You are on page 1of 1

0.15 Ø3/8" @.18 Ø3/8" @.

18
RELLENO COMPACTADO TALUD EN RELLENO LS
LS TALUD EN RELLENO RELLENO COMPACTADO
1.48 2Ø3/8" 2Ø3/8"

Ø 3/8"@.20 Ø 3/8"@.20
Ø 3/8"@.25
0.30

1.00 1.63 1.63 1.00

1.00
0.2800

0.28
Traslape Traslape
.50 .50
Ø 3/8"@.18
0.4000

0.40
Ø=60" Ø=60"
3.00 TMC. Ø=60"

1
2.3
3.00

2 .3
1

1.48
1.48
Ø 3/8"@.20

0.80
TMC Ø=60" TMC Ø=60"
Ø 3/8"@.20

0.20
1.48
Ø 3/8" Ø 3/8"
0.50
DETALLE DE ARMADURA
Corte 1-1
ESCALA 1/25
0.25 1.28 0.20

4.15

8.48
4.15

1.48 1.48
0.15 0.15

DETALLE DE ARMADURA
Corte A-A
ESCALA 1/25
0.20

0.2000

TMC Ø=60" TMC Ø=60"

0.44

1.48
1.48

0"
45°
0'0. 0'0.
0" 45°
0.4000

0.40
Ø=60" Ø=60"
0.2800

0.28
Variable Ø 3/8"@.18 Ø 3/8"@.20

0.25

0.50 Ø3/8"@.20

ALERO INCLINADO - PLANTA


0.20 0.20
ESTRUCTURA DE SALIDA ALERO INCLINADO - PLANTA ESC: 1/25

ESC: 1/50
ESTRUCTURA DE ENTRADA
ESC: 1/50 SUPERFICIE DE RODADURA
SUPERFICIE DE RODADURA
4.27
A A

VARIABLE
VARIABLE

Ø
1.80
=6

=6
0

0"
0"

0"

1.80 "
=6

=6
Ø

0'0"
45°0'0"

45°
0.20
0.20
0.30
0.30
2.16

0.50
MEJORAMIENTO CON PIEDRA DE 2-6"
MEJORAMIENTO CON PIEDRA DE 2-6"
0.50

(e=0.50 m)
(e=0.50 m)
1.52 0.7500 1.52
0.25 0.25
1.52 0.7500 1.52
0.25 0.25

ESC: 1/50

ESC: 1/50
SUPERFICIE DE RODADURA
SUPERFICIE DE RODADURA

0.15
0.15
1.48 0.15 1.48 1.90 1.48
VARIABLE
1.48
VARIABLE A A
JUNTA CON ASFALTO 1/2"
0.30 Protección a la Entrada
(Mampostería de piedra
PLANTA DE CABEZAL
Protección a la Salida 0.30
(Mampostería de piedra JUNTA CON ASFALTO 1/2" emboquillada e=0.20m) ESC: 1/25
1.00
emboquillada e=0.20m)
1.00
LS
LS TMC. Ø=60"
1.00
TMC. Ø=60"
1.00
0.80
0.80 0.40
0.40
0.20
0.50

0.20 0.50 0.50


0.50

0.50 0.50 2
0.30

2 1
1 0.50
0.30
0.50

MEJORAMIENTO CON CAMA DE MATERIAL GRANULAR


0.20 PIEDRA DE 2-6" COMPACTADO (e=0.50m)
CAMA DE MATERIAL GRANULAR MEJORAMIENTO PIEDRA 2-6" 0.25 1.28 0.20 MEJORAMIENTO CON PIEDRA DE 2-6"
COMPACTADO (e=0.50m) (e=0.30 m) SOLADO CAMA DE MATERIAL GRANULAR
MEJORAMIENTO CON CAMA DE MATERIAL GRANULAR SOLADO 0.20 1.28 0.25 (e=0.30 m) (e=0.50 m)
CONCRETO F'C = 175 e=0.10 m COMPACTADO (e=0.20m)
PIEDRA DE 2-6" COMPACTADO (e=0.20m) e=0.10 m CAMA DE MATERIAL GRANULAR
CONCRETO F'C = 175 Kg/cm2.
(e=0.50 m) CAMA DE MATERIAL GRANULAR COMPACTADO (e=0.20m)
COMPACTADO (e=0.20m) Kg/cm2.

