4.00 -
4.00 25.00 100.00
3 1+200 Full 4.00 -
4.00 25.00 100.00
4 1+225 Full 4.00 -
4.10 25.00 102.50
5 1+250 Full 4.20 -
4.35 25.00 108.75
6 1+275 Full 4.50 -
4.40 25.00 110.00
7 1+300 Full 4.30 -
4.30 25.00 107.50
8 1+325 Full 4.30 -
4.30 25.00 107.50
9 1+350 Full 4.30 -
4.25 25.00 106.25
10 1+375 Full 4.20 -
4.10 25.00 102.50
11 1+400 Full 4.00 -
4.10 25.00 102.50
12 1+425 Full 4.20 -
4.25 25.00 106.25
13 1+450 Full 4.30 -
4.30 25.00 107.50
14 1+475 Full 4.30 -
4.40 25.00 110.00
15 1+500 Full 4.50 -
4.50 25.00 112.50
16 1+525 Full 4.50 -
4.40 25.00 110.00
17 1+550 Full 4.30 -
4.40 25.00 110.00
18 1+575 Full 4.50 -
4.50 25.00 112.50
19 1+600 Full 4.50
4.50 25.00 112.50
20 1+625 Full 4.50
4.50 25.00 112.50
21 1+650 Full 4.50
4.50 25.00 112.50
22 1+675 Full 4.50
4.50 25.00 112.50
23 1+700 Full 4.50

550.00 2,368.75
Lebar Luas
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) Segmen
(m) (m) (m2)
1 12 Desember 2013 0+526 KA 4.20 -
0+526-1+150 4.25 24.00 102.00
2 0+550 KA 4.30 -
4.30 25.00 107.50
3 0+575 KA 4.30 -
4.30 25.00 107.50
4 0+600 KA 4.30 -
4.30 25.00 107.50
5 0+625 KA 4.30 -
4.45 25.00 111.25
6 0+650 KA 4.60 -
4.60 25.00 115.00
7 0+675 KA 4.60 -
4.55 25.00 113.75
8 0+700 KA 4.50 -
4.50 25.00 112.50
9 0+725 KA 4.50 -
4.40 25.00 110.00
10 0+750 KA 4.30 -
4.30 25.00 107.50
11 0+775 KA 4.30 -
4.30 25.00 107.50
12 0+800 KA 4.30 -
4.40 25.00 110.00
13 0+825 KA 4.50 -
4.40 25.00 110.00
14 0+850 KA 4.30 -
4.30 25.00 107.50
15 0+875 KA 4.30 -
4.40 25.00 110.00
16 0+900 KA 4.50 -
4.40 25.00 110.00
17 0+925 KA 4.30 -
4.30 25.00 107.50
18 0+950 KA 4.30 -
4.30 25.00 107.50
19 0+975 KA 4.30 -
4.30 25.00 107.50
20 1+000 KA 4.30 -
4.30 25.00 107.50
21 1+025 KA 4.30 -
4.30 25.00 107.50
22 1+050 KA 4.30 -
4.30 25.00 107.50
23 1+075 KA 4.30 -
4.30 25.00 107.50
24 1+100 KA 4.30 -
4.30 25.00 107.50
25 1+125 KA 4.30 -
4.25 25.00 106.25
26 1+150 KA 4.20
624.00 2,715.75
Lebar Luas
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) Segmen
(m) (m) (m2)
1 13 Desember 2013 0+000 KI 4.50 -
0+000-0+526 4.50 25.00 112.50
2 0+025 KI 4.50 -
4.50 25.00 112.50
3 0+050 KI 4.50 -
4.50 25.00 112.50
4 0+075 KI 4.50 -
4.50 25.00 112.50
5 0+100 KI 4.50 -
4.50 25.00 112.50
6 0+125 KI 4.50 -
4.40 25.00 110.00
7 0+150 KI 4.30 -
4.30 25.00 107.50
8 0+175 KI 4.30 -
4.30 25.00 107.50
9 0+200 KI 4.30 -
4.30 25.00 107.50
10 0+225 KI 4.30 -
4.30 25.00 107.50
11 0+250 KI 4.30 -
4.30 25.00 107.50
12 0+275 KI 4.30 -
4.30 25.00 107.50
13 0+300 KI 4.30 -
4.30 25.00 107.50
14 0+325 KI 4.30 -
4.25 25.00 106.25
15 0+350 KI 4.20 -
4.25 25.00 106.25
16 0+375 KI 4.30 -
4.30 25.00 107.50
17 0+400 KI 4.30 -
4.30 25.00 107.50
18 0+425 KI 4.30 -
4.40 25.00 110.00
19 0+450 KI 4.50 -
4.50 25.00 112.50
20 0+475 KI 4.50 -
4.40 25.00 110.00
21 0+500 KI 4.30 -
4.25 26.00 110.50
22 0+526 KI 4.20
526.00 2,295.50
TOTAL 1,700.00 7,380.00

Pengawas Lapangan TIM SUPERVISI Penyedia Jasa


CV. LEMBANG JAYA

ASEP JUHARA,ST.M.Si HARRY KUSWIAN, ST, MT EDI SUPYADI


NIP. 1966 1010 2009 01 1 001 NIP. 1974 0331 2008 01 1 002 Penanggung Jawab Teknik
DATA PENDUKUNG KUANTITAS
SERTIFIKAT BULANAN N0 - 02

KEGIATAN : REHABILITASI JALAN DAN JEMBATAN PROVINSI BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II
PEKERJAAN : REHABILITASI JALAN RUAS JALAN CIKEMBAR - CIKEMBANG ( 1,00 KM )
LOKASI : RUAS JALAN CIKEMBAR - CIKEMBANG
NO.ITEM PEKERJAAN : 6.1.2
ITEM PEKERJAAN : LAPIS PEREKAT
SATUAN : LITER

Lebar PEMAKAIAN Luas


Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) RATA-RATA/HARI Segmen
(m) (m) ( LITER ) ( LITER )
1 30 September 2014 1+150 Full 4.20
1+150-1+700 4.10 25.00 0.348 35.67
2 1+175 Full 4.00 -
4.00 25.00 0.348 34.80
3 1+200 Full 4.00 -
4.00 25.00 0.348 34.80
4 1+225 Full 4.00 -
4.10 25.00 0.348 35.67
5 1+250 Full 4.20 -
4.35 25.00 0.348 37.85
6 1+275 Full 4.50 -
4.40 25.00 0.348 38.28
7 1+300 Full 4.30 -
4.30 25.00 0.348 37.41
8 1+325 Full 4.30 -
4.30 25.00 0.348 37.41
9 1+350 Full 4.30 -
4.25 25.00 0.348 36.98
10 1+375 Full 4.20 -
4.10 25.00 0.348 35.67
11 1+400 Full 4.00 -
4.10 25.00 0.348 35.67
12 1+425 Full 4.20 -
4.25 25.00 0.348 36.98
13 1+450 Full 4.30 -
4.30 25.00 0.348 37.41
14 1+475 Full 4.30 -
4.40 25.00 0.348 38.28
15 1+500 Full 4.50 -
4.50 25.00 0.348 39.15
16 1+525 Full 4.50 -
4.40 25.00 0.348 38.28
17 1+550 Full 4.30 -
4.40 25.00 0.348 38.28
18 1+575 Full 4.50 -
4.50 25.00 0.348 39.15
19 1+600 Full 4.50
4.50 25.00 0.348 39.15
20 1+625 Full 4.50
4.50 25.00 0.348 39.15
21 1+650 Full 4.50
4.50 25.00 0.348 39.15
22 1+675 Full 4.50
4.50 25.00 0.348 39.15
23 1+700 Full 4.50

550.00 824.33
Lebar PEMAKAIAN Luas
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) RATA-RATA/HARI Segmen
(m) (m) ( LITER ) ( LITER )
1 1 Oktober 2014 0+526 Full 4.20 -
0+526-1+150 4.25 24.00 0.346 35.29
2 0+550 Full 4.30 -
4.30 25.00 0.346 37.20
3 0+575 Full 4.30 -
4.30 25.00 0.346 37.20
4 0+600 Full 4.30 -
4.30 25.00 0.346 37.20
5 0+625 Full 4.30 -
4.45 25.00 0.346 38.49
6 0+650 Full 4.60 -
4.60 25.00 0.346 39.79
7 0+675 Full 4.60 -
4.55 25.00 0.346 39.36
8 0+700 Full 4.50 -
4.50 25.00 0.346 38.93
9 0+725 Full 4.50 -
4.40 25.00 0.346 38.06
10 0+750 Full 4.30 -
4.30 25.00 0.346 37.20
11 0+775 Full 4.30 -
4.30 25.00 0.346 37.20
12 0+800 Full 4.30 -
4.40 25.00 0.346 38.06
13 0+825 Full 4.50 -
4.40 25.00 0.346 38.06
14 0+850 Full 4.30 -
4.30 25.00 0.346 37.20
15 0+875 Full 4.30 -
4.40 25.00 0.346 38.06
16 0+900 Full 4.50 -
4.40 25.00 0.346 38.06
17 0+925 Full 4.30 -
4.30 25.00 0.346 37.20
18 0+950 Full 4.30 -
4.30 25.00 0.346 37.20
19 0+975 Full 4.30 -
4.30 25.00 0.346 37.20
20 1+000 Full 4.30 -
4.30 25.00 0.346 37.20
21 1+025 Full 4.30 -
4.30 25.00 0.346 37.20
22 1+050 Full 4.30 -
4.30 25.00 0.346 37.20
23 1+075 Full 4.30 -
4.30 25.00 0.346 37.20
24 1+100 Full 4.30 -
4.30 25.00 0.346 37.20
25 1+125 Full 4.30 -
4.25 25.00 0.346 36.76
26 1+150 Full 4.20
624.00 939.65
Lebar PEMAKAIAN Luas
Lebar Rata - rata Panjang
No. TANGGAL STA POSISI (m) RATA-RATA/HARI Segmen
(m) (m) ( LITER ) ( LITER )
1 2 Oktober 2014 0+000 Full 4.50 -
0+000-0+526 4.50 25.00 0.350 39.38
2 0+025 Full 4.50 -
4.50 25.00 0.350 39.38
3 0+050 Full 4.50 -
4.50 25.00 0.350 39.38
4 0+075 Full 4.50 -
4.50 25.00 0.350 39.38
5 0+100 Full 4.50 -
4.50 25.00 0.350 39.38
6 0+125 Full 4.50 -
4.40 25.00 0.350 38.50
7 0+150 Full 4.30 -
4.30 25.00 0.350 37.63
8 0+175 Full 4.30 -
4.30 25.00 0.350 37.63
9 0+200 Full 4.30 -
4.30 25.00 0.350 37.63
10 0+225 Full 4.30 -
4.30 25.00 0.350 37.63
11 0+250 Full 4.30 -
4.30 25.00 0.350 37.63
12 0+275 Full 4.30 -
4.30 25.00 0.350 37.63
13 0+300 Full 4.30 -
4.30 25.00 0.350 37.63
14 0+325 Full 4.30 -
4.25 25.00 0.350 37.19
15 0+350 Full 4.20 -
4.25 25.00 0.350 37.19
16 0+375 Full 4.30 -
4.30 25.00 0.350 37.63
17 0+400 Full 4.30 -
4.30 25.00 0.350 37.63
18 0+425 Full 4.30 -
4.40 25.00 0.350 38.50
19 0+450 Full 4.50 -
4.50 25.00 0.350 39.38
20 0+475 Full 4.50 -
4.40 25.00 0.350 38.50
21 0+500 Full 4.30 -
4.25 26.00 0.350 38.68
22 0+526 Full 4.20
526.00 803.43
TOTAL 1,700.00 2,567.41

Pengawas Lapangan TIM SUPERVISI Penyedia Jasa


CV. LEMBANG JAYA

ASEP JUHARA,ST.M.Si HARRY KUSWIAN, ST, MT EDI SUPYADI


NIP. 1966 1010 2009 01 1 001 NIP. 1974 0331 2008 01 1 002 Penanggung Jawab Teknik
DATA PENDUKUNG
HASIL PERHITUNGAN TEBAL DAN KEPADATAN

Nama Balai : BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II


Nama Kegiatan : REHABILITASI JALAN DAN JEMBATAN PROVINSI BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II
Nama Paket : REHABILITASI JALAN RUAS JALAN CIKEMBAR - CIKEMBANG ( 1,00 KM )
Lokasi : RUAS JALAN CIKEMBAR - CIKEMBANG
No. Kontrak : 602/Ktr.27/ 209/BPJ.WIL.PEL.II
Tgl. Kontrak : 28 JULI 2015
Penyedia Jasa : CV. LEMBANG JAYA
Jenis Pekerjaan : LASTON LAPIS ANTARA AC - BC LEVELLING
Tanggal Penghamparan : 30 september-5 Oktober 2014
Panjang Segmen : 1,50 Km
Tebal Rencana : 5,5 Cm

Tebal Tebal Kepadatan Kepadatan Be Isi Lap


Tebal BJ Isi Lap BJ Isi JSD
No. TANGGAL STA Sta Posisi Jarak diterima yg diambil Lapangan Lapangan Rata -rata
1 2 3 rata-rata (Gr/cm3 (Gr/cm3 rata-rata (Gr/cm3
1 11 September 2013 00 + 012 KI 0.70 4.50 4.40 4.20 4.37 4.37 2.241 2.275 98.51
0+000-0+425 ( ki ) KI.T 2.85 4.70 4.50 4.30 4.50 4.50 2.245 2.275 98.68
2 00 + 102 KI 0.80 4.20 4.20 4.40 4.27 4.27 2.244 2.275 98.64
KI.T 3.00 4.80 4.55 4.60 4.65 4.65 2.241 2.275 98.51
3 00 + 204 KI 1.25 4.40 4.30 4.40 4.37 4.37 2.253 2.275 99.03
KI.T 3.09 4.30 4.60 4.40 4.43 4.43 2.247 2.275 98.77
4 00 + 251 KI 0.80 4.20 4.10 4.30 4.20 4.20 2.239 2.275 98.42
KI.T 2.95 4.40 4.40 4.30 4.37 4.37 2.238 2.275 98.37
5 00 + 300 KI 0.88 4.30 4.40 4.30 4.33 4.33 2.236 2.275 98.29
KI.T 2.25 4.40 4.60 4.40 4.47 4.47 2.243 2.275 98.59
6 00 + 400 KI 0.90 3.70 4.60 3.70 4.00 4.00 2.238 2.275 98.37
KI.T 2.10 4.00 3.80 4.00 3.93 3.93 2.236 2.275 98.29
4.32 98.54 2.242
Tebal Tebal Kepadatan Kepadatan Be Isi Lap
Tebal BJ Isi Lap BJ Isi JSD
No. TANGGAL STA Sta Posisi Jarak diterima yg diambil Lapangan Lapangan Rata -rata
1 2 3 rata-rata (Gr/cm3 (Gr/cm3 rata-rata (Gr/cm3
1 12 September 2013 00 + 027 KA 1.80 4.10 4.00 4.30 4.13 4.13 2.245 2.275 98.68
0+000-1+052( ka ) KA.T 2.70 4.30 4.40 4.50 4.40 4.40 2.244 2.275 98.64
2 00 + 075 KA 1.00 3.40 3.90 3.80 3.70 3.70 2.239 2.275 98.42
KA.T 1.90 4.60 4.50 4.60 4.57 4.57 2.242 2.275 98.55
3 00 + 125 KA 1.70 4.00 4.00 4.00 4.00 4.00 2.245 2.275 98.68
KA,T 2.30 4.10 4.40 4.30 4.27 4.27 2.248 2.275 98.81
4 00 + 175 KA 1.00 4.60 3.90 4.10 4.20 4.20 2.249 2.275 98.86
KA.T 1.90 4.50 4.50 4.30 4.43 4.43 2.241 2.275 98.51
5 00 + 275 KA 1.10 4.20 4.20 4.20 4.20 4.20 2.244 2.275 98.64
KA.T 2.30 4.90 4.90 4.90 4.90 4.90 2.242 2.275 98.55
6 00 + 325 KA 1.25 4.40 4.60 4.50 4.50 4.50 2.239 2.275 98.42
KA.T 2.35 4.00 4.00 4.00 4.00 4.00 2.249 2.275 98.86
7 00 + 477 KA 1.00 4.90 5.00 5.00 4.97 4.97 2.241 2.275 98.51
KA.T 2.20 4.50 4.30 4.30 4.37 4.37 2.235 2.275 98.24
8 00 + 525 KA 1.00 4.40 4.30 4.50 4.40 4.40 2.238 2.275 98.37
KA.T 2.20 4.40 4.50 4.50 4.47 4.47 2.235 2.275 98.24
9 00 + 575 KA 0.70 3.90 3.90 4.00 3.93 3.93 2.241 2.275 98.51
KA.T 1.60 3.70 3.80 3.80 3.77 3.77 2.244 2.275 98.64
10 00 + 625 KA 1.00 4.00 4.10 4.00 4.03 4.03 2.239 2.275 98.42
KA.T 1.95 4.10 3.90 4.00 4.00 4.00 2.236 2.275 98.29
11 00 + 675 KA 0.70 4.20 4.40 4.40 4.33 4.33 2.247 2.275 98.77
KA.T 1.80 4.80 5.00 5.00 4.93 4.93 2.245 2.275 98.68
12 00 + 875 KA 0.90 3.80 4.10 4.00 3.97 3.97 2.242 2.275 98.55
KA.T 2.10 3.90 3.80 3.80 3.83 3.83 2.249 2.275 98.86
13 00 + 925 KA 0.90 4.40 4.50 4.50 4.47 4.47 2.242 2.275 98.55
KA.T 2.00 4.50 4.30 4.40 4.40 4.40 2.240 2.275 98.46
14 00 + 975 KA 0.80 4.70 4.50 4.60 4.60 4.60 2.245 2.275 98.68
KA.T 1.90 4.60 4.50 4.50 4.53 4.53 2.244 2.275 98.64
15 01 + 025 KA 1.00 4.50 4.60 4.40 4.50 4.50 2.238 2.275 98.37
KA.T 2.00 4.00 4.10 4.00 4.03 4.03 2.239 2.275 98.42
16 4.29 98.56 2.242
1 13 September 2013 00 + 450 KI 1.60 4.40 4.70 4.60 4.57 4.57 2.250 2.275 98.90
0+425-1+270( ki ) KI.T 2.50 4.50 4.50 4.50 4.50 4.50 2.247 2.275 98.77
2 00 + 500 KI 1.00 4.60 4.40 4.20 4.40 4.40 2.236 2.275 98.29
KI.T 2.00 4.30 4.30 4.30 4.30 4.30 2.241 2.275 98.51
3 00 + 550 KI 1.30 4.50 4.60 4.40 4.50 4.50 2.240 2.275 98.46
KI.T 2.60 4.40 4.40 4.60 4.47 4.47 2.237 2.275 98.33
4 00 + 650 KI 1.10 4.00 4.00 4.10 4.03 4.03 2.236 2.275 98.29
KI.T 2.70 4.20 4.20 4.20 4.20 4.20 2.242 2.275 98.55
5 00 + 700 KI 1.10 4.30 4.30 4.30 4.30 4.30 2.239 2.275 98.42
KI.T 2.60 3.80 4.20 4.20
DATA PENDUKUNG
HASIL PERHITUNGAN LUAS HAMPARAN

