You are on page 1of 13

4 WEEKLY S

WO Description Work Type

202110460 COMMISIONING TEST MAJOR INSPECTION PLTA WONOGIRI UNIT 2 OH

202110460 COMMISIONING TEST MAJOR INSPECTION PLTA WONOGIRI UNIT 2 OH

202110460 COMMISIONING TEST MAJOR INSPECTION PLTA WONOGIRI UNIT 2 OH

202110460 COMMISIONING TEST MAJOR INSPECTION PLTA WONOGIRI UNIT 2 OH

202110460 COMMISIONING TEST MAJOR INSPECTION PLTA WONOGIRI UNIT 2 OH
WEEKLY SCHEDULE PLTA WONOGIRI

Scheduled Start Scheduled Finish Seksi Priority Status Duration

SENIN, 18 Januari 2021


1/13/21 1:37 PM 1/22/21 5:00 PM SPS.PLTA WNG 3 WAPPR 0:00

SELASA, 19 Januari 2021


1/13/21 1:37 PM 1/22/21 5:00 PM SPS.PLTA WNG 3 WAPPR 0:00

RABU, 20 Januari 2021


1/13/21 1:37 PM 1/22/21 5:00 PM SPS.PLTA WNG 3 WAPPR 0:00

KAMIS, 21 Januari 2021


1/13/21 1:37 PM 1/22/21 5:00 PM SPS.PLTA WNG 3 WAPPR 0:00

JUMAT, 22 Januari 2021


1/13/21 1:37 PM 1/22/21 5:00 PM SPS.PLTA WNG 3 WAPPR 0:00

Total Work Hour


Total Available Man Hour
SPS WONOGIRI ANANG ROSIHAN
K3L PUNGKI DYANTORO
TEKNISI ARIS WIDIHADMAKA
HELPER ERIK KURNIAWAN
JASA
Utilisasi Man Hour
W
Craft SN SL
Man Hour
SPV SRIC/ELC SRMECH JRMECH HELPER 18-Jan-21 19-Jan-21

1 1 0:00 0:00

1 1 0:00 0:00

1 1 0:00

1 1 0:00

otal Work Hour 0:00:00 0:00:00


Available Man Hour 12:00:00 12:00:00
0:00 0:00
0:00 0:00
6:00 6:00
6:00 6:00
JASA 0:00 0:00
lisasi Man Hour 0.00% 0.00%

0.00%
W-3
RB KM JM SB MG
20-Jan-21 21-Jan-21 22-Jan-21 23-Jan-21 24-Jan-21

0:00

0:00

0:00

0:00:00 0:00:00 0:00:00


18:00:00 18:00:00 12:00:00
0:00 0:00 0:00
6:00 6:00 4:00
6:00 6:00 4:00
6:00 6:00 4:00
0:00 0:00 0:00
0.00% 0.00% 0.00%

0.00%
No SEKSI PM COMPLIANCE SCHEDULE COMPLIANCE FINDING DIAGNOSA

1 SPS. PLTA WNG 100.00% 100.00%

INDICATOR PERFORMANCE MAINTENANCE

28.66%

100.00%

100.00%

SPS. PLTA WNG

UT SCHEDULE COMPLIANCE PM COMPLIANCE


KESIMPULAN REKOMENDASI UT CREW AVAILABILITY

28.66% 128

PLIANCE
ACTUAL LABOR KESIMPULAN REKOMENDASI

36.69 Selesai Kegiatan Major Inspection


REKAP FEEDBACK PLTA K

Periode No WO Deskripsi UNIT


REKAP FEEDBACK PLTA KETENGER

Feedback
Follow Up

You might also like