You are on page 1of 4
Chassis Electrical TOYOTA seh0s August 31, 2011 Clamp Release Interlock (Standard Lever Units) SERVICE INFORMATION BULLETIN a TOUTS SS, BrOLeIUTS 32, 7FGCU35-70 and 7FGU35-80 ‘Subject: Clamp Release Interlock (Standard Lever Units) Page 1 of 4 MODEL APPLICATION: 7FBEU15-20, 7FBEHU18, 8FBCU20-32, 8FBCHU25, 7FBCU15-55 8FGCU15-32, 8FGU15-32, 7FGCU35-70 and 7FGU35-80 GENERAL INFORMATION: Starting with October 2010, new units with standard hydraulic levers may be equipped with a Clamp Release Interlock Circuit. ANSI 856.1 states that all units with clamp attachment or roll attachments must have a 2nd release method (2 moves to open the attachment) to prevent accidental opening Please refer to product bulletins 19-10 and 24-10. Toyota Designed Circuit for ANSI B56.1 CRI SWITCH = Y 3A Ap SOLENOID VALVE (Subject: Clamp Release Interlock (Standard Lever Units) Page 2 of 4 Switch and Wiring Installation Clamp release switch Wire routing through boot and lever connects to relay circuit. Switch assembly and wiring as routed by the factory. ‘Subject: Clamp Release Interlock (Standard Lever Units) Page 3 of 4 Solenoid and Hydraulic Hose Connections Hose Connection at Oil Control Valve |— | Hose to Attachment Spacer Plate _-4 Specific). Solenoids 12, 36 and 48 volts (Voltage Hose from valve Fitting ‘Subject: Clamp Release Interlock (Standard Lever Units) Page 4 of 4 Power and Ground Wire Connections CONNECT A WIRE(+) TO Pat CONNECT W WIRE(-)TO Ni UNDER CONTACTOR PANEL

You might also like