CLIENT: REPUBLICA OF CONGO CONSULTANT: SIAC CONTRACTOR: GNCAC QUANTITY: 8500LM (proposed total project length) TUBE DIAMETER: 1.8M TUBE LENGTH: 38M
Project Summary: Extraction by dredging of 1.670.000m3 of the sand of the
river an place in on a surface of 117 hectares is an average height of 1.4m. This project was done in joint venture between Maccaferri France, Bidim France and Guintoli France
Climate: Tropical with monsoon season, constantly high temperature
and humidity
Contact Person: Karine Aubry
Technical Manager Maccaferri France krine.aubry@maccaferri.fr