NOTES:

1) THIS SHOP DRAWING AS PER REV.06 SANITARY PLUMBING


BANGSAR 61 SDN. BHD.
CONSTRUCTION DRAWING & TO SUIT WITH THE 02/09/20 ARCHITECTURAL
DRAWING. (DESIGN TOTALLY CHANGE FROM THE TENDER DRAWING)
2) RISER AND SUMP LOCATION WAS CHANGED. JA U

1500mm
JA LA
QIB

CBP
LA N
N MA
M
AA
RO
AR
OF B LA T
F

UTILITY
3) ADDITIONAL SUMP PS.3 PS.4

P.LOBBY 3

P.LOBBY 4
T

1500mm
CBP
BOMBA/
BOMBA/
4) UPVC PIPE (FT & STACK INSIDE RISER) CHANGE TO DUCTILE IRON PIPE AT
GA
RISA

PL.10
N

KEY PLAN
BAN

1500mm
JA
S
GU

CBP
NA
LA

PL.7 PL.8
N
N JA
KE LA
TA N
MA M
U N JA AA
Qiblat BA LA RO
NG N F
GA SA AT
RISA R AS
N / BU

FAN RM.5A FAN RM.5D


SER

TOWER 1,2 & 3 AREA.


AHA BAN
KI

I
K

N
GU
T

UTILITY

A
N

IO
SKALA 1 : 1,000 NA DA

K
KAW

1500mm
N

AT
MA

N
ASA BAR

CBP

ST
N U

L
LAN NS

A
J
SKA AR

R
G

SA
A

P
P
2m R A

S
IS

NG
A
A

T
N

BA
A
SE

J
PL.9
M

E
P

T
A

LR
D
A
N

TO
B
A
R
U

SER
TA

AHA
5) 150MM MILD STEEL OVERFLOW & SCOUR PIPE FROM TANK CHANGE TO
N
A

N
OK
H

1500mm

KAW
Y

CBP
A
N

ASA
G

ND

N
A
K

LAN
A
N

TA

SKA
D
IS

P 2m
E
R
A

N
H
K

LA
A
N

JA
SER
AH GA
AN RIS GA
KAW AN RISA

DUCTILE IRON

1500mm
ASA BAN N
BAN

CBP
N GU
LAN NA GU
SER SKA N NA
AH BAR N
P
AN 2m U
HA
WA
SAN
LAN
SHA
P
2m

1500mm
6) ADDITIONAL INSPECTION CHAMBER.

CBP
6M
AN
GUN
BAN
N
AKA

GA
ANJ

GA

RISA
1500mm
ISAN

RISA
CBP

N
GAR

7) SUMP PUMP AT BASEMENT 2 WAS OMITTED.

BAN
PLA

GUN
NTIN
SER

AN
AHA

G
N

BAR
2m
KAW
GA

U
ASA
RISA
N
N LAN
BAN SKA
GU P
NA 2m

7.05m.WIDE DRIVEWAY
N
BAR
U

1500mm
CBP
GA
RISA

8) ADDITIONAL 2 NOS SUMP PUMP FOR OSD 1 & OSD 2.