ESC: 1/50 ESC: 1/50


1 1 1 1
1 VARIABLE 1 1 1
0.40 VARIABLE 0.40

Mampostería de Piedra Mampostería de Piedra


Emboquillada e=0.20m Emboquillada e=0.20m
0.50
0.50

MEJORAMIENTO PIEDRA 2-6" CAMA DE MATERIAL GRANULAR SOLADO SOLADO CAMA DE MATERIAL GRANULAR MEJORAMIENTO CON PIEDRA DE 2-6"
(e=0.50 m) COMPACTADO (e=0.20m) e=0.10 m COMPACTADO (e=0.20m) (e=0.50 m)
e=0.10 m

ESC: 1/50
ESC: 1/50

DIVISIÓN DE ESTUDIOS Y PROYECTOS - I.V.P.M. - M


INSTITUTO VIAL PROVINCIAL CONSTRUCCION DE ALCANTARILLA; EN EL(LA) RUTA R178: EMP. SM-576
MOYOBAMBA I.V.P.M. - MOYOBAMBA INDICADA
(HUASCAYACU) - EL TORNILLO DISTRITO DE MOYOBAMBA, PROVINCIA MOYOBAMBA ING. EDGAR IVÁN VELA TANG - I.V.P.M. - M
ALC-TMC-DR-02
MUNICIPAL DE MOYOBAMBA MOYOBAMBA, DEPARTAMENTO SAN MARTIN DETALLES DE REFUERZO
km 2+127
SAN MARTÍN SUB GERENCIA DE ESTUDIOS, PROYECTOS Y OBRAS
PÚBLICAS - M.P.M. I.V.P.M. - MOYOBAMBA NOVIEMBRE 2020 lámina 02 de 04

1 2 3
TALUD EN RELLENO

TALUD EN RELLENO
LS

TALUD EN RELLENO RELLENO COMPACTADO RELLENO COMPACTADO TALUD EN RELLENO


LS

LS

TALUD EN RELLENO RELLENO COMPACTADO RELLENO COMPACTADO TALUD EN RELLENO LS


LS

RELLENO COMPACTADO RELLENO COMPACTADO


LS

LE

TALUD EN RELLENO RELLENO COMPACTADO


0.2800
0.4000

1.00

1.63

1.63

1.00

0.28
0.40

0.2800
0.4000

1.00

1.63

1.63
1.00

0.28
0.40

0.28
0.40

1.00 1.63
1.63

1.00
0.28
0.40

0.28
0.40

1.00

1.63
3.00

1.48

2.31

2.31

1.48

3.00

3.00

1.48

2.31

2.31
1.48

3.00
1.48

2.31

2.31

1.48

2.00

1.48

2.16
Ø=60"

Ø=60"

Ø=60"
1.48

TMC TMC
1.48

TMC

TMC

Ø=60"
TMC Ø60"

TMC Ø60"

TMC Ø60"
A

4.27

4.27

1.52

1.48
0.15

0.15

1.48
1.52

0.20
1.90

1.28
0.15
45°0'0.0"

45°0'0.0"
4.15

1.48

0.15

0.15
1.48

4.15

8.48

2.16

45°0'0"

45°0'0"

4.15

0.15
1.48

0.15

1.48

4.15

8.48

2.16
45°0'0"

45°0'0"

1.48

1.48

1.48

2.10
Ø=60"

Ø=60"

Ø=60"
0.20

TMC TMC
0.2000

0.15

ESC: 1/25

1.48
A

1.90

0.15

ESC: 1/25

PLANTA DE CABEZAL
A

1.48

0.20

TMC

TMC

Ø=60"
0.2000

1.48

1.90

1.48

0.40
0.28

0.40
0.28

0.15

0.20

PLANTA DE CABEZAL
45°0'0"

0.40
0.28
45°0'0.0"

45°0'0.0"

45°0'0.0"
1.48

45°0'0.0"
1.48

Ø 3/8"@.20

2.16

Ø3/8" @.18
2Ø3/8"

Ø 3/8"@.20

Ø3/8" @.18
2Ø3/8"

1.48

1.48

Ø 3/8"@.20

Ø3/8" @.18

3/8"@.20
2Ø3/8"

Ø3/8" @.18
Ø

2Ø3/8"
0.2800
0.4000

0.28
0.40

Ø=60"

Ø=60"

0.2800
0.4000
Traslape

Traslape

0.28
0.40

Ø=60"

Traslape

Ø=60"