Nama Balai : BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II


Nama Kegiatan : REHABILITASI JALAN DAN JEMBATAN PROVINSI BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II
Nama Paket : REHABILITASI JALAN RUAS JALAN CIKEMBAR - CIKEMBANG ( 1,00 KM )

Lokasi : RUAS JALAN CIKEMBAR - CIKEMBANG


No. Kontrak : 602/Ktr.27/ 209/BPJ.WIL.PEL.II
Tgl. Kontrak : 28 JULI 2015
Penyedia Jasa : CV. LEMBANG JAYA
Jenis Pekerjaan : Laston Lapis Aus ( AC -WC) LEVELLING
Tanggal Penghamparan : 14 -20 September 2013 ,26 - 27 September d 2013
Panjang Segmen : 3.75 km
Tebal Rencana : 4,30 cm

Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 30 September 2014 0+000 KI 5.90
0+000-0+425 ( ki ) - 5.00 25.00 125.00
2 0+025 KI 4.10 -
- 4.03 25.00 100.63
3 0+050 KI 3.95 -
- 4.00 25.00 100.00
4 0+075 KI 4.05 -
- 3.90 25.00 97.50
5 0+100 KI 3.75 -
- 3.80 25.00 95.00
6 0+125 KI 3.85 -
- 3.88 25.00 96.88
7 0+150 KI 3.90 -
- 3.83 25.00 95.63
8 0+175 KI 3.75 -
- 3.90 25.00 97.50
9 0+200 KI 4.05 -
- 3.90 25.00 97.50
10 0+225 KI 3.75 -
- 3.85 25.00 96.25
11 0+250 KI 3.95 -
- 3.93 25.00 98.13
12 0+275 KI 3.90 -
- 3.95 25.00 98.75
13 0+300 KI 4.00 -
- 3.98 25.00 99.38
14 0+325 KI 3.95 -
- 3.98 25.00 99.38
15 0+350 KI 4.00 -
- 3.95 25.00 98.75
16 0+375 KI 3.90 -
- 3.93 25.00 98.13
17 0+400 KI 3.95 -
- 4.10 25.00 102.50
18 0+425 KI 4.25 -
- 425.00 1,696.88
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 1 Oktober 2014 0+000 KA 5.90 -
0+000-1+052( ka ) - 5.00 25.00 125.00
2 0+025 KA 4.10 -
- 4.03 25.00 100.63
3 0+050 KA 3.95 -
- 4.00 25.00 100.00
4 0+075 KA 4.05 -
- 3.90 25.00 97.50
5 0+100 KA 3.75 -
- 3.80 25.00 95.00
6 0+125 KA 3.85 -
- 3.88 25.00 96.88
7 0+150 KA 3.90 -
- 3.83 25.00 95.63
8 0+175 KA 3.75 -
- 3.90 25.00 97.50
9 0+200 KA 4.05 -
- 3.90 25.00 97.50
10 0+225 KA 3.75 -
- 3.85 25.00 96.25
11 0+250 KA 3.95 -
- 3.93 25.00 98.13
12 0+275 KA 3.90 -
- 3.95 25.00 98.75
13 0+300 KA 4.00 -
- 3.98 25.00 99.38
14 0+325 KA 3.95 -
- 3.98 25.00 99.38
15 0+350 KA 4.00 -
- 3.95 25.00 98.75
16 0+375 KA 3.90 -
- 3.93 25.00 98.13
17 0+400 KA 3.95 -
- 4.10 25.00 102.50
18 0+425 KA 4.25 -
- 4.18 25.00 104.38
19 0+450 KA 4.10 -
- 4.15 25.00 103.75
20 0+475 KA 4.20 -
- 4.18 25.00 104.38
21 0+500 KA 4.15 -
- 4.05 25.00 101.25
22 0+525 KA 3.95 -
- 3.98 25.00 99.38
23 0+550 KA 4.00 -
- 4.00 25.00 100.00
24 0+575 KA 4.00 -
- 3.95 25.00 98.75
25 0+600 KA 3.90 -
- 4.00 25.00 100.00
26 0+625 KA 4.10 -
- 4.08 25.00 101.88
27 0+650 KA 4.05 -
- 4.20 25.00 105.00
28 0+675 KA 4.35 -
- 4.28 25.00 106.88
29 0+700 KA 4.20 -
- 4.00 25.00 100.00
30 0+725 KA 3.80 -
- 3.95 25.00 98.75
31 0+750 KA 4.10 -
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
31 0+750 KA 4.10
- 4.03 25.00 100.63
32 0+775 KA 3.95 -
- 4.08 25.00 101.88
33 0+800 KA 4.20 -
- 4.25 25.00 106.25
34 0+825 KA 4.30 -
- 4.18 25.00 104.38
35 0+850 KA 4.05 -
- 4.03 25.00 100.63
36 0+875 KA 4.00 -
- 4.10 25.00 102.50
37 0+900 KA 4.20 -
- 4.10 25.00 102.50
38 0+925 KA 4.00 -
- 4.08 25.00 101.88
39 0+950 KA 4.15 -
- 4.13 25.00 103.13
40 0+975 KA 4.10 -
- 4.10 25.00 102.50
41 1+000 KA 4.10 -
- 4.10 25.00 102.50
42 1+025 KA 4.10 -
- 4.08 25.00 101.88
43 1+050 KA 4.05 -
- 4.05 2.00 8.10
44 1+052 KA 4.05 -
- 1,052.00 4,259.98
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 2 Oktober 2014 0+425 KI 4.25 -
0+425-1+270( ki ) - 4.18 25.00 104.38
2 0+450 KI 4.10 -
- 4.15 25.00 103.75
3 0+475 KI 4.20 -
- 4.18 25.00 104.38
4 0+500 KI 4.15 -
- 4.05 25.00 101.25
5 0+525 KI 3.95 -
- 3.98 25.00 99.38
6 0+550 KI 4.00 -
- 4.00 25.00 100.00
7 0+575 KI 4.00 -
- 3.95 25.00 98.75
8 0+600 KI 3.90 -
- 4.00 25.00 100.00
9 0+625 KI 4.10 -
- 4.08 25.00 101.88
10 0+650 KI 4.05 -
- 4.20 25.00 105.00
11 0+675 KI 4.35 -
- 4.28 25.00 106.88
12 0+700 KI 4.20 -
- 4.00 25.00 100.00
13 0+725 KI 3.80 -
- 3.95 25.00 98.75
14 0+750 KI 4.10 -
- 4.03 25.00 100.63
15 0+775 KI 3.95 -
- 4.08 25.00 101.88
16 0+800 KI 4.20 -
- 4.25 25.00 106.25
17 0+825 KI 4.30 -
- 4.18 25.00 104.38
18 0+850 KI 4.05 -
- 4.03 25.00 100.63
19 0+875 KI 4.00 -
- 4.10 25.00 102.50
20 0+900 KI 4.20 -
- 4.10 25.00 102.50
21 0+925 KI 4.00 -
- 4.08 25.00 101.88
22 0+950 KI 4.15 -
- 4.13 25.00 103.13
23 0+975 KI 4.10 -
- 4.10 25.00 102.50
24 1+000 KI 4.10 -
- 4.10 25.00 102.50
25 1+025 KI 4.10 -
- 4.08 25.00 101.88
26 1+050 KI 4.05 -
- 4.10 25.00 102.50
27 1+075 KI 4.15 -
- 4.10 25.00 102.50
28 1+100 KI 4.05 -
- 4.10 25.00 102.50
29 1+125 KI 4.15 -
- 4.10 25.00 102.50
30 1+150 KI 4.05 -
- 3.98 25.00 99.38
31 1+175 KI 3.90 -
- 3.95 25.00 98.75
32 1+200 KI 4.00 -
- 4.00 25.00 100.00
33 1+225 KI 4.00 -
- 4.00 25.00 100.00
34 1+250 KI 4.00 -
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
- 4.05 20.00 81.00
35 1+270 KI 4.10 -
- 845.00 3,444.13
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 Err:509 1+052 KA 4.05
1+052-1+850 ( ka ) 4.10 23.00 94.30
2 1+075 KA 4.15
4.10 25.00 102.50
3 1+100 KA 4.05
4.10 25.00 102.50
4 1+125 KA 4.15
4.10 25.00 102.50
5 1+150 KA 4.05
3.98 25.00 99.38
6 1+175 KA 3.90
3.95 25.00 98.75
7 1+200 KA 4.00
4.00 25.00 100.00
8 1+225 KA 4.00
4.00 25.00 100.00
9 1+250 KA 4.00
4.05 25.00 101.25
10 1+275 KA 4.10
4.03 25.00 100.63
11 1+300 KA 3.95
4.10 25.00 102.50
12 1+325 KA 4.25
4.20 25.00 105.00
13 1+350 KA 4.15
4.13 25.00 103.13
14 1+375 KA 4.10
3.99 25.00 99.75
15 1+400 KA 3.88
3.94 25.00 98.50
16 1+425 KA 4.00
3.98 25.00 99.38
17 1+450 KA 3.95
4.03 25.00 100.63
18 1+475 KA 4.10
4.13 25.00 103.13
19 1+500 KA 4.15
4.13 25.00 103.13
20 1+525 KA 4.10
4.08 25.00 101.88
21 1+550 KA 4.05
4.20 25.00 105.00
22 1+575 KA 4.35
4.06 25.00 101.50
23 1+600 KA 3.77
3.89 25.00 97.13
24 1+625 KA 4.00
3.95 25.00 98.75
25 1+650 KA 3.90
3.90 25.00 97.50
26 1+675 KA 3.90
3.95 25.00 98.75
27 1+700 KA 4.00
3.98 25.00 99.38
28 1+725 KA 3.95
3.90 25.00 97.50
29 1+750 KA 3.85
3.88 25.00 96.88
30 1+775 KA 3.90
3.90 25.00 97.50
31 1+800 KA 3.90
3.85 25.00 96.25
32 1+825 KA 3.80
3.88 25.00 96.88
33 1+850 KA 3.95
- 798.00 3,201.80
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 Err:509 1+270 KI 4.10
1+270-1+700 ( K1 ) 4.10 5.00 20.50
2 1+275 KI 4.10
4.03 25.00 100.63
3 1+300 KI 3.95
4.10 25.00 102.50
4 1+325 KI 4.25
4.20 25.00 105.00
5 1+350 KI 4.15
4.13 25.00 103.13
6 1+375 KI 4.10
3.99 25.00 99.63
7 1+400 KI 3.87
3.94 25.00 98.38
8 1+425 KI 4.00
3.98 25.00 99.38
9 1+450 KI 3.95
4.03 25.00 100.63
10 1+475 KI 4.10
4.13 25.00 103.13
11 1+500 KI 4.15
4.13 25.00 103.13
12 1+525 KI 4.10
4.08 25.00 101.88
13 1+550 KI 4.05
4.20 25.00 105.00
14 1+575 KI 4.35
4.06 25.00 101.50
15 1+600 KI 3.77
3.89 25.00 97.13
16 1+625 KI 4.00
3.95 25.00 98.75
17 1+650 KI 3.90
3.90 25.00 97.50
18 1+675 KI 3.90
3.95 25.00 98.75
19 1+700 KI 4.00
- 430.00 1,736.50
- 1,228.00 4,938.30
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 Err:509 1+850 KA 3.95
1+850-2+550 ( ka ) 3.90 25.00 97.50
2 1+875 KA 3.85
3.85 25.00 96.25
3 1+900 KA 3.85
3.98 25.00 99.38
4 1+925 KA 4.10
4.00 25.00 99.88
5 1+950 KA 3.89
3.90 25.00 97.38
6 1+975 KA 3.90
3.88 25.00 96.88
7 2+000 KA 3.85
3.90 25.00 97.50
8 2+025 KA 3.95
4.00 25.00 100.00
9 2+050 KA 4.05
4.03 25.00 100.63
10 2+075 KA 4.00
4.08 25.00 101.88
11 2+100 KA 4.15
4.10 25.00 102.50
12 2+125 KA 4.05
4.03 25.00 100.63
13 2+150 KA 4.00
3.98 25.00 99.38
14 2+175 KA 3.95
4.13 25.00 103.13
15 2+200 KA 4.30
4.20 25.00 105.00
16 2+225 KA 4.10
4.05 25.00 101.25
17 2+250 KA 4.00
4.05 25.00 101.25
18 2+275 KA 4.10
4.05 25.00 101.25
19 2+300 KA 4.00
4.03 25.00 100.63
20 2+325 KA 4.05
4.05 25.00 101.25
21 2+350 KA 4.05
4.05 25.00 101.25
22 2+375 KA 4.05
4.05 25.00 101.25
23 2+400 KA 4.05
4.03 25.00 100.63
24 2+425 KA 4.00
3.98 25.00 99.38
25 2+450 KA 3.95
3.95 25.00 98.75
26 2+475 KA 3.95
3.98 25.00 99.38
27 2+500 KA 4.00
4.00 25.00 100.00
28 2+525 KA 4.00
3.95 25.00 98.75
29 2+550 KA 3.90
- 700.00 2,802.88
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 Err:509 1+700 KI 4.00
1+700-2+550 ( ki ) 3.98 25.00 99.38
2 1+725 KI 3.95
3.90 25.00 97.50
3 1+750 KI 3.85
3.88 25.00 96.88
4 1+775 KI 3.90
3.90 25.00 97.50
5 1+800 KI 3.90
3.85 25.00 96.25
6 1+825 KI 3.80
3.88 25.00 96.88
7 1+850 KI 3.95
3.90 25.00 97.50
8 1+875 KI 3.85
3.85 25.00 96.25
9 1+900 KI 3.85
3.98 25.00 99.38
10 1+925 KI 4.10
4.00 25.00 99.88
11 1+950 KI 3.89
3.90 25.00 97.38
12 1+975 KI 3.90
3.88 25.00 96.88
13 2+000 KI 3.85
3.90 25.00 97.50
14 2+025 KI 3.95
4.00 25.00 100.00
15 2+050 KI 4.05
4.03 25.00 100.63
16 2+075 KI 4.00
4.08 25.00 101.88
17 2+100 KI 4.15
4.10 25.00 102.50
18 2+125 KI 4.05
4.03 25.00 100.63
19 2+150 KI 4.00
3.98 25.00 99.38
20 2+175 KI 3.95
4.13 25.00 103.13
21 2+200 KI 4.30
4.20 25.00 105.00
22 2+225 KI 4.10
4.05 25.00 101.25
23 2+250 KI 4.00
4.05 25.00 101.25
24 2+275 KI 4.10
4.05 25.00 101.25
25 2+300 KI 4.00
4.03 25.00 100.63
26 2+325 KI 4.05
4.05 25.00 101.25
27 2+350 KI 4.05
4.05 25.00 101.25
28 2+375 KI 4.05
4.05 25.00 101.25
29 2+400 KI 4.05
4.03 25.00 100.63
30 2+425 KI 4.00
3.98 25.00 99.38
31 2+450 KI 3.95
3.95 25.00 98.75
32 2+475 KI 3.95
3.98 25.00 99.38
33 2+500 KI 4.00
4.00 25.00 100.00
34 2+525 KI 4.00
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
3.95 25.00 98.75
35 2+550 KI 3.90
- 850.00 3,387.25
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 Err:509 2+550 KA 3.90
2+550-2+840 ( ka ) 3.95 25.00 98.75
2 2+575 KA 4.00
4.00 25.00 100.00
3 2+600 KA 4.00
4.00 25.00 100.00
4 2+625 KA 4.00
4.00 25.00 100.00
5 2+650 KA 4.00
3.95 25.00 98.75
6 2+675 KA 3.90
3.90 25.00 97.50
7 2+700 KA 3.90
3.90 25.00 97.50
8 2+725 KA 3.90
3.93 25.00 98.13
9 2+750 KA 3.95
3.93 25.00 98.13
10 2+775 KA 3.90
3.93 25.00 98.13
11 2+800 KA 3.95
4.00 25.00 100.00
12 2+825 KA 4.05
4.13 15.00 61.88
13 2+840 KA 4.20
290.00 1,148.75
1 Err:509 2+550 KI 3.90
2+550-2+825 ( Ki ) 3.95 25.00 98.75
2 2+575 KI 4.00
4.00 25.00 100.00
3 2+600 KI 4.00
4.00 25.00 100.00
4 2+625 KI 4.00
4.00 25.00 100.00
5 2+650 KI 4.00
3.95 25.00 98.75
6 2+675 KI 3.90
3.90 25.00 97.50
7 2+700 KI 3.90
3.90 25.00 97.50
8 2+725 KI 3.90
3.93 25.00 98.13
9 2+750 KI 3.95
3.93 25.00 98.13
10 2+775 KI 3.90
3.93 25.00 98.13
11 2+800 KI 3.95
4.00 25.00 100.00
12 2+825 KI 4.05
275.00 1,086.88
565.00 2,235.63
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 Err:509 2+840 KA 4.20
2+840-3+540 ( ka ) 4.20 10.00 42.00
2 2+850 KA 4.20
4.15 25.00 103.75
3 2+875 KA 4.10
4.15 25.00 103.75
4 2+900 KA 4.20
4.13 25.00 103.13
5 2+925 KA 4.05
4.05 25.00 101.25
6 2+950 KA 4.05
3.98 25.00 99.38
7 2+975 KA 3.90
3.90 25.00 97.50
8 3+000 KA 3.90
3.90 25.00 97.50
9 3+025 KA 3.90
3.95 25.00 98.75
10 3+050 KA 4.00
4.00 25.00 100.00
11 3+075 KA 4.00
4.00 25.00 100.00
12 3+100 KA 4.00
3.93 25.00 98.13
13 3+125 KA 3.85
3.83 25.00 95.63
14 3+150 KA 3.80
3.83 25.00 95.63
15 3+175 KA 3.85
3.93 25.00 98.13
16 3+200 KA 4.00
4.00 25.00 100.00
17 3+225 KA 4.00
4.03 25.00 100.63
18 3+250 KA 4.05
3.93 25.00 98.13
19 3+275 KA 3.80
3.98 25.00 99.38
20 3+300 KA 4.15
4.10 25.00 102.50
21 3+325 KA 4.05
4.05 25.00 101.25
22 3+350 KA 4.05
4.08 25.00 101.88
23 3+375 KA 4.10
4.10 25.00 102.50
24 3+400 KA 4.10
4.10 25.00 102.50
25 3+425 KA 4.10
4.18 25.00 104.38
26 3+450 KA 4.25
4.15 25.00 103.75
27 3+475 KA 4.05
4.18 25.00 104.38
28 3+500 KA 4.30
4.35 25.00 108.75
29 3+525 KA 4.40
4.33 15.00 64.88
30 3+540 KA 4.25
700.00 2,829.38
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 Err:509 2+825 KI 4.05
2+825-3+150 ( Ki ) 4.13 25.00 103.13
2 2+850 KI 4.20 - - -
4.15 25.00 103.75
3 2+875 KI 4.10 - - -
4.15 25.00 103.75
4 2+900 KI 4.20 - - -
4.13 25.00 103.13
5 2+925 KI 4.05 - - -
4.05 25.00 101.25
6 2+950 KI 4.05 - - -
3.98 25.00 99.38
7 2+975 KI 3.90 - - -
3.90 25.00 97.50
8 3+000 KI 3.90 - - -
3.90 25.00 97.50
9 3+025 KI 3.90 - - -
3.95 25.00 98.75
10 3+050 KI 4.00 - - -
4.00 25.00 100.00
11 3+075 KI 4.00 - - -
4.00 25.00 100.00
12 3+100 KI 4.00 - - -
3.93 25.00 98.13
13 3+125 KI 3.85 - - -
3.83 25.00 95.63
14 3+150 KI 3.80 - - -
325.00 1,301.88
1,025.00 4,131.26
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 Err:509 3+150 KI 3.80 - - -
3+150-3+750 ( ki ) 3.83 25.00 95.63
2 3+175 KI 3.85 - - -
3.93 25.00 98.13
3 3+200 KI 4.00 - - -
4.00 25.00 100.00
4 3+225 KI 4.00 - - -
4.03 25.00 100.63
5 3+250 KI 4.05 - - -
3.93 25.00 98.13
6 3+275 KI 3.80 - - -
3.98 25.00 99.38
7 3+300 KI 4.15 - - -
4.10 25.00 102.50
8 3+325 KI 4.05 - - -
4.05 25.00 101.25
9 3+350 KI 4.05 - - -
4.08 25.00 101.88
10 3+375 KI 4.10 - - -
4.10 25.00 102.50
11 3+400 KI 4.10 - - -
4.10 25.00 102.50
12 3+425 KI 4.10 - - -
4.18 25.00 104.38
13 3+450 KI 4.25 - - -
4.15 25.00 103.75
14 3+475 KI 4.05 - - -
4.18 25.00 104.38
15 3+500 KI 4.30 - - -
4.35 25.00 108.75
16 3+525 KI 4.40 - - -
4.33 25.00 108.13
17 3+550 KI 4.25 - - -
4.20 25.00 105.00
18 3+575 KI 4.15 - - -
4.13 25.00 103.13
19 3+600 KI 4.10 - - -
4.08 25.00 101.88
20 3+625 KI 4.05 - - -
4.05 25.00 101.25
21 3+650 KI 4.05 - - -
4.05 25.00 101.25
22 3+675 KI 4.05 - - -
4.10 25.00 102.50
23 3+700 KI 4.15 - - -
4.08 25.00 101.88
24 3+725 KI 4.00 - - -
4.03 25.00 100.63
25 3+750 KI 4.05 - - -
600.00 2,449.38
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 Err:509 3+540 KA 4.25
3+540-3+750 ( ka ) 4.25 10.00 42.50
2 3+550 KA 4.25
4.20 25.00 105.00
3 3+575 KA 4.15
4.13 25.00 103.13
4 3+600 KA 4.10
4.08 25.00 101.88
5 3+625 KA 4.05
4.05 25.00 101.25
6 3+650 KA 4.05
4.05 25.00 101.25
7 3+675 KA 4.05
4.10 25.00 102.50
8 3+700 KA 4.15
4.08 25.00 101.88
9 3+725 KA 4.00
4.03 25.00 100.63
10 3+750 KA 4.05
210.00 860.00
810.00 3,309.38
TOTAL 7,500.00 30,205.69

