The document contains status and work breakdown structure (WBS) code information for over 100 activities with status code "Not Started". It also includes a table with over 60 planned activities related to tank construction, including task names, estimated start dates, and WBS codes. The activities cover tasks from initial site work through tank assembly, testing and painting.
The document contains status and work breakdown structure (WBS) code information for over 100 activities with status code "Not Started". It also includes a table with over 60 planned activities related to tank construction, including task names, estimated start dates, and WBS codes. The activities cover tasks from initial site work through tank assembly, testing and painting.
The document contains status and work breakdown structure (WBS) code information for over 100 activities with status code "Not Started". It also includes a table with over 60 planned activities related to tank construction, including task names, estimated start dates, and WBS codes. The activities cover tasks from initial site work through tank assembly, testing and painting.
OEM1400 Not Started C1.4.2.7.1 OEM1410 Not Started C1.4.2.7.1 OEM1420 Not Started C1.4.2.7.1 OEM1430 Not Started C1.4.2.7.1 OEM1440 Not Started C1.4.2.7.2 OEM1450 Not Started C1.4.2.7.2 OEM1460 Not Started C1.4.2.7.2 OEM1470 Not Started C1.4.2.7.2 OEM1480 Not Started C1.4.2.7.2 OEM1490 Not Started C1.4.2.7.2 OEM1500 Not Started C1.4.2.7.2 OEM1510 Not Started C1.4.2.7.2 OEM1520 Not Started C1.4.2.7.2 OEM1530 Not Started C1.4.2.7.2 OEM1540 Not Started C1.4.2.7.2 OEM1550 Not Started C1.4.2.7.2 OEM1560 Not Started C1.4.2.7.2 OEM1570 Not Started C1.4.2.7.2 OEM1580 Not Started C1.4.2.7.2 OEM1590 Not Started C1.4.2.7.2 OEM1600 Not Started C1.4.2.7.2 OEM1610 Not Started C1.4.2.7.2 OEM1620 Not Started C1.4.2.7.2 OEM1630 Not Started C1.4.2.7.2 OEM1640 Not Started C1.4.2.7.3 OEM1650 Not Started C1.4.2.7.3 OEM1660 Not Started C1.4.2.7.3 OEM1670 Not Started C1.4.2.7.3 OEM1680 Not Started C1.4.2.7.3 OEM1690 Not Started C1.4.2.7.3 OEM1700 Not Started C1.4.2.7.3 OEM1710 Not Started C1.4.2.7.3 OEM1720 Not Started C1.4.2.7.3 OEM1730 Not Started C1.4.2.7.3 OEM1740 Not Started C1.4.2.7.4 OEM1750 Not Started C1.4.2.7.4 OEM1760 Not Started C1.4.2.7.5 OEM1770 Not Started C1.4.2.7.5 OEM1780 Not Started C1.4.2.7.5 OEM1790 Not Started C1.4.2.7.2 OEM1800 Not Started C1.4.2.7.2 OEM1810 Not Started C1.4.2.6.1 OEM1820 Not Started C1.4.2.6.1 OEM1830 Not Started C1.4.2.6.1 OEM1840 Not Started C1.4.2.6.1 OEM1850 Not Started C1.4.2.6.2 OEM1860 Not Started C1.4.2.6.2 OEM1870 Not Started C1.4.2.6.2 OEM1880 Not Started C1.4.2.6.2 OEM1890 Not Started C1.4.2.6.2 OEM1900 Not Started C1.4.2.6.2 OEM1910 Not Started C1.4.2.6.2 OEM1920 