Professional Documents
Culture Documents
LOCATED AT DB ROOM
(ISOLATOR SWITCH BY
FOR SCADA POWER SUPPLY
KVLRT3-APEX-GS05-STN14-ELEC-MSB-SLD-850101
MATCHLINE
KERAJAAN MALAYSIA
PROJECT TITLE:
PROJECT PACKAGE:
UPS ROOM
EASTERN CORRIDOR
UPS
(BY SYSTEM)
T.C.L = 11.15kW
T.C.L = 10.25kW
T.C.L = 15.15kW
T.C.L = 2.21kW
T.C.L = 4.02kW
T.C.L = 1.00kW
T.C.L = 1.36kW
T.C.L = 2.22kW
T.C.L = 3.45kW
T.C.L = 8.79kW
T.C.L = 3.60kW
T.C.L = 1.50kW
T.C.L = 2.75kW
T.C.L = 7.30kW
T.C.L = 1.80kW
CU. CABLE + EARTH IN G.I CONDUIT
50350 Kuala Lumpur Tel : 03 - 2603 6600
M.D = 1.99kW
M.D = 3.61kW
M.D = 0.90kW
M.D = 1.22kW
M.D = 2.00kW
M.D = 3.10kW
M.D = 7.91kW
M.D = 3.24kW
M.D = 8.36kW
M.D = 1.10kW
M.D = 5.98kW
M.D = 8.20kW
M.D = 4.60kW
M.D = 1.62kW
CU. CABLE + EARTH IN TRUNKING
DB-CL-BOH/L
DB-CL-BOH/P
DB-CL-FOH/P
DB-CL-FOH/L
DB-GL1/R1
DB-GL2/R1
DB-GL1/P
DB-GL2/P
DB-GL1/L
DB-GL2/L
DB-EL1/P
DB-EL2/P
DB-EL1/L
DB-EL2/2
SPARE
DB-PL/L
DB-PL/P
DB-SG
DB-FL
(BESIDE REPEATER FIRE ALARM PANEL)
CONTRACTOR :
ELR
30A 30A 30A 30A 30A 30A 30A 200A 30A 30A 30A 30A 30A 30A 30A 30A 30A 40A 40A 30A
TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN SPN SPN SPN
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCB MCB MCB MRCB GEORGE KENT SDN BHD
800A 4 POLE
BUSBAR COUPLER LEVEL 3, MENARA BANK RAKYAT SHAH ALAM
400V, 800A, 3 PHASE,
4 WIRE, 50kA, 1 SEC. RYB1 RYB2 RYB3 RYB4 RYB5 RYB6 RYB7 RYB8 RYB9 RYB10 RYB11 RYB12 RYB13 RYB14 RYB15 RYB16 RYB17 R18 Y18 B18
NO. 1, JALAN INDAH 14/8, SEKSYEN 14,
40000, SHAH ALAM,
AUTO SELANGOR DARUL EHSAN.
EF/OC 400/5A POWER FACTOR
CL 5P10 REGULATOR 4 NOS
400A PFR 800/5A, 15VA 1000/5A, 15VA Tel: 603-50336888 Fax: 603-50336999
ST
TPN CL 1.0
4 x 240mm²/1C MCCB 4 NOS
XLPE/PVC COPPER CABLE TO SCADA DPM 800/5A, 15VA 1000/5A, 15VA
2 x 20A CL 1.0 LEAD CONSULTANT :
4 x 400A TINNED 1 x 40A
COPPER BUSBAR 1 x 80A 3x5A CTs
2 x 150A
AUTOMATIC POWER 2 x 22A
FACTOR CORRECTION 1 x 40A
CAPACITOR BANK 1 x 80A 6 STEPS
AUTO P.F R Y B
3x5A MINCONSULT SDN. BHD.
c/w 6 STEPS AUTOMATIC 2 x 150A REGULATOR (Company No. : 58835-P)
P.F REGULATOR
2 x 15 KVAR Minconsult
1 x 30 KVAR 4 NOS
3XOC EF 800/5A, 15VA 1000/5A, 15VA
1 x 60 KVAR
2 x 120 KVAR 5P20 LOT 6, JALAN 51A/223,
46100 PETALING JAYA, SELANGOR, MALAYSIA.
INTERTRIP 800A Tel : 603-79545757, 79525757
RELAY 4P Fax : 603-79547373, 79547575
ST ATS
(LV BOARD) ACB
SURGE ARRESTOR CLASS 1 CB1 MECHANICAL INTERLOCK by ACB SUPPLIER
c/w 315A AUTO/OFF/MANUAL,
HEALTHY/FAIL COORDINATED ATS MICROPROCESSOR CONTROLLER C/W
limp (N-PE) = 100kA STATUS MCCB ELECTRICALLY INTERLOCKED.
