NOMOR TYPE TOWER Keterangan S/D Maret APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER

NO
TOWER REVISI 2 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 KETERANGAN

Finish On Site langsir Finish


1 T.01 DRD +12 TIPE I ERECTION belum ada tower
Pondasi Tower erection Erection
Finish langsir Finish
2 T.02 CC +12 TIPE II 8-32 ERECTION
Pondasi erection Erection
Finish
3 T.03 DD +9 TIPE I
Pondasi+erection
Finish Finish On Site langsir Finish
4 T.04 CC +12 TIPE II 6-32 belum ada tower
Borepile Pondasi Tower erection Erection
On Site Lahan Finish Finish langsir Finish
5 T.05 CC +15 blm di sondir ERECTION Belum Bebas belum ada stub
Stub Bebas Borepile Pondasi erection Erection
Lahan Finish Finish langsir Finish
6 T.06 BB +12 blm di sondir ERECTION Belum Bebas
Bebas Borepile Pondasi erection Erection
Finish langsir Finish
7 T.07 DD +15 TIPE II 7-48 ERECTION DPT
Pondasi erection Erection
Finish
8 T.08 BB +15 TIPE II 5-16
Pondasi+erection
Finish
9 T.09 CC +15 TIPE I 5-5

IDUL FITRI
Pondasi+erection
Desain On Site On Site Finish Finish langsir Finish
10 T.10 DD +33 ERECTION Desain tower spesial stub dan tower by wki
Pondasi Stub Tower Borepile Pondasi erection Erection
Desain On Site On Site Finish Finish langsir Finish
11 T.11 DD +27 ERECTION Desain tower spesial stub dan tower by wki
Pondasi Stub Tower Borepile Pondasi erection Erection
Finish Finish Finish
12 T.12 BB +12 TIPE I 5-20 Bebas
Borepile Pondasi Erection
Finish Finish langsir Finish
13 T.13 BB +15 TIPE I 7-20 ERECTION Belum Bebas belum ada tower
Borepile Pondasi erection Erection
Finish
14 T.14 DD +12 TIPE II 5-36
Pondasi+erection
Finish
15 T.15 AA +12 TIPE I 9-16
Pondasi+erection
Finish
16 T.16 BB +12 TIPE I 6-20
Pondasi+erection
Finish
17 T.17 DD +12 TIPE I
Pondasi+erection
Finish Finish On Site langsir Finish
18 T.18 EE +12 TIPE II 9-48 ERECTION DPT KEKURANGAN BESI DAN MATERIAL UNTUK BETON DISESUAIKAN DENGAN KONDISI CUACA
Borepile Pondasi Tower erection Erection
Desain On Site On Site Finish Finish langsir Finish
19 T.19 CC +24 ERECTION Desain tower spesial stub dan tower by wki
Pondasi Stub Tower Borepile Pondasi erection Erection
Finish
20 T.20 BB +12 TIPE I
Pondasi+erection
Finish
21 T.21 BB +15 TIPE II 6-20
Pondasi+erection
Desain Finish Finish langsir Finish
22 T.22 CC +24 ERECTION Desain tower spesial
Pondasi Borepile Pondasi erection Erection
On Site On Site
stub dan tower by wki
Stub Tower
Finish langsir Finish
23 T.23 CC +15 TIPE II 14-32 ERECTION
Pondasi erection Erection
Finish
24 T.24 BB +15 TIPE II 10-20
Pondasi+erection
Finish
25 T.25 CC +12 TIPE II 6-32
Pondasi+erection
Finish
26 T.26 BB +12 TIPE II 10-20 STRINGING
Pondasi+erection
Finish
27 T.27 EE +6 TIPE II 13-48
IDUL FITRI

Pondasi+erection
Desain Finish Finish langsir Finish
28 T.28A BB +18 ERECTION Desain tower spesial stub dan tower by wki
Pondasi Borepile Pondasi erection Erection
On Site On Site
Stub Tower
Finish
29 T.29A AA +15 TIPE I 5-16
Pondasi+erection
Finish
30 T.30A AA +12 TIPE I 5-16
Pondasi+erection
Finish
31 T.31A BB +9 TIPE I
Pondasi+erection
desain Finish Finish langsir Finish
32 T.32A BB +15 sondir ulang ERECTION belum sondir sondir persiapan
pondasi Borepile Pondasi erection Erection
desain Lahan Finish Finish langsir Finish
33 T.33A BB +15 TIPE II 18-16 ERECTION belum bebas sondir
pondasi Bebas Borepile Pondasi erection Erection
Finish langsir Finish
34 T.34A BB +15 TIPE I ERECTION belum bebas persiapan
Pondasi erection Erection
Finish langsir Finish
35 T.35A BB +9 TIPE II 9-16 ERECTION
Pondasi erection Erection
Finish langsir Finish
36 T.39 BB +9 TIPE II 8-20 ERECTION
Pondasi erection Erection
Finish
37 T.40 BB +9 TIPE II 7-16
Pondasi+erection
Finish langsir Finish
38 T.41 AA +12 TIPE I 7-16 ERECTION Finish Borepile BESI DAN STUB SUDAH DI LANGSIR KE LOKASI TANGGAL 03 MARET 2020
Pondasi erection Erection
Finish langsir Finish
39 T.42 BB +12 TIPE I ERECTION Finish Borepile BESI DAN STUB SUDAH DI LANGSIR KE LOKASI TANGGAL 03 MARET 2020
Pondasi erection Erection
Finish
40 T.43 BB +9 TIPE I
Pondasi+erection
Finish
41 T.44 AA +12 TIPE I
Pondasi+erection
Finish langsir Finish
42 T.45 CC +9 TIPE I ERECTION bebas STRINGING
Pondasi erection Erection
Lahan Finish Finish langsir Finish
43 T.45A CC +9 TIPE II 6-32 ERECTION belum bebas belum ada tower
Bebas Borepile Pondasi erection Erection
IDUL FITRI

On Site
Tower
Finish langsir Finish
44 T.46 CC +12 TIPE II 5-48 ERECTION
Pondasi erection Erection
On Site Finish langsir Finish
45 T.47 EE +6 TIPE II 9-48 ERECTION Finish Borepile
Stub Pondasi erection Erection
Finish
46 T.48 BB +12 TIPE II 7-20
Pondasi+erection
Finish langsir Finish
47 T.49 AA +15 TIPE I 7-16 ERECTION Finish Borepile
Pondasi erection Erection
Finish
48 T.50 BB +12 TIPE I
Pondasi+erection
Finish
49 T.51 BB +9 TIPE I
Pondasi+erection
NEGO
DPT Finish Finish langsir Finish
50 T.52 DD +9 TIPE II 6-48 bebas HARGA
FINISH FINISH Borepile Pondasi erection Erection
Finish Finish langsir Finish
51 T.54 DRD +3 TIPE II 7-48 ERECTION bebas
Borepile Pondasi erection Erection
GI PLTU KALTIM