Traslape

1.48
.50

.50

.50

.50

1.48

1.90
PLANTA DE CABEZAL
ESC: 1/20
ESCALA 1/251-1

ESCALA 1/251-1

ESC: 1/50

ESC: 1/50

ESC: 1/50
Corte

Corte

3/8"@.20
@.18

DETALLE DE ARMADURA DETALLE DE ARMADURA SUPERFICIE DE RODADURA ESTRUCTURA


ALERO INCLINADO
DE SALIDA
- PLANTA ESTRUCTURA
ALERO INCLINADO
DE ENTRADA
- PLANTA SUPERFICIE DE RODADURA
Ø3/8"

ESTRUCTURA
ALERO INCLINADO
DE SALIDA
- PLANTA
Ø

2Ø3/8"

SUPERFICIE DE RODADURA
VARIABLE

ESTRUCTURA
ALERO INCLINADO
DE SALIDA
- PLANTA
0.44

ESTRUCTURA
ALERO INCLINADO
DE SALIDA
- PLANTA
0.44

Ø60"

VARIABLE .50
Traslape VARIABLE
ESC: 1/50

ESC: 1/50

Variable

ESC: 1/50

SUPERFICIE DE RODADURA ESTRUCTURA


ALERO INCLINADO
DE ENTRADA
- PLANTA
SUPERFICIE DE RODADURA
0.50
0.25

Ø 3/8"@.18

Ø3/8"@.20
Ø=60"

Ø=60"

Ø 3/8"@.20

SUPERFICIE DE RODADURA ESTRUCTURA


ALERO INCLINADO DE ENTRADA
ESC: 1/50 - PLANTA SUPERFICIE DE RODADURA Variable
Ø 3/8"@.18
0.50
0.25

Ø3/8"@.20
Ø=60"

Ø=60"

Ø60"

1.80

1.80

Ø60"

ESCALA 1/20

1.80

Ø60"

Ø 3/8"@.20 DETALLE
Corte 1-1 DE ARMADURA
VARIABLE

VARIABLE

VARIABLE

VARIABLE

Variable
ESC: 1/25

0.20
0.20

0.20

ESC: 1/25

0.20

MEJORAMIENTO CON PIEDRA


(e=0.20
DE 2-6"
m)
0.30
0.20

0.20 0.20
0.30
0.20

MEJORAMIENTO
(e=0.20 m) CON PIEDRA DE 2-6"
0.44

Ø 3/8"@.20

0.30
0.20

Ø 3/8"@.18 Ø60" MEJORAMIENTO


(e=0.20 m) CON PIEDRA DE 2-6"
Ø=60"

Ø=60"

Ø=60"

Ø=60"

Ø=60"

Ø=60"

Ø=60"

ESC: 1/50

ESC: 1/50

ESC: 1/50
1.80

Ø=60"
1.80
0.20

0.153/8"@.25
0.30

1.48

1.00

1.80
0.20

Ø 3/8"@.25

0.15
1.48 3/8"@.18

0.25

Ø 3/8"@.18 1.80
0.30

1.00

0.25

e=0.10 m
SOLADO
1.52

CAMA DE MATERIAL
COMPACTADO (e=0.20
GRANULAR
m)
0.25
Ø

CAMA DE MATERIAL
COMPACTADO (e=0.20
GRANULAR
m)
1.52

e=0.10 m
SOLADO
0.25

0.50
0.25

Ø3/8"@.20

0.25

CAMA DE MATERIAL
COMPACTADO (e=0.20
GRANULAR
m)
1.52

e=0.10 m
SOLADO
0.25
(e=0.40 m)

(e=0.50 m)

(e=0.50 m)

VARIABLE

VARIABLE

VARIABLE
0.25

1.52

ESC: 1/50
0.7500 1.52
0.25

0.20
0.30

MEJORAMIENTO CON PIEDRA DE 2-6"


0.25

1.52

0.7500

1.52

0.25

0.30
0.40

Ø=60"
TMC.

