Professional Documents
Culture Documents
1. Application should be made by low pressure spray, taking care to cover the concrete as
evenly as possible and medium temperature (max 30°C).
2. Horizontal surfaces shall be treated as soon as the initial surface sheen has left the
concrete.
3. Formed concrete should receive treatment as soon as formwork is removed.
4. Vertical and formed surfaces shall be hosed down with clean water prior to application to
assist film breakdown.
5. The application rate of 5 - 6m²/litre must be strictly adhered to.
6. Subsequent surface treatments shall not be made until breakdown or removal of the curing
membrane is complete.
Page - 1