JA N
BAN
LA GU
294 N NA
N
RIO
NG
G

JA
A
R
IS

LA
A
N

N
SE

1500mm
M

BA
CBP
P
A
D

NG
A
N
B

SA
9) ADDITIONAL OIL INTERCEPTOR FOR CAR WASHING AREA.
A
R
U

R
TA
N
A
H
Y
A
N 2m
G G

JALAN MAAROF
A NTIN
K
A PLA
N
N
DTAXI
I STAND
SE RISA U
GA BAR

1500mm
R
443 JA
A
H N

CBP
K NA
A GU
LA N
BAN
N N

RIO GA
RISA

NG
SER RU N
AH BA HKA
N
AN DA ERA
KAW PA DIS
ASA SEMAKAN AN
N AN UN
GA LAN RIS NG NG
RISA SKA YA BA
GA

1500mm
P AH
N AN

CBP
2m TAN RIS
GA BAN
RISA GU GA
N NAN
10 BAN BAR
GU U
NA
N

J
E
RAMP 5

J
A
N
T
A
S
P
E
J
A
53

L
A
N
1500mm

K
A
CBP

K
I
S
E
D
IA
D
A
R
SA
G
N
BA
1500mm

N
CBP

LA
JA
1500mm
CBP1500mm
CBP1500mm
CBP
1500mm
CBP 1500mm
CBP
6.475m.WIDE DRIVEWAY

1500mm
CBP
PACKAGE 2: THE CONSTRUCTION AND COMPLETION OF EARTHWORK,

1500mm
BASEMENT AND ASSOCIATED WORK FOR:

CBP
1500mm
CBP
CADANGAN PEMBANGUNAN BERCAMPUR YANG MENGANDUNGI:-

TOTAL NOS.OF CARPARKS = 614 NOS. 1 BLOK PEJABAT – 34 TINGKAT.

1500mm
CBP
i) 30 TINGKAT RUANG PEJABAT DARI

1500mm
TINGKAT 3 HINGGA TINGKAT 32

CBP
(591+23)) ii) 4 TINGKAT RUANG PERNIAGAAN

1500mm
CBP
DARI TINGKAT TANAH HINGGA TINGKAT 2 (MEZZANINE)
BERSERTA TEMPAT LETAK KERETA DI TINGKAT TANAH,

1500mm
CBP
2 . 5 0 0 x 5 . 0 0 0 m C A R P A R K
4 TINGKAT BASEMEN 1, 2 , 3 & 4 TEMPAT LETAK KERETA

1500mm
CBP
& TEMPAT LETAK MOTOSIKAL,1 UNIT PUSAT PENCAWANG
UTAMA DI TINGKAT TANAH.

1500mm
1500mm
CBP
CBP
DI FASA 1 DI ATAS SEBAHAGIAN LOT 20001
(Dahulunya adalah LOT 61) , SEKSYEN 96A, JALAN MAAROF,

1500mm
1500mm
CBP
CBP
WILAYAH PERSEKUTUAN, KUALA LUMPUR.

1500mm
6.475m.WIDE DRIVEWAY

1500mm
CBP
UNTUK: TETUAN BANGSAR 61 SDN BHD.

CBP
1500mm
1500mm
CBP
CBP
BANGSAR 61 SDN. BHD

1500mm
1500mm
CBP
CBP
Level 9, Block D, Dataran PHB,
Saujana Resort, Section U2,

1500mm
1500mm
CBP
CBP
40150 Shah Alam, Selangor Darul Ehsan.

P.LOBBY 2
P.LOBBY 1
Tel : 03 - 7711 3000, Fax : 03 - 7711 3031

1500mm
1500mm
CBP
CBP
BOMBA/

BOMBA/
2 . 5 0 0 x 5 . 0 0 0 m C A R P A R K

PL.2

PL.4

1500mm
1500mm
FAN RM.4C

CBP
CBP
FAN RM.4D
BANGSAR 61 SDN. BHD

1500mm
1500mm
CBP
CBP
PL.3
PL.1
Level 9, Block D, Dataran PHB,
Saujana Resort, Section U2,

1500mm
1500mm
CBP
CBP
PS.2
PS.1
40150 Shah Alam, Selangor Darul Ehsan.

1500mm
Tel : 03 - 7711 3000, Fax : 03 - 7711 3031

1500mm
CBP
CBP
1500mm
1500mm
CBP
CBP
KLCC PROJEKS SDN. BHD.