0.20

Ø 3/8"@.20

0.80

MEJORAMIENTO CON PIEDRA DE 2-6"


1.52

0.7500

1.52

0.20
0.30
0.50

MEJORAMIENTO CON PIEDRA DE 2-6"


0.25

1.52

0.7500

1.52

0.25

0.30
0.50

TMC.
Ø=60"
0.20

Ø 3/8"@.20

Ø 3/8"@.20
0.80

1.48

0.15

0.15

1.48

0.20

0.15

ESC: 1/20

0.20

1.48

0.15
JUNTA CON ASFALTO 1/2"

(Mampostería
emboquillada de piedra
Protección a lae=0.20m)
Salida
ESC: 1/50

A-A

ESC: 1/50

ESC: 1/50

A-A

SUPERFICIE DE RODADURA SUPERFICIE DE RODADURA


0.25

Corte
0.20
1.28

0.50

0.25

Corte
0.25
1.28

0.30

DETALLE
Ø 3/8" DE ARMADURA
Ø 3/8"

0.25 SUPERFICIE DE RODADURA SUPERFICIE DE RODADURA


3/8"

0.20
0.50

DETALLE DE ARMADURA Protección a lae=0.20m)


(Mampostería
emboquillada de
Salida
piedra 1.00
0.30
Ø

Ø 3/8"

LS

1.00
Ø 3/8"@.25
3/8"@.18
0.30

LS
JUNTA CON ASFALTO 1/2" emboquillada
Protección a lae=0.20m)
(Mampostería de
Entrada
piedra
1.48

1.00 JUNTA DE DILATACIÓN


12"1.00

0.30
VARIABLE

VARIABLE

VARIABLE

TMC. 60"

TMC. 60"

60
"TMC.

Protección a la Salida JUNTA CON ASFALTO 1/2"


1.48
0.15

0.30

VARIABLE
0.30

0.15
1.48

Protección a lade
(Mampostería Entrada
piedra
ESCALA 1/25
3/8"@.20

1.48

0.15
0.30

0.30
0.15

1.48

ESCALA 1/25

0.50
0.40

1.00

0.80
0.50

Ø 3/8"
Ø

Protección a la Salida JUNTA CON ASFALTO 1/2" Protección a lade


(Mampostería Entrada
piedra 0.20 0.20
0.80
0.50

1.00

0.50
0.40

TMC.
Ø60"

0.20

Ø 3/8"@.20

0.50
0.40

Ø 3/8"@.20 0.80
0.50
LE

0.80
1.00

0.20
Ø=60"

Ø=60"

Ø=60"

(e=0.20 m)

(e=0.20 m)
TMC.

TMC.

TMC.

1SOLADO
2e=0.10 m

Kg/cm2.

(Mampostería e=0.20m)
emboquillada de piedra
LS

1.00

TMC. Ø=60"
0.80
1.00

JUNTA CON ASFALTO 1/2"


LS

emboquillada e=0.20m) (Mampostería e=0.20m)


emboquillada de piedra
LS

1.00

0.80

1.00
1.00

JUNTA CON ASFALTO 1/2" emboquillada e=0.20m)


LS

CAMA DE MATERIAL
COMPACTADO (e=0.20
GRANULAR
m) SOLADO
e=0.10 m
1.28
0.20

CAMA DE MATERIAL
COMPACTADO (e=0.20
GRANULAR
m) Kg/cm2.
0.25
21

CONCRETO F'C = 175 CAMA DE MATERIAL


COMPACTADO (e=0.50
GRANULAR
m) MEJORAMIENTO PIEDRA 2-6" MEJORAMIENTO PIEDRA 2-6"COMPACTADO
CAMA DE MATERIAL
(e=0.50
GRANULAR
m) Kg/cm2.
CONCRETO F'C = 175
0.25

1.28 DE MATERIAL
CAMA
COMPACTADO (e=0.20
GRANULAR
m) SOLADO
0.20

e=0.10 m
21

CAMA DE MATERIAL
COMPACTADO (e=0.20
GRANULAR
m)
0.25
Ø 3/8"

1.28 1/20A-A DE ARMADURA


0.20

DETALLE
Corte
ESCALA
Ø 3/8"

0.18 DE MATERIAL
CAMA
COMPACTADO (e=0.20
GRANULAR
m)
0.20
12

CAMA DE MATERIAL
COMPACTADO (e=0.20
GRANULAR
m) 0.25
1.28

CONCRETO
CAMA
COMPACTADO
DE MATERIAL
F'C(e=0.50
= 175GRANULAR
m) (e=0.20
MEJORAMIENTO
m) PIEDRA 2-6"
ESC: 1/50

ESC: 1/50

ESC: 1/50
0.50
0.40

0.20
0.80
120.50

0.20
0.25
1.28

0.20
0.50

0.20
0.50

CAMA DE MATERIAL GRANULAR


0.20

120.50
0.40

0.50
0.40

0.50
0.40

0.50
0.80
0.20

0.30
0.50

0.30
0.50

0.20
12

0.50
0.40
0.50
12
COMPACTADO (e=0.20m)

