You are on page 1of 79

Teradyne FLEX

BASIC OPE
OPERA
RATIO
TIONN
TRAINING OBJECTIVES
• At the end of the course the attendees should be able to
perform basic operation of the equipment.

 In order to do this, attendees should:


• Understand the system capabilities.
• Identify major section of the test system,
system, and describe the
t he
function of each major section.
• Perform proper power up and shutdown procedure of the system.
• Operate the Tester User Interface.
• Understand
Understand safety precaution when operating the equipment.
TRAINING OUTLINE
• System Description
• Installing
Installing the DIB
• Proper Power Up and Power Down Procedure
• User Interface Operating Guidelines
• System Diagnostics
• Safety Precautions
• System Description
• Installing the DIB
• Proper Power Up and Power Down Procedure

LESSON 1
FLEX TEST SYSTEM

INTEGRA FLEX MICRO FLEX

ULTRA FLEX