‘Bocument Number
a Construction Afrika (Pty) Ltd.
| Revision Number? Dale aj
Poiiat anv one Quality Management Systems | SOS
| Page Number ~
eee TECHNICAL QUERY
Client [DRA Gontract No | C8396-233 1
Project [Asanko Gold Mine Project | T.@. Number | 017
Discipline | STRUCTURAL-Tailings ‘Attention Monammed Akoojes
Disposal Structure |
[Date Raised [41 02-2015 | Date Closed |
Details of Query :
4.0 Gleat plate(PA610) attached to beam 101-UE305X102X29) for side bracing on
elevation ‘y', TOS +5.025 notin correct position. Please refer to the attached markups and
pleture1 for your information and advice.
2.0 Cleat (PA5Q0) attached to column (ITEM 53-UB203K133X25) Is positioned on the wrong
side. Please see attached markup and picture 2.0 for information and advice,
Please refer to drawing #56201 SHT 3.ev.1 and Job #ED-14-29, erection drawing # P@10
Rey.0, 102 Rev.0, 01 Rev.0, 02Rev.0 63Rev.0.
Raised by
Name Postion E
Signature S Date
(NB Please state the drawing number and relevant specifications)
Reponse
[Response by |
Name Position | io
Signature Date |
Comments
Cost oF time implication)Se ee ere ee
ovs-sup.ronaes | Redis Construction Aftika (Pty) Ltd. |
aaimtaisoea pees an 8
Sinai | Quality Management Systems ~~ |
Page Number.
Poge Zoi 2 TECHNICAL QUERY |
ee sca ce
0 Gloat should be on other side of Column TroughCo(ueedt Vaiss
of Cleat
paTacebes 1° her
em oN VHS
Vesy {lod Gur St
Yori Qe on TH
oThAL Gad
Lol08 He
Wo v9 0
Pome
ARE 610 Gio ew
| Pozoeie (x) =
wy
=
Uuem =F? Ve
de -Pornitened
[shi womAl SIRVEIO RES,
ExecuDraw
PRCPET ASO COLD WHE
hime “waye SUPT RC
= PART OETAa4 magn cso,
Saal Be
ov eae
oer ae
1 sin Jeti
4] Bor | Pciszas
iL Ste LPC 25nd
ee aes ;
ExecuDraw Ro hee a
r sper?
eam on ANSE FO ar eee —_—_—— a
f rastiacnt = wkuaier TILE: THLNS OS70GA SRL
EL ie 2 eal a
Ass DETAL
SSE Eee
un