You are on page 1of 5
MAHANAGAR GAS LIMITED MAHANAGAR GAS Ref No. MGL/Env/Dom-Mahape/June 2021 Date: 24" June 2021 ‘The Director Ministry of Environment and Forest, Climate Change Regional Office (WCZ), Ground Floor East Wing, New Secretariat Building Civil Lines, Nagpur-440001 Subject: Submission of Half yearly Compliance report on CRZ Clearance received for setting up Natural Gas transmission pipeline (Mahape ~Dombivali Looping) near MGL's City gate station in Mahape to Manpada junction in Dombivali MIDC along Kalyan — Shilphata road crossing Ulhas River from North Side of the Bridge of Katai Naka. Ref: 1.CRZ Permission F.No.11-26/2015-IA.I| Dated 24" Nov 2015 Respected Sir, ‘This is with reference to the above subject, we hereby submit the present half yearly Compliance Status report 1. Present status (Physical/Civil) of work Progress - Currently no work has been started. Permission for laying approach line and NOCs from other statutory related to creek crossing are awaited. Next compliance report will be send after receiving of permission & starting of the job. 2. Point wise compliance status to various stipulations with supporting documents and reports: - Will be submitted once the construction will be started. 3. Copies of ~ -EIA / EMP / Form: EIA report was already submitted with CRZ application. “Consent to Establish/Operate from MPCB: Consent to Establish has been obtained from MPC8 is already submitted on 30" June 2016 letter No. MGL/Env/Dom-Mahape/June 16 4. The information in the enclosed Data Sheet:- Details provided in the Data Sheet is enclosed (Annexure I). Thanking you, For M/s. Mahanagar Gas Limited Encl: Annexure |-information enclosed in data sheet Branch Office: City Gate Station, Opp. Anik BEST Depot, Sion, Mumbai- 400022. |T-+91 22 2404 5785/2403 1720/21 F491 22 2401 0080 | Einfo@mahanagargas.com | W wwwmahanagargas.com Regd. Office: MGL House, Block G-33, Bandra - Kurla Complex, Bandra (East), Mumbai -400 051, ‘CIN No. U40200MH1995PLCO881 33 | An 1509001, 14001 BOHSAS 18001 Certified Company Monitoring the Implementation of Environmental safeguards Ministry of Environment, Forest and Climate Change Regional Office (WC7Z), Nagpur "MONITORING REPORT Part-I DATASHEET —_Date 10/06/2021 Infrastructure (Proposed Natural Gas Project 7 pieciDes Transmission Pipeline Passing through Ulhas River Creek) ‘Name df ieproiect Proposed Natural Gas transmission pipeline Clearance letter (s)/OM No. and date Location a). District b) state ¢) Location Latitude / Longitude ‘Address for correspondence . Salient features a) Of the project b) Of the Environmental management plans . Breakup of the project area forest & non- b) thers, Ss & a) Submergence area : Forest (Mahape -Dombivali Looping) near MGU’s gate station in Mahape to Manpada junction in Dombivali MIDC along Kalyan ~ Shilphata road crossing Ulhas River from North Side of the Bridge of Katai Naka F.No.11-26/2015-IA.lII Dated 24" Nov 2015 Thane Maharashtra latitude 19°09'45.07" N and longitude 73°04 20.'50"E GM - HSE Mahanagar Gas Limited, Plot No. x -5/1, MIDC Mahape, TTC Industrial Area, Post- Kopar Khairane, Navi Mumbai - 400 709. Ph. No-02261725400 Proposed 12” Diameter Natural Gas transmission pipeline (Mahape —Dombivali Looping) near MGU's City gate station in Mahape to Manpada junction in Dombivali MIDC along Kalyan ~ Shilphata road crossing Ulhas River from North Side of the Bridge of Katai Naka which also covers a narrow portion of 500 metres in CRZ area of river Ulhas. The length of pipeline will be 230 metres. The pipeline will be used of grade API- SL Gr.B of Diameter 12 NB", 9.5 mm thickness and 4’ NB 6.4 mm thick steel pipeline crossing river lay together by HDD Method. The pipeline shall be faid at a depth more than 2.5m from the water bed. 1. No effluent generation from the project 2. Environment management Cell in place 3. Emergency preparedness plan in place 4, Regular Maintenance of Machinery NIL Page 1 of 3 ANNEXURE: I 8. Breakup of the project affected population With enumeration of those loosing houses / dwelling units onty agricultural land only both dwelling units & agricultural land & landless laborers/artisans a) SC, ST/Adivasi b) Others NIL, No population is getting affected 9. Financial Details: Project cost as originally planned and ‘Abprox:3.00 (Crores Subsequent revised estimates and the year of price reference a) Allocation made for environmental EMP will be addressed in the contract management plan with item wise and year wise break up b) Benefit cost ratio / Internal rate of Nil for the current year since the Natural Gas Return and the Year of assessment pipeline yet to establish, ¢) Whether it includes the cost of Nil for the current year since the Natural Gas environmental Management as shown pipeline yet to establish. above. d) Actual expenditure incurred on the Nil, since the Project is yet to start project so far e) Actual expenditure incurred on the environmental Management plans so Nil since the Project is yet to start, far 10,Forest land requirement : Not Applicable 11.The status of clear felling in non-forest areas (Such as submergence area or Not Applicable reservoir, approach Roads), if any with quantitative information required 12,Status of construction a) Date of commencement (Actual & / or : Not yet Started/Calendar Year 2022 planned) b) Date of completion (Actual & /or : Not yet Started/Calendar Year 2022 planned) a 2 Page 2 of 3 13.Reason for delay if the project is yet to : The follow up was on for Permissions / NOCS start for laying approach line from other statutory authorities like MSROC, MMB & private parties etc related to creek crossing. However BPCL initiated work across creek in same alignment of MGL's proposed pipeline. in view of this it is thought prudent to re-examine MGU's proposed alignment & exploring the possibility of laying gas pipeline at opposite side of creek. The proposal will be submitted to CRZ accordingly for revised alignment. GIPN MURTHY, AVP Projects (Signature of the Project in charge) Page 3 0f 3 Seer ster: - RReSTIMGATEDN TRGB277e574 . AL mveOHR 5.0 Counter fo:3,25/06/0021,11:57 Vint \ TorTE DRECTIR. CHR PIMGMOODL, Hagar B20 ‘Traci on em indizgost.gov.ind

You might also like