Top Assembly
(tote)
uty @ nlled man whe i familar withthe top xsembl. By employing two man for this wor, the Tok
‘st tng the top cover wil be eonadarely spied.
“The aasmbly of inva! part fhe top deserbed In he following sections can nturelly Be catied out
seperately
[photograph in the ston “iting Heading and “Filing Top Cove show port made of plate
‘itoosreuired for the
‘ras tacks wee nt vied for tcking the paing pars andthe fo. A comprasidairtcker was uid
‘he mogerine of which wa filed wih nverosing lip,
Top Frame Installation
Preparation
1 = coverallboy partinthe working ares, 4 = Pllbarcord carpet wheel owing
2 Remove rot seats and lower rear sat Backe
rn 5 Pullcaraboerd oll package shell on rear pana
= ull hlreord carpet of laggage compartment
Moor 6+ Remove quarter rim pana on both sdaA834
2
Detach trim mera from rear
Press robber sealing beading (Terostt)
Serween body ond rear body bow
‘sch fide Da ol org washers and
sero areas
= Abin nm
Place « 24 in (6 mm) thick distance piece
ech iain bow and lel an righ sporNote
Headlining Installation
“The headlining isuppliedas.a spare part, compet withthe sppertsripstorataching othe individual bows
‘te terol pore he eel heading ter he top cover hat been ited whl fe face oe
in he flowing Seqve
Gyan rnd ow et pres fy a3 Slightly tension headlining and tack it near the
proven iearng drive leks houghside anon,
Apply univerat edhesive 012 fo rear end
‘tension headlining towards reer, lay round bow
tna pres Srmly In postion. Tock heading
in bow racer and et off excess ater
Important
Sp exocly with the ini ofthe webbing.
between de soon,
to ensore thet seom of front 1ppor ay It
+ Apply niversl adhesive D 1 0 itermodte
bow. then pall support sp up ntl seam
ental underside af bow tay ppt snp
found bow and pret arp in place, Cel off
+ Corsly slope headlining to header onthe
‘atone sre
header This retenoning neues that longi
tenoned
{Ct of surplus leaherete on fattened srface
ot heater.Fitting Linen Sheet
“Thelinen materi forms. Boseor he rberse hie. Thelining moteral teed ony enclose the uber
‘Th nn ond ning melril ppn in pra grts which cons fe loge ra pte and wo ror
“The two sips of black ling material hold the
Fubberised ‘hair poscing together and give.
‘Una materi {oh forthe ws se pels. Al he part fr th
2 nr in st rote in twig
j J 1 - Teck piece of back ining material each side
«‘ retin te
Cut the pieces of nena he webbings. TheA-83A
40Instailing Rubberised Hair Padding4 6 Sew lining material to rubbersed hat
5 + Lay ref part ot abbersedhoir padding onto
top frame wih month surface ing upwards
Sides fina down oan Wrox
i068 mr) ot ed hate pdsing
ails
4 6 - Secoe roo patting o rear bow on each sid7+ Pl oot pedig gen towards header nd
8 = Pll root paling o reat edge of header ane
Sse flog ot aan ego a od
luce material oct sight oper of
19S el ping ne het ter bow
A834
13oe
Sow roof paling to nen sheet with rows of
large sicher ero the rot
Thinly coot header with univerat adhesive
Di and pod i out wih 2 (Sm) hk
foam robber e flows
12 Cement narrow sip of fam robber
Cement nartow sep of foam rubber ot
= Cement square place of foom rubber toCement a 55° (40mm) wide.
{am robber ove le lng of
snaring tht ata cavers ont port
w
pedaeggudion bth scone ved
in een eor bow 7
14 Slighy open top, pl sis of faded fining
meter iy orward end Teck them to Be
15 -Careflyseple fad lining material strips
A83A
15Installing Top Cover
iy tthe rear bow ond
Use robber tape (Tere) near thee
Note:
A8344
alti.
ail,
al,
A834
20A834
2“The ror port of he top cover mus be under
(Open top, ensuring that flexible rear window
ier opeover ened oer od at ES
W necenary corey out any nacestry correcon rack ody bow and sop In FF
>
To avd eokoge, the top materiel mostpr rr
lis 2k‘Cement top meterial stip end header rubber
scitoloing econo oe besser wood
42 Close and lock roof without plying fore.
Beading ofthe hecder pocket must not
“Seman bow: The ripe ma bet” 2" GO mn)
ie oh op at 5m) wn he
e217 Gm)
Boa Geom
Fitting Trim Mouldings
‘ear bow st both ener near seams The sling
‘Compound mostnatbe wider hen the mocldingThis sein tpe i nator rbber sip of
‘alowred protective erp mt be removed
sug
\
6 = Nail two-piece mouicing to rear body vow B
‘ond aide dip over in,
The dance between tri moulding and lock
Imovldng by fing, meowring. oF marking
A834
4Securing Headlining
‘rim monldng and loo roar boty bow,
then tere mosiding witha Philips srw
center nailoer moulding hall
‘Open top and unter top lock handhandles to header plate,ortopiece of ethers orto) th same salu
ich (white arrows) ond Yo fp comperteant
tower part wth ho Pilipe sere cach (ack
crowd.
‘Ghener for poteie boston each ae .
A834
3815 Cement hoireord carpet to loggege compart
q
iy opened and closed ond
“Thera ie aways eeton amount of ension
‘ny form of coraton, ax afer carta
Installing Lock Pillar Trim Plate and Weatherstrips
“The wethersrps are of ample langth sha they can be fied and ato length. They are ached tothe
ret oma by ma sin wich nd te raer mong an ra aire by Pie taping ew
Before he indvidal wecerrps can be secured, hey mus be scuatl ed For thi purpose, he cor-
fealy adjusted windows mont be he waaersps be Insate n the poston In when they
‘nil be scored Ter, Spei ee te lpn the aoor window los
A834
36at weeravps tocproinate gt ee
= Merleand dil ere hoes otha hey coincide
wth oes In meal sp
Important
It 4 racommandad thot the weathers be
tecired to" rect frame?” Ginn). tiet
A-B3A,
38
= Atoch weatartrpe together with metal
‘he aeling tape be cached fo weatheraip