Not Started C1.4.2.6.2 OEM1930 Not Started C1.4.2.6.2 OEM1940 Not Started C1.4.2.6.2 OEM1950 Not Started C1.4.2.6.2 OEM1960 Not Started C1.4.2.6.2 OEM1970 Not Started C1.4.2.6.2 OEM1980 Not Started C1.4.2.6.2 OEM1990 Not Started C1.4.2.6.2 OEM2000 Not Started C1.4.2.6.2 OEM2010 Not Started C1.4.2.6.2 OEM2020 Not Started C1.4.2.6.2 OEM2030 Not Started C1.4.2.6.2 OEM2040 Not Started C1.4.2.6.2 OEM2050 Not Started C1.4.2.6.2 OEM2060 Not Started C1.4.2.6.2 OEM2070 Not Started C1.4.2.6.3 OEM2080 Not Started C1.4.2.6.3 OEM2090 Not Started C1.4.2.6.3 OEM2100 Not Started C1.4.2.6.3 OEM2110 Not Started C1.4.2.6.3 OEM2120 Not Started C1.4.2.6.3 OEM2130 Not Started C1.4.2.6.3 OEM2140 Not Started C1.4.2.6.3 OEM2150 Not Started C1.4.2.6.3 OEM2160 Not Started C1.4.2.6.3 OEM2170 Not Started C1.4.2.6.4 OEM2180 Not Started C1.4.2.6.4 OEM2190 Not Started C1.4.2.6.5 OEM2200 Not Started C1.4.2.6.5 OEM2210 Not Started C1.4.2.6.5 A3230 Not Started C1.4.2.1 A3240 Not Started C1.4.2.1 A3250 Not Started C1.4.2.1 A3620 Not Started C1.4.2.3 A3630 Not Started C1.4.2.3 A3640 Not Started C1.4.2.2.1 A3650 Not Started C1.4.2.2.1 A3660 Not Started C1.4.2.2.1 A3670 Not Started C1.4.2.2.2 A3680 Not Started C1.4.2.2.2 A3690 Not Started C1.4.2.2.2 task_name start_date Activity Name (*)Start Trazo y Replanteo 11/14/2021 16:00 Instalacion y armado de planchas 11/15/2021 16:00 Armado de Andamios Anillo 1 11/24/2021 16:00 Soldeo de Planchas 11/26/2021 16:00 Instalacion de Postes de Izaje 11/30/2021 16:00 Instalacion y Armado de Anillo 4 12/7/2021 16:00 Soldeo de Juntas Verticales de Anillo 4 12/9/2021 16:00 Instalacion y Armado de Anillo 3 1/2/2022 16:00 Soldeo de Juntas Verticales de Anillo 3 1/4/2022 16:00 Armado de Anillo 4 y Anillo 3 1/6/2022 16:00 Soldeo Junta Horizontal de Anillo 3 y Anillo 4 1/8/2022 16:00 Instalacion y Armado de Anillo 2 1/12/2022 16:00 Soldeo de Juntas Verticales de Anillo 2 1/14/2022 16:00 Armado de Anillo 3 y Anillo 2 1/16/2022 16:00 Soldeo Junta Horizontal de Anillo 3 y Anillo 2 1/17/2022 16:00 Instalacion y Armado de Anillo 1 1/21/2022 16:00 Soldeo de Juntas Verticales de Anillo 1 1/23/2022 16:00 Armado de Anillo 2 y Anillo 1 1/25/2022 16:00 Soldeo Junta Horizontal de Anillo 2 y Anillo 1 1/26/2022 16:00 Armado de Casco y Fondo 1/30/2022 16:00 Soldeo Junta Horizontal de Casco y Fondo 2/1/2022 16:00 Instalacion y Armado de Anillo 5 12/2/2021 16:00 Soldeo de Juntas Verticales de Anillo 5 12/4/2021 16:00 Soldeo Junta Horizontal de Anillo 4 y Anillo 5 12/12/2021 16:00 Armado de Planchas de Techo 11/15/2021 16:00 Soldeo de las Planchas de Techo 11/21/2021 16:00 Armado de Radiales con Planchas de Techo 11/26/2021 16:00 Soldeo de Radiales con Planchas de Techo 12/4/2021 16:00 Soldeo Interior del Techo 12/12/2021 16:00 Armado de