You are on page 1of 3

Document Number

QMS-SMP-FOR-036
Redis Construction Afrika (Pty) Ltd.
Revision Number / Date
04 / 11 JULY 2014 Quality Management Systems
Page Number
Page 1 of 2
TECHNICAL QUERY

Client DRA Contract No C8396-233


Project Asanko Gold Mine Project T.Q. Number 022
Discipline STRUCTU RAL- CIL Screen Attention Mohammed Akoojee
Support Structure
Date Raised 19-02-2015 Date Closed

Details of Query :
Holes on bottom side of beam (UB305x102x33-62) not drilled during fabrication
Please see attached markup and advice.

Please refer to drawings. Job No. ED14-28 DRG.No. 1 Revision 0.


Raised by
Name SAMUEL YEKO Position QC
Signature Date
(NB : Please state the drawing number and relevant specifications)

Reponse

Response by
Name Position
Signature Date
Comments

(NB : Cost or time implication)

 Copyright Redis Construction Afrika (Pty) Ltd. All Rights Reserved - This documentation is considered the intellectual property of Redis Construction Afrika (Pty) Ltd. Unauthorised
reproduction or distribution of this documentation or any portion of it may result in severe civil and criminal penalties, and violators will be prosecuted.
22 Dia. Holes Not
Drilled During
Fabrication

You might also like