Bob the Dodgy Builder was charged for various plastering jobs he completed, including removing old plaster, preparing walls, plastering walls, accidentally knocking off new plaster and replastering it, skimming, and clearing up. He was charged different hourly rates depending on if the work was done during standard hours, overtime, weekends, or weekend overtime. A total was calculated for each job item using a vlookup to reference the hourly rates table.
Bob the Dodgy Builder was charged for various plastering jobs he completed, including removing old plaster, preparing walls, plastering walls, accidentally knocking off new plaster and replastering it, skimming, and clearing up. He was charged different hourly rates depending on if the work was done during standard hours, overtime, weekends, or weekend overtime. A total was calculated for each job item using a vlookup to reference the hourly rates table.
Bob the Dodgy Builder was charged for various plastering jobs he completed, including removing old plaster, preparing walls, plastering walls, accidentally knocking off new plaster and replastering it, skimming, and clearing up. He was charged different hourly rates depending on if the work was done during standard hours, overtime, weekends, or weekend overtime. A total was calculated for each job item using a vlookup to reference the hourly rates table.
Removing old plaster 4 Standard Brew time 0.5 Standard Preparing walls 3 Standard Preparing walls 1 Overtime Plastering walls 7.5 Weekend Accidentally knocking off some new plaster 0.5 Wkend OT Replastering bits knocked off 2 Wkend OT Skimming 3 Standard Brew time 0.5 Standard Skimming 3 Standard Clear up 2 Overtime
Labour total £ -
Sample Result on Result Sheet
Create the following range names: RatesTable - referring to H6:I9 Hours - referring to D6:D16 Rates Rates - referring to E6:E16 Standard £ 50.00 Overtime £ 75.00 Use a Vlookup function in a formula to Weekend £ 100.00 calculate the total for each item. Wkend OT £ 150.00