MAHANAGAR GAS LIMITED GGAL.Govt.of Maharashtra & BGAPH Enterprise MAHANAGAR GAS Ref No. MGL/GA-03/VM/38/2021-22 Date: 09" June 2021, The Director Ministry of Environment and Forest, Climate Change Regional Office (WCZ), Ground Floor East Wing, New Secretariat Building Civil Lines, Nagpur-440001. ‘Subject: Submission of information / Documents as required vide below referenced letter. Ref: F. No EC-919/RON 2018-NGP/4347 Dated. 24.09.2018 Respected Sir, This is with reference to the above subject, we hereby submit the half yearly Compliance Status report 1. Present status (Physical/Civil) of work Progress ~ Belapur creek crossing completed Copies of consent to Establish / Operate from MPCB- Consent to Establish received on 22.11.2019 (copy enclosed). 3. The information in the enclosed Data Sheet: - Datasheet with required information is enclosed. Thanking you, For M/s. Mahanagar Gas Limited a ‘Vinayak Mhamane Chief Manager - Projects Encl: Information enclosed in data sheet Regd. Office: MGL House, Block G-33, Bandra - Kurla Complex, Bandra (East), Mumbai -400 051 +91 22 6678 5000 | F +91 22 2654 0092 | Einfo@mahanagargas.com | W www.mahanagargas.com | CIN L40200MH1995PLCO88133, ‘An S0 9001, 14001 & OHSAS 16001 Certified Company Monitoring the implementation of Environmental safeguards Ministry of Environment, Forest and climate Change Regional Office (West Central Zone), Nagpur ‘Monitoring Report Parts DATA SHEET Date: 09.06.2023 1. _| Project Type: River-valley / Mining / Industry / | Infrastructure (Laying of pipelines for transportation and | Thermal / Nuclear /Other (Specify) distribution of Natural Gas from Uran to Navi Mumbai) 2. | Name of the project Proposed Project for Laying of pipelines for transportation and distribution of Natural Gas from Uran to Navi Mumbai 3.__| Clearance letter (5)/OM No. and date F.No. 11-11/2018-1A.1I Dated 16.08.2018 ee 4._| Location a) District (s) a) Raigad b) State (s) b) Maharashtra ©) Latitude ©) 8°59'13.70'N 4) Longitude d) 73°2'13.09"E. | 5. | Address for correspondence Mr. Vinayak Mhamane Chief Manager - Projects MAHANAGAR GAS LTD Plot No. X-5/1, MIDC Mahape, TTC Industrial Area, Post Koper Khairane, Navi Mumbal - 400709 & | Salient features a) The total length of Pipeline will be approx. 22.5 kms a) Of the project | Aportion of pipeline of about 1.9 kms will pass through CRZ area, out of which about 1.5 Kms will pass through CRZ-II near Ulwe Gaothan and 0.4 m in CRZ-I through Panvel Creek, Belapur, Navi Mumbai The pipeline will not pass through any mangrove areas. b)_ The pipeline diameter will be 8” NB, with a thickness of 7.1mm, No effluent generation from the project Regular Environment Monitoring Emergency preparedness plan in place Regular Maintenance of Machinery Disposal of excess excavated earth material to authorized site b) Of the Environmental management plans 7. | Breakup of the project area a) Submergence Area: Forest & Non-Forest | NIL b) Others a. Total Plot Area NA 'b. Built-Up Area (Including Road) NA ._Open Space available NA d. Green belt area NA 8. | Breakup of the project affected population NIL, No population is getting affected. With enumeration of those loosing houses / dwelling units only agricultural land only both dwelling units & agricultural land & landless laborers/artisans : a) SC, ST/Adivasi b) Others 9. | Financial Details: ‘@ Project cost as originally planned and | 294 Lacs | Subsequent revised estimates and the year of | price reference ae b. Allocation made for environmental management plan with item wise and year wise break up EMP will be addressed in the contract c. Benefit cost ratio / Internal rate of Return and the Year of assessment Nil for the current year since the Natural Gas pipeline Network yet to be established. ‘d. Whether (c) includes the cost of environmental Management as shown above. Nil for the current year since the Natural Gas pipeline yet to be established . Actual expenditure incurred on the project so far 294 Lacs as on date. f Actual expenditure incurred on the environmental Management plans so far Expenditure incurred on environmental management plan includes in total project cost as mentioned in (e) 10. | Forest land requirement Not Applicable a. The status of approval for diversion of Forestland for non-forestry use The status of clearing felling The status of compensatory Afforestation Programme in the light of actual field experience 11. | The status of clear felling in non-forest areas (Such | Not Applicable as submergence area or reservoir, approach Roads), if any with quantitative information 12. | Status of construction a) Nov-2020. a. Date of commencement (Actual & / or planned) b) Jan 2021 b. Date of completion (Actual & /or planned) 13. | Reason for delay if the project is yet to start NA. 14, | Dates of site visits a. The dates on which Project was monitored by | NIL Regional Office on previous occasions, if any b. Date of site visit for this monitoring Report __| NA 15. | Details of correspondence with project authorities | NIL for obtaining action plan/information on status of compliance to safeguards other than the routing letters for logistic support for site visit. (The monitoring report may obtain the details of all the letters issued so far but the later reports may cover only the letters issued subsequently) (Signature of the Project in charge) pea Vinayak Mhamane Chief Manager - Projects ree ‘mA sD : aTMgR6IN M77 SF RBIR $0 <6100> ror i Dante Woe 2/M6/0C1 1 P TeaTHE RECTOR ,ADOSTRY OF GWT Poon, Nayar 0 - Fron:PAW PATHAK AOPER IRAE : eRe fats (CashiTasb. 7 ack 2 waindianst.aneit>

You might also like