7.1 The width of a D6 blade is 11 ft. Its effective height is 4 ft 10 in, Considering SAE J1265, calculate the capacity of the blade in Icy. Whe ahr 7 P90} ea} ¥0 0 0 « ar 0 sal «0 sx Fo 20 v0 a z 7 oe vse sos) em se ee eng dg de FIGURE 7.19 Docrg pros esintrg canes sigh ade Cater 8, 14, 07,64, 2, nd es equiped sth Bas. Ravine re of Cer. ‘The machine cats for SO, then dit the lade lad to dump ove a high wall 4. A wil desty of 23001 pe ey. S. Coefficient of rac: ‘Track mechines—05 or beter 'b. Wheel machines 04 or ete 6 Theuseofyauocomld bakes, To ales id profuton ates, the curve aes must be adj by the enpeted ob coins. Table 7.2 the comet factors to use wih he Cots dz production carves. The formula fr pdt cael is Produon ideal production prt ofthe (ieyperbour) = from cave * corectin faxors «7 Rares had et his tg oe ed We, ove was meee} Tene of prt esi pat teu Ae lf hn fi eer i deren ‘0 dns nee nD, Fr mw ee sos Ow Be rg dig ‘louRE 7.14 Deore posuoneimsirg cer Cap D7 fret OMY Sears euppd win ve Das. erie oy of are DOZER PRODUCTION ESTIMATING FORMAT ‘eis format that can be used to analyze dozer procuctio. The ealeultions ‘based on wing «Cael DIG ere doar witha sig Bade fo ‘ic th speciation informations given in Table 72 and the perfomance kan i shon nig. 113. Tis wil be a otdzing operon Tie meal ‘0 dry, noncohesve silty san, and itis to be moved a distance of 300 ft from "be beginng fhe cu. Doxa is down on 0 grade, The peor wll ave average il he duet wil havea poershi rasnisin nd tsk Viiy and rao shuld be sisactary, The mri weighs 18 pe Penh un stand is exited to vel 12% whe excavated (ek 'o loose sate). Job efficiency is assumed to be equivalent to SU-min how. Calculate the direct cost ofthe proposed earthmoving operation in dolar per TABLE 7.2 Caterpillar job condition correction faciors for estimating dozer production. “Track-type tractor Operator Excellent 1.00 4.00 Average 0.75 0.60 Poor 0.60 050 Materiat Loose stockpile 4.20 120 Hard to cut; frozen with tilt cylinder 0.80 O75 without tit eyiinder 0.70 = cable-controlled blade O60 — Herd to drift; “dead" (dry, noncohesive 0.80 0.80 material) of very sticky material Rock, ripped or blasted 0.60-0.80 — Slot dozing 1.20 1.20 Side-by-side dozing 11.25 1.15-1.25 Visibility Dust, rain, snow, fog, or darkness 0.80 0.70 Job efficiency 50 min/hr 083 0.83 40 min/hr 067 0.67 Direct-drive transmission (0.1-min fixed time) 0.80 _ Bulldozer” ‘Adjust based on SAE capacity relative to the base blade used in the estimated dozing production graphs Grades—see the graph 9% Grade vs. Dozing Factor ©)Downnill (+) Uphill Le 3 16 ry 12 10 ; 8, 06 04 02, “300 °-~-200~*~CSSSC

You might also like