You are on page 1of 1

Building site: Lot#2: Rehabilitation of 4 Tunnels Sector: Podgorica Objekat: Tunel 210

(Second Group) on the “Vrbnica – Bar”


railway line in Montenegro
Gradilište: Lot#2: Rehabilitacija 4 Tunela Sektor: Podgorica Building: Tunnel 210
(Druga grupa) na željezničkoj
pruzi "Vrbnica-Bar" u Crnoj Gori
Building book-measurement of quantities
Obračunski list građevinske knjige
Page number:
List broj : 1
Vrsta rada: Štemovanje šlica na spoju kampada sa
ugradnjom polutke od PVC cijevi ili fleksibilnog Building constans Code Calc.of BOQ item
crijeva, sa fiksiranjem istog. Građevinska norma project/Obrač. Poz. predra
Description of the works: Chase-cutting of a slit at the nacrta br. 2.3
ring joint with the installation of a half-PVC-pipe or
flexible hose, including its fixing. __________
Unite price € /Jedinična cijena € 44.81 per/po: Measure/Mjera:
m 448.00
A= B= A+B mjesečno Ukupno
Billing for/ Obračun za Transfer/Prenos: 0,00
November/Novembar 2021:

15*15.60+2.10+4.5+4+5+4+4+3+6.5+3+4.5+7+3+7.3+4.5+5.3+2.7+3.3+2.8+
+2.8+6.5+6.5=326.30 m 326.30
-------------------
326.30

-------------
326.30
Contractor/Izvođač: Supervisor/ Nadzorni organ :

.......................................... ...........................................

ZA PRENOS/ FOR TRANSFER 326.30