Andamios interior del tanque 12/17/2021 16:00 Soldeo al interior del Casco 12/19/2021 16:00 Izaje de Estructura de Techo 12/22/2021 16:00 Armado de Casco y Techo 12/23/2021 16:00 Soldeo de Casco y Techo 12/27/2021 16:00 Instalacion de Soldeo de Escalera 2/4/2022 16:00 Soldeo de Boquillas 2/10/2022 16:00 Pruebas NDT 2/9/2022 16:00 Prueba Hidrostatica y control de asentamiento de las bases de Tks 2/12/2022 16:00 Pintura 2/23/2022 16:00 Instalacion y Armado de Anillo de Rigidez 12/16/2021 16:00 Soldeo de Anillo de Rigidez 12/19/2021 16:00 Trazo y Replanteo 11/19/2021 16:00 Instalacion y armado de planchas 11/20/2021 16:00 Armado de Andamios Anillo 1 11/29/2021 16:00 Soldeo de Planchas 12/1/2021 16:00 Instalacion de Postes de Izaje 12/5/2021 16:00 Instalacion y Armado de Anillo 5 12/7/2021 16:00 Soldeo de Juntas Verticales de Anillo 5 12/9/2021 16:00 Instalacion y Armado de Anillo 4 12/12/2021 16:00 Soldeo de Juntas Verticales de Anillo 4 12/14/2021 16:00 Soldeo Junta Horizontal de Anillo 4 y Anillo 5 12/17/2021 16:00 Instalacion y Armado de Anillo de Rigidez 12/21/2021 16:00 Soldeo de Anillo de Rigidez 12/24/2021 16:00 Instalacion y Armado de Anillo 3 1/7/2022 16:00 Soldeo de Juntas Verticales de Anillo 3 1/9/2022 16:00 Armado de Anillo 4 y Anillo 3 1/11/2022 16:00 Soldeo Junta Horizontal de Anillo 3 y Anillo 4 1/13/2022 16:00 Instalacion y Armado de Anillo 2 1/17/2022 16:00 Soldeo de Juntas Verticales de Anillo 2 1/19/2022 16:00 Armado de Anillo 3 y Anillo 2 1/21/2022 16:00 Soldeo Junta Horizontal de Anillo 3 y Anillo 2 1/22/2022 16:00 Instalacion y Armado de Anillo 1 1/26/2022 16:00 Soldeo de Juntas Verticales de Anillo 1 1/28/2022 16:00 Armado de Anillo 2 y Anillo 1 1/30/2022 16:00 Soldeo Junta Horizontal de Anillo 2 y Anillo 1 1/31/2022 16:00 Armado de Casco y Fondo 2/4/2022 16:00 Soldeo Junta Horizontal de Casco y Fondo 2/6/2022 16:00 Armado de Planchas de Techo 11/20/2021 16:00 Soldeo de las Planchas de Techo 11/26/2021 16:00 Armado de Radiales con Planchas de Techo 12/1/2021 16:00 Soldeo de Radiales con Planchas de Techo 12/9/2021 16:00 Soldeo Interior del Techo 12/17/2021 16:00 Armado de Andamios interior del tanque 12/22/2021 16:00 Soldeo al interior del Casco 12/24/2021 16:00 Izaje de Estructura de Techo 12/27/2021 16:00 Armado de Casco y Techo 12/28/2021 16:00 Soldeo de Casco y Techo 1/1/2022 16:00 Instalacion de Soldeo de Escalera 2/9/2022 16:00 Soldeo de Boquillas 2/15/2022 16:00 Pruebas NDT 2/14/2022 16:00 Prueba Hidrostatica y control de asentamiento de las bases de Tks 2/23/2022 16:00 Pintura 3/2/2022 16:00 Montaje de estructura 2/9/2022 16:00 Barandas y grating 2/11/2022 16:00 Pre-ensamble 2/4/2022 16:00 Montaje de duchas lava ojos 8/1/2021 0:00 Montaje de extintores/SCI 8/1/2021 0:00 Montaje de