ANALISA PERHITUNGAN SUDUT KEMIRINGAN BALOK KASTELLA

Di Pakai Sudut kemiringan : 60' derajat

dg = Tinggi Profile Castella/ honey Comb)


db = Tinngi Profil Balok Awal
h = Tinggi Pemotong Profil

WF = 300 150 6.5 9


H = 300 500
B = 150 200
t1 = 6.5 6
t2 = 9 10
h = 250

Tan Sd = h dg = db + h
b =
Tan. 60' = 250
b
1.73 = 250
1.73 1200
b = 144.5 668
532
b = 145 mm 2
266
Syarat Tinnggi Penampang balok honey comb
= 2 y › h
= 2 300 + 150 › 2250
= 450 › 2250
kg/btg kg/m1
WF = 300 150 6.5 9 = 440 36.67 =

kg/btg kg/m1
WF = 300 150 6.5 9 = 440 36.67 =

1 btg =
0.5 btg =

440
220
660 kg =
155.43 kg =
angkur 12 bh =
baud 16 bh =

JASA 660 KG =

660
155.43
Rp 6,820,000

Rp 7,800,000

Rp 8,000,000 Rp 8,000,000 440 Rp 18,182


Rp 8,000,000 Rp 4,000,000
Rp 12,000,000

Rp 20,000 Rp 13,200,000
Rp 20,000 Rp 3,108,600
Rp 35,000 Rp 420,000
Rp 8,000 Rp 128,000
Rp 16,856,600

Rp 6,000 Rp 3,960,000

Rp 20,816,600

Rp 25,000 Rp 16,500,000
Rp 25,000 Rp 3,885,750

20,385,750 MATERIAL
5,000,000 JASA
25,385,750
pjg lbr tgi kg luas
kolom 2.660 36.667
balok 6.680 36.667

base plat 40 x 20 0.400 0.200 7.536 0.080


Top plat 40 x 20 0.400 0.200 7.536 0.080
Stiffner 50 x 75 0.500 0.075 3.533 0.038
Plat Pengaku 10 10 0.942 3.000

Mur + baud + ring 4.000


Angkur Bold
Groting
jlh pcs tot
97.533 2.000 195.067 kg
244.933 1.000 244.933 kg
440.000 kg 25,700.00 11,308,000.00

4.000 30.144 kg
2.000 15.072 kg
28.000 98.910 kg
2.000 12.000 11.304 kg
155.430 kg 25,700.00 3,994,551.00

2.000 2.000 16.000 bh 10,300.00 164,800.00


6.000 2.000 12.000 bh 33,000.00 396,000.00
2.000 ttk -

15,863,351.00
I. PEKERJAAN PERSIAPAN
1 Mobilisasi Material ls 1.00 1,470,000.00 1,470,000.00
2 Pembersihan lokasi hok 10.00 85,000.00 850,000.00
3 Pek. Peralatan K3 ls 1.00 1,415,200.00 1,415,200.00
4 Laporan Dokumentasi ls 1.00 450,000.00 450,000.00
4,185,200.00

II. PEKERJAAN TIANG STRUKTUR


1 Pek. Bongkaran Dinding, Lantai & lemari ls 1.00 1,053,300.00 1,053,300.00
2 Pembuangan bekas bongkaran ls 1.00 1,180,000.00 1,180,000.00
3 Galian Tanah m3 1.70 99,400.00 168,980.00
4 Pek. Urugan Kembali m3 0.85 73,700.00 62,645.00
5 Cor Lantai Kerja 7 cm m3 0.14 876,700.00 122,738.00
6 Cor beton Pondasi Tapak m3 0.85 3,458,400.00 2,939,640.00
7 Plat landasan & penutup t=8 mm double kg 74.02 24,400.00 1,806,088.00
8 Pek. Plat Pengaku Balok t= 8 mm kg 39.77 24,400.00 970,388.00
9 Pek. Angkur 5/8 mm 35 cm bh 8.00 33,000.00 264,000.00
10 Pek. Mur baud 5/8 bh 16.00 10,300.00 164,800.00
11 Melubangi Konstruksi ttk 24.00 7,500.00 180,000.00
12 Pek. Tiang WF kg 299.50 25,700.00 7,697,150.00
13 Pek. Balok WF kg 339.75 25,700.00 8,731,575.00
14 Erection kg 639.25 2,500.00 1,598,125.00
15 Pengecatan m2 11.10 104,900.00 1,164,390.00
16 Pemasangan lantai keramik m2 4.00 393,600.00 1,574,400.00
29,678,219.00

