You are on page 1of 3

EMP BENTU Ltd.

CALCULATION
AC UPS

BGP MODIFICATION FOR NEW DELIVERY POINT OF GAS


SALES TO PT PLN (PLTGU TENAYAN) PROJECT

Document No.
BGP2-E2-CAL-003

A Issued For Bid 22-Jul-21 HTS RY AK


Prepared Checked Approved
Rev. Description Date EMP
By By By
Document No. :BGP2-E2-CAL-003
CALCULATION Revision :A
AC UPS Sheet :2 OF 3

REV BY DATE DESCRIPTION Project Title : BGP MODIFICATION FOR NEW


A HTS 22-Jul-21 Issued For Bid DELIVERY POINT OF GAS SALES
TO PT PLN
Prepared by : HSN
Checked by : RY
Approved by : AK/KBH

TABULATION OF REVISED PAGES

REVISIONS REVISIONS
SHEET SHEET
A B C D 0 1 2 3 4 A B C D 0 1 2 3 4
1 X 41

2 X 42

3 X 43

4 44

5 45

6 46

7 47

8 48

9 49

10 50

11 51

12 52

13 53

14 54

15 55

16 56

17 57

18 58

19 59

20 60

21 61

22 62

23 63

24 64

25 65

26 66

27 67

28 68

29 69

30 70

31 71

32 72

33 73

34 74

35 75

36 76

37 77

38 78

39 79

40 80
BGP-2
AC UPS
LOAD SCHEDULE

CONTINUOUS UTILITY EFFECTIVE


NO TAG NO. EQUIPMENT DESCRIPTION LOAD FACTOR CONT LOAD REMARKS
W P.U. W

1. PLC PANEL Panel (Feeder-1) 2000 0.5 1000


2. PLC PANEL Panel (Feeder-2) 2000 0.5 1000
5. OWS/EWS/Printer 1000 1 1000
6. Metering Panel (Feeder 1) 3700 0.5 1850
7. Metering Panel (Feeder 2 3700 0.5 1850
8. Telecom Panel (Feeder-1) 2260 0.5 1130
9. Telecom Panel (Feeder-2) 2260 0.5 1130
10. Flare Ignition Control Panel 500 1 500
11. Aviation Warning Light 250 1 250
12. LV Switchgear 750 1 750

Watt VA
SUB TOTAL 10460 13075
20% SPARE 2092 2615
TOTAL POWER CONSUMPTION 12552 15690

You might also like