equipos 8/1/2021 0:00 Grout 8/1/2021 0:00 Alineación de equipos 8/1/2021 0:00 Montaje de equipos 8/1/2021 0:00 Grout 8/1/2021 0:00 Alineación de equipos 8/1/2021 0:00 end_date target_drtn_hr_cnt wbs_path wbs_name (*)Finish Original Duration(d) (*)WBS Path (*)WBS Name 11/15/2021 16:00 1 4.2.7.1 FONDO 11/24/2021 16:00 9 4.2.7.1 FONDO 11/26/2021 16:00 2 4.2.7.1 FONDO 11/30/2021 16:00 4 4.2.7.1 FONDO 12/2/2021 16:00 2 4.2.7.2 CASCO 12/9/2021 16:00 2 4.2.7.2 CASCO 12/12/2021 16:00 3 4.2.7.2 CASCO 1/4/2022 16:00 2 4.2.7.2 CASCO 1/6/2022 16:00 2 4.2.7.2 CASCO 1/8/2022 16:00 2 4.2.7.2 CASCO 1/12/2022 16:00 4 4.2.7.2 CASCO 1/14/2022 16:00 2 4.2.7.2 CASCO 1/16/2022 16:00 2 4.2.7.2 CASCO 1/17/2022 16:00 1 4.2.7.2 CASCO 1/21/2022 16:00 4 4.2.7.2 CASCO 1/23/2022 16:00 2 4.2.7.2 CASCO 1/25/2022 16:00 2 4.2.7.2 CASCO 1/26/2022 16:00 1 4.2.7.2 CASCO 1/30/2022 16:00 4 4.2.7.2 CASCO 2/1/2022 16:00 2 4.2.7.2 CASCO 2/4/2022 16:00 3 4.2.7.2 CASCO 12/4/2021 16:00 2 4.2.7.2 CASCO 12/7/2021 16:00 3 4.2.7.2 CASCO 12/16/2021 16:00 4 4.2.7.2 CASCO 11/21/2021 16:00 6 4.2.7.3 TECHO 11/26/2021 16:00 5 4.2.7.3 TECHO 12/4/2021 16:00 8 4.2.7.3 TECHO 12/12/2021 16:00 8 4.2.7.3 TECHO 12/17/2021 16:00 5 4.2.7.3 TECHO 12/19/2021 16:00 2 4.2.7.3 TECHO 12/24/2021 16:00 5 4.2.7.3 TECHO 12/23/2021 16:00 1 4.2.7.3 TECHO 12/27/2021 16:00 4 4.2.7.3 TECHO 1/2/2022 16:00 6 4.2.7.3 TECHO 2/16/2022 16:00 12 4.2.7.4 ESCALERA Y BOQUILLAS 2/17/2022 16:00 7 4.2.7.4 ESCALERA Y BOQUILLAS 2/12/2022 16:00 3 4.2.7.5 PRUEBAS Y CIERRE 2/23/2022 16:00 11 4.2.7.5 PRUEBAS Y CIERRE 3/10/2022 16:00 15 4.2.7.5 PRUEBAS Y CIERRE 12/19/2021 16:00 3 4.2.7.2 CASCO 12/22/2021 16:00 3 4.2.7.2 CASCO 11/20/2021 16:00 1 4.2.6.1 FONDO 11/29/2021 16:00 9 4.2.6.1 FONDO 12/1/2021 16:00 2 4.2.6.1 FONDO 12/5/2021 16:00 4 4.2.6.1 FONDO 12/7/2021 16:00 2 4.2.6.2 CASCO 12/9/2021 16:00 2 4.2.6.2 CASCO 12/12/2021 16:00 3 4.2.6.2 CASCO 12/14/2021 16:00 2 4.2.6.2 CASCO 12/17/2021 16:00 3 4.2.6.2 CASCO 12/21/2021 16:00 4 4.2.6.2 CASCO 12/24/2021 16:00 3 4.2.6.2 CASCO 12/27/2021 16:00 3 4.2.6.2 CASCO 1/9/2022 16:00 2 4.2.6.2 CASCO 1/11/2022 16:00 2 4.2.6.2 CASCO 1/13/2022 16:00 2 4.2.6.2 CASCO 1/17/2022 16:00 4 4.2.6.2 CASCO 1/19/2022 16:00 2 4.2.6.2 CASCO 1/21/2022 16:00 2 4.2.6.2 CASCO 1/22/2022 16:00 1 4.2.6.2 CASCO 1/26/2022 16:00 4 4.2.6.2 CASCO 1/28/2022 16:00 2 4.2.6.2 CASCO 1/30/2022 16:00 2 4.2.6.2 CASCO 1/31/2022 16:00 1 4.2.6.2 CASCO 2/4/2022 16:00 4 4.2.6.2 CASCO 2/6/2022 16:00 2 4.2.6.2 CASCO 2/9/2022 16:00 3 4.2.6.2 CASCO 11/26/2021 16:00 6 4.2.6.3 TECHO 12/1/2021 16:00 5 4.2.6.3 TECHO 12/9/2021 16:00 8 4.2.6.3 TECHO 12/17/2021 16:00 8 4.2.6.3 TECHO 12/22/2021 16:00 5 4.2.6.3 TECHO 12/24/2021 16:00 2 4.2.6.3 TECHO 12/29/2021 16:00 5 4.2.6.3 TECHO 12/28/2021 16:00 1 4.2.6.3 TECHO 1/1/2022 