Pengawas Lapangan Tim Supervisi Penyedia Jasa


PT. ARIESTA KARYA

DADAN SUPARMAN HARRY KUSWIAN ,ST DENI RISANA,ST


NIP. 19800113 200801 1 003 NIP. 1974 0331 2008 01 1 002 Penanggung Jawab Teknik
DATA PENDUKUNG
HASIL PERHITUNGAN LUAS HAMPARAN

Nama Balai : BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II


Nama Kegiatan : REHABILITASI JALAN DAN JEMBATAN PROVINSI BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II
Nama Paket : REHABILITASI JALAN RUAS JALAN CIKEMBAR - CIKEMBANG ( 1,00 KM )

Lokasi : RUAS JALAN CIKEMBAR - CIKEMBANG


No. Kontrak : 602/Ktr.27/ 209/BPJ.WIL.PEL.II
Tgl. Kontrak : 28 JULI 2015
Penyedia Jasa : CV. LEMBANG JAYA
Jenis Pekerjaan : Laston Lapis Aus ( AC -WC) LEVELLING
Tanggal Penghamparan : 11 -19 September 2013
Panjang Segmen : 3.75 km
Tebal Rencana : 4,30 cm

Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 11 September 2013 0+000 KI 5.90
0+000-0+425 ( ki ) - 5.00 25.00 125.00
2 0+025 KI 4.10 -
- 4.03 25.00 100.63
3 0+050 KI 3.95 -
- 4.00 25.00 100.00
4 0+075 KI 4.05 -
- 3.90 25.00 97.50
5 0+100 KI 3.75 -
- 3.80 25.00 95.00
6 0+125 KI 3.85 -
- 3.88 25.00 96.88
7 0+150 KI 3.90 -
- 3.83 25.00 95.63
8 0+175 KI 3.75 -
- 3.90 25.00 97.50
9 0+200 KI 4.05 -
- 3.90 25.00 97.50
10 0+225 KI 3.75 -
- 3.85 25.00 96.25
11 0+250 KI 3.95 -
- 3.93 25.00 98.13
12 0+275 KI 3.90 -
- 3.95 25.00 98.75
13 0+300 KI 4.00 -
- 3.98 25.00 99.38
14 0+325 KI 3.95 -
- 3.98 25.00 99.38
15 0+350 KI 4.00 -
- 3.95 25.00 98.75
16 0+375 KI 3.90 -
- 3.93 25.00 98.13
17 0+400 KI 3.95 -
- 4.10 25.00 102.50
18 0+425 KI 4.25 -
- 425.00 1,696.88
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 12 September 2013 0+000 KA 5.90 -
0+000-1+052( ka ) - 5.00 25.00 125.00
2 0+025 KA 4.10 -
- 4.03 25.00 100.63
3 0+050 KA 3.95 -
- 4.00 25.00 100.00
4 0+075 KA 4.05 -
- 3.90 25.00 97.50
5 0+100 KA 3.75 -
- 3.80 25.00 95.00
6 0+125 KA 3.85 -
- 3.88 25.00 96.88
7 0+150 KA 3.90 -
- 3.83 25.00 95.63
8 0+175 KA 3.75 -
- 3.90 25.00 97.50
9 0+200 KA 4.05 -
- 3.90 25.00 97.50
10 0+225 KA 3.75 -
- 3.85 25.00 96.25
11 0+250 KA 3.95 -
- 3.93 25.00 98.13
12 0+275 KA 3.90 -
- 3.95 25.00 98.75
13 0+300 KA 4.00 -
- 3.98 25.00 99.38
14 0+325 KA 3.95 -
- 3.98 25.00 99.38
15 0+350 KA 4.00 -
- 3.95 25.00 98.75
16 0+375 KA 3.90 -
- 3.93 25.00 98.13
17 0+400 KA 3.95 -
- 4.10 25.00 102.50
18 0+425 KA 4.25 -
- 4.18 25.00 104.38
19 0+450 KA 4.10 -
- 4.15 25.00 103.75
20 0+475 KA 4.20 -
- 4.18 25.00 104.38
21 0+500 KA 4.15 -
- 4.05 25.00 101.25
22 0+525 KA 3.95 -
- 3.98 25.00 99.38
23 0+550 KA 4.00 -
- 4.00 25.00 100.00
24 0+575 KA 4.00 -
- 3.95 25.00 98.75
25 0+600 KA 3.90 -
- 4.00 25.00 100.00
26 0+625 KA 4.10 -
- 4.08 25.00 101.88
27 0+650 KA 4.05 -
- 4.20 25.00 105.00
28 0+675 KA 4.35 -
- 4.28 25.00 106.88
29 0+700 KA 4.20 -
- 4.00 25.00 100.00
30 0+725 KA 3.80 -
- 3.95 25.00 98.75
31 0+750 KA 4.10 -
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
31 0+750 KA 4.10
- 4.03 25.00 100.63
32 0+775 KA 3.95 -
- 4.08 25.00 101.88
33 0+800 KA 4.20 -
- 4.25 25.00 106.25
34 0+825 KA 4.30 -
- 4.18 25.00 104.38
35 0+850 KA 4.05 -
- 4.03 25.00 100.63
36 0+875 KA 4.00 -
- 4.10 25.00 102.50
37 0+900 KA 4.20 -
- 4.10 25.00 102.50
38 0+925 KA 4.00 -
- 4.08 25.00 101.88
39 0+950 KA 4.15 -
- 4.13 25.00 103.13
40 0+975 KA 4.10 -
- 4.10 25.00 102.50
41 1+000 KA 4.10 -
- 4.10 25.00 102.50
42 1+025 KA 4.10 -
- 4.08 25.00 101.88
43 1+050 KA 4.05 -
- 4.05 2.00 8.10
44 1+052 KA 4.05 -
- 1,052.00 4,259.98
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 13 September 2013 0+425 KI 4.25 -
0+425-1+270( ki ) - 4.18 25.00 104.38
2 0+450 KI 4.10 -
- 4.15 25.00 103.75
3 0+475 KI 4.20 -
- 4.18 25.00 104.38
4 0+500 KI 4.15 -
- 4.05 25.00 101.25
5 0+525 KI 3.95 -
- 3.98 25.00 99.38
6 0+550 KI 4.00 -
- 4.00 25.00 100.00
7 0+575 KI 4.00 -
- 3.95 25.00 98.75
8 0+600 KI 3.90 -
- 4.00 25.00 100.00
9 0+625 KI 4.10 -
- 4.08 25.00 101.88
10 0+650 KI 4.05 -
- 4.20 25.00 105.00
11 0+675 KI 4.35 -
- 4.28 25.00 106.88
12 0+700 KI 4.20 -
- 4.00 25.00 100.00
13 0+725 KI 3.80 -
- 3.95 25.00 98.75
14 0+750 KI 4.10 -
- 4.03 25.00 100.63
15 0+775 KI 3.95 -
- 4.08 25.00 101.88
16 0+800 KI 4.20 -
- 4.25 25.00 106.25
17 0+825 KI 4.30 -
- 4.18 25.00 104.38
18 0+850 KI 4.05 -
- 4.03 25.00 100.63
19 0+875 KI 4.00 -
- 4.10 25.00 102.50
20 0+900 KI 4.20 -
- 4.10 25.00 102.50
21 0+925 KI 4.00 -
- 4.08 25.00 101.88
22 0+950 KI 4.15 -
- 4.13 25.00 103.13
23 0+975 KI 4.10 -
- 4.10 25.00 102.50
24 1+000 KI 4.10 -
- 4.10 25.00 102.50
25 1+025 KI 4.10 -
- 4.08 25.00 101.88
26 1+050 KI 4.05 -
- 4.10 25.00 102.50
27 1+075 KI 4.15 -
- 4.10 25.00 102.50
28 1+100 KI 4.05 -
- 4.10 25.00 102.50
29 1+125 KI 4.15 -
- 4.10 25.00 102.50
30 1+150 KI 4.05 -
- 3.98 25.00 99.38
31 1+175 KI 3.90 -
- 3.95 25.00 98.75
32 1+200 KI 4.00 -
- 4.00 25.00 100.00
33 1+225 KI 4.00 -
- 4.00 25.00 100.00
34 1+250 KI 4.00 -
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
- 4.05 20.00 81.00
35 1+270 KI 4.10 -
- 845.00 3,444.13
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 14 September 2013 1+052 KA 4.05
1+052-1+850 ( ka ) 4.10 23.00 94.30
2 1+075 KA 4.15
4.10 25.00 102.50
3 1+100 KA 4.05
4.10 25.00 102.50
4 1+125 KA 4.15
4.10 25.00 102.50
5 1+150 KA 4.05
3.98 25.00 99.38
6 1+175 KA 3.90
3.95 25.00 98.75
7 1+200 KA 4.00
4.00 25.00 100.00
8 1+225 KA 4.00
4.00 25.00 100.00
9 1+250 KA 4.00
4.05 25.00 101.25
10 1+275 KA 4.10
4.03 25.00 100.63
11 1+300 KA 3.95
4.10 25.00 102.50
12 1+325 KA 4.25
4.20 25.00 105.00
13 1+350 KA 4.15
4.13 25.00 103.13
14 1+375 KA 4.10
3.99 25.00 99.75
15 1+400 KA 3.88
3.94 25.00 98.50
16 1+425 KA 4.00
3.98 25.00 99.38
17 1+450 KA 3.95
4.03 25.00 100.63
18 1+475 KA 4.10
4.13 25.00 103.13
19 1+500 KA 4.15
4.13 25.00 103.13
20 1+525 KA 4.10
4.08 25.00 101.88
21 1+550 KA 4.05
4.20 25.00 105.00
22 1+575 KA 4.35
4.06 25.00 101.50
23 1+600 KA 3.77
3.89 25.00 97.13
24 1+625 KA 4.00
3.95 25.00 98.75
25 1+650 KA 3.90
3.90 25.00 97.50
26 1+675 KA 3.90
3.95 25.00 98.75
27 1+700 KA 4.00
3.98 25.00 99.38
28 1+725 KA 3.95
3.90 25.00 97.50
29 1+750 KA 3.85
3.88 25.00 96.88
30 1+775 KA 3.90
3.90 25.00 97.50
31 1+800 KA 3.90
3.85 25.00 96.25
32 1+825 KA 3.80
3.88 25.00 96.88
33 1+850 KA 3.95
- 798.00 3,201.80
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 14 September 2013 1+270 KI 4.10
1+270-1+700 ( K1 ) 4.10 5.00 20.50
2 1+275 KI 4.10
4.03 25.00 100.63
3 1+300 KI 3.95
4.10 25.00 102.50
4 1+325 KI 4.25
4.20 25.00 105.00
5 1+350 KI 4.15
4.13 25.00 103.13
6 1+375 KI 4.10
3.99 25.00 99.63
7 1+400 KI 3.87
3.94 25.00 98.38
8 1+425 KI 4.00
3.98 25.00 99.38
9 1+450 KI 3.95
4.03 25.00 100.63
10 1+475 KI 4.10
4.13 25.00 103.13
11 1+500 KI 4.15
4.13 25.00 103.13
12 1+525 KI 4.10
4.08 25.00 101.88
13 1+550 KI 4.05
4.20 25.00 105.00
14 1+575 KI 4.35
4.06 25.00 101.50
15 1+600 KI 3.77
3.89 25.00 97.13
16 1+625 KI 4.00
3.95 25.00 98.75
17 1+650 KI 3.90
3.90 25.00 97.50
18 1+675 KI 3.90
3.95 25.00 98.75
19 1+700 KI 4.00
- 430.00 1,736.50
- 1,228.00 4,938.30
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 15 September 2013 1+850 KA 3.95
1+850-2+550 ( ka ) 3.90 25.00 97.50
2 1+875 KA 3.85
3.85 25.00 96.25
3 1+900 KA 3.85
3.98 25.00 99.38
4 1+925 KA 4.10
4.00 25.00 99.88
5 1+950 KA 3.89
3.90 25.00 97.38
6 1+975 KA 3.90
3.88 25.00 96.88
7 2+000 KA 3.85
3.90 25.00 97.50
8 2+025 KA 3.95
4.00 25.00 100.00
9 2+050 KA 4.05
4.03 25.00 100.63
10 2+075 KA 4.00
4.08 25.00 101.88
11 2+100 KA 4.15
4.10 25.00 102.50
12 2+125 KA 4.05
4.03 25.00 100.63
13 2+150 KA 4.00
3.98 25.00 99.38
14 2+175 KA 3.95
4.13 25.00 103.13
15 2+200 KA 4.30
4.20 25.00 105.00
16 2+225 KA 4.10
4.05 25.00 101.25
17 2+250 KA 4.00
4.05 25.00 101.25
18 2+275 KA 4.10
4.05 25.00 101.25
19 2+300 KA 4.00
4.03 25.00 100.63
20 2+325 KA 4.05
4.05 25.00 101.25
21 2+350 KA 4.05
4.05 25.00 101.25
22 2+375 KA 4.05
4.05 25.00 101.25
23 2+400 KA 4.05
4.03 25.00 100.63
24 2+425 KA 4.00
3.98 25.00 99.38
25 2+450 KA 3.95
3.95 25.00 98.75
26 2+475 KA 3.95
3.98 25.00 99.38
27 2+500 KA 4.00
4.00 25.00 100.00
28 2+525 KA 4.00
3.95 25.00 98.75
29 2+550 KA 3.90
- 700.00 2,802.88
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 16 September 2013 1+700 KI 4.00
1+700-2+550 ( ki ) 3.98 25.00 99.38
2 1+725 KI 3.95
3.90 25.00 97.50
3 1+750 KI 3.85
3.88 25.00 96.88
4 1+775 KI 3.90
3.90 25.00 97.50
5 1+800 KI 3.90
3.85 25.00 96.25
6 1+825 KI 3.80
3.88 25.00 96.88
7 1+850 KI 3.95
3.90 25.00 97.50
8 1+875 KI 3.85
3.85 25.00 96.25
9 1+900 KI 3.85
3.98 25.00 99.38
10 1+925 KI 4.10
4.00 25.00 99.88
11 1+950 KI 3.89
3.90 25.00 97.38
12 1+975 KI 3.90
3.88 25.00 96.88
13 2+000 KI 3.85
3.90 25.00 97.50
14 2+025 KI 3.95
4.00 25.00 100.00
15 2+050 KI 4.05
4.03 25.00 100.63
16 2+075 KI 4.00
4.08 25.00 101.88
17 2+100 KI 4.15
4.10 25.00 102.50
18 2+125 KI 4.05
4.03 25.00 100.63
19 2+150 KI 4.00
3.98 25.00 99.38
20 2+175 KI 3.95
4.13 25.00 103.13
21 2+200 KI 4.30
4.20 25.00 105.00
22 2+225 KI 4.10
4.05 25.00 101.25
23 2+250 KI 4.00
4.05 25.00 101.25
24 2+275 KI 4.10
4.05 25.00 101.25
25 2+300 KI 4.00
4.03 25.00 100.63
26 2+325 KI 4.05
4.05 25.00 101.25
27 2+350 KI 4.05
4.05 25.00 101.25
28 2+375 KI 4.05
4.05 25.00 101.25
29 2+400 KI 4.05
4.03 25.00 100.63
30 2+425 KI 4.00
3.98 25.00 99.38
31 2+450 KI 3.95
