OEE Calculator (Per Shift Per Machine)

OEE = 89.867%
Availability(A) Performance(P) Quality(Q)
A= 0.92222 P= 0.9976 Q= 0.97681

Run Time= 415 Ideal Cycle Time= 1.2 Good Quantity = 337

Planned Production 450 Total Production 345 8


Time= Quantity= Rejection Quantity=
Stop Time/Down 35
Time=

Shift Length= 480


Breaks= 30

UOM of Time is Minute