16:00 4 4.2.6.3 TECHO 1/7/2022 16:00 6 4.2.6.3 TECHO 2/21/2022 16:00 12 4.2.6.4 ESCALERA Y BOQUILLAS 2/22/2022 16:00 7 4.2.6.4 ESCALERA Y BOQUILLAS 2/17/2022 16:00 3 4.2.6.5 PRUEBAS Y CIERRE 3/2/2022 16:00 7 4.2.6.5 PRUEBAS Y CIERRE 3/17/2022 16:00 15 4.2.6.5 PRUEBAS Y CIERRE 2/11/2022 16:00 2 4.2.1 MONTAJE DE PLATAFORMA DE INTERCONEXIÓN 2/18/2022 16:00 7 4.2.1 MONTAJE DE PLATAFORMA DE INTERCONEXIÓN 2/9/2022 16:00 5 4.2.1 MONTAJE DE PLATAFORMA DE INTERCONEXIÓN 8/6/2021 13:00 5.6 4.2.3 MONTAJE DE EQUIPOS MISCELANEOS 8/6/2021 13:00 5.6 4.2.3 MONTAJE DE EQUIPOS MISCELANEOS 8/6/2021 13:00 5.6 4.2.2.1 BOMBA DE ÁCIDO SULFURICO (CENTRIFUGA HORIZ 8/6/2021 13:00 5.6 4.2.2.1 BOMBA DE ÁCIDO SULFURICO (CENTRIFUGA HORIZ 8/6/2021 13:00 5.6 4.2.2.1 BOMBA DE ÁCIDO SULFURICO (CENTRIFUGA HORIZ 8/6/2021 13:00 5.6 4.2.2.2 BOMBA SUMIDERO ÁCIDO SULFURICO (CENTRIFUG 8/6/2021 13:00 5.6 4.2.2.2 BOMBA SUMIDERO ÁCIDO SULFURICO (CENTRIFUG 8/6/2021 13:00 5.6 4.2.2.2 BOMBA SUMIDERO ÁCIDO SULFURICO (CENTRIFUG delete_record_flag Delete This Row PLATAFORMA DE INTERCONEXIÓN PLATAFORMA DE INTERCONEXIÓN PLATAFORMA DE INTERCONEXIÓN EQUIPOS MISCELANEOS EQUIPOS MISCELANEOS CIDO SULFURICO (CENTRIFUGA HORIZONTAL DE 55 M3/H) CIDO SULFURICO (CENTRIFUGA HORIZONTAL DE 55 M3/H) CIDO SULFURICO (CENTRIFUGA HORIZONTAL DE 55 M3/H) IDERO ÁCIDO SULFURICO (CENTRIFUGA VERTICAL 15 M3/H) IDERO ÁCIDO SULFURICO (CENTRIFUGA VERTICAL 15 M3/H) IDERO ÁCIDO SULFURICO (CENTRIFUGA VERTICAL 15 M3/H) task_id TASK__statusrsrc_id role_id acct_id rsrc_type Activity ID (*)Activity St Resource ID Role ID Cost Account ID (*)Resource Type A3230 Not Started HH_MECAN Labor A3240 Not Started HH_MECAN Labor A3250 Not Started HH_MECAN Labor A3620 Not Started HH_MECAN Labor A3630 Not Started HH_MECAN Labor A3640 Not Started HH_MECAN Labor A3650 Not Started HH_MECAN Labor A3660 Not Started HH_MECAN Labor A3670 Not Started HH_MECAN Labor A3680 Not Started HH_MECAN Labor A3690 Not Started HH_MECAN Labor OEM1400 Not Started HH_MECAN Labor OEM1410 Not Started HH_MECAN Labor OEM1420 Not Started HH_MECAN Labor OEM1430 Not Started HH_MECAN Labor OEM1440 Not Started HH_MECAN Labor OEM1450 Not Started HH_MECAN Labor OEM1460 Not Started HH_MECAN Labor OEM1470 Not Started HH_MECAN Labor OEM1480 Not Started HH_MECAN Labor OEM1490 Not Started HH_MECAN Labor OEM1500 Not Started HH_MECAN Labor OEM1510 Not Started HH_MECAN Labor OEM1520 Not Started HH_MECAN Labor OEM1530 Not Started HH_MECAN Labor OEM1540 Not Started HH_MECAN Labor OEM1550 Not Started HH_MECAN Labor OEM1560 Not Started HH_MECAN Labor OEM1570 Not Started HH_MECAN Labor OEM1580 Not Started HH_MECAN Labor OEM1590 Not Started HH_MECAN Labor OEM1600 Not Started HH_MECAN Labor OEM1610 Not Started HH_MECAN Labor OEM1620 Not Started HH_MECAN