You are on page 1of 8

Transformer configuration

and the effects on SFRA

Presented by: Michelle Ward


Transformer Shipment Configuration

• What configuration is the transformer


going to be in when SFRA is performed?

– Actual Bushings
– Oil or no Oil
– Spark plug bushings
– Special Test Leads
– Tap Position
Example

Before Shipment – Oil and Actual Bushings


Ex. Change in Primary Winding response

After Shipment -> Oil and Actual Bushings


Ex. Change in Primary Winding response

Per Phase Relationship (C phase)


Primary Winding Link Changed
Summary - why are these results different?

• Communication is key
• Should have the factory SFRA data upfront

• Field testing, must have transformer in the same


configuration to avoid confusion

• Think ahead, be prepared for site testing


conditions. Put it in your specification
Thanks for coming!

SFRA User Group