Data Center/Server Room Self-Assessment Worksheet
Teview your Data Center / Server Room based on size.
5 Enterprise-Class Data Center: 5,000+ ft.? / hundreds to thousands of servers, extensive external storage
4 Mid-Tier Data Center: < 5,000 ft.’ / hundreds of servers, extensive external storage
3 Localized Data Center: < 1,000 ft. / dozens to hundreds of servers, moderate external storage
2 Server Room: < 500 ft. ?/a few to dozens of servers, no external storage
x's in the DC/SR Size columns indicate suggested best practices
z
Consolidate Servers nto Common Data Centers x
[ulation - get economies of sale using existing servers ee
Mechanica: Air Flow Management
Hot Ale Cla Aske ayeut ee
Blank Unused Rack Postions pel x [xl
‘se appropriate a dfsers 7a
aston supply nd urs tonne ang a
WMiniize a eats need Noor a
Mechanica: Air Handler Systems
Gee redundant airhander pac i poral operations a
Configure Redundancy to Reduee Fan Power Use h Normal Operon a
Contl Volume by Varible speed rive on Fans Based on Space Temperature ae
Mectancal: Humidfcation
Use Wes utabi Homily Cantal Band ae
Canales Huriity Cont pox [oe
‘se Lower Power HuniesTon Tecoiony [| [fx
Meckanical: Plant Optimization
Use Free Cooling / Waterside EononTaton F
‘Mono sjstem Efeleney 3
Tigi the Cot Plat z
Equipment: Selection
Speci High Tien Powe Supper | x ae
‘Consider Equipment Power Consumption Spacers Sal [xl
ecical infrastructure
Maximize UPS Unt lading moe
Speefy Minivun UPs Unt ETideney tapered ond Pais iam [x
Evaluate UPS Technologies fr Mont Eee
Lighting |
Occapaney Senses mae
Level aha 5
asking alae
commissioning and Revocommistoning
Performa Per Review oe
Engage a Commissioning Aas xo [ox
Document Testing of Al Equlpient and ona Sequences 7
‘Measure augment Energy Eieney Onsite ee
Provide Appropriate Budget and Scheduling for Commnisionng 7
erfor Fall Operational Testing of Al Equipment. mo
Perfor Fl Retvocormisionng ae
Aecalbrote AT Gonve Sersors ox