F'C(e=0.50m)
DE 2-6" CON

= 175
MEJORAMIENTO

DE 2-6"

COMPACTADO
(e=0.20 m)

CONCRETO
e=0.10 m
SOLADO

ESC: 1/50

(e=0.20 m)

0.20 mm)

e=0.10 m
SOLADO

(e=0.30 m)

(e=0.50 m)

VARIABLE

VARIABLE

VARIABLE
Kg/cm2.

Kg/cm2.

SOLADO
PIEDRA

PIEDRAm)
(e=0.40

(e=0.50

Kg/cm2.

e=0.10 m
SOLADO

CAMA DE MATERIAL
COMPACTADO (e=0.20m)
GRANULAR CAMA DE MATERIAL
COMPACTADO (e=0.20m)
GRANULAR CAMA DE MATERIAL
COMPACTADO
CONCRETO F'C(e=0.50m)
= 175GRANULAR
MEJORAMIENTO PIEDRA 2-6" MEJORAMIENTO
PIEDRA DE 2-6" CON COMPACTADO
CONCRETO F'C(e=0.50m)
= 175 0.25 DE MATERIAL
CAMA
COMPACTADO (e=0.20m)
GRANULAR
1.28

e=0.10

CAMA DE MATERIAL
COMPACTADO (e=0.20m)
GRANULAR
0.50

MEJORAMIENTO CON CAMA DE MATERIAL GRANULAR


1.28
0.20

CAMA DE MATERIAL
COMPACTADO (e=0.20m)
GRANULAR
0.25
0.20

CAMA DE MATERIAL
COMPACTADO
CONCRETO
Kg/cm2. F'C(e=0.50m)
= 175GRANULAR MEJORAMIENTO PIEDRA 2-6" MEJORAMIENTO
PIEDRA
(e=0.30 m)
DE 2-6" CON CAMA DE MATERIAL GRANULAR
0.25

CAMA DE MATERIAL
COMPACTADO (e=0.20m)
GRANULAR
1.28
0.20

CAMA DE MATERIAL
COMPACTADO (e=0.20m)
GRANULAR MEJORAMIENTO CON PIEDRA DE 2-6" Mampostería de
Emboquillada e=0.20m
Piedra
0.40

0.40
1

Mampostería de
Emboquillada e=0.20m
Piedra
0.40
1

Mampostería de
Emboquillada e=0.20m
Piedra
VARIABLE

VARIABLE
ESC: 1/50

VARIABLE
ESC: 1/50

e=0.10 m
SOLADO

e=0.10 m
SOLADO

ESC: 1/50

e=0.10 m
SOLADO

ESC: 1/50
0.40

0.40

0.40

0.40
1

ESC: 1/50
VARIABLE
1

1 ESC: 1/50 CAMA DE MATERIAL GRANULAR


COMPACTADO (e=0.20 m) CAMA DE MATERIAL
COMPACTADO (e=0.20
GRANULAR
m) CAMA DE MATERIAL
COMPACTADO (e=0.20
GRANULAR
m)
e=0.10 m
SOLADO

e=0.10 m
SOLADO

e=0.10 m
SOLADO

Mampostería de
Emboquillada e=0.20m
Piedra CAMA DE MATERIAL
COMPACTADO (e=0.20m)
GRANULAR
e=0.10 m
SOLADO CAMA DE MATERIAL
COMPACTADO (e=0.20m)
GRANULAR Mampostería de
Emboquillada e=0.20m
Piedra Mampostería de
Emboquillada e=0.20m
Piedra MEJORAMIENTO
(e=0.50 m) PIEDRA 2-6" ESC: 1/50 CAMA DE MATERIAL
COMPACTADO (e=0.20m)
GRANULAR
0.50

CAMA DE MATERIAL
COMPACTADO (e=0.20m)
GRANULAR MEJORAMIENTO
(e=0.50 m) CON PIEDRA DE 2-6"
0.50

Mampostería de
Emboquillada e=0.20m
Piedra
ESC: 1/50

ESC: 1/50

ESC: 1/50

2Ø60" 2Ø60" 60"

You might also like