PERUSAHAAN DAERAH AIR MINUM KOTA SAMARINDA

LAPORAN BULANAN PRODUKSI


01 Oktober 2008
Unit Instalasi
NO URAIAN KEGIATAN SAT
Cendana Tirta Kencana Seberang Palaran Lempake Selili Bengkuring 1 Bengkuring 2 P. Atas Bendang Jumlah
I Kapasitas Terpasang I/det 600 360 125 17.5 12.5 125 20 5 20 400 1.685
m3bulan 1,555,200 933,120 324,000 45,360 32,400 324,000 51,840 12,960 51,840 1,036,800 4,3

II AIR YANG DIOLAH


1 Debit Air Baku I/det 479.00 320.08 122.70 22.90 7.50 120.61 18.00 3.12 20.00 398.50 1,
2 Pengolahan air baku m3 1,284,658.00 857,299.98 321,831.00 60,332.34 15,369.75 312.355,100 44,226.00 6.759,8 51,876.00 1,122,533.00 4,077,
3 Pemakaian sendiri instalasi (a+b+c) : m3 41.643,8 78.592,4 7.271,6 2,193.38 254,3 17.765,100 326.9 214 1,910.00 53.693,0 203,
a. Cuci Filter m3 2.637,0 29,878.80 4.824 679.50 61.50 6,922.80 110.40 49.50 1,488.00 - 46,
b. Buang lumpr m3 32,634.79 22,995.60 1,923,00 1,393.92 142.80 10,692.00 166.50 68,0 372.00 - 70,
c. Air service instalasi m3 6,372.00 25.718,0 524.59 119.96 50,0 150,300 50,0 96.25 50,0 - 33,
III AIR YANG DIDISTRIBUSIKAN
4 Air yang didistribusikan m3 1,243,014.21 778,707.58 314559,410 58,138.96 15,115.45 294,590.00 43,899.10 6,546.00 49,966.00 1,068,840.00 3,873,
5 Air yang didistribusikan bulan lalu (juni) m3 1,450,317.35 775,851.60 315.333,080 57,497.00 14,777.50 286,761.00 44,688.10 5,503.72 48,958.00 1,080,825.00 4,080,
6 Debit Terdistribusi Rata-rata bulan ini I/det 464.00 290.74 121.86 21.99 7.38 113.75 17.87 3.02 19.26 386.06 1,
Produktivitas % 79.93 83.45 97.09 129.82 46.65 90.92 85.71 50.51 96.39 103.09
IV PEMAKAIAN BAHAN KIMIA PPM Kg PPM Kg PPM Kg PPM Kg PPM Kg PPM Kg PPM Kg PPM Kg PPM Kg PPM Kg PPM
7 Almunium Sulfat Al2(SO4)3 18H2O 37.87 48,650 30.10 26,150 37.13 11,950 34.81 2,100 45.54 699.98 36.02 11,250 70.09 3.100 62.13 420 50.12 2,600 23.30 26,150.00 32.64
8 Soda Ash, Na2CO3 1.95 2,500 3,44 2,950 12.55 775 2.49 150 14.89 228.78 0,00 0 0,00 0 0,00 0 6.75 350 0,00 0 1.71
9 Kaolin 0,00 0 0,00 0 0,00 0 0,00 0 0,00 0 0,00 0 1.13 50 0,00 0 0,00 0 0,00 0 0,01
10 Caostic Soda 0,00 0 0,00 0 0,00 0 0,00 0 0,00 0 0,00 0 0,00 0 0,00 0 0 0 - 6.700 0,00
11 Kapur Powder CaO 2.37 3,040 4.18 3,000 11.71 3.640 7.29 440 0,00 0,00 12.81 4,000 27.13 1.200 13.76 93 0 0 0,00 0 3.78
12 Gas Chloor Cl2 1.56 2,000 1.04 888 2.50 806.00 0,00 0 0,00 0 0,00 0 0,00 0 0,00 0 0 0 0,00 0 0.91
13 Kaporit, Ca (OCL2) 0,00 0 1.60 450 0.28 90 1.99 120 7.89 121,2 6.00 1,875 6.90 305 4.44 30 3.47 180.00 4.69 5.265 2.07
14 Poly Elektrolit (PE) 0.21 275 0 0,0 0 0 0 0 0 0 0,0 0,0 0 0,000 0,1491 1,008 0 0 0,00 0 0.0677

Catatan :
Sejak tgl 14 maret 2008 : IPA Paket BNI Lempake dioperasikan
Jam Operasi 18 jam/hari
IPA lama (2,5 I/det) Sementara tidak dioperasikan

