LOCO-SHOP-JMP-ENGINEERING/EASTERN RLY

TENDER DOCUMENT
Tender No: DTE_JMP_Z8 Closing Date/Time: 03/12/2021 13:00

Asst. Town Engineer, Jamalpur Workshop acting for and on behalf of The President of India invites E-Tenders against Tender No
DTE_JMP_Z8 Closing Date/Time 03/12/2021 13:00 Hrs. Bidders will be able to submit their original/revised bids upto closing date and
time only. Manual offers are not allowed against this tender, and any such manual offer received shall be ignored.

Contractors are allowed to make payments against this tender towards tender document cost and earnest money only through only
payment modes available on IREPS portal like net banking, debit card, credit card etc. Manual payments through Demand draft, Banker
cheque, Deposit receipts, FDR etc. are not allowed.

1. NIT HEADER

Annual repairing/minor addition and alteration white/colour washing, painting and misc.
Name of Work
nature of works of West colony in the section of SSE(W)/Col/JMP of Z-08/21-22
Bidding type Normal Tender
Tender Type Open Bidding System Single Packet System
Tender Closing Date Time 03/12/2021 13:00 Date Time Of Uploading Tender 09/11/2021 17:57
Pre-Bid Conference
No Pre-Bid Conference Date Time Not Applicable
Required
Advertised Value 3500000.00 Tendering Section DTE OFFICE
Bidding Style Single Rate for Tender Bidding Unit Above/Below/Par
Earnest Money /Bid Security
0.00 Validity of Offer ( Days) 45
(Rs.)
Obtain Bid Security Declaration in lieu of Bid Security Yes
Tender Doc. Cost (Rs.) 0.00 Period of Completion 7 Months
Contract Type Works Contract Category Expenditure
Are Joint Venture (JV) firms
Bidding Start Date 19/11/2021 No
allowed to bid
Ranking Order For Bids Lowest to Highest Expenditure Type Revenue

2. SCHEDULE

S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding
Unit
Schedule A-USSOR-2011 3500000.00
Lump Sum 3500000.00 AT Par 3500000.00
Description :- Description: Description: Item Description:- Flat% above/Below/At par of chapter of the Eastern
Railway USSOR-2011. The work order will cover 100% of (Schedule B -1) Chapters - 3, 4, 5 & 10 - 30%
1 (Schedule B -2) Chapters -1, 2, 6, 8, 9, 11, 12, 17, 18, 24 & 25 - 70% This will include(i) New work addition and
alteration to existing structures, special repair works and supply of building materials subjected to the contract
value of work through the work order not exceeding Rs. 5.00 lakhs(Rupees Five Lakhs) in each such work (ii) All
ordinary repairs and maintenance works and (iii) Conveyance of materials e.g. bricks, lime, sand etc. which are
likely to be required in a zone during the year.

3. ITEM BREAKUP

No item break up added

4. ELIGIBILITY CONDITIONS

Special Technical Criteria

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
Documents to be uploaded only in the website by the Tenderer Following Annexures duly
filled and signed are to be uploaded online only prior to Closing of Tender. Original copy Allowed
1 No No
of all the documents to be submitted to office within 7 days whenever demanded by the (Mandatory)
Railway.

Submission of Document Verification Certificate

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading

Pa g e 1 o f 5 Ru n Da te/Time: 0 9 /11/2 0 2 1 17:5 7:12


LOCO-SHOP-JMP-ENGINEERING/EASTERN RLY
TENDER DOCUMENT
Tender No: DTE_JMP_Z8 Closing Date/Time: 03/12/2021 13:00

Please submit a certificate in the prescribed format (please download the format from the
link given below) for verification / confirmation of the documents submitted for
compliance of eligibility / qualifying criteria. Non submission of the certificate, or Allowed
1 No No
submission of certificate either not properly filled in, or in a format other than the (Mandatory)
prescribed format shall lead to summary rejection of your offer.
( Click here to download the Format of Self Certificatio)