3.95 25.00 98.75
32 2+475 KI 3.95
3.98 25.00 99.38
33 2+500 KI 4.00
4.00 25.00 100.00
34 2+525 KI 4.00
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
3.95 25.00 98.75
35 2+550 KI 3.90
- 850.00 3,387.25
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 17 September 2013 2+550 KA 3.90
2+550-2+840 ( ka ) 3.95 25.00 98.75
2 2+575 KA 4.00
4.00 25.00 100.00
3 2+600 KA 4.00
4.00 25.00 100.00
4 2+625 KA 4.00
4.00 25.00 100.00
5 2+650 KA 4.00
3.95 25.00 98.75
6 2+675 KA 3.90
3.90 25.00 97.50
7 2+700 KA 3.90
3.90 25.00 97.50
8 2+725 KA 3.90
3.93 25.00 98.13
9 2+750 KA 3.95
3.93 25.00 98.13
10 2+775 KA 3.90
3.93 25.00 98.13
11 2+800 KA 3.95
4.00 25.00 100.00
12 2+825 KA 4.05
4.13 15.00 61.88
13 2+840 KA 4.20
290.00 1,148.75
1 17 September 2013 2+550 KI 3.90
2+550-2+825 ( Ki ) 3.95 25.00 98.75
2 2+575 KI 4.00
4.00 25.00 100.00
3 2+600 KI 4.00
4.00 25.00 100.00
4 2+625 KI 4.00
4.00 25.00 100.00
5 2+650 KI 4.00
3.95 25.00 98.75
6 2+675 KI 3.90
3.90 25.00 97.50
7 2+700 KI 3.90
3.90 25.00 97.50
8 2+725 KI 3.90
3.93 25.00 98.13
9 2+750 KI 3.95
3.93 25.00 98.13
10 2+775 KI 3.90
3.93 25.00 98.13
11 2+800 KI 3.95
4.00 25.00 100.00
12 2+825 KI 4.05
275.00 1,086.88
565.00 2,235.63
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 18 September 2013 2+840 KA 4.20
2+840-3+540 ( ka ) 4.20 10.00 42.00
2 2+850 KA 4.20
4.15 25.00 103.75
3 2+875 KA 4.10
4.15 25.00 103.75
4 2+900 KA 4.20
4.13 25.00 103.13
5 2+925 KA 4.05
4.05 25.00 101.25
6 2+950 KA 4.05
3.98 25.00 99.38
7 2+975 KA 3.90
3.90 25.00 97.50
8 3+000 KA 3.90
3.90 25.00 97.50
9 3+025 KA 3.90
3.95 25.00 98.75
10 3+050 KA 4.00
4.00 25.00 100.00
11 3+075 KA 4.00
4.00 25.00 100.00
12 3+100 KA 4.00
3.93 25.00 98.13
13 3+125 KA 3.85
3.83 25.00 95.63
14 3+150 KA 3.80
3.83 25.00 95.63
15 3+175 KA 3.85
3.93 25.00 98.13
16 3+200 KA 4.00
4.00 25.00 100.00
17 3+225 KA 4.00
4.03 25.00 100.63
18 3+250 KA 4.05
3.93 25.00 98.13
19 3+275 KA 3.80
3.98 25.00 99.38
20 3+300 KA 4.15
4.10 25.00 102.50
21 3+325 KA 4.05
4.05 25.00 101.25
22 3+350 KA 4.05
4.08 25.00 101.88
23 3+375 KA 4.10
4.10 25.00 102.50
24 3+400 KA 4.10
4.10 25.00 102.50
25 3+425 KA 4.10
4.18 25.00 104.38
26 3+450 KA 4.25
4.15 25.00 103.75
27 3+475 KA 4.05
4.18 25.00 104.38
28 3+500 KA 4.30
4.35 25.00 108.75
29 3+525 KA 4.40
4.33 15.00 64.88
30 3+540 KA 4.25
700.00 2,829.38
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 18 September 2013 2+825 KI 4.05
2+825-3+150 ( Ki ) 4.13 25.00 103.13
2 2+850 KI 4.20 - - -
4.15 25.00 103.75
3 2+875 KI 4.10 - - -
4.15 25.00 103.75
4 2+900 KI 4.20 - - -
4.13 25.00 103.13
5 2+925 KI 4.05 - - -
4.05 25.00 101.25
6 2+950 KI 4.05 - - -
3.98 25.00 99.38
7 2+975 KI 3.90 - - -
3.90 25.00 97.50
8 3+000 KI 3.90 - - -
3.90 25.00 97.50
9 3+025 KI 3.90 - - -
3.95 25.00 98.75
10 3+050 KI 4.00 - - -
4.00 25.00 100.00
11 3+075 KI 4.00 - - -
4.00 25.00 100.00
12 3+100 KI 4.00 - - -
3.93 25.00 98.13
13 3+125 KI 3.85 - - -
3.83 25.00 95.63
14 3+150 KI 3.80 - - -
325.00 1,301.88
1,025.00 4,131.26
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 19 September 2013 3+150 KI 3.80 - - -
3+150-3+750 ( ki ) 3.83 25.00 95.63
2 3+175 KI 3.85 - - -
3.93 25.00 98.13
3 3+200 KI 4.00 - - -
4.00 25.00 100.00
4 3+225 KI 4.00 - - -
4.03 25.00 100.63
5 3+250 KI 4.05 - - -
3.93 25.00 98.13
6 3+275 KI 3.80 - - -
3.98 25.00 99.38
7 3+300 KI 4.15 - - -
4.10 25.00 102.50
8 3+325 KI 4.05 - - -
4.05 25.00 101.25
9 3+350 KI 4.05 - - -
4.08 25.00 101.88
10 3+375 KI 4.10 - - -
4.10 25.00 102.50
11 3+400 KI 4.10 - - -
4.10 25.00 102.50
12 3+425 KI 4.10 - - -
4.18 25.00 104.38
13 3+450 KI 4.25 - - -
4.15 25.00 103.75
14 3+475 KI 4.05 - - -
4.18 25.00 104.38
15 3+500 KI 4.30 - - -
4.35 25.00 108.75
16 3+525 KI 4.40 - - -
4.33 25.00 108.13
17 3+550 KI 4.25 - - -
4.20 25.00 105.00
18 3+575 KI 4.15 - - -
4.13 25.00 103.13
19 3+600 KI 4.10 - - -
4.08 25.00 101.88
20 3+625 KI 4.05 - - -
4.05 25.00 101.25
21 3+650 KI 4.05 - - -
4.05 25.00 101.25
22 3+675 KI 4.05 - - -
4.10 25.00 102.50
23 3+700 KI 4.15 - - -
4.08 25.00 101.88
24 3+725 KI 4.00 - - -
4.03 25.00 100.63
25 3+750 KI 4.05 - - -
600.00 2,449.38
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 19 September 2013 3+540 KA 4.25
3+540-3+750 ( ka ) 4.25 10.00 42.50
2 3+550 KA 4.25
4.20 25.00 105.00
3 3+575 KA 4.15
4.13 25.00 103.13
4 3+600 KA 4.10
4.08 25.00 101.88
5 3+625 KA 4.05
4.05 25.00 101.25
6 3+650 KA 4.05
4.05 25.00 101.25
7 3+675 KA 4.05
4.10 25.00 102.50
8 3+700 KA 4.15
4.08 25.00 101.88
9 3+725 KA 4.00
4.03 25.00 100.63
10 3+750 KA 4.05
210.00 860.00
810.00 3,309.38
TOTAL 7,500.00 30,205.69

Dibuat oleh :
Disetujui oleh : Penyedia Jasa
Pengawas Lapangan PT. ARIESTA KARYA

DENI RISANA,ST
DADAN SUPARMAN Penanggung Jawab Teknik
NIP. 19800113 200801 1 003
PEMAKAIAN KUANTITAS
RATA-RATA/HARI
(LITER/M2) (LITER)

0.348 43.50

0.348 35.02

0.348 34.80

0.348 33.93

0.348 33.06

0.348 33.71

0.348 33.28

0.348 33.93

0.348 33.93

0.348 33.50

0.348 34.15

0.348 34.37

0.348 34.58

0.348 34.58

0.348 34.37

0.348 34.15

0.348 35.67

590.51
PEMAKAIAN KUANTITAS
RATA-RATA/HARI
(LITER/M2) (LITER)

0.346 43.25

0.346 34.82

0.346 34.60

0.346 33.74

0.346 32.87

0.346 33.52

0.346 33.09

0.346 33.74

0.346 33.74

0.346 33.30

0.346 33.95

0.346 34.17

0.346 34.38

0.346 34.38

0.346 34.17

0.346 33.95

0.346 35.47

0.346 36.11

0.346 35.90

0.346 36.11

0.346 35.03

0.346 34.38

0.346 34.60

0.346 34.17

0.346 34.60

0.346 35.25

0.346 36.33

0.346 36.98

0.346 34.60

0.346 34.17
PEMAKAIAN KUANTITAS
RATA-RATA/HARI
(LITER/M2) (LITER)

0.346 34.82

0.346 35.25

0.346 36.76

0.346 36.11

0.346 34.82

0.346 35.47

0.346 35.47

0.346 35.25

0.346 35.68

0.346 35.47

0.346 35.47

0.346 35.25

0.346 2.80

1,473.95
PEMAKAIAN KUANTITAS
RATA-RATA/HARI
(LITER/M2) (LITER)

0.345 36.01

0.345 35.79

0.345 36.01

0.345 34.93

0.345 34.28

0.345 34.50

0.345 34.07

0.345 34.50

0.345 35.15

0.345 36.23

0.345 36.87

0.345 34.50

0.345 34.07

0.345 34.72

0.345 35.15

0.345 36.66

0.345 36.01

0.345 34.72

0.345 35.36

0.345 35.36

0.345 35.15

0.345 35.58

0.345 35.36

0.345 35.36

0.345 35.15

0.345 35.36

0.345 35.36

0.345 35.36

0.345 35.36

0.345 34.28

0.345 34.07

0.345 34.50

0.345 34.50
PEMAKAIAN KUANTITAS
RATA-RATA/HARI
(LITER/M2) (LITER)
0.345 27.95

1,188.22
PEMAKAIAN KUANTITAS
RATA-RATA/HARI
(LITER/M2) (LITER)

0.348 32.82

0.348 35.67

0.348 35.67

0.348 35.67

0.348 34.58

0.348 34.37

0.348 34.80

0.348 34.80

0.348 35.24

0.348 35.02

0.348 35.67

0.348 36.54

0.348 35.89

0.348 34.71

0.348 34.28

0.348 34.58

0.348 35.02

0.348 35.89

0.348 35.89

0.348 35.45

0.348 36.54

0.348 35.32

0.348 33.80

0.348 34.37

0.348 33.93

0.348 34.37

0.348 34.58

0.348 33.93

0.348 33.71

0.348 33.93

0.348 33.50

0.348 33.71

1,114.23
PEMAKAIAN KUANTITAS
RATA-RATA/HARI
(LITER/M2) (LITER)

0.348 7.13

0.348 35.02

0.348 35.67

0.348 36.54

0.348 35.89

0.348 34.67

0.348 34.23

0.348 34.58

0.348 35.02

0.348 35.89

0.348 35.89

0.348 35.45

0.348 36.54

0.348 35.32

0.348 33.80

0.348 34.37

0.348 33.93

0.348 34.37

604.30
1,718.53
PEMAKAIAN KUANTITAS
RATA-RATA/HARI
(LITER/M2) (LITER)

0.350 34.13

0.350 33.69

0.350 34.78

0.350 34.96

0.350 34.08

0.350 33.91

0.350 34.13

0.350 35.00

0.350 35.22

0.350 35.66

0.350 35.88

0.350 35.22

0.350 34.78

0.350 36.09

0.350 36.75

0.350 35.44

0.350 35.44

0.350 35.44

0.350 35.22

0.350 35.44

0.350 35.44

0.350 35.44

0.350 35.22

0.350 34.78

0.350 34.56

0.350 34.78

0.350 35.00

0.350 34.56

981.01
PEMAKAIAN KUANTITAS
RATA-RATA/HARI
(LITER/M2) (LITER)

0.349 34.68

0.349 34.03

0.349 33.81

0.349 34.03

0.349 33.59

0.349 33.81

0.349 34.03

0.349 33.59

0.349 34.68

0.349 34.86

0.349 33.98

0.349 33.81

0.349 34.03

0.349 34.90

0.349 35.12

0.349 35.55

0.349 35.77

0.349 35.12

0.349 34.68

0.349 35.99

0.349 36.65

0.349 35.34

0.349 35.34

0.349 35.34

0.349 35.12

0.349 35.34

0.349 35.34

0.349 35.34

0.349 35.12

0.349 34.68

0.349 34.46

0.349 34.68

0.349 34.90
PEMAKAIAN KUANTITAS
RATA-RATA/HARI
(LITER/M2) (LITER)
0.349 34.46

1,182.15
PEMAKAIAN KUANTITAS
RATA-RATA/HARI
(LITER/M2) (LITER)

0.347 34.27

0.347 34.70

0.347 34.70

0.347 34.70

0.347 34.27

0.347 33.83

0.347 33.83

0.347 34.05

0.347 34.05

0.347 34.05

0.347 34.70

0.347 21.47

4.16 398.62

0.347 34.27

0.347 34.70

0.347 34.70

0.347 34.70

0.347 34.27

0.347 33.83

0.347 33.83

0.347 34.05

0.347 34.05

0.347 34.05

0.347 34.70

377.15
775.77
PEMAKAIAN KUANTITAS
RATA-RATA/HARI
(LITER/M2) (LITER)

0.349 14.66

0.349 36.21

0.349 36.21

0.349 35.99

0.349 35.34

0.349 34.68

0.349 34.03

0.349 34.03

0.349 34.46

0.349 34.90

0.349 34.90

0.349 34.25

0.349 33.37

0.349 33.37

0.349 34.25

0.349 34.90

0.349 35.12

0.349 34.25

0.349 34.68

0.349 35.77

0.349 35.34

0.349 35.55

0.349 35.77

0.349 35.77

0.349 36.43

0.349 36.21

0.349 36.43

0.349 37.95

0.349 22.64

987.45
PEMAKAIAN KUANTITAS
RATA-RATA/HARI
(LITER/M2) (LITER)

0.349 35.99

0.349 36.21

0.349 36.21

0.349 35.99

0.349 35.34

0.349 34.68

0.349 34.03

0.349 34.03

0.349 34.46

0.349 34.90

0.349 34.90

0.349 34.25

0.349 33.37

454.35
1,441.80
PEMAKAIAN KUANTITAS
RATA-RATA/HARI
(LITER/M2) (LITER)

