Time Decriptions Location Status


TOTAL
TITLE 38
1. Nov 6, 2021 10:00:… Warming Up Genset no 1,2, dan 3 B1 Done

2. Nov 6, 2021 15:25:… Preventive Maintenance gondola Multi Functi… Continue

3. Nov 6, 2021 10:00:… Cleaning Cartridge Filter Circulation Equalising Pump B1 Done

4. Nov 6, 2021 20:00:… Pengecekan HT NO 3 , baterai rusak perlu diganti baru, setelah d… B1 Info

12.8% 5. Nov 13, 2021 17:30:… Monitoring Perbaikan Lift Passenger oleh Pak Manarul ( PT. Schi… All Area Done
Done
Info 6. Nov 14, 2021 17:30:… Warming up Genset 1,2, dan 3 B1 Done
Monitor
Continue 7. Nov 14, 2021 16:00:… Warming up Diesel Pump B1 Done

82.1% 8. Nov 14, 2021 20:00:… Preventive Pompa Water Fountain Lobby B1 Done

9. Nov 19, 2021 16:00:… Pemasangan Filter pada Drain Mesin Es kopi JJ royal untuk me… Food Court Done

NAME 10. Nov 19, 2021 8:30:00 Pengiriman 1 tabung gas ke MURAMASA dan 1 tabung gas ke B… Food Court Info

Total Task 11. Nov 19, 2021 9:40:00 Daily checklist equipment dan kontrol area gedung All Area Done

12. Nov 19, 2021 16:40:… Pemasangan kembali pompa water fountain drop off setelah dil… GF Done
Inspection 9

13. Nov 19, 2021 15:00:… Perbaikan Instalasi Drain Foodcourt karena mampet. Food Court Done
Troubleshoot 0
14. Nov 19, 2021 11:00:… Perbaikan kebocoran cartridge filter pompa Sirkulasi Equalising B1 Done
Supervisi 23
15. Nov 19, 2021 8:00:00 Pengecekan water fountain drop off yang tidak keluar air. Terjadi… GF Done

Handling Complaint 0 16. Nov 20, 2021 17:00:… Prepare dan warming up genset tanpa beban B1 Done

17. Nov 20, 2021 14:10:… Monitoring pekerjaan maintenance di JJ Royal Food Court Done
Preventive 20

18 Nov 21 2021 10:00: Warming Up Diesel Pump B1 Done