5. COMPLIANCE

Check Lst

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
The documents to be uploaded only in the website by the Tenderer Following
Annexures duly filled and signed are to be uploaded online only prior to closing
of Tender. Original copy of all the documents to be submitted to the office
within 7 days whenever demanded by the Railway Annexures are available at
upload view document menu in home page of IREP portal for works tender 1)
the details of the work completed by the tenderer during the last 7 years to be
filled in Annexure-I. 2) The details of plant & machinery with the tenderer to be
filled in Annexure-II. 3) Details of personal and organization of the tenderer to
be filled in Annexure-III. 4) Details of works presently on hand of the tenderer
1 to be filled in Annexure-IV. 5) The details regarding Association of Railway No No Not Allowed
Officer(s) with the tenderer to be filled in Annexure- V. 6) No. of List of the
Arbitration cases of the Tenderer during last Five years to be filled in
Annexure-VI. 7. List of the Court cases of the Tenderer during last Five years
to be filled in Annexure- VII. 8. NEFT mandate Form all payments to the
agency including the refund of the Earnest Money of the unsuccessful bidder
preferably will be remitted through NEFT. The tenderer is required to submit
bank details and Account No. in Annexure - VIII. 9. Format of Affidavit to be
uploaded in Annexure-IX. 10. GST compliance invoice Annexure-X 11. Letter
of Credit - Annexure-XI.
The tender offer complete in all respect and with all documents is to be
submitted online by e-tendering process through the website www.ireps.gov.in
2 before the closing time/date of this tender as mentioned in the NIT (Notice No No Not Allowed
inviting tender). Tenderer can revised the bids any number of times till the
closing time/date of the tender. No manual offer shall be accepted.

Commercial-Compliance

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
Please enter the percentage of local content in the material being offered.
Please enter 0 for fully imported items, and 100 for fully indigenous items. The Allowed
1 No No
definition and calculation of local content shall be in accordance with the Make (Mandatory)
in India policy as incorporated in the tender conditions.
Please enter the percentage of local content in the material being offered.
Please enter 0 for fully imported items, and 100 for fully indigenous items. The Allowed
2 No Yes
definition and calculation of local content shall be in accordance with the Make (Optional)
in India policy as incorporated in the tender conditions.
Please enter the percentage of local content in the material being offered.
Please enter 0 for fully imported items, and 100 for fully indigenous items. The Allowed
3 No Yes
definition and calculation of local content shall be in accordance with the Make (Optional)
in India policy as incorporated in the tender conditions.

General Instructions

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
For those conditions for which standard formats have been given in the
1 uploaded document titled-Formats for uploading of various format. The No No Not Allowed
information should only be submitted in these standard formats.
Rates are inclusive of all taxes/octroi, license fee, royalty charges etc. legally
2 No No Not Allowed
leviable by State, Central Govt. and/or any other local authority.

Pa g e 2 o f 5 Ru n Da te/Time: 0 9 /11/2 0 2 1 17:5 7:12


LOCO-SHOP-JMP-ENGINEERING/EASTERN RLY
TENDER DOCUMENT
Tender No: DTE_JMP_Z8 Closing Date/Time: 03/12/2021 13:00

In addition to General condition of contract 2020 and Indian Railway Unified


Standard Specification Volume-I & II 2010 edition/USSOR Schedule of Rates
3 No No Not Allowed
(For labour & materials), revised up to date, special condition attached shall
also apply.
Tenderers are requested to go through the following documents which are
available in upload/View Documents in Home page of IREPS portal for works
4 No No Not Allowed
tenders before submitting the e-tender. (1) General Instruction for E-Tenders
on works contract--Chapter- I (2) Special Condition-General- Chapter-II
Non-compliance with any of the conditions set forth therein above will result in
5 No No Not Allowed
summarily rejection of the tender offer.
All documents to support fulfillment of eligibility criteria should be furnished
along with the tender and should be available at the time of tender opening.
6 Tenders not accompanied by documentary evidence in support of eligibility No No Not Allowed
criteria will be rejected. No post tender communication, in any form will be
made or entertained, after opening of tenders, in this regard.
The working site shall be provided to the Contractor in phases by the Railway
7 No No Not Allowed
after completion/commissioning of the allotted portion of work.
The scope of work mentioned above is indicative and for general guidance
8 only. Actual scope of work may vary as per Railway's requirement and site No No Not Allowed
conditions.
In case, any discrepancy between the tender document downloaded from the
9 internet and the master copy, latter shall prevail and will be binding on the No No Not Allowed
tenderer/s. No claim on this account will be entertained.

