1. Discuss the properties and assumptions of linear programming problems
Plant 2 2 30 40 60 9
70 7
Plant 3 40 8 8 70 20 7 18
3
Demand 5 8 7 14 34
S1 S2 S3 S4
P1 19 30 50 10 2
5
P2 70 30 2 40 7 60
P3 40 8 70 20 12
6
S1 S2 S3 S4
P1 19 30 50 2 10
5
P2 70 30 740 2 60
P3 40 8 70 20
8 1
Ui+vj = cij
Assume u1= 0
C12=30+0 +2=32
U1=0 V1=-19
C13=50+0 +10=60
Ui+vj = cij U2=-50 V2=2
Assume u1= 0 C21=70+ (-50) + (-19) =1
C12=30+0 +2=32 U3=-10 V3=10
C22=30+ (-50) +2=-18
C13=50+0 + (-8) =42 V4=-10 C31=40+ (-10) + (-19) =11
C21=70+ (-32) + (-19) =19 C33=70+ (-10) +10=70
C22=60+ (-32) + (-10) =18
C31=40+ (-10) + (-19) =11 U1=0 V1=-19
5. A manager has prepared a table that shows the cost of performing each of four jobs by each of
four employees. According to this table, Job 1 will cost $15 if done by Employee A, $20 if it is
done by Employee B, and so on. The manager has stated that his goal is to develop a set of job
assignments that will minimize the total cost of getting all four jobs done. It is further required
that the jobs be performed simultaneously, thus requiring one job being assigned to each
employee. Although the manager recognizes that this problem can be solved using the simplex
routine, he also knows that he can solve the problem by hand using the assignment method.
Employees
Abdella Bontu Chanie Debela
Job M1 $15 20 18 24
M2 12 17 16 15
M3 14 15 19 17
M4 11 14 12 13
Required:
Employees
Abdella Bontu Chanie Debela
Job M1 $15 20 18 24
M2 12 17 16 15
M3 14 15 19 17 Step 1, the given matrix is Square Matrix
M4 11 14 12 13
it is not necessary to add Dummy
Step 2, Select the smallest Value from the row and subtract it from the others
Employees
Abdella Bontu Chanie Debela
Job M1 0 5 3 9
M2 0 5 4 3
M3 0 1 5 3
M4 0 3 1 2
Step 3, Select the smallest Value from the column and subtract it from the others
Employees
Abdella Bontu Chanie Debela
Job M1 0 4 2 7
M2 0 4 3 1
M3 0 0 4 1
M4 0 2 0 0
Step 4,
Employees
Abdella Bontu Chanie Debela
Job M1 0 3 1 6
M2 0 3 2 0
M3 1 0 4 1
M4 1 2 0 0
Employees
Abdella Bontu Chanie Debela
Job M1 00 3 1 6
M2 0 3 2 0
M3 1 0 4 1
M4 1 2 0 0
M1A=15
M2D=15
M3B=15
M4C=12
Total =57
A firm makes two types of furniture chairs and tables. The contribution for each product to
objective function is birr 20 per chair and birr 30 per table respectively. Both products are
processed on three Machines M1, M2 and M3. The time required (in hours) by each product and
total time available per week on each machine are as follows:
Machine Chair Table Available time
M1 3 3 36
M2 5 2 50
M3 2 6 60
How should the manufacturer schedule his production in order to maximize contribution?
Solution
Le x1 = Number of chairs to be produced
t x1 = Number of tables to be produced
Since the objective is to maximize the profit, the objective function is given by
Maximize Z = 20x1 + 30x2
Subject to constraints:
3x1 + 3x2 ≤ 36 (Total time of machine M1)
5x1 + 2x2 ≤ 50 (Total time of machine M2)
2x1 + 6x2 ≤ 60 (Total time of machine M3)
x1, x2 ≥ 0 (Non-negativity constraint)
Table 2
Variable Profit Capacity Cj 20 30 0 0 0
a b S1 S2 S3 Replacement Ratio
S1 0 6 2 0 1 0 -0.5 6/2=3
S2 0 50 4.33 0 0 1 -0.33 30/4=6.93
b 30 60 0.33 1 0 0 0.167 10/0.33=30.30
Zj 10 0 0 0 5.01
Cj-zj 10 0 0 0 -5.01
Table 3
Variable Profit Capacity Cj 20 30 0 0 0
a b S1 S2 S3
a 20 3 1 0 0.5 0 -0.25
b 30 9 0 1 -0.165 0 0.25
S2 0 17 0 0 -2.165 1 0.7525
Zj 20 30 5.05 0 2.5
Cj-zj 0 0 -5.05 0 -2.5
Zmax=20a+30b
20(3) +30(9)
60 +270
= 330
Table 4
To complete the wing assembly for a new helicopter, Ethiopia has laid out the major steps and
seven activities involved. These activities have been labeled A through G in the following table,
which also shows their estimated completion times (in weeks) and immediate predecessors.
Activity a m b Immediate
predecessor
A 1 2 3 -
B 2 3 4 -
C 4 5 6 A
D 8 9 10 B
E 2 5 8 C,D
F 4 5 6 B
G 1 2 3 E
The critical path for the entire activities earliest start time, earliest finish time, latest start
time, latest finis time and slack time can be determined by using critical path procedure.
Table 5
Activity
Activity ES EF LS LF Slack
A 0 2 5 7 5
B 0 3 0 3 0
C 2 7 7 12 5
D 3 12 3 12 0
E 12 17 12 17 0
F 3 8 14 19 11
G 17 19 17 19 0
Expected project length =19 weeks
Variance of critical path = 1.33
Standard deviation of critical path = 1.155 weeks
Solve the problem using Excel solver
Table 4
Decision Variable
X1 X2 X3
0.115274 2.881844 0
Constraints
X1 X2 X3 Total Limit
19 27 34 80 <= 80
22 13 12 40 <= 40
Objective
X1 X2 X3 Total
50 45 48 135.4467
6. using the maximal flow technique, determine the amount of fuel shipped through the network
The maximum flow through this network is 600 amount of fuel in gallon
Table 5
Path Flow amount of fuel in gallon
1-2-4-7 3000
1-2-5-7 1000
1-5-7 1000
1-3-6-7 1000
Total 6000
Objective
x1 x2 x3 total
50 45 48 135.4467