0.347 33.18

0.347 34.05

0.347 34.70

0.347 34.92

0.347 34.05

0.347 34.48

0.347 35.57

0.347 35.13

0.347 35.35

0.347 35.57

0.347 35.57

0.347 36.22

0.347 36.00

0.347 36.22

0.347 37.74

0.347 37.52

0.347 36.44

0.347 35.78

0.347 35.35

0.347 35.13

0.347 35.13

0.347 35.57

0.347 35.35

0.347 34.92

849.93
PEMAKAIAN KUANTITAS
RATA-RATA/HARI
(LITER/M2) (LITER)

0.347 14.75

0.347 36.44

0.347 35.78

0.347 35.35

0.347 35.13

0.347 35.13

0.347 35.57

0.347 35.35

0.347 34.92

298.42
1,148.35
10,500.29
DATA PENDUKUNG
SERTIFIKAT BULANAN NO - 05

Nama Kegiatan : REHABILITASI JALAN DAN JEMBATAN PROVINSI BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II
Nama Paket : REHABILITASI JALAN RUAS JALAN CIKEMBAR - CIKEMBANG ( 1,00 KM )

Lokasi : RUAS JALAN CIKEMBAR - CIKEMBANG


Item Pekerjaan : 6.1(2)
Jenis Pekerjaan : Lapis Perekat
Satuan : Liter

Luas PEMAKAIAN KUANTITAS


1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen RATA-RATA/HARI
(m) (m) (m) (m2) (LITER/M2) (LITER)
1 14 September 2013 0+000 KI 5.90
0+000-0+425 ( ki ) - 5.00 25.00 125.00 0.348 43.50
2 0+025 KI 4.10 -
- 4.03 25.00 100.63 0.348 35.02
3 0+050 KI 3.95 -
- 4.00 25.00 100.00 0.348 34.80
4 0+075 KI 4.05 -
- 3.90 25.00 97.50 0.348 33.93
5 0+100 KI 3.75 -
- 3.80 25.00 95.00 0.348 33.06
6 0+125 KI 3.85 -
- 3.88 25.00 96.88 0.348 33.71
7 0+150 KI 3.90 -
- 3.83 25.00 95.63 0.348 33.28
8 0+175 KI 3.75 -
- 3.90 25.00 97.50 0.348 33.93
9 0+200 KI 4.05 -
- 3.90 25.00 97.50 0.348 33.93
10 0+225 KI 3.75 -
- 3.85 25.00 96.25 0.348 33.50
11 0+250 KI 3.95 -
- 3.93 25.00 98.13 0.348 34.15
12 0+275 KI 3.90 -
- 3.95 25.00 98.75 0.348 34.37
13 0+300 KI 4.00 -
- 3.98 25.00 99.38 0.348 34.58
14 0+325 KI 3.95 -
- 3.98 25.00 99.38 0.348 34.58
15 0+350 KI 4.00 -
- 3.95 25.00 98.75 0.348 34.37
16 0+375 KI 3.90 -
- 3.93 25.00 98.13 0.348 34.15
17 0+400 KI 3.95 -
- 4.10 25.00 102.50 0.348 35.67
18 0+425 KI 4.25 -
- 425.00 1,696.88 590.51
Luas PEMAKAIAN KUANTITAS
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen RATA-RATA/HARI
(m) (m) (m) (m2) (LITER/M2) (LITER)
1 15 September 2013 0+000 KA 5.90 -
0+000-1+052( ka ) - 5.00 25.00 125.00 0.346 43.25
2 0+025 KA 4.10 -
- 4.03 25.00 100.63 0.346 34.82
3 0+050 KA 3.95 -
- 4.00 25.00 100.00 0.346 34.60
4 0+075 KA 4.05 -
- 3.90 25.00 97.50 0.346 33.74
5 0+100 KA 3.75 -
- 3.80 25.00 95.00 0.346 32.87
6 0+125 KA 3.85 -
- 3.88 25.00 96.88 0.346 33.52
7 0+150 KA 3.90 -
- 3.83 25.00 95.63 0.346 33.09
8 0+175 KA 3.75 -
- 3.90 25.00 97.50 0.346 33.74
9 0+200 KA 4.05 -
- 3.90 25.00 97.50 0.346 33.74
10 0+225 KA 3.75 -
- 3.85 25.00 96.25 0.346 33.30
11 0+250 KA 3.95 -
- 3.93 25.00 98.13 0.346 33.95
12 0+275 KA 3.90 -
- 3.95 25.00 98.75 0.346 34.17
13 0+300 KA 4.00 -
- 3.98 25.00 99.38 0.346 34.38
14 0+325 KA 3.95 -
- 3.98 25.00 99.38 0.346 34.38
15 0+350 KA 4.00 -
- 3.95 25.00 98.75 0.346 34.17
16 0+375 KA 3.90 -
- 3.93 25.00 98.13 0.346 33.95
17 0+400 KA 3.95 -
- 4.10 25.00 102.50 0.346 35.47
18 0+425 KA 4.25 -
- 4.18 25.00 104.38 0.346 36.11
19 0+450 KA 4.10 -
- 4.15 25.00 103.75 0.346 35.90
20 0+475 KA 4.20 -
- 4.18 25.00 104.38 0.346 36.11
21 0+500 KA 4.15 -
- 4.05 25.00 101.25 0.346 35.03
22 0+525 KA 3.95 -
- 3.98 25.00 99.38 0.346 34.38
23 0+550 KA 4.00 -
- 4.00 25.00 100.00 0.346 34.60
24 0+575 KA 4.00 -
- 3.95 25.00 98.75 0.346 34.17
25 0+600 KA 3.90 -
- 4.00 25.00 100.00 0.346 34.60
26 0+625 KA 4.10 -
- 4.08 25.00 101.88 0.346 35.25
27 0+650 KA 4.05 -
- 4.20 25.00 105.00 0.346 36.33
28 0+675 KA 4.35 -
- 4.28 25.00 106.88 0.346 36.98
29 0+700 KA 4.20 -
- 4.00 25.00 100.00 0.346 34.60
30 0+725 KA 3.80 -
- 3.95 25.00 98.75 0.346 34.17
31 0+750 KA 4.10 -
Luas PEMAKAIAN KUANTITAS
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen RATA-RATA/HARI
(m) (m) (m) (m2) (LITER/M2) (LITER)
31 0+750 KA 4.10
- 4.03 25.00 100.63 0.346 34.82
32 0+775 KA 3.95 -
- 4.08 25.00 101.88 0.346 35.25
33 0+800 KA 4.20 -
- 4.25 25.00 106.25 0.346 36.76
34 0+825 KA 4.30 -
- 4.18 25.00 104.38 0.346 36.11
35 0+850 KA 4.05 -
- 4.03 25.00 100.63 0.346 34.82
36 0+875 KA 4.00 -
- 4.10 25.00 102.50 0.346 35.47
37 0+900 KA 4.20 -
- 4.10 25.00 102.50 0.346 35.47
38 0+925 KA 4.00 -
- 4.08 25.00 101.88 0.346 35.25
39 0+950 KA 4.15 -
- 4.13 25.00 103.13 0.346 35.68
40 0+975 KA 4.10 -
- 4.10 25.00 102.50 0.346 35.47
41 1+000 KA 4.10 -
- 4.10 25.00 102.50 0.346 35.47
42 1+025 KA 4.10 -
- 4.08 25.00 101.88 0.346 35.25
43 1+050 KA 4.05 -
- 4.05 2.00 8.10 0.346 2.80
44 1+052 KA 4.05 -
- 1,052.00 4,259.98 1,473.95
Luas PEMAKAIAN KUANTITAS
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen RATA-RATA/HARI
(m) (m) (m) (m2) (LITER/M2) (LITER)
1 16 September 2013 0+425 KI 4.25 -
0+425-1+270( ki ) - 4.18 25.00 104.38 0.345 36.01
2 0+450 KI 4.10 -
- 4.15 25.00 103.75 0.345 35.79
3 0+475 KI 4.20 -
- 4.18 25.00 104.38 0.345 36.01
4 0+500 KI 4.15 -
- 4.05 25.00 101.25 0.345 34.93
5 0+525 KI 3.95 -
- 3.98 25.00 99.38 0.345 34.28
6 0+550 KI 4.00 -
- 4.00 25.00 100.00 0.345 34.50
7 0+575 KI 4.00 -
- 3.95 25.00 98.75 0.345 34.07
8 0+600 KI 3.90 -
- 4.00 25.00 100.00 0.345 34.50
9 0+625 KI 4.10 -
- 4.08 25.00 101.88 0.345 35.15
10 0+650 KI 4.05 -
- 4.20 25.00 105.00 0.345 36.23
11 0+675 KI 4.35 -
- 4.28 25.00 106.88 0.345 36.87
12 0+700 KI 4.20 -
- 4.00 25.00 100.00 0.345 34.50
13 0+725 KI 3.80 -
- 3.95 25.00 98.75 0.345 34.07
14 0+750 KI 4.10 -
- 4.03 25.00 100.63 0.345 34.72
15 0+775 KI 3.95 -
- 4.08 25.00 101.88 0.345 35.15
16 0+800 KI 4.20 -
- 4.25 25.00 106.25 0.345 36.66
17 0+825 KI 4.30 -
- 4.18 25.00 104.38 0.345 36.01
18 0+850 KI 4.05 -
- 4.03 25.00 100.63 0.345 34.72
19 0+875 KI 4.00 -
- 4.10 25.00 102.50 0.345 35.36
20 0+900 KI 4.20 -
- 4.10 25.00 102.50 0.345 35.36
21 0+925 KI 4.00 -
- 4.08 25.00 101.88 0.345 35.15
22 0+950 KI 4.15 -
- 4.13 25.00 103.13 0.345 35.58
23 0+975 KI 4.10 -
- 4.10 25.00 102.50 0.345 35.36
24 1+000 KI 4.10 -
- 4.10 25.00 102.50 0.345 35.36
25 1+025 KI 4.10 -
- 4.08 25.00 101.88 0.345 35.15
26 1+050 KI 4.05 -
- 4.10 25.00 102.50 0.345 35.36
27 1+075 KI 4.15 -
- 4.10 25.00 102.50 0.345 35.36
28 1+100 KI 4.05 -
- 4.10 25.00 102.50 0.345 35.36
29 1+125 KI 4.15 -
- 4.10 25.00 102.50 0.345 35.36
30 1+150 KI 4.05 -
- 3.98 25.00 99.38 0.345 34.28
31 1+175 KI 3.90 -
- 3.95 25.00 98.75 0.345 34.07
32 1+200 KI 4.00 -
- 4.00 25.00 100.00 0.345 34.50
33 1+225 KI 4.00 -
- 4.00 25.00 100.00 0.345 34.50
34 1+250 KI 4.00 -
- 4.05 20.00 81.00 0.345 27.95
35 1+270 KI 4.10 -
- 845.00 3,444.13 1,188.22
Luas PEMAKAIAN KUANTITAS
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen RATA-RATA/HARI
(m) (m) (m) (m2) (LITER/M2) (LITER)
1 17 September 2013 1+052 KA 4.05
1+052-1+850 ( ka ) 4.10 23.00 94.30 0.348 32.82
2 1+075 KA 4.15
4.10 25.00 102.50 0.348 35.67
3 1+100 KA 4.05
4.10 25.00 102.50 0.348 35.67
4 1+125 KA 4.15
4.10 25.00 102.50 0.348 35.67
5 1+150 KA 4.05
3.98 25.00 99.38 0.348 34.58
6 1+175 KA 3.90
3.95 25.00 98.75 0.348 34.37
7 1+200 KA 4.00
4.00 25.00 100.00 0.348 34.80
8 1+225 KA 4.00
4.00 25.00 100.00 0.348 34.80
9 1+250 KA 4.00
4.05 25.00 101.25 0.348 35.24
10 1+275 KA 4.10
4.03 25.00 100.63 0.348 35.02
11 1+300 KA 3.95
4.10 25.00 102.50 0.348 35.67
12 1+325 KA 4.25
4.20 25.00 105.00 0.348 36.54
13 1+350 KA 4.15
4.13 25.00 103.13 0.348 35.89
14 1+375 KA 4.10
3.99 25.00 99.75 0.348 34.71
15 1+400 KA 3.88
3.94 25.00 98.50 0.348 34.28
16 1+425 KA 4.00
3.98 25.00 99.38 0.348 34.58
17 1+450 KA 3.95
4.03 25.00 100.63 0.348 35.02
18 1+475 KA 4.10
4.13 25.00 103.13 0.348 35.89
19 1+500 KA 4.15
4.13 25.00 103.13 0.348 35.89
20 1+525 KA 4.10
4.08 25.00 101.88 0.348 35.45
21 1+550 KA 4.05
4.20 25.00 105.00 0.348 36.54
22 1+575 KA 4.35
4.06 25.00 101.50 0.348 35.32
23 1+600 KA 3.77
3.89 25.00 97.13 0.348 33.80
24 1+625 KA 4.00
3.95 25.00 98.75 0.348 34.37
25 1+650 KA 3.90
3.90 25.00 97.50 0.348 33.93
26 1+675 KA 3.90
3.95 25.00 98.75 0.348 34.37
27 1+700 KA 4.00
3.98 25.00 99.38 0.348 34.58
28 1+725 KA 3.95
3.90 25.00 97.50 0.348 33.93
29 1+750 KA 3.85
3.88 25.00 96.88 0.348 33.71
30 1+775 KA 3.90
3.90 25.00 97.50 0.348 33.93
31 1+800 KA 3.90
3.85 25.00 96.25 0.348 33.50
32 1+825 KA 3.80
3.88 25.00 96.88 0.348 33.71
33 1+850 KA 3.95
- 798.00 3,201.80 1,114.23
Luas PEMAKAIAN KUANTITAS
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen RATA-RATA/HARI
(m) (m) (m) (m2) (LITER/M2) (LITER)
1 17 September 2013 1+270 KI 4.10
1+270-1+700 ( K1 ) 4.10 5.00 20.50 0.348 7.13
2 1+275 KI 4.10
4.03 25.00 100.63 0.348 35.02
3 1+300 KI 3.95
4.10 25.00 102.50 0.348 35.67
4 1+325 KI 4.25
4.20 25.00 105.00 0.348 36.54
5 1+350 KI 4.15
4.13 25.00 103.13 0.348 35.89
6 1+375 KI 4.10
3.99 25.00 99.63 0.348 34.67
7 1+400 KI 3.87
3.94 25.00 98.38 0.348 34.23
8 1+425 KI 4.00
3.98 25.00 99.38 0.348 34.58
9 1+450 KI 3.95
4.03 25.00 100.63 0.348 35.02
10 1+475 KI 4.10
4.13 25.00 103.13 0.348 35.89
11 1+500 KI 4.15
4.13 25.00 103.13 0.348 35.89
12 1+525 KI 4.10
4.08 25.00 101.88 0.348 35.45
13 1+550 KI 4.05
4.20 25.00 105.00 0.348 36.54
14 1+575 KI 4.35
4.06 25.00 101.50 0.348 35.32
15 1+600 KI 3.77
3.89 25.00 97.13 0.348 33.80
16 1+625 KI 4.00
3.95 25.00 98.75 0.348 34.37
17 1+650 KI 3.90
3.90 25.00 97.50 0.348 33.93
18 1+675 KI 3.90
3.95 25.00 98.75 0.348 34.37
19 1+700 KI 4.00
- 430.00 1,736.50 604.30
- 1,228.00 4,938.30 1,718.53
Luas PEMAKAIAN KUANTITAS
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen RATA-RATA/HARI
(m) (m) (m) (m2) (LITER/M2) (LITER)
1 18 September 2013 1+850 KA 3.95
1+850-2+550 ( ka ) 3.90 25.00 97.50 0.350 34.13
2 1+875 KA 3.85
3.85 25.00 96.25 0.350 33.69
3 1+900 KA 3.85
3.98 25.00 99.38 0.350 34.78
4 1+925 KA 4.10
4.00 25.00 99.88 0.350 34.96
5 1+950 KA 3.89
3.90 25.00 97.38 0.350 34.08
6 1+975 KA 3.90
3.88 25.00 96.88 0.350 33.91
7 2+000 KA 3.85
3.90 25.00 97.50 0.350 34.13
8 2+025 KA 3.95
4.00 25.00 100.00 0.350 35.00
9 2+050 KA 4.05
4.03 25.00 100.63 0.350 35.22
10 2+075 KA 4.00
4.08 25.00 101.88 0.350 35.66
11 2+100 KA 4.15
4.10 25.00 102.50 0.350 35.88
12 2+125 KA 4.05
4.03 25.00 100.63 0.350 35.22
13 2+150 KA 4.00
3.98 25.00 99.38 0.350 34.78
14 2+175 KA 3.95
4.13 25.00 103.13 0.350 36.09
15 2+200 KA 4.30
4.20 25.00 105.00 0.350 36.75
16 2+225 KA 4.10
4.05 25.00 101.25 0.350 35.44
17 2+250 KA 4.00
4.05 25.00 101.25 0.350 35.44
18 2+275 KA 4.10
4.05 25.00 101.25 0.350 35.44
19 2+300 KA 4.00
4.03 25.00 100.63 0.350 35.22
20 2+325 KA 4.05
4.05 25.00 101.25 0.350 35.44
21 2+350 KA 4.05
4.05 25.00 101.25 0.350 35.44
22 2+375 KA 4.05
4.05 25.00 101.25 0.350 35.44
23 2+400 KA 4.05
4.03 25.00 100.63 0.350 35.22
24 2+425 KA 4.00
3.98 25.00 99.38 0.350 34.78
25 2+450 KA 3.95
3.95 25.00 98.75 0.350 34.56
26 2+475 KA 3.95
3.98 25.00 99.38 0.350 34.78
27 2+500 KA 4.00
4.00 25.00 100.00 0.350 35.00
28 2+525 KA 4.00
3.95 25.00 98.75 0.350 34.56
29 2+550 KA 3.90
- 700.00 2,802.88 981.01
Luas PEMAKAIAN KUANTITAS
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen RATA-RATA/HARI
(m) (m) (m) (m2) (LITER/M2) (LITER)
1 19 September 2013 1+700 KI 4.00
1+700-2+550 ( ki ) 3.98 25.00 99.38 0.349 34.68
2 1+725 KI 3.95
3.90 25.00 97.50 0.349 34.03
3 1+750 KI 3.85
3.88 25.00 96.88 0.349 33.81
4 1+775 KI 3.90
3.90 25.00 97.50 0.349 34.03
5 1+800 KI 3.90
3.85 25.00 96.25 0.349 33.59
6 1+825 KI 3.80
3.88 25.00 96.88 0.349 33.81
7 1+850 KI 3.95
3.90 25.00 97.50 0.349 34.03
8 1+875 KI 3.85
3.85 25.00 96.25 0.349 33.59
9 1+900 KI 3.85
3.98 25.00 99.38 0.349 34.68
10 1+925 KI 4.10
4.00 25.00 99.88 0.349 34.86
11 1+950 KI 3.89
3.90 25.00 97.38 0.349 33.98
12 1+975 KI 3.90
3.88 25.00 96.88 0.349 33.81
13 2+000 KI 3.85
3.90 25.00 97.50 0.349 34.03
14 2+025 KI 3.95
4.00 25.00 100.00 0.349 34.90
15 2+050 KI 4.05
4.03 25.00 100.63 0.349 35.12
16 2+075 KI 4.00
4.08 25.00 101.88 0.349 35.55
17 2+100 KI 4.15
4.10 25.00 102.50 0.349 35.77
18 2+125 KI 4.05
4.03 25.00 100.63 0.349 35.12
19 2+150 KI 4.00
3.98 25.00 99.38 0.349 34.68
20 2+175 KI 3.95
4.13 25.00 103.13 0.349 35.99
21 2+200 KI 4.30
4.20 25.00 105.00 0.349 36.65
22 2+225 KI 4.10
4.05 25.00 101.25 0.349 35.34
23 2+250 KI 4.00
4.05 25.00 101.25 0.349 35.34
24 2+275 KI 4.10
4.05 25.00 101.25 0.349 35.34
25 2+300 KI 4.00
4.03 25.00 100.63 0.349 35.12
26 2+325 KI 4.05
4.05 25.00 101.25 0.349 35.34
27 2+350 KI 4.05
4.05 25.00 101.25 0.349 35.34
28 2+375 KI 4.05
4.05 25.00 101.25 0.349 35.34
29 2+400 KI 4.05
4.03 25.00 100.63 0.349 35.12
30 2+425 KI 4.00
3.98 25.00 99.38 0.349 34.68
31 2+450 KI 3.95
3.95 25.00 98.75 0.349 34.46
32 2+475 KI 3.95
3.98 25.00 99.38 0.349 34.68
33 2+500 KI 4.00
4.00 25.00 100.00 0.349 34.90
34 2+525 KI 4.00
3.95 25.00 98.75 0.349 34.46
35 2+550 KI 3.90
- 850.00 3,387.25 1,182.15
Luas PEMAKAIAN KUANTITAS
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen RATA-RATA/HARI
(m) (m) (m) (m2) (LITER/M2) (LITER)
1 20 September 2013 2+550 KA 3.90
2+550-2+840 ( ka ) 3.95 25.00 98.75 0.347 34.27
2 2+575 KA 4.00
4.00 25.00 100.00 0.347 34.70
3 2+600 KA 4.00
4.00 25.00 100.00 0.347 34.70
4 2+625 KA 4.00
4.00 25.00 100.00 0.347 34.70
5 2+650 KA 4.00
3.95 25.00 98.75 0.347 34.27
6 2+675 KA 3.90
3.90 25.00 97.50 0.347 33.83
7 2+700 KA 3.90
3.90 25.00 97.50 0.347 33.83
8 2+725 KA 3.90
3.93 25.00 98.13 0.347 34.05
9 2+750 KA 3.95
3.93 25.00 98.13 0.347 34.05
10 2+775 KA 3.90
3.93 25.00 98.13 0.347 34.05
11 2+800 KA 3.95
4.00 25.00 100.00 0.347 34.70
12 2+825 KA 4.05
4.13 15.00 61.88 0.347 21.47
13 2+840 KA 4.20
290.00 1,148.75 4.16 398.62
1 20 September 2013 2+550 KI 3.90
2+550-2+825 ( Ki ) 3.95 25.00 98.75 0.347 34.27
2 2+575 KI 4.00
4.00 25.00 100.00 0.347 34.70
3 2+600 KI 4.00
4.00 25.00 100.00 0.347 34.70
4 2+625 KI 4.00
4.00 25.00 100.00 0.347 34.70
5 2+650 KI 4.00
3.95 25.00 98.75 0.347 34.27
6 2+675 KI 3.90
3.90 25.00 97.50 0.347 33.83
7 2+700 KI 3.90
3.90 25.00 97.50 0.347 33.83
8 2+725 KI 3.90
3.93 25.00 98.13 0.347 34.05
9 2+750 KI 3.95
3.93 25.00 98.13 0.347 34.05
10 2+775 KI 3.90
3.93 25.00 98.13 0.347 34.05
11 2+800 KI 3.95
4.00 25.00 100.00 0.347 34.70
12 2+825 KI 4.05
275.00 1,086.88 377.15
565.00 2,235.63 775.77
TOTAL 5,665.00 22,765.05 7,910.14
Bulan Ini 7,910.14
s/d Bulan lalu -
s/d Bulan ini 7,910.14

