Dosuent Number = 5 F
TESS Redis Construction Afrika (Pty) Ltd.
Revision Number / Date ji Di
oVRTen ae Quality Management Systems 9 (A —=O'S
age Number
Seem TECHNICAL QUERY o
Client DRA [Contract No_| Ca306-235
Project ‘Asanko Gold Mine Project | T.@. Number | 018
Discipline STRUCTURAL CiL Screen [Attention | Mohammed Acco
Support Structure |
Date 42-02-2015 [Date Closed
Details of Query :
1.0 Gusset Plate (P1239x10-512) on beam ( item 61-UB203X133X26) has been oreinted
wrongly during fabrication. Please find attached, picture and markups on drawing for your
information and advice.
Please refer to drawings # Job # ED-14-28, Frabrication drawing # P61 Rev.A, P612 Rev.0,
01 Rev.A, $6201 SHT? Rev 0, $6201 SHT10 Rev 1
Raised by
Name SAMUEL YEKO | Position ac
Signature 2 ~J | pate fa h
(NB: Please state the drawing number and relevant specifications) | |
Reponse
Response by
Name nana Position T |
Signature Date
‘Comments
(NB: Cost or time implication)Document Number
‘QMS-SMP-FOR-036
Redis Construction Afrika (Pty) Ltd.
Revision Number / Date
04/11 JULY 2014
Quality Management Systems
rReois
If
eee
Page 20f 2
TECHNICAL QUERY
Picture 1.0 Gusset Plate wrongly fabricated.eta e Soe OTS
sc ose @)Cone om YrIWG
Qh Layrromited ysiosdly
Guityt Juie Te be nsbiies
2 SAA»
paaeees
FILE ChL SREEN SORT STRUCT
soVOCTML OF BEAL aa 6
esgl | 32 200 Sef ae
sso | 25 | 136
Ton, i
IBN 312 en ew (S10
BAST, Gergen 60
er ne poe ie —— RE eum wan STOETRES ==
Te Pe warcare —| ExecunDraw (arr ssawo coo une = Eanes:
Ee = hme: cu. screen suppor SmRCTRE ETS Babeare
A ia 4 SME Pet DEAL ee Fe