You are on page 1of 8

PROJECT : PT.

MSEI GEOLOGIST : Endro


DATE DRILLED Stake out coordinate by GPS
NO HOLE ID RIG No./Type
COMMENCED COMPLETED EASTING NORTHING RL
BOREHOLE COMPLET

Resurvey coordinate by TS/Tremble OPEN HOLE SECTION CORED HOLE SECTION


TOTAL
Depth (m) FROM TO TOTAL RUN FROM TO
EASTING NORTHING RL
(m) (m) (m) (m) (m)
HOLE COMPLETION

CORE
LE SECTION CORE CORE COAL INTESECTED
RECOVERED
TOTAL RECOVERY SIZE Drilling Depth Geophysical Log Depth
(m) (m) % FROM TO THICK FROM TO
Geophysical Log Status
SEAM COMMENT
physical Log Depth
THICK Gamma Density Caliper

You might also like