Pengawas Lapangan TIM SUPERVISI Penyedia Jasa


PT. ARIESTA KARYA

DADAN SUPARMAN HARRY KUSWIAN ,ST DENI RISANA,ST


NIP. 19800113 200801 1 003 NIP. 1974 0331 2008 01 1 002 Penanggung Jawab Teknik
DATA PENDUKUNG
HASIL PERHITUNGAN LUAS HAMPARAN

Nama Balai : BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II


Nama Kegiatan : REHABILITASI JALAN DAN JEMBATAN PROVINSI BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II
Nama Paket : REHABILITASI JALAN RUAS JALAN CIKEMBAR - CIKEMBANG ( 1,00 KM )

Lokasi : RUAS JALAN CIKEMBAR - CIKEMBANG


No. Kontrak : 602/Ktr.27/ 209/BPJ.WIL.PEL.II
Tgl. Kontrak : 28 JULI 2015
Penyedia Jasa : CV. LEMBANG JAYA
Jenis Pekerjaan : Laston Lapis Aus ( AC -WC) LEVELLING
Tanggal Penghamparan : 11 -19 September 2013
Panjang Segmen : 3.75 km
Tebal Rencana : 4,30 cm

Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 14 September 2013 0+000 KI 5.90
0+000-0+425 ( ki ) - 5.00 25.00 125.00
2 0+025 KI 4.10 -
- 4.03 25.00 100.63
3 0+050 KI 3.95 -
- 4.00 25.00 100.00
4 0+075 KI 4.05 -
- 3.90 25.00 97.50
5 0+100 KI 3.75 -
- 3.80 25.00 95.00
6 0+125 KI 3.85 -
- 3.88 25.00 96.88
7 0+150 KI 3.90 -
- 3.83 25.00 95.63
8 0+175 KI 3.75 -
- 3.90 25.00 97.50
9 0+200 KI 4.05 -
- 3.90 25.00 97.50
10 0+225 KI 3.75 -
- 3.85 25.00 96.25
11 0+250 KI 3.95 -
- 3.93 25.00 98.13
12 0+275 KI 3.90 -
- 3.95 25.00 98.75
13 0+300 KI 4.00 -
- 3.98 25.00 99.38
14 0+325 KI 3.95 -
- 3.98 25.00 99.38
15 0+350 KI 4.00 -
- 3.95 25.00 98.75
16 0+375 KI 3.90 -
- 3.93 25.00 98.13
17 0+400 KI 3.95 -
- 4.10 25.00 102.50
18 0+425 KI 4.25 -
- 425.00 1,696.88
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 15 September 2013 0+000 KA 5.90 -
0+000-1+052( ka ) - 5.00 25.00 125.00
2 0+025 KA 4.10 -
- 4.03 25.00 100.63
3 0+050 KA 3.95 -
- 4.00 25.00 100.00
4 0+075 KA 4.05 -
- 3.90 25.00 97.50
5 0+100 KA 3.75 -
- 3.80 25.00 95.00
6 0+125 KA 3.85 -
- 3.88 25.00 96.88
7 0+150 KA 3.90 -
- 3.83 25.00 95.63
8 0+175 KA 3.75 -
- 3.90 25.00 97.50
9 0+200 KA 4.05 -
- 3.90 25.00 97.50
10 0+225 KA 3.75 -
- 3.85 25.00 96.25
11 0+250 KA 3.95 -
- 3.93 25.00 98.13
12 0+275 KA 3.90 -
- 3.95 25.00 98.75
13 0+300 KA 4.00 -
- 3.98 25.00 99.38
14 0+325 KA 3.95 -
- 3.98 25.00 99.38
15 0+350 KA 4.00 -
- 3.95 25.00 98.75
16 0+375 KA 3.90 -
- 3.93 25.00 98.13
17 0+400 KA 3.95 -
- 4.10 25.00 102.50
18 0+425 KA 4.25 -
- 4.18 25.00 104.38
19 0+450 KA 4.10 -
- 4.15 25.00 103.75
20 0+475 KA 4.20 -
- 4.18 25.00 104.38
21 0+500 KA 4.15 -
- 4.05 25.00 101.25
22 0+525 KA 3.95 -
- 3.98 25.00 99.38
23 0+550 KA 4.00 -
- 4.00 25.00 100.00
24 0+575 KA 4.00 -
- 3.95 25.00 98.75
25 0+600 KA 3.90 -
- 4.00 25.00 100.00
26 0+625 KA 4.10 -
- 4.08 25.00 101.88
27 0+650 KA 4.05 -
- 4.20 25.00 105.00
28 0+675 KA 4.35 -
- 4.28 25.00 106.88
29 0+700 KA 4.20 -
- 4.00 25.00 100.00
30 0+725 KA 3.80 -
- 3.95 25.00 98.75
31 0+750 KA 4.10 -
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
31 0+750 KA 4.10
- 4.03 25.00 100.63
32 0+775 KA 3.95 -
- 4.08 25.00 101.88
33 0+800 KA 4.20 -
- 4.25 25.00 106.25
34 0+825 KA 4.30 -
- 4.18 25.00 104.38
35 0+850 KA 4.05 -
- 4.03 25.00 100.63
36 0+875 KA 4.00 -
- 4.10 25.00 102.50
37 0+900 KA 4.20 -
- 4.10 25.00 102.50
38 0+925 KA 4.00 -
- 4.08 25.00 101.88
39 0+950 KA 4.15 -
- 4.13 25.00 103.13
40 0+975 KA 4.10 -
- 4.10 25.00 102.50
41 1+000 KA 4.10 -
- 4.10 25.00 102.50
42 1+025 KA 4.10 -
- 4.08 25.00 101.88
43 1+050 KA 4.05 -
- 4.05 2.00 8.10
44 1+052 KA 4.05 -
- 1,052.00 4,259.98
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 16 September 2013 0+425 KI 4.25 -
0+425-1+270( ki ) - 4.18 25.00 104.38
2 0+450 KI 4.10 -
- 4.15 25.00 103.75
3 0+475 KI 4.20 -
- 4.18 25.00 104.38
4 0+500 KI 4.15 -
- 4.05 25.00 101.25
5 0+525 KI 3.95 -
- 3.98 25.00 99.38
6 0+550 KI 4.00 -
- 4.00 25.00 100.00
7 0+575 KI 4.00 -
- 3.95 25.00 98.75
8 0+600 KI 3.90 -
- 4.00 25.00 100.00
9 0+625 KI 4.10 -
- 4.08 25.00 101.88
10 0+650 KI 4.05 -
- 4.20 25.00 105.00
11 0+675 KI 4.35 -
- 4.28 25.00 106.88
12 0+700 KI 4.20 -
- 4.00 25.00 100.00
13 0+725 KI 3.80 -
- 3.95 25.00 98.75
14 0+750 KI 4.10 -
- 4.03 25.00 100.63
15 0+775 KI 3.95 -
- 4.08 25.00 101.88
16 0+800 KI 4.20 -
- 4.25 25.00 106.25
17 0+825 KI 4.30 -
- 4.18 25.00 104.38
18 0+850 KI 4.05 -
- 4.03 25.00 100.63
19 0+875 KI 4.00 -
- 4.10 25.00 102.50
20 0+900 KI 4.20 -
- 4.10 25.00 102.50
21 0+925 KI 4.00 -
- 4.08 25.00 101.88
22 0+950 KI 4.15 -
- 4.13 25.00 103.13
23 0+975 KI 4.10 -
- 4.10 25.00 102.50
24 1+000 KI 4.10 -
- 4.10 25.00 102.50
25 1+025 KI 4.10 -
- 4.08 25.00 101.88
26 1+050 KI 4.05 -
- 4.10 25.00 102.50
27 1+075 KI 4.15 -
- 4.10 25.00 102.50
28 1+100 KI 4.05 -
- 4.10 25.00 102.50
29 1+125 KI 4.15 -
- 4.10 25.00 102.50
30 1+150 KI 4.05 -
- 3.98 25.00 99.38
31 1+175 KI 3.90 -
- 3.95 25.00 98.75
32 1+200 KI 4.00 -
- 4.00 25.00 100.00
33 1+225 KI 4.00 -
- 4.00 25.00 100.00
34 1+250 KI 4.00 -
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
- 4.05 20.00 81.00
35 1+270 KI 4.10 -
- 845.00 3,444.13
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 17 September 2013 1+052 KA 4.05
1+052-1+850 ( ka ) 4.10 23.00 94.30
2 1+075 KA 4.15
4.10 25.00 102.50
3 1+100 KA 4.05
4.10 25.00 102.50
4 1+125 KA 4.15
4.10 25.00 102.50
5 1+150 KA 4.05
3.98 25.00 99.38
6 1+175 KA 3.90
3.95 25.00 98.75
7 1+200 KA 4.00
4.00 25.00 100.00
8 1+225 KA 4.00
4.00 25.00 100.00
9 1+250 KA 4.00
4.05 25.00 101.25
10 1+275 KA 4.10
4.03 25.00 100.63
11 1+300 KA 3.95
4.10 25.00 102.50
12 1+325 KA 4.25
4.20 25.00 105.00
13 1+350 KA 4.15
4.13 25.00 103.13
14 1+375 KA 4.10
3.99 25.00 99.75
15 1+400 KA 3.88
3.94 25.00 98.50
16 1+425 KA 4.00
3.98 25.00 99.38
17 1+450 KA 3.95
4.03 25.00 100.63
18 1+475 KA 4.10
4.13 25.00 103.13
19 1+500 KA 4.15
4.13 25.00 103.13
20 1+525 KA 4.10
4.08 25.00 101.88
21 1+550 KA 4.05
4.20 25.00 105.00
22 1+575 KA 4.35
4.06 25.00 101.50
23 1+600 KA 3.77
3.89 25.00 97.13
24 1+625 KA 4.00
3.95 25.00 98.75
25 1+650 KA 3.90
3.90 25.00 97.50
26 1+675 KA 3.90
3.95 25.00 98.75
27 1+700 KA 4.00
3.98 25.00 99.38
28 1+725 KA 3.95
3.90 25.00 97.50
29 1+750 KA 3.85
3.88 25.00 96.88
30 1+775 KA 3.90
3.90 25.00 97.50
31 1+800 KA 3.90
3.85 25.00 96.25
32 1+825 KA 3.80
3.88 25.00 96.88
33 1+850 KA 3.95
- 798.00 3,201.80
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 17 September 2013 1+270 KI 4.10
1+270-1+700 ( K1 ) 4.10 5.00 20.50
2 1+275 KI 4.10
4.03 25.00 100.63
3 1+300 KI 3.95
4.10 25.00 102.50
4 1+325 KI 4.25
4.20 25.00 105.00
5 1+350 KI 4.15
4.13 25.00 103.13
6 1+375 KI 4.10
3.99 25.00 99.63
7 1+400 KI 3.87
3.94 25.00 98.38
8 1+425 KI 4.00
3.98 25.00 99.38
9 1+450 KI 3.95
4.03 25.00 100.63
10 1+475 KI 4.10
4.13 25.00 103.13
11 1+500 KI 4.15
4.13 25.00 103.13
12 1+525 KI 4.10
4.08 25.00 101.88
13 1+550 KI 4.05
4.20 25.00 105.00
14 1+575 KI 4.35
4.06 25.00 101.50
15 1+600 KI 3.77
3.89 25.00 97.13
16 1+625 KI 4.00
3.95 25.00 98.75
17 1+650 KI 3.90
3.90 25.00 97.50
18 1+675 KI 3.90
3.95 25.00 98.75
19 1+700 KI 4.00
- 430.00 1,736.50
- 1,228.00 4,938.30
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 18 September 2013 1+850 KA 3.95
1+850-2+550 ( ka ) 3.90 25.00 97.50
2 1+875 KA 3.85
3.85 25.00 96.25
3 1+900 KA 3.85
3.98 25.00 99.38
4 1+925 KA 4.10
4.00 25.00 99.88
5 1+950 KA 3.89
3.90 25.00 97.38
6 1+975 KA 3.90
3.88 25.00 96.88
7 2+000 KA 3.85
3.90 25.00 97.50
8 2+025 KA 3.95
4.00 25.00 100.00
9 2+050 KA 4.05
4.03 25.00 100.63
10 2+075 KA 4.00
4.08 25.00 101.88
11 2+100 KA 4.15
4.10 25.00 102.50
12 2+125 KA 4.05
4.03 25.00 100.63
13 2+150 KA 4.00
3.98 25.00 99.38
14 2+175 KA 3.95
4.13 25.00 103.13
15 2+200 KA 4.30
4.20 25.00 105.00
16 2+225 KA 4.10
4.05 25.00 101.25
17 2+250 KA 4.00
4.05 25.00 101.25
18 2+275 KA 4.10
4.05 25.00 101.25
19 2+300 KA 4.00
4.03 25.00 100.63
20 2+325 KA 4.05
4.05 25.00 101.25
21 2+350 KA 4.05
4.05 25.00 101.25
22 2+375 KA 4.05
4.05 25.00 101.25
23 2+400 KA 4.05
4.03 25.00 100.63
24 2+425 KA 4.00
3.98 25.00 99.38
25 2+450 KA 3.95
3.95 25.00 98.75
26 2+475 KA 3.95
3.98 25.00 99.38
27 2+500 KA 4.00
4.00 25.00 100.00
28 2+525 KA 4.00
3.95 25.00 98.75
29 2+550 KA 3.90
- 700.00 2,802.88
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 19 September 2013 1+700 KI 4.00
1+700-2+550 ( ki ) 3.98 25.00 99.38
2 1+725 KI 3.95
3.90 25.00 97.50
3 1+750 KI 3.85
3.88 25.00 96.88
4 1+775 KI 3.90
3.90 25.00 97.50
5 1+800 KI 3.90
3.85 25.00 96.25
6 1+825 KI 3.80
3.88 25.00 96.88
7 1+850 KI 3.95
3.90 25.00 97.50
8 1+875 KI 3.85
3.85 25.00 96.25
9 1+900 KI 3.85
3.98 25.00 99.38
10 1+925 KI 4.10
4.00 25.00 99.88
11 1+950 KI 3.89
3.90 25.00 97.38
12 1+975 KI 3.90
3.88 25.00 96.88
13 2+000 KI 3.85
3.90 25.00 97.50
14 2+025 KI 3.95
4.00 25.00 100.00
15 2+050 KI 4.05
4.03 25.00 100.63
16 2+075 KI 4.00
4.08 25.00 101.88
17 2+100 KI 4.15
4.10 25.00 102.50
18 2+125 KI 4.05
4.03 25.00 100.63
19 2+150 KI 4.00
3.98 25.00 99.38
20 2+175 KI 3.95
4.13 25.00 103.13
21 2+200 KI 4.30
4.20 25.00 105.00
22 2+225 KI 4.10
4.05 25.00 101.25
23 2+250 KI 4.00
4.05 25.00 101.25
24 2+275 KI 4.10
4.05 25.00 101.25
25 2+300 KI 4.00
4.03 25.00 100.63
26 2+325 KI 4.05
4.05 25.00 101.25
27 2+350 KI 4.05
4.05 25.00 101.25
28 2+375 KI 4.05
4.05 25.00 101.25
29 2+400 KI 4.05
4.03 25.00 100.63
30 2+425 KI 4.00
3.98 25.00 99.38
31 2+450 KI 3.95
3.95 25.00 98.75
32 2+475 KI 3.95
3.98 25.00 99.38
33 2+500 KI 4.00
4.00 25.00 100.00
34 2+525 KI 4.00
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
3.95 25.00 98.75
35 2+550 KI 3.90
- 850.00 3,387.25
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 20 September 2013 2+550 KA 3.90
2+550-2+840 ( ka ) 3.95 25.00 98.75
2 2+575 KA 4.00
4.00 25.00 100.00
3 2+600 KA 4.00
4.00 25.00 100.00
4 2+625 KA 4.00
4.00 25.00 100.00
5 2+650 KA 4.00
3.95 25.00 98.75
6 2+675 KA 3.90
3.90 25.00 97.50
7 2+700 KA 3.90
3.90 25.00 97.50
8 2+725 KA 3.90
3.93 25.00 98.13
9 2+750 KA 3.95
3.93 25.00 98.13
10 2+775 KA 3.90
3.93 25.00 98.13
11 2+800 KA 3.95
4.00 25.00 100.00
12 2+825 KA 4.05
4.13 15.00 61.88
13 2+840 KA 4.20
290.00 1,148.75
1 20 September 2013 2+550 KI 3.90
2+550-2+825 ( Ki ) 3.95 25.00 98.75
2 2+575 KI 4.00
4.00 25.00 100.00
3 2+600 KI 4.00
4.00 25.00 100.00
4 2+625 KI 4.00
4.00 25.00 100.00
5 2+650 KI 4.00
3.95 25.00 98.75
6 2+675 KI 3.90
3.90 25.00 97.50
7 2+700 KI 3.90
3.90 25.00 97.50
8 2+725 KI 3.90
3.93 25.00 98.13
9 2+750 KI 3.95
3.93 25.00 98.13
10 2+775 KI 3.90
3.93 25.00 98.13
11 2+800 KI 3.95
4.00 25.00 100.00
12 2+825 KI 4.05
275.00 1,086.88
565.00 2,235.63
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 26 September 2013 2+840 KA 4.20
2+840-3+540 ( ka ) 4.20 10.00 42.00
2 2+850 KA 4.20
4.15 25.00 103.75
3 2+875 KA 4.10
4.15 25.00 103.75
4 2+900 KA 4.20
4.13 25.00 103.13
5 2+925 KA 4.05
4.05 25.00 101.25
6 2+950 KA 4.05
3.98 25.00 99.38
7 2+975 KA 3.90
3.90 25.00 97.50
8 3+000 KA 3.90
3.90 25.00 97.50
9 3+025 KA 3.90
3.95 25.00 98.75
10 3+050 KA 4.00
4.00 25.00 100.00
11 3+075 KA 4.00
4.00 25.00 100.00
12 3+100 KA 4.00
3.93 25.00 98.13
13 3+125 KA 3.85
3.83 25.00 95.63
14 3+150 KA 3.80
3.83 25.00 95.63
15 3+175 KA 3.85
3.93 25.00 98.13
16 3+200 KA 4.00
4.00 25.00 100.00
17 3+225 KA 4.00
4.03 25.00 100.63
18 3+250 KA 4.05
3.93 25.00 98.13
19 3+275 KA 3.80
3.98 25.00 99.38
20 3+300 KA 4.15
4.10 25.00 102.50
21 3+325 KA 4.05
4.05 25.00 101.25
22 3+350 KA 4.05
4.08 25.00 101.88
23 3+375 KA 4.10
4.10 25.00 102.50
24 3+400 KA 4.10
4.10 25.00 102.50
25 3+425 KA 4.10
4.18 25.00 104.38
26 3+450 KA 4.25
4.15 25.00 103.75
27 3+475 KA 4.05
4.18 25.00 104.38
28 3+500 KA 4.30
4.35 25.00 108.75
29 3+525 KA 4.40
4.33 15.00 64.88
30 3+540 KA 4.25
700.00 2,829.38
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 26 September 2013 2+825 KI 4.05
2+825-3+150 ( Ki ) 4.13 25.00 103.13
2 2+850 KI 4.20 - - -
4.15 25.00 103.75
3 2+875 KI 4.10 - - -
4.15 25.00 103.75
4 2+900 KI 4.20 - - -
4.13 25.00 103.13
5 2+925 KI 4.05 - - -
4.05 25.00 101.25
6 2+950 KI 4.05 - - -
3.98 25.00 99.38
7 2+975 KI 3.90 - - -
3.90 25.00 97.50
8 3+000 KI 3.90 - - -
3.90 25.00 97.50
9 3+025 KI 3.90 - - -
3.95 25.00 98.75
10 3+050 KI 4.00 - - -
4.00 25.00 100.00
11 3+075 KI 4.00 - - -
4.00 25.00 100.00
12 3+100 KI 4.00 - - -
3.93 25.00 98.13
13 3+125 KI 3.85 - - -
3.83 25.00 95.63
14 3+150 KI 3.80 - - -
325.00 1,301.88
1,025.00 4,131.26
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 27 September 2013 3+150 KI 3.80 - - -
3+150-3+750 ( ki ) 3.83 25.00 95.63
2 3+175 KI 3.85 - - -
3.93 25.00 98.13
3 3+200 KI 4.00 - - -
4.00 25.00 100.00
4 3+225 KI 4.00 - - -
4.03 25.00 100.63
5 3+250 KI 4.05 - - -
3.93 25.00 98.13
6 3+275 KI 3.80 - - -
3.98 25.00 99.38
7 3+300 KI 4.15 - - -
4.10 25.00 102.50
8 3+325 KI 4.05 - - -
4.05 25.00 101.25
9 3+350 KI 4.05 - - -
4.08 25.00 101.88
10 3+375 KI 4.10 - - -
4.10 25.00 102.50
11 3+400 KI 4.10 - - -
4.10 25.00 102.50
12 3+425 KI 4.10 - - -
4.18 25.00 104.38
13 3+450 KI 4.25 - - -
4.15 25.00 103.75
14 3+475 KI 4.05 - - -
4.18 25.00 104.38
15 3+500 KI 4.30 - - -
4.35 25.00 108.75
16 3+525 KI 4.40 - - -
4.33 25.00 108.13
17 3+550 KI 4.25 - - -
4.20 25.00 105.00
18 3+575 KI 4.15 - - -
4.13 25.00 103.13
19 3+600 KI 4.10 - - -
4.08 25.00 101.88
20 3+625 KI 4.05 - - -
4.05 25.00 101.25
21 3+650 KI 4.05 - - -
4.05 25.00 101.25
22 3+675 KI 4.05 - - -
4.10 25.00 102.50
23 3+700 KI 4.15 - - -
4.08 25.00 101.88
24 3+725 KI 4.00 - - -
4.03 25.00 100.63
25 3+750 KI 4.05 - - -
600.00 2,449.38
Luas
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen
(m) (m) (m) (m2)
1 27 September 2013 3+540 KA 4.25
3+540-3+750 ( ka ) 4.25 10.00 42.50
2 3+550 KA 4.25
4.20 25.00 105.00
3 3+575 KA 4.15
4.13 25.00 103.13
4 3+600 KA 4.10
4.08 25.00 101.88
5 3+625 KA 4.05
4.05 25.00 101.25
6 3+650 KA 4.05
4.05 25.00 101.25
7 3+675 KA 4.05
4.10 25.00 102.50
8 3+700 KA 4.15
4.08 25.00 101.88
9 3+725 KA 4.00
4.03 25.00 100.63
10 3+750 KA 4.05
210.00 860.00
810.00 3,309.38
TOTAL 7,500.00 30,205.69