33,863,419.00
3,386,341.90
37,249,760.90
37,249,000.00
Unit Vol Satuan Total
I. PEKERJAAN PERSIAPAN
1 Mobilisasi Material ls 1.00 1,470,000.00 1,470,000.00
2 Pembersihan lokasi hok 10.00 85,000.00 850,000.00
3 Pek. Peralatan K3 ls 1.00 1,415,200.00 1,415,200.00
4 Laporan Dokumentasi ls 1.00 450,000.00 450,000.00
4,185,200.00

II. PEKERJAAN TIANG STRUKTUR


1 Pek. Bongkaran Dinding, Lantai & lemari ls 1.00 1,053,300.00 1,053,300.00
2 Pembuangan bekas bongkaran ls 1.00 1,180,000.00 1,180,000.00
3 Galian Tanah m3 1.70 99,400.00 168,980.00
4 Pek. Urugan Kembali m3 0.85 73,700.00 62,645.00
5 Cor Lantai Kerja 7 cm m3 0.14 876,700.00 122,738.00
6 Cor beton Pondasi Tapak m3 0.85 3,458,400.00 2,939,640.00
Cor beton pedastal 100 x 100 m3
Cor beton pedastal 45 x 25 m3
7 Plat landasan & penutup t=8 mm double kg 74.02 24,400.00 1,806,088.00
8 Pek. Plat Pengaku Balok t= 8 mm kg 39.77 24,400.00 970,388.00
9 Pek. Angkur 5/8 mm 35 cm bh 8.00 33,000.00 264,000.00
10 Pek. Mur baud 5/8 bh 16.00 10,300.00 164,800.00
11 Melubangi Konstruksi ttk 24.00 7,500.00 180,000.00
12 Pek. Tiang WF kg 299.50 25,700.00 7,697,150.00
13 Pek. Balok WF kg 339.75 25,700.00 8,731,575.00
14 Erection kg 639.25 2,500.00 1,598,125.00
Pekerjaan groting ttk 2.00
15 Pengecatan m2 11.10 104,900.00 1,164,390.00
16 Pemasangan lantai keramik m2 4.00 393,600.00 1,574,400.00
29,678,219.00

639.25 33,863,419.00
684.93 3,386,341.90
37,249,760.90
37,249,000.00
Unit Vol Satuan Total

ls 1.00 Rp 1,470,000 Rp 1,470,000


hok 10.00 Rp 85,000 Rp 850,000
ls 1.00 Rp 1,415,200 Rp 1,415,200
ls 1.00 Rp 450,000 Rp 450,000
- Rp 4,185,200
-
-
ls 1.00 Rp 1,053,300 Rp 1,053,300
ls 1.00 Rp 1,180,000 Rp 1,180,000
m3 2.00 Rp 99,400 Rp 198,800 1.00
m3 1.16 Rp 73,700 Rp 85,492
m3 0.14 Rp 876,700 Rp 122,738 1.00
m3 0.70 Rp 3,458,400 Rp 2,420,880 1.00
m3 - Rp -
m3 0.45 Rp 3,458,400 Rp 1,556,280 0.45
kg 45.22 Rp 24,400 Rp 1,103,270 Rp 1,103,270
kg 110.21 Rp 24,400 Rp 2,689,222 Rp 2,689,222
bh 12.00 Rp 33,000 Rp 396,000 Rp 396,000
bh 16.00 Rp 10,300 Rp 164,800 Rp 164,800
ttk 28.00 Rp 7,500 Rp 210,000 Rp 210,000
kg 195.07 Rp 25,700 Rp 5,013,213 Rp 5,013,213
kg 244.93 Rp 25,700 Rp 6,294,787 Rp 6,294,787
kg 440.00 Rp 2,500 Rp 1,100,000 Rp 1,100,000
ttk 2.00 Rp 150,000 Rp 300,000 Rp 300,000
m2 15.60 Rp 104,900 Rp 1,636,440 Rp 1,636,440 12.00
m2 4.00 Rp 393,600 Rp 1,574,400
Rp 27,099,622 Rp 18,907,732

Rp 31,284,822
Rp 3,128,482
Rp 34,413,304
Rp 34,413,000

440.00
1.00 1.00 1.00 2.00 2.00
2.00 0.84 1.16
1.00 0.07 0.07 2.00 0.14
1.00 0.35 0.35 2.00 0.70

0.25 2.00 0.23 2.00 0.45

1.00 0.30 15.60


plat bordes
type 8 ft x 4 ft = 23.33 x tbl
= 23.33 x 8
= berat kg
= 186.64 kg

= 1.00 x 1.00 x 0.0010 m3 x 7,850.00 kg/m3


= 7.85 kg

= 0.20 x 0.40 x 0.0120 m3 x 7,850.00 kg/m3


= 7.54 kg

= 0.08 x 0.50 x 0.0120 m3 x 7,850.00 kg/m3


= 3.53 kg

= 0.10 x 0.10 x 0.0120 m3 x 7,850.00 kg/m3


= 0.94 kg