1500mm
1500mm
CBP
CBP
7.1m.WIDE DRIVEWAY Level 33 & 34, Menara Dayabumi,
Jalan Sultan Hishamuddin,

1500mm
1500mm
CBP
CBP
K L C C
P.O.Box 13214, 50050 Kuala Lumpur.
Tel : 03 - 2783 6000, Fax : 03 - 2783 7701

UTILITY IN
FAN RM.3B
2.700x5.000m CARPARK (TO B3)

( FFL.19.488 TO B3 & B4)


ST.9

TUNNEL RAMP 2
TUNNEL RAMP 2
6.3m.WIDE DRIVEWAY (BUILD NOW)
( FFL.19.488 TO B3 & B4) IN
(TO B4)
SUPER RAMP 2B KUMPULAN SENIREKA SDN. BHD.
SUPER RAMP 2A ARKITEK BERKANUN (Company No. 98567-U)
Tingkat 13, Wisma Bumi Raya, 10,
Jalan Raja Laut, 50350, Kuala Lumpur.
HR ST.10
WR Tel : 03 - 2693 6688, Fax : 03 - 2691 8448

CARPARK
ELV/DB

L.LOBBY (BUILD NOW)


BOMBA/

IN
CPL.5

(TO B3) GJ RUNDING SDN BHD

R Lot B, 11-3a, Jalan Selaman 1, Dataran Palma,


CPL.6

6800 0 Ampang, Selangor Darul Ehsan


Tel : 03 - 4270 5929, Fax : 03 - 4270 5839

2.500x5.000m CARPARK
6.8m.WIDE DRIVEWAY

PERUNDING TIMUR SDN BHD

BOMBA/

1500mm
PJX - HM, SHAH TOWER, Suite L16-1,

CBP
PL.6
6.4m.WIDE DRIVEWAY FAN RM.4A FAN RM.4B NO. 16A, Jalan Persiaran Barat,

P.LOBBY 5

1500mm
CBP
UTILITY 46050 Petaling Jaya, Selangor Darul Ehsan

PL.5
Tel : 03 - 7499 1105 Fax : 03 - 7499 7160

1500mm
COMPART

CBP
Email : office@perundingtimur.com.my
SUB-STATION
PS.5

1500mm
(FOR TUNNEL)

CBP
ARH JURUKUR BAHAN SDN. BHD.

1500mm
CBP
224A, Jalan Negara 2, Taman Melawati,
53100 Kuala Lumpur

1500mm
CBP
Tel: 03-41068192/3/4/5 Fax: 03-41068190
2 . 7 0 0 x 5 . 0 0 0 m C A R P A R K

1500mm
Email: info@arh.com.my

CBP
1500mm
CBP
BGMC CORPORATION SDN BHD

1500mm
CBP
A-3A-02, BLOK A LEVEL 3A,
6.1m.WIDE DRIVEWAY

1500mm
6.45m.WIDE DRIVEWAY 6.45m.WIDE DRIVEWAY SKY PARK ONE CITY, JALAN USJ 25/1A,

CBP
47650 SUBANG JAYA, SELANGOR.

1500mm
UTILITY

CBP
Tel : 03-5115 1128 Fax : 03-51151126

1500mm
CBP
1500mm
CBP
ST.13

TO JALAN MAAROF
FAN RM.1E FAN RM.1F

1500mm
CBP
FAN RM.1C

1500mm
FAN RM.2B GUAN HUAT PLUMBING (M) SDN. BHD.

CBP
FAN RM.1B/3A FAN RM.2A
FAN RM.1A
SUPER RAMP 1B 16-02, Jalan Puteri 7/7,

1500mm
CBP
Bandar Puteri Puchong,
2 . 7 0 0 x 5 . 0 0 0 m C A R P A R K 47100 Puchong, Selangor Darul Ehsan.

1500mm
CBP
Tel: 03-80616698 Fax: 03-80681698

1500mm
CBP
1500mm
CBP
1500mm
CBP
6.1m.WIDE DRIVEWAY
6.1m.WIDE DRIVEWAY

1500mm
CBP
1500mm
CBP
1500mm
CBP
1500mm
CBP
2 . 7 0 0 x 5 . 0 0 0 m C A R P A R K 2 . 7 0 0 x 5 . 0 0 0 m C A R P A R K 2 . 7 0 0 x 5 . 0 0 0 m C A R P A R K

