Professional Documents
Culture Documents
Front Side Elevation: Box Window
Front Side Elevation: Box Window
5'
01 SD 4'4" x 8'0" ±0'0" +8'0"
8'
+53'-0" PARAPET LVL LVL: -44'
02 D 3'6" x 8'0" ±0'0" +8'0"
3'
+50'-0" TERRACE
03 D1 3'3" x 8'0" ±0'0" +8'0"
FLOOR LVL
04 D2 3'0" x 8'0" ±0'0" +8'0"
4'
4'
+38'-0" THIRD
09 W1 4'6" x 5'6" +2'6" +8'0"
LVL: +7'
FLOOR LVL
10 V 2'0" x 2'6" +5'6" +8'0"
LVL: +1"
4'
LVL: +1'3"
+34'-0" LINTEL LVL 11 W2 3' x 5'6" +2'6" +8'0"
12 MD 4'6" x 8' ±0'0" +8'0"
12'
Box
5'-6"
W LVL: ±00 W
SD Window
+28'-6" SILL LVL
2'-6"
W LVL: ±00
W
SD
Railing
+14'-0" FIRST FL. LVL
LVL: +1'3"
4'
LVL: ±00
+10'-0" LINTEL LVL LVL: ±00
12'
Texture
5'-6"
W W2
Painting
MD
+4'-6" SILL LVL
2'-6"
WORKING DRAWING
SABYA NO-21/P-36/WO-06
notion
Signature of Client
PROPOSED RESIDENTIAL BUILDING FOR FRONT SIDE ELEVATION S NORTH
ALOK CHOUDHARY, AT : BHUBANESWAR Scale Date
E W
19/10/2021
N Signature of Architect