Labor OEM1630 Not Started HH_MECAN Labor OEM1640 Not Started HH_MECAN Labor OEM1650 Not Started HH_MECAN Labor OEM1660 Not Started HH_MECAN Labor OEM1670 Not Started HH_MECAN Labor OEM1680 Not Started HH_MECAN Labor OEM1690 Not Started HH_MECAN Labor OEM1700 Not Started HH_MECAN Labor OEM1710 Not Started HH_MECAN Labor OEM1720 Not Started HH_MECAN Labor OEM1730 Not Started HH_MECAN Labor OEM1740 Not Started HH_MECAN Labor OEM1750 Not Started HH_MECAN Labor OEM1760 Not Started HH_MECAN Labor OEM1770 Not Started HH_MECAN Labor OEM1780 Not Started HH_MECAN Labor OEM1790 Not Started HH_MECAN Labor OEM1800 Not Started HH_MECAN Labor OEM1810 Not Started HH_MECAN Labor OEM1820 Not Started HH_MECAN Labor OEM1830 Not Started HH_MECAN Labor OEM1840 Not Started HH_MECAN Labor OEM1850 Not Started HH_MECAN Labor OEM1860 Not Started HH_MECAN Labor OEM1870 Not Started HH_MECAN Labor OEM1880 Not Started HH_MECAN Labor OEM1890 Not Started HH_MECAN Labor OEM1900 Not Started HH_MECAN Labor OEM1910 Not Started HH_MECAN Labor OEM1920 Not Started HH_MECAN Labor OEM1930 Not Started HH_MECAN Labor OEM1940 Not Started HH_MECAN Labor OEM1950 Not Started HH_MECAN Labor OEM1960 Not Started HH_MECAN Labor OEM1970 Not Started HH_MECAN Labor OEM1980 Not Started HH_MECAN Labor OEM1990 Not Started HH_MECAN Labor OEM2000 Not Started HH_MECAN Labor OEM2010 Not Started HH_MECAN Labor OEM2020 Not Started HH_MECAN Labor OEM2030 Not Started HH_MECAN Labor OEM2040 Not Started HH_MECAN Labor OEM2050 Not Started HH_MECAN Labor OEM2060 Not Started HH_MECAN Labor OEM2070 Not Started HH_MECAN Labor OEM2080 Not Started HH_MECAN Labor OEM2090 Not Started HH_MECAN Labor OEM2100 Not Started HH_MECAN Labor OEM2110 Not Started HH_MECAN Labor OEM2120 Not Started HH_MECAN Labor OEM2130 Not Started HH_MECAN Labor OEM2140 Not Started HH_MECAN Labor OEM2150 Not Started HH_MECAN Labor OEM2160 Not Started HH_MECAN Labor OEM2170 Not Started HH_MECAN Labor OEM2180 Not Started HH_MECAN Labor OEM2190 Not Started HH_MECAN Labor OEM2200 Not Started HH_MECAN Labor OEM2210 Not Started HH_MECAN Labor target_qty delete_record_flag Budgeted Units Delete This Row 1403.8 312 1403.8 274.9 52.8 134.5 44.9 44.9 80.7 26.9 26.9 0 561.5 561.5 1684.5 160.5 160.5 306.3 160.5 306.3 280.8 306.3 160.5 306.3 280.8 306.3 160.5 306.3 280.8 306.3 280.8 306.3 160.5 306.3 306.3 175.5 421.2 175.5 421.2 421.2 175.5 421.2 701.9 175.5 421.2 491.4 912.5 210.6 210.6 280.8 160.5 306.3 0 561.5 561.5 1684.5 160.5 160.5 306.3 160.5 306.3 280.8 306.3 160.5 306.3 280.8 306.3 160.5 306.3 280.8 306.3 280.8 306.3 160.5 306.3 306.3 160.5 306.3 175.5 421.2 175.5 421.2 421.2 175.5 421.2 701.9 175.5 421.2 491.4 912.5 210.6 210.6 280.8 user_data UserSettings Do Not Edit DateFormat=d/MM/yyyy CurrencyFormat=US Dollar