Technical-Compliances

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
Eligibility of tenderers shall be decided solely on the basis of valid documents
submitted along with the tender offers and any subsequent document
Allowed
1 whatsoever submitted in this connection would not be given any cognizance No No
(Mandatory)
on any account(Authority:-CGE/E.Rly's letter No. W(2)623/25/System
Improvement dated 04.03.2015).
Tenderer shall submit the Notarized Copy of partnership deed of present
constitution of firm & also photo copy of prior partnership deed ( if there is
change in constitution of firm) pertaining to the period for which the document
in support of technical & financial eligibility criteria attached. If the participating
firm is with different name and style, then Photo Copy of partnership deed /
Sole proprietorship affidavit ( as applicable) of the firms whose credential are Allowed
2 No No
being submitted by the tenderer in support of their offer shall also be attached. (Mandatory)
If Participating firm is a company registered under Companies Act 1956, then
copies of Memorandum of association & Article of association shall be
attached. Power of attorney in favour of the authorized signatory shall also be
attached . If participating firm is a sole proprietorship firm, then Declaration in
the form of duly notarized affidavit shall be attached
Demand for the credential criteria both technical and similar nature of work
and other technical details are to be uploaded with a scanned copy duly filled
in and signed as per annexure No. I, II, III these annexures are available in
Allowed
3 Yes view document menu at home page and are downloadable. the details of No No
(Mandatory)
the uploaded documents should be produced whenever demanded for
verification on written request at any point of time of the tender and contract
within seven days.

Undertakings

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
I/ We have visited the works site and I / We am / are aware of the site
1 No No Not Allowed
conditions.

Pa g e 3 o f 5 Ru n Da te/Time: 0 9 /11/2 0 2 1 17:5 7:12


LOCO-SHOP-JMP-ENGINEERING/EASTERN RLY
TENDER DOCUMENT
Tender No: DTE_JMP_Z8 Closing Date/Time: 03/12/2021 13:00

