You are on page 1of 1
PRE-STRESSED CONCRETE DESIGN 4.12 m long sroly sspparied som coris @ ‘ner moored sod load of 10 kfm ord he feo! ais sj tmougheat Is lana Sccentihy of 20 mentor the nee oe Determine meme of nara of he pedesed section, BR Seesktomme Sex orn Fre hostess oho fop Roern th midspon a zswiwoi e211 MPIC) Bo isehrem = azanpe tt Compute te testr a the bolo fern the migoon ee aneele) e Zt pele} Bane = Tezanatt Pretetea alow coves wih piel ection thonmin tha fain oe used fo the fowing ot iran thesia bvestesedvith 20 IN ores at ‘on eccentcy, 2 63mm Solow the neato Stihe section. he sab ssp supported on {pan cl 8m. Alowobb s90508 ot soe loads Ge 20. ua, in terion and 135. Mee. ih oman, Consider 58 er feos ot sonics loads Load onthe sb: Slob aight = 27 ka Stporipad nod wood =20Kra a Sele the ses he top be of hese a he nds ve e. 2hPot) gaat Bthre & samo) Ccoevate th esting tos a he top bes ofthe slab ot ‘mdspan duo ore dh ana proses free e zahirolcy ec 7aFaC} B Sonweic =O rac} stoi themasinum ftalcadinclna tanith {hal he sob can be sbjcted fof he dlowabie sess oh FEN eatin Benim Late

You might also like