Dibuat oleh :
Disetujui oleh : Penyedia Jasa
Pengawas Lapangan PT. ARIESTA KARYA

DENI RISANA,ST
DADAN SUPARMAN Penanggung Jawab Teknik
NIP. 19800113 200801 1 003
PEMAKAIAN KUANTITAS
RATA-RATA/HARI
(LITER/M2) (LITER)

0.348 43.50

0.348 35.02

0.348 34.80

0.348 33.93

0.348 33.06

0.348 33.71

0.348 33.28

0.348 33.93

0.348 33.93

0.348 33.50

0.348 34.15

0.348 34.37

0.348 34.58

0.348 34.58

0.348 34.37

0.348 34.15

0.348 35.67

590.51
PEMAKAIAN KUANTITAS
RATA-RATA/HARI
(LITER/M2) (LITER)

0.346 43.25

0.346 34.82

0.346 34.60

0.346 33.74

0.346 32.87

0.346 33.52

0.346 33.09

0.346 33.74

0.346 33.74

0.346 33.30

0.346 33.95

0.346 34.17

0.346 34.38

0.346 34.38

0.346 34.17

0.346 33.95

0.346 35.47

0.346 36.11

0.346 35.90

0.346 36.11

0.346 35.03

0.346 34.38

0.346 34.60

0.346 34.17

0.346 34.60

0.346 35.25

0.346 36.33

0.346 36.98

0.346 34.60

0.346 34.17
PEMAKAIAN KUANTITAS
RATA-RATA/HARI
(LITER/M2) (LITER)

0.346 34.82

0.346 35.25

0.346 36.76

0.346 36.11

0.346 34.82

0.346 35.47

0.346 35.47

0.346 35.25

0.346 35.68

0.346 35.47

0.346 35.47

0.346 35.25

0.346 2.80

1,473.95
PEMAKAIAN KUANTITAS
RATA-RATA/HARI
(LITER/M2) (LITER)

0.345 36.01

0.345 35.79

0.345 36.01

0.345 34.93

0.345 34.28

0.345 34.50

0.345 34.07

0.345 34.50

0.345 35.15

0.345 36.23

0.345 36.87

0.345 34.50

0.345 34.07

0.345 34.72

0.345 35.15

0.345 36.66

0.345 36.01

0.345 34.72

0.345 35.36

0.345 35.36

0.345 35.15

0.345 35.58

0.345 35.36

0.345 35.36

0.345 35.15

0.345 35.36

0.345 35.36

0.345 35.36

0.345 35.36

0.345 34.28

0.345 34.07

0.345 34.50

0.345 34.50
PEMAKAIAN KUANTITAS
RATA-RATA/HARI
(LITER/M2) (LITER)
0.345 27.95

1,188.22
PEMAKAIAN KUANTITAS
RATA-RATA/HARI
(LITER/M2) (LITER)

0.348 32.82

0.348 35.67

0.348 35.67

0.348 35.67

0.348 34.58

0.348 34.37

0.348 34.80

0.348 34.80

0.348 35.24

0.348 35.02

0.348 35.67

0.348 36.54

0.348 35.89

0.348 34.71

0.348 34.28

0.348 34.58

0.348 35.02

0.348 35.89

0.348 35.89

0.348 35.45

0.348 36.54

0.348 35.32

0.348 33.80

0.348 34.37

0.348 33.93

0.348 34.37

0.348 34.58

0.348 33.93

0.348 33.71

0.348 33.93

0.348 33.50

0.348 33.71

1,114.23
PEMAKAIAN KUANTITAS
RATA-RATA/HARI
(LITER/M2) (LITER)

0.348 7.13

0.348 35.02

0.348 35.67

0.348 36.54

0.348 35.89

0.348 34.67

0.348 34.23

0.348 34.58

0.348 35.02

0.348 35.89

0.348 35.89

0.348 35.45

0.348 36.54

0.348 35.32

0.348 33.80

0.348 34.37

0.348 33.93

0.348 34.37

604.30
1,718.53
PEMAKAIAN KUANTITAS
RATA-RATA/HARI
(LITER/M2) (LITER)

0.350 34.13

0.350 33.69

0.350 34.78

0.350 34.96

0.350 34.08

0.350 33.91

0.350 34.13

0.350 35.00

0.350 35.22

0.350 35.66

0.350 35.88

0.350 35.22

0.350 34.78

0.350 36.09

0.350 36.75

0.350 35.44

0.350 35.44

0.350 35.44

0.350 35.22

0.350 35.44

0.350 35.44

0.350 35.44

0.350 35.22

0.350 34.78

0.350 34.56

0.350 34.78

0.350 35.00

0.350 34.56

981.01
PEMAKAIAN KUANTITAS
RATA-RATA/HARI
(LITER/M2) (LITER)

0.349 34.68

0.349 34.03

0.349 33.81

0.349 34.03

0.349 33.59

0.349 33.81

0.349 34.03

0.349 33.59

0.349 34.68

0.349 34.86

0.349 33.98

0.349 33.81

0.349 34.03

0.349 34.90

0.349 35.12

0.349 35.55

0.349 35.77

0.349 35.12

0.349 34.68

0.349 35.99

0.349 36.65

0.349 35.34

0.349 35.34

0.349 35.34

0.349 35.12

0.349 35.34

0.349 35.34

0.349 35.34

0.349 35.12

0.349 34.68

0.349 34.46

0.349 34.68

0.349 34.90
PEMAKAIAN KUANTITAS
RATA-RATA/HARI
(LITER/M2) (LITER)
0.349 34.46

1,182.15
PEMAKAIAN KUANTITAS
RATA-RATA/HARI
(LITER/M2) (LITER)

0.347 34.27

0.347 34.70

0.347 34.70

0.347 34.70

0.347 34.27

0.347 33.83

0.347 33.83

0.347 34.05

0.347 34.05

0.347 34.05

0.347 34.70

0.347 21.47

4.16 398.62

0.347 34.27

0.347 34.70

0.347 34.70

0.347 34.70

0.347 34.27

0.347 33.83

0.347 33.83

0.347 34.05

0.347 34.05

0.347 34.05

0.347 34.70

377.15
775.77
PEMAKAIAN KUANTITAS
RATA-RATA/HARI
(LITER/M2) (LITER)

0.349 14.66

0.349 36.21

0.349 36.21

0.349 35.99

0.349 35.34

0.349 34.68

0.349 34.03

0.349 34.03

0.349 34.46

0.349 34.90

0.349 34.90

0.349 34.25

0.349 33.37

0.349 33.37

0.349 34.25

0.349 34.90

0.349 35.12

0.349 34.25

0.349 34.68

0.349 35.77

0.349 35.34

0.349 35.55

0.349 35.77

0.349 35.77

0.349 36.43

0.349 36.21

0.349 36.43

0.349 37.95

0.349 22.64

987.45
PEMAKAIAN KUANTITAS
RATA-RATA/HARI
(LITER/M2) (LITER)

0.349 35.99

0.349 36.21

0.349 36.21

0.349 35.99

0.349 35.34

0.349 34.68

0.349 34.03

0.349 34.03

0.349 34.46

0.349 34.90

0.349 34.90

0.349 34.25

0.349 33.37

454.35
1,441.80
PEMAKAIAN KUANTITAS
RATA-RATA/HARI
(LITER/M2) (LITER)