I do hereby certify that one qualified Graduate Engineer or Qualified Diploma


Holder Engineer will be deployed by me at work site, based on value of
contract in terms of provision of Clause 26A.1 to the General condition of
contract (GCC)-2020. In case of failure to deploy qualified Graduate Engineer
or Qualified Diploma Holder Engineer during execution of the allotted Work,I
2 am agree to pay an amount of Rs. 40,000/- when cost of work to be executed No No Not Allowed
is Rs.200 lakh and above or Rs.25000/- when cost of work to be executed is
more than 25 Lakh, but less than Rs.200 lakh for each month or part thereof
for the default period for the provisions, as contained in Para 2(a) and 2(b) to
the GCC-2014 respectively. (Authority: Railway Board's letter No. 2012/CE-
I/CT/O/20, New Delhi, Dated 10.05.2013)
I HAVE READ THE ENTIRE TENDER DOCUMENT INCLUDING UPLOADED
3 No No Not Allowed
DOCUMENTS
Until a formal agreement is prepared and executed, acceptance of the tender
shall constitute a binding contract between us subject to modifications, as may
4 No No Not Allowed
be mutually agreed to between us and indicated in the letter of acceptance of
my/our offer for this work.
Where as the President of India acting through the Eastern Railway
Administration and their authorized officers has invited e-tenders for the above
mentioned work vide tender notice mentioned in the NIT notice inviting tender
publish in the website. 2. And where as I/We, have read the above NIT notice
inviting tender for e-tender, General Instructions, Special condition General, all
special condition and have purchased this e-tender documents, have carefully
read and understood the same, have visited the site and have satisfied
myself/ourselves as to the nature of the work and site conditions before filling
this e-tender. 3. AND WHEREAS my/our address for all communications
hereinafter shall be considered as official and shall be made in the address,
email Id and Mobile phone and other phone nos. given in the portal of IREPS
5 while registering as tenderer for e-tender. In case of any change in this No No Not Allowed
concerned officer of railway will be informed. 4. AND WHEREAS I/We state
that in the event of this e-tender being unsuccessful, the aforesaid earnest
money deposited by me/us may be refunded to me/us through NEFT. 5. AND
WHEREAS I/We hereby sign this e-tender document digitally by virtue of the
legal authorities vested with me/us to enter into commitment on behalf of the
tenderer, documentary support whereof is enclosed herewith. 6. AND
WEREAS I/We have read and understood this e-tender document and agree
to abide by the various terms and conditions contained therein. I/We also
agree to keep the offer open for acceptance for a period of 45 days form the
date fixed for closing of the same and in default hereof, I/We will be liable for
forfeiture of my/our earnest money.
Now, therefore I/We hereby submit this e-tender and offer to do the work for
the Eastern Railway at the rates quoted in the schedule through online and
hereby bind myself/ourselves to complete the work in all respects within the
stipulated period of completion from the date of issue of the letter of
acceptance of this tender. 8. And I/We agree to abide by the General
Conditions of Contract 2020 editions and the Unified Standard Schedule of
Rates Labour Materials of 2011 edition issu3ed by the Eastern Railway, read
with all correction slips issued thereto from time to time, and to carry out the
works according to the special conditions and specifications of materials and
works as laid hereunder in various chapters of this e-tender document. 9. And
6 I/We have understood and accept the stipulation that full value of the earnest No No Not Allowed
money shall stand forfeited without prejudice to any other right or remedies if.
1. I/We do not execute the contract documents, ibn case my/our tender is
accepted, within seven days after receipt of notice issued by the Railway that
such documents are ready, or 2. I/We do not commence the work, in case
my/our e-tender is accepted, within fifteen days after receipt of orders to that
effect. 10. And until a formal agreement is executed, acceptance of this tender
shall constitute a binding contract between us and indicated in the letter of
acceptance of my/our offer for this work. 11. And I/We agree to produce the
details of the uploaded documents whenever demanded for verification on
written request at any point of time of the tender and contract within 7 days.

6. Documents attached with tender

S.No. Document Name Document Description


1 Annexure-IX_X-GoogleDocs.pdf Annexure IX X

Pa g e 4 o f 5 Ru n Da te/Time: 0 9 /11/2 0 2 1 17:5 7:12


LOCO-SHOP-JMP-ENGINEERING/EASTERN RLY
TENDER DOCUMENT
Tender No: DTE_JMP_Z8 Closing Date/Time: 03/12/2021 13:00

2 Annexure-XI-GoogleDocs.pdf Annexure XI
3 Bidsecuritydeclaration.pdf Bid Security Declaration
4 GCCJuly2020.pdf GCCJuly2020
5 NewTenderDocumentwithoutEMD.pdf Tender Document
ComlComplianceAnnexure-
6 Coml compliance Annexure IV, V, VI, VII, VIII
IV,V,VI,VII,VIII.pdf
7 TechComplianceAnnexure-I,II,III.pdf Tech Compliance Annexure I,II,III

This tender complies with Public Procurement Policy (Make in India) Order 2017, dated 15/06/2017, issued by
Department of Industrial Promotion and Policy, Ministry of Commerce, circulated vide Railway Board letter no.
2015/RS(G)/779/5 dated 03/08/2017 and 27/12/2017 and amendments/ revisions thereof.

As a Tender Inviting Authority, the undersigned has ensured that the issue of this tender does not violate provisions of
GFR regarding procurement through GeM.

Signed By: MUKESH KUMAR JHARAKESH

Designation : ATEN/JMP

Pa g e 5 o f 5 Ru n Da te/Time: 0 9 /11/2 0 2 1 17:5 7:12