M-24 1 Unit Septicktank 3x3x3 +kedap air

NO URAIAN SAT VOLUME HARGA SATUAN HARGA


1 Galian tanah m3 27,000 20.000,00 540.000,00
2 Pasir Urug m3 1,800 175.300,00 315.540,00
4 Pasangan bata adk 1pc:3ps m2 36,000 110.000,00 3.960.000,00
5 Pelat beton K-225 m3 0,400 6.438.864,00 2.575.545,60
6 Pelesteran adk 1pc:3ps m2 36,000 41.000,00 1.476.000,00
7 PipaPVC 4" Jenis AW m1 6,000 125.000,00 750.000,00
9 Galian tanah untuk rembesan m3 2,700 20.000,00 54.000,00
10 Pas ijuk kg 4,500 23.400,00 105.300,00
11 Urugan kerikil 3/5 m3 0,900 205.000,00 184.500,00
12 Pipa PVC 4" berlubang jenis AW m1 9,000 36.700,00 330.300,00
13 Urugan dan peralatan tanah m3 1,800 34.584,00 62.251,20
Jumlah 10.353.436,80
Dibulatkan 10.353.000,00