Professional Documents
Culture Documents
Survey
Survey
12
13
14
15
16
17
PEDC 3 Storeyed Building Survey Record
Plan (A)
1 1 Road 1.64 30
2 2 PT(1) 2 12.9 -11.26 18.74 0
3 PT(2) 4.51 -2.51 16.23 2.51
4 PT(3) 8.22 -3.71 12.52 6.22
5 PT(4) 9.01 -0.79 11.73 7.01
6 PT(5) 10.13 -1.12 10.61 8.13
7 3 PT(6) 5.99 11.45 -1.32 9.29 9.45
8 PT(7) 7.01 -1.02 8.27 10.47
9 PT(8) 6.9 0.11 8.38 10.36
10 PT(9) 5.48 1.42 9.8 8.94
11 PT(10) 3.34 2.14 11.94 6.8
12 PT(11) 0.57 2.77 14.71 4.03
AVG 13.222 7.392
Plan (B)
1 1 Road 1.64 30
2 2 PT(1) 0.43 11.33 -9.69 20.31 0
3 PT(2) 5.98 -5.55 14.76 5.55
4 PT(3) 8.2 -2.22 12.54 7.77
5 PT(4) 10.08 -1.88 10.66 9.65
6 PT(5) 10.32 -0.24 10.42 9.89
7 3 PT(6) 5.99 11.45 -1.13 9.29 11.02
8 PT(7) 7.18 -1.19 8.1 12.21
9 PT(8) 7.75 -0.57 7.53 12.78
10 PT(9) 6.98 0.77 8.3 12.01
11 PT(10) 5.68 1.3 9.6 10.71
12 PT(11) 4.81 0.87 10.47 9.84
AVG 12.198 10.143
DUHD Maubin Survey Record
PT-10 11.94
12.54 20
PT-3
10.66
PT-4 15
Feet
PT-5 10.42
10 9.6
PT-6 9.29
8.1 5
PT-7
7.53 0
PT-8
PT-1 PT-2 PT-3 PT-4 PT-5 PT-6 PT-7 PT-8 PT-9 PT-10
8.3
PT-9
PT-10 9.6
Reduce Level(Plan-A)
A)
9.6