Disetujui Oleh : Diketahui Oleh : Samarinda, 10 Maret 2008


Direktur Teknik Kabag Produksi Dibuat Oleh
Pel. Administrasi

Alimuddin, ST Bambang Supriyadi Widyasturi,S


NIPP 137 NIPP 153
mlah
685
4,367,520

1,512.40
4,077,240.96
203,864.25
46,651.50
70,388.65
33,131.10

3,873,376.71
4,080,512.35
1,446.00
86.19
Kg
133,069.98
6,953.78
50.00
6,700.00
15,413.00
3,694.00
8,436.21
276.01
PERUSAHAAN DAERAH AIR MINUM KOTA SAMARINDA
LAPORAN BULANAN PRODUKSI
01 Desember 2008
Unit Instalasi
NO URAIAN KEGIATAN SAT
Cendana Tirta Kencana Seberang Palaran Lempake Selili Bengkuring 1 Bengkuring 2 P. Atas Bendang Jumlah
I Kapasitas Terpasang I/det 600 360 125 17.5 12.5 125 20 5 20 400 1,685
m3bulan 1,555,200 933,120 324,000 45,360 32,400 324,000 51,840 12,960 51,840 1,036,800 4,367,520

II AIR YANG DIOLAH


1 Debit Air Baku I/det 49,600.00 32,137.00 124.29 22.72 7.50 107.62 18.00 2.62 20.00 398.50 1,518.62
2 Pengolahan air baku m3 1,294,694.00 860,760.60 332,490.00 60,716.93 16,737.75 288,249.400 47,908.80 6,409.0 52,560.00 1,079,341.00 4,039,057.52
3 Pemakaian sendiri instalasi (a+b+c) : m3 39,667.8 68,788.6 8,887.0 2,109.93 242.0 17,923.400 475.4 233 2,100.00 74,312.0 214,739.13
a. Cuci Filter m3 2,695.5 40,085.40 4,284 526.50 57.00 6,912.00 249.60 60.00 1,464.00 10,257.00 66,861.00
b. Buang lumpr m3 30,253.3 23,538.60 3,024.00 1,428.48 135.00 10,902.60 175.80 80.1 585.60 12,393.00 82,516.47
c. Air service instalasi m3 6,449.0 5,164.6 1,579.01 154.95 50.0 108.800 50.0 92.94 50.4 51,662.00 65,361.66
III AIR YANG DIDISTRIBUSIKAN
4 Air yang didistribusikan m3 1,255,026.21 791,972.04 323,602.990 58,607.00 16,495.75 270,326.00 46,623.40 6,176.00 50,460.00 1,005,029.00 3,824,318.39
5 Air yang didistribusikan bulan lalu (juni) m3 1,243,014.00 758,209.86 311,183.950 57,607.00 16,134.10 223,811.00 43,446.10 6,359.00 47,020.00 985,457.00 3,692,242.01
6 Debit Terdistribusi Rata-rata bulan ini I/det 469.00 295.69 122.26 21.93 7.39 100.93 17.82 2.52 19.20 386.06 1,442.81
Produktivitas % 80.70 84.87 99.88 129.20 50.91 83.43 85.71 47.65 97.34 96.94 85.66
IV PEMAKAIAN BAHAN KIMIA PPM PPM Kg PPM Kg PPM Kg PPM Kg PPM Kg PPM Kg PPM Kg PPM Kg PPM Kg PPM Kg
7 Almunium Sulfat Al2(SO4)3 18H2O 57,600 30.10 30,250 36.09 12,000 37.06 2,250.0 44.80 749.89 40.24 11,600 65.82 3,100 79.58 510 47.56 2,500 25.11 27,100 36.56 147,659.89
8 Soda Ash, Na2CO3 0 3 0 12.55 775 3.29 200 12.24 204.91 0.00 0 0.00 0 0.00 0 7.61 400 0.00 0 0.39 1,579.91
9 Kaolin 0 0.00 0 0.00 0 2.47 150 0.00 0 0.00 0 0.53 25 0.00 0 0.00 0 0.22 240 415.04
10 Caostic Soda 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0 0 0.0000006 6,500 0.00 6,500.00
11 Kapur Powder CaO 30,080 4.18 6,960 11.96 3,720 3.62 220 0.00 0.00 13.88 4,000 26.33 1,240 19.35 124 0 0 0.00 0 11.47 46,344.00
12 Gas Chloor Cl2 2,000 1.44 1,236 2.78 923.70 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0 0 0.00 0 1.03 4,159.70
13 Kaporit, Ca (OCL2) 0 1.60 300 0.00 0 1.98 120 6.45 107.88 6.50 1,875 6.05 285 9.36 60.00 3.71 195.00 4.86 5,250 2.03 8,192.88
14 Poly Elektrolit (PE) 250 0 0 0 0 0 0 0 0.005 0.0 0.0 0 0.0000 0.0899 0.576 0 0 0.00 0 0.0620 250.58

Catatan :
Sejak tgl 14 maret 2008 : IPA Paket BNI Lempake dioperasikan
Jam Operasi 18 jam/hari
IPA lama (2,5 I/det) Sementara tidak dioperasikan

Disetujui Oleh : Diketahui Oleh : Samarinda, 10 Desember 2008


Direktur Teknik Kabag Produksi Dibuat Oleh
Pel. Administrasi

Alimuddin, ST Bambang Supriyadi Widyasturi,S


NIPP 137 NIPP 153