0.347 33.18

0.347 34.05

0.347 34.70

0.347 34.92

0.347 34.05

0.347 34.48

0.347 35.57

0.347 35.13

0.347 35.35

0.347 35.57

0.347 35.57

0.347 36.22

0.347 36.00

0.347 36.22

0.347 37.74

0.347 37.52

0.347 36.44

0.347 35.78

0.347 35.35

0.347 35.13

0.347 35.13

0.347 35.57

0.347 35.35

0.347 34.92

849.93
PEMAKAIAN KUANTITAS
RATA-RATA/HARI
(LITER/M2) (LITER)

0.347 14.75

0.347 36.44

0.347 35.78

0.347 35.35

0.347 35.13

0.347 35.13

0.347 35.57

0.347 35.35

0.347 34.92

298.42
1,148.35
10,500.29
DATA PENDUKUNG
SERTIFIKAT BULANAN NO - 06

Nama Kegiatan : REHABILITASI JALAN DAN JEMBATAN PROVINSI DI BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II
Nama Paket : REHABILITASI JALAN RAYA BAROS ( SUKABUMI ), JALAN SARASA ( SUKABUMI ) DAN JALAN PEMBANGUNAN ( SUKABUMI) ( 3,75 KM )
Lokasi : JALAN RAYA BAROS ( SUKABUMI ), JALAN SARASA ( SUKABUMI ) DAN JALAN PEMBANGUNAN ( SUKABUMI)

Item Pekerjaan : 6.1(2)


Jenis Pekerjaan : Lapis Perekat
Satuan : Liter

Luas PEMAKAIAN KUANTITAS


1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen RATA-RATA/HARI
(m) (m) (m) (m2) (LITER/M2) (LITER)
1 26 September 2013 2+840 KA 4.20
2+840-3+540 ( ka ) 4.20 10.00 42.00 0.349 14.66
2 2+850 KA 4.20
4.15 25.00 103.75 0.349 36.21
3 2+875 KA 4.10
4.15 25.00 103.75 0.349 36.21
4 2+900 KA 4.20
4.13 25.00 103.13 0.349 35.99
5 2+925 KA 4.05
4.05 25.00 101.25 0.349 35.34
6 2+950 KA 4.05
3.98 25.00 99.38 0.349 34.68
7 2+975 KA 3.90
3.90 25.00 97.50 0.349 34.03
8 3+000 KA 3.90
3.90 25.00 97.50 0.349 34.03
9 3+025 KA 3.90
3.95 25.00 98.75 0.349 34.46
10 3+050 KA 4.00
4.00 25.00 100.00 0.349 34.90
11 3+075 KA 4.00
4.00 25.00 100.00 0.349 34.90
12 3+100 KA 4.00
3.93 25.00 98.13 0.349 34.25
13 3+125 KA 3.85
3.83 25.00 95.63 0.349 33.37
14 3+150 KA 3.80
3.83 25.00 95.63 0.349 33.37
15 3+175 KA 3.85
3.93 25.00 98.13 0.349 34.25
16 3+200 KA 4.00
4.00 25.00 100.00 0.349 34.90
17 3+225 KA 4.00
4.03 25.00 100.63 0.349 35.12
18 3+250 KA 4.05
3.93 25.00 98.13 0.349 34.25
19 3+275 KA 3.80
3.98 25.00 99.38 0.349 34.68
20 3+300 KA 4.15
4.10 25.00 102.50 0.349 35.77
21 3+325 KA 4.05
4.05 25.00 101.25 0.349 35.34
22 3+350 KA 4.05
4.08 25.00 101.88 0.349 35.55
23 3+375 KA 4.10
4.10 25.00 102.50 0.349 35.77
24 3+400 KA 4.10
4.10 25.00 102.50 0.349 35.77
25 3+425 KA 4.10
4.18 25.00 104.38 0.349 36.43
26 3+450 KA 4.25
4.15 25.00 103.75 0.349 36.21
27 3+475 KA 4.05
4.18 25.00 104.38 0.349 36.43
28 3+500 KA 4.30
4.35 25.00 108.75 0.349 37.95
29 3+525 KA 4.40
4.33 15.00 64.88 0.349 22.64
30 3+540 KA 4.25
700.00 2,829.38 987.45
Luas PEMAKAIAN KUANTITAS
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen RATA-RATA/HARI
(m) (m) (m) (m2) (LITER/M2) (LITER)
1 26 September 2013 2+825 KI 4.05
2+825-3+150 ( Ki ) 4.13 25.00 103.13 0.349 35.99
2 2+850 KI 4.20 - - -
4.15 25.00 103.75 0.349 36.21
3 2+875 KI 4.10 - - -
4.15 25.00 103.75 0.349 36.21
4 2+900 KI 4.20 - - -
4.13 25.00 103.13 0.349 35.99
5 2+925 KI 4.05 - - -
4.05 25.00 101.25 0.349 35.34
6 2+950 KI 4.05 - - -
3.98 25.00 99.38 0.349 34.68
7 2+975 KI 3.90 - - -
3.90 25.00 97.50 0.349 34.03
8 3+000 KI 3.90 - - -
3.90 25.00 97.50 0.349 34.03
9 3+025 KI 3.90 - - -
3.95 25.00 98.75 0.349 34.46
10 3+050 KI 4.00 - - -
4.00 25.00 100.00 0.349 34.90
11 3+075 KI 4.00 - - -
4.00 25.00 100.00 0.349 34.90
12 3+100 KI 4.00 - - -
3.93 25.00 98.13 0.349 34.25
13 3+125 KI 3.85 - - -
3.83 25.00 95.63 0.349 33.37
14 3+150 KI 3.80 - - -
325.00 1,301.88 454.35
1,025.00 4,131.26 1,441.80
Luas PEMAKAIAN KUANTITAS
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen RATA-RATA/HARI
(m) (m) (m) (m2) (LITER/M2) (LITER)
1 27 September 2013 3+150 KI 3.80 - - -
3+150-3+750 ( ki ) 3.83 25.00 95.63 0.347 33.18
2 3+175 KI 3.85 - - -
3.93 25.00 98.13 0.347 34.05
3 3+200 KI 4.00 - - -
4.00 25.00 100.00 0.347 34.70
4 3+225 KI 4.00 - - -
4.03 25.00 100.63 0.347 34.92
5 3+250 KI 4.05 - - -
3.93 25.00 98.13 0.347 34.05
6 3+275 KI 3.80 - - -
3.98 25.00 99.38 0.347 34.48
7 3+300 KI 4.15 - - -
4.10 25.00 102.50 0.347 35.57
8 3+325 KI 4.05 - - -
4.05 25.00 101.25 0.347 35.13
9 3+350 KI 4.05 - - -
4.08 25.00 101.88 0.347 35.35
10 3+375 KI 4.10 - - -
4.10 25.00 102.50 0.347 35.57
11 3+400 KI 4.10 - - -
4.10 25.00 102.50 0.347 35.57
12 3+425 KI 4.10 - - -
4.18 25.00 104.38 0.347 36.22
13 3+450 KI 4.25 - - -
4.15 25.00 103.75 0.347 36.00
14 3+475 KI 4.05 - - -
4.18 25.00 104.38 0.347 36.22
15 3+500 KI 4.30 - - -
4.35 25.00 108.75 0.347 37.74
16 3+525 KI 4.40 - - -
4.33 25.00 108.13 0.347 37.52
17 3+550 KI 4.25 - - -
4.20 25.00 105.00 0.347 36.44
18 3+575 KI 4.15 - - -
4.13 25.00 103.13 0.347 35.78
19 3+600 KI 4.10 - - -
4.08 25.00 101.88 0.347 35.35
20 3+625 KI 4.05 - - -
4.05 25.00 101.25 0.347 35.13
21 3+650 KI 4.05 - - -
4.05 25.00 101.25 0.347 35.13
22 3+675 KI 4.05 - - -
4.10 25.00 102.50 0.347 35.57
23 3+700 KI 4.15 - - -
4.08 25.00 101.88 0.347 35.35
24 3+725 KI 4.00 - - -
4.03 25.00 100.63 0.347 34.92
25 3+750 KI 4.05 - - -
600.00 2,449.38 849.93
Luas PEMAKAIAN KUANTITAS
1/2 Lebar Lebar Rata - rata Panjang
No. TANGGAL STA POSISI Segmen RATA-RATA/HARI
(m) (m) (m) (m2) (LITER/M2) (LITER)
1 27 September 2013 3+540 KA 4.25
3+540-3+750 ( ka ) 4.25 10.00 42.50 0.347 14.75
2 3+550 KA 4.25
4.20 25.00 105.00 0.347 36.44
3 3+575 KA 4.15
4.13 25.00 103.13 0.347 35.78
4 3+600 KA 4.10
4.08 25.00 101.88 0.347 35.35
5 3+625 KA 4.05
4.05 25.00 101.25 0.347 35.13
6 3+650 KA 4.05
4.05 25.00 101.25 0.347 35.13
7 3+675 KA 4.05
4.10 25.00 102.50 0.347 35.57
8 3+700 KA 4.15
4.08 25.00 101.88 0.347 35.35
9 3+725 KA 4.00
4.03 25.00 100.63 0.347 34.92
10 3+750 KA 4.05
210.00 860.00 298.42
810.00 3,309.38 1,148.35
TOTAL 1,835.00 7,440.64 2,590.15
Bulan Ini 2,590.15
s/d Bulan lalu 7,910.14
s/d Bulan ini 10,500.29

Pengawas Lapangan TIM SUPERVISI Penyedia Jasa


PT. ARIESTA KARYA

DADAN SUPARMAN HARRY KUSWIAN ,ST DENI RISANA,ST


NIP. 19800113 200801 1 003 NIP. 1974 0331 2008 01 1 002 Penanggung Jawab Teknik
DATA PENDUKUNG

KEGIATAN : REHABILITASI JALAN DAN JEMBATAN PROVINSI DI BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II
PEKERJAAN : REHABILITASI JALAN RUAS JALAN CIKEMBAR - CIKEMBANG ( 1,00 KM )
LOKASI : RUAS JALAN CIKEMBAR - CIKEMBANG
NOMOR ITEM PEKERJAAN : 6.3 (6c)
ITEM PEKERJAAN : Laston Lapis Antara (AC-WC) Leveling
SATUAN : Ton

Lokasi Kontrol Berat


Tebal Hasil Berat Isi Berat Hasil Kadar Tebal Kadar Berat Isi Tebal Volume Volume
Segmen Luas Hasil Core Berat Hasil Kepadatan Volume Diterima Koreksi Ket.
No. Tanggal Dari Ke Core Drill Drill Tiket Selisih Aspal Maksimum Aspal JMF JSD Diterima Terukur Terbayar
Perhitungan Kadar Aspal
Ki/Ka M2 Cm Gr/Cm3 Ton Ton % % % Cm % Gr/Cm3 Cm Ton Ton Ton
a b c d e f g h i j=(fxgxh)/(100) k=(i-j)/j l m n o p q=min(g,n) r=(fxqxh)/(100) s=min(i,r) t=l/o t=sxt u

1 30 September 2014 1+150 1+700 FULL - 4.94 2.220 168.00 - - 6.20 98.14 10.00 6.20 2.262 4.94 - - 1.000 -
2 1 Oktober 2014 0+526 1+150 FULL 1,122.10 5.26 2.218 189.00 130.88 0.444 6.20 98.05 10.00 6.20 2.262 5.26 130.88 130.88 1.000 130.88
3 2 Oktober 2014 0+000 0+526 FULL 582.05 5.38 2.219 206.00 69.45 1.966 6.20 98.10 10.00 6.20 2.262 5.38 69.45 69.45 1.000 69.45

- 563.00 0.00 -
S/D BULAN LALU Err:509 0.00 757.00
194.00
BINA MARGA TIM SUPERVISI Penyedia Jasa
PENGAWAS LAPANGAN CV. LEMBANG JAYA
BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II

DADAN SUPARMAN HARRY KUSWIAN ,ST DENI RISANA,ST


NIP. 19800113 200801 1 003 NIP. 1974 0331 2008 01 1 002 Penanggung Jawab Teknis
DATA PENDUKUNG
SERTIFIKAT BULANAN NO - 05

KEGIATAN : REHABILITASI JALAN DAN JEMBATAN PROVINSI DI BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II
PEKERJAAN : REHABILITASI JALAN RUAS JALAN CIKEMBAR - CIKEMBANG ( 1,00 KM )
LOKASI : RUAS JALAN CIKEMBAR - CIKEMBANG
NOMOR ITEM PEKERJAAN : 6.3 (6c)
ITEM PEKERJAAN : Laston Lapis Antara (AC-WC) Leveling
SATUAN : Ton

Lokasi Kontrol Berat


Tebal Hasil Berat Isi Berat Hasil Kadar Tebal Kadar Berat Isi Tebal Volume Volume
Segmen Luas Hasil Core Berat Hasil Kepadatan Volume Diterima Koreksi Ket.
No. Tanggal Dari Ke Core Drill Drill Tiket Selisih Aspal Maksimum Aspal JMF JSD Diterima Terukur Terbayar
Perhitungan Kadar Aspal
Ki/Ka M2 Cm Gr/Cm3 Ton Ton % % % Cm % Gr/Cm3 Cm Ton Ton Ton
a b c d e f g h i j=(fxgxh)/(100) k=(i-j)/j l m n o p q=min(g,n) r=(fxqxh)/(100) s=min(i,r) t=l/o t=sxt u

1 30 September 2014 0+000 0+425 KI 1,696.88 4.28 2.233 162.50 162.17 0.002 5.93 98.79 10.00 5.90 2.275 4.28 162.17 162.17 1.000 162.17
2 1 Oktober 2014 0+000 1+052 KA 4,259.98 4.28 2.234 408.00 407.31 0.002 5.91 98.83 10.00 5.90 2.275 4.28 407.31 407.31 1.000 407.31
3 2 Oktober 2014 0+425 1+270 KI 3,444.13 4.30 2.230 331.00 330.25 0.002 5.92 98.68 10.00 5.90 2.275 4.30 330.25 330.25 1.000 330.25
4 Err:509 1+052 1+850 KA
4,938.30 4.30 2.236 475.20 474.80 0.0008 5.90 98.94 10.00 5.90 2.275 4.30 474.80 474.80 1.000 474.80
1+270 1+700 KI
5 Err:509 1+850 2+550 KA 2,802.88 4.23 2.238 266.00 265.34 0.002 5.92 99.01 10.00 5.90 2.275 4.23 265.34 265.34 1.000 265.34
6 Err:509 1+700 2+550 KI 3,387.25 4.33 2.239 329.00 328.38 0.002 5.93 99.06 10.00 5.90 2.275 4.33 328.38 328.38 1.000 328.38
7 Err:509 2+550 2+840 KA
2,235.63 4.28 2.230 214.00 213.37 0.003 5.91 98.66 10.00 5.90 2.275 4.28 213.37 213.37 1.000 213.37
2+550 2+825 KI

22,765.05 2185.70 2181.62 2,181.62


Bulan Ini Err:509 4.08 2,181.62
s/d Bulan lalu -
s/d Bulan ini 2,181.62

BINA MARGA TIM SUPERVISI Penyedia Jasa


PENGAWAS LAPANGAN CV. LEMBANG JAYA
BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II

DADAN SUPARMAN HARRY KUSWIAN ,ST DENI RISANA,ST


NIP. 19800113 200801 1 003 NIP. 1974 0331 2008 01 1 002 Penanggung Jawab Teknis
DATA PENDUKUNG
SERTIFIKAT BULANAN NO - 06

KEGIATAN : REHABILITASI JALAN DAN JEMBATAN PROVINSI DI BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II
PEKERJAAN : REHABILITASI JALAN RUAS JALAN CIKEMBAR - CIKEMBANG ( 1,00 KM )
LOKASI : RUAS JALAN CIKEMBAR - CIKEMBANG
NOMOR ITEM PEKERJAAN : 6.3 (6c)
ITEM PEKERJAAN : Laston Lapis Antara (AC-WC) Leveling
SATUAN : Ton

Lokasi Kontrol Berat


Tebal Hasil Berat Isi Berat Hasil Kadar Tebal Kadar Berat Isi Tebal Volume Volume
Segmen Luas Hasil Core Berat Hasil Kepadatan Volume Diterima Koreksi Ket.
No. Tanggal Dari Ke Core Drill Drill Tiket Selisih Aspal Maksimum Aspal JMF JSD Diterima Terukur Terbayar
Perhitungan Kadar Aspal
Ki/Ka M2 Cm Gr/Cm3 Ton Ton % % % Cm % Gr/Cm3 Cm Ton Ton Ton
a b c d e f g h i j=(fxgxh)/(100) k=(i-j)/j l m n o p q=min(g,n) r=(fxqxh)/(100) s=min(i,r) t=l/o t=sxt u

1 Err:509 Err:509 3+540 KA


4,131.26 4.35 2.232 402.00 401.11 0.002 5.92 98.77 10.00 5.90 2.275 4.35 401.11 401.11 1.000 401.11
Err:509 3+150 KI
2 Err:509 3+150 3+750 KI
3,309.38 4.37 2.238 324.30 323.65 0.002 5.92 99.03 10.00 5.90 2.275 4.37 323.65 323.65 1.000 323.65
3+540 3+750 KA

7,440.64 726.30 724.76 724.76


Bulan Ini Err:509 2912.00 2906.38 724.76
s/d Bulan lalu 2,181.62
s/d Bulan ini 2,906.38

BINA MARGA TIM SUPERVISI Penyedia Jasa


PENGAWAS LAPANGAN CV. LEMBANG JAYA
BALAI PENGELOLAAN JALAN WILAYAH PELAYANAN II

DADAN SUPARMAN HARRY KUSWIAN ,ST DENI RISANA,ST


NIP. 19800113 200801 1 003 NIP. 1974 0331 2008 01 1 002 Penanggung Jawab Teknis