PRE-STRESSED CONCRETE DESIGN
4.12 m long sroly sspparied som coris @
‘ner moored sod load of 10 kfm ord he
feo! ais sj tmougheat Is lana
Sccentihy of 20 mentor the nee oe
Determine meme of nara of he pedesed section,
BR Seesktomme Sex orn
Fre hostess oho fop Roern th midspon
a zswiwoi e211 MPIC)
Bo isehrem = azanpe tt
Compute te testr a the bolo fern the migoon
ee aneele) e Zt pele}
Bane = Tezanatt
Pretetea alow coves wih piel ection
thonmin tha fain oe used fo the fowing ot
iran thesia bvestesedvith 20 IN ores at
‘on eccentcy, 2 63mm Solow the neato
Stihe section. he sab ssp supported on
{pan cl 8m. Alowobb s90508 ot soe loads
Ge 20. ua, in terion and 135. Mee. ih
oman, Consider 58 er feos ot
sonics loads
Load onthe sb:
Slob aight = 27 ka
Stporipad nod wood =20Kra
a
Sele the ses he top be of hese a he nds ve
e. 2hPot) gaat
Bthre & samo)
Ccoevate th esting tos a he top bes ofthe slab ot
‘mdspan duo ore dh ana proses free
e zahirolcy ec 7aFaC}
B Sonweic =O rac}
stoi themasinum ftalcadinclna tanith
{hal he sob can be sbjcted fof he dlowabie sess oh
FEN eatin
Benim Late