1500mm
CBP
1500mm
CBP
4.67m.WIDE DRIVEWAY

1500mm
CBP
4.7m.WIDE DRIVEWAY

1500mm
CBP
1500mm
CBP
S.L.LOBBY

SPS
STAIR 6

1500mm
CBP
R.C COLUMN TO ENGR'S DETAIL

LPS
WR/
SPR

1500mm
CBP
CP/EP-1
569 S.LIFT LOBBY

1500mm
FAN RM.1G S/B

CBP
IT / ELV
FAN RM.1D LIFT 1
FLLPS LANDLORD HR

1500mm
CBP
ELECT.RM.
S/B HR
LIFT 1

1500mm
CBP
WR/

1500mm
CBP
SPR

SPS LPS ELE-LV ELV

1500mm
CBP
CPL.13 CPL.14
CPL.3 CPL.4
STAIR 1

1500mm
CBP
UTILITY 1
ELE-HT
UTILITY

(6 person capacity) CPL.


CABLE
CWSP

CARPARK
SERVICE/

1500mm
LOBBY

CBP
L.LOBBY B.L.LOBBY
WR UTILITY 1
C A R P A R K

1500mm
CBP
HR

HR CPL.12 CPL.11
ST.2 CPL.2 CPL.1 SUPER RAMP 1A B/S.LIFT
STPS

1500mm
CBP
TEL

CW

1500mm
CBP
SPS

ST.7a
6.8m.WIDE DRIVEWAY

6.1m.WIDE DRIVEWAY

6.2m.WIDE DRIVEWAY

1500mm
ST.14a

CBP
6.1m.WIDE DRIVEWAY

7.1m.WIDE DRIVEWAY

6.1m.WIDE DRIVEWAY
C A R P A R K
2 . 7 0 0 x 5 . 0 0 0 m

1500mm
CBP
STAIR 2
6.1m.WIDE DRIVEWAY

1500mm
6.1m.WIDE DRIVEWAY

CBP
2.700x5.000m CARPARK

UTILITY 3 UTILITY 2

1500mm
CBP
OFF FORM R.C WALL TO

1500mm
CBP
2 . 7 0 0 x 5 . 0 0 0 m

ENGR'S DETAIL
6.2m.WIDE DRIVEWAY

1500mm
CBP
1500mm
CBP
CARPARK CARPARK CARPARK
CP/EP-2 LIFT 1 LIFT 1 LIFT 1

1500mm
CBP
CARPARK
L.LOBBY

1500mm
CBP
1500mm
CBP
1500mm
CBP
1500mm
CBP
ST.15
STPS

SMOKE SMOKE
SPS

STAIR 5
ST.1

LOBBY LOBBY

1500mm
CBP
FAN RM.2C
WR

WR

HR HR

1500mm
CBP
HR

1500mm
CBP
1500mm
CBP
1500mm
CBP
CBP
1500mm

6.65m. WIDE DRIVEWAY

1500mm
CBP
RAMP 3 RAMP 4

1500mm
CBP
1500mm
CBP
UTILITY

1500mm
CBP
1500mm
CBP
UTILITY UTILITY

1500mm
CBP
CBP
1500mm

CBP
1500mm
CBP CBP CBP CBP CBP CBP CBP CBP CBP CBP CBP CBP CBP CBP CBP CBP CBP CBP CBP CBP CBP CBP CBP CBP CBP CBP CBP CBP CBP CBP CBP CBP CBP CBP CBP CBP
1500mm 1500mm 1500mm 1500mm 1500mm 1500mm 1500mm 1500mm 1500mm 1500mm 1500mm 1500mm 1500mm 1500mm 1500mm 1500mm 1500mm 1500mm 1500mm 1500mm 1500mm 1500mm 1500mm 1500mm 1500mm 1500mm 1500mm 1500mm 1500mm 1500mm 1500mm 1500mm 1500mm 1500mm 1500mm 1500mm

SUMP PUMP 1 SANITARY PLUMBING SERVICES


BASEMENT 3

SUMP PUMP 2
U
P-1 BASEMEN 3 ( FFL.21.10 )
TOATL NOS.CARPARK = 614 NOS.(TOWER 1)
(612PH1 +2 NOS.FROM TUNNEL RAMP 1) SHOP DRAWING
BGMC-T042-B61-M&E-SD -SP-03 00