FITUP INSPECTION LOGSHEET FOR PIPING

PROJECT TITLE REPORT NO.

CLIENT DATE

JOB NO. DRAWING NO.

EQUIPMENT NO. SHEET NO.

Total Joints Included:

Line Class - Material - Size:

WPS No:

RT %:

MT %:

Joint Spool Material Material Sche Weld Weld FitUp OK Welder Welder Weld Visual
Dwg. Sheet No.Rev. Heat (1) Heat (2) Size MRIR NO:
No. No. (1) (2) dule F/S Type Date Root Cap Date

dwg - Drawing
Rev. - Revision

COMPLETED BY RESA QC CLIENT COMPANY

SIGNATURE

NAME

Rev.00
DATE

Rev.00