Professional Documents
Culture Documents
M/C
DETAIL L&T60-15
NO. OF CYCLE TIME SHIFT TARGET ALTERNATE
SL.NO TOOL NO. PART NO. DESCRIPTION OF COMPONENT
CAVITY (SEC) (12 HR) MACHINE
APPROVED
PREPARED BY venkatesh h.p BY chethan h.n
production part list
M/C
DETAIL L&T 150ton-16
2CDS206707P0427 &
1 8643 Cover & Housing 0,5-25A PA66 CPI 2 22 3731 engel-50
2CDS206708P0418
2 8644 P207 & P34 COVER & HOUSING 63A COMPACT 2 22 3731 engel-50
TOOL LOADING CHART _ALTERNATE MACHINE
M/C
L&T60TON-17
DETAIL
APPROVED
PREPARED BY venkatesh h.p BY chethan h.n
production part plan
M/C
DETAIL L&T 60-18
APPROVED
PREPARED BY venkatesh h.p BY
chethan h.n
PRODUCTION PART LIST
M/C
shine well 90t-30
DETAIL
NO. OF CYCLE TIME SHIFT TARGET ALTERNATE
SL.NO TOOL NO. PART NO. DESCRIPTION OF COMPONENT
CAVITY (SEC) (12 HR) MACHINE
APPROVED
PREPARED BY
BY
DATE DATE
PRODUCTION PAR LIST
M/C
DETAIL
PREPARED BY
production part list
M/C
L&T 100-34
DETAIL
NO. OF CYCLE TIME SHIFT TARGET ALTERNATE
SL.NO TOOL NO. PART NO. DESCRIPTION OF COMPONENT
CAVITY (SEC) (12 HR) MACHINE
4 PISTRON 4 8208
ALTERNATE
MACHINE
production part list
M/C
L&T60ton_46
DETAIL
PREPARED BY
DATE
n part list
APPROVED
BY
DATE
production part list
M/C
ENGEL 40TON-49
DETAIL
NO. OF
SL.NO TOOL NO. PART NO. DESCRIPTION OF COMPONENT
CAVITY
APPROVED
PREPARED BY venkatesh h.p
BY
st
SHIFT
CYCLE TIME ALTERNATE
TARGET (12
(SEC) MACHINE
HR)
35 4690 L&T60ton-17
35 4690 90t-29
chethan h.n
M/C NO. CAPACITY
1 15 0
2 16 0
3 17 0
4 18 0
5 29 0
6 30 0
7 33 0
8 34 0
9 35 0
10 36 #REF!
11 37 0
12 41 0
13 42 0
14 43 0
15 44 0
16 45 0
17 46 0
18 48 0
19 49 0
20 50 Err:509
21 51 Err:509
#REF! #REF!
production part list
M/C
ENGEL 80TON-51
DETAIL
APPROVED
BY chethan h.n