(10/350us) SPD SUBCONTRACTOR :
limp (L-N) = 25kA
(10/350us)
IP31 Isccr = 50kA rms
U 1.5kV @ l
p imp
UV
SYSTEM SUB-CONTRACTOR)
(BY SYSTEM SUB-CONTRACTOR)
MATCHLINE
LOCATED AT DB ROOM
(ISOLATOR SWITCH BY
FOR SCADA POWER SUPPLY
PROJECT TITLE:
ISOLATOR SWITCH
CONSTRUCTION AND COMPLETION OF LIGHT RAIL
TRANSIT LINE 3 (LRT3) FROM
BANDAR UTAMA TO JOHAN SETIA
PROJECT PACKAGE:
EASTERN CORRIDOR
SUPERVISING AGENCY :
CABLING BY SYSTEM SUB-CONTRACTOR
1-4C x 10mm² FIRE RATED LSOH Cu. CABLE
C/W EARTHING CABLE IN CABLE TRAY/TRUNKING
T.C.L = 37.00kW
T.C.L = 73.00kW
T.C.L = 53.76kW
T.C.L = 47.00kW
SSB-ESCALATOR (U)
M.D = 27.75kW
T.C.L = 6.20kW
SSB-ESCALATOR (P)
T.C.L = 3.50kW
T.C.L = 5.00kW
T.C.L = 3.36kW
T.C.L = 6.68kW
T.C.L = 2.88kW
T.C.L = 3.06kW
T.C.L = 3.06kW
T.C.L = 1.00kW
M.D = 54.75kW
M.D = 26.88kW
M.D = 35.25kW
SSB-FIRE FIGHTING
M.D = 6.20kW
M.D = 2.63kW
M.D = 3.75kW
M.D = 2.26kW
M.D = 3.96kW
M.D = 2.08kW
M.D = 1.94kW
M.D = 1.94kW
M.D = 1.00kW
DB-CL-ADV
DB-PL-ADV
DB-CL/R1
DB-CL/R2
DB-CTER
SSB-LIFT
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
DB-ATM
DB-MDF
SSB-ME
PRASARANA MALAYSIA BERHAD (467220-U)
DB-BR
B-20-1, LEVEL 20, MENARA UOA BANGSAR,
NO. 5 JALAN BANGSAR UTAMA 1,
59000 KUALA LUMPUR.
CONTRACTOR :
30A 100A 150A 100A 60A 100A 30A 30A 200A 30A 30A 30A 40A 40A 150A 60A 60A 30A 30A 30A 30A 30A 30A 30A Tel: 603-50336888 Fax: 603-50336999
SPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN SPN SPN SPN SPN SPN SPN
MCB 800A 4 POLE MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB
BUSBAR COUPLER
LEAD CONSULTANT :
B18 RYB1 RYB2 RYB3 RYB4 RYB5 RYB6 RYB7 RYB8 RYB9 RYB10 RYB11 RYB12 RYB13 RYB14 RYB15 RYB16 RYB17 R18 Y18 B18 R19 Y19 B19
AUTO AUTO
MINCONSULT SDN. BHD.
MARSHALLING CABINET
POWER FACTOR POWER FACTOR 400/5A
REGULATOR EF/OC
REGULATOR 4 NOS 4 NOS CL 5P10 (Company No. : 58835-P)
PFR 800/5A, 15VA 800/5A, 15VA PFR 400A
CL 1.0 ST
CL 1.0 TPN Minconsult
4 NOS 4 NOS MCCB 4 x 240mm²/1C
TO SCADA DPM 800/5A, 15VA 800/5A, 15VA DPM TO SCADA XLPE/PVC COPPER CABLE LOT 6, JALAN 51A/223,
CL 1.0 CL 1.0 2 x 20A
1 x 40A 4 x 400A TINNED 46100 PETALING JAYA, SELANGOR, MALAYSIA.
CTs CTs 3x5A COPPER BUSBAR
3x5A 1 x 80A Tel : 603-79545757, 79525757
2 x 150A
Fax : 603-79547373, 79547575
2 x 22A AUTOMATIC POWER
3x5A 3x5A 1 x 40A FACTOR CORRECTION
6 STEPS 1 x 80A CAPACITOR BANK
R Y B R Y B AUTO P.F 2 x 150A c/w 6 STEPS AUTOMATIC
REGULATOR P.F REGULATOR
4 NOS 2 x 15 KVAR
4 NOS 1 x 30 KVAR
3XOC EF 800/5A, 15VA 800/5A, 15VA EF 3XOC
5P20 1 x 60 KVAR
5P20 2 x 120 KVAR SUBCONTRACTOR :
EXIT DOOR
INCOMING NO. 2
3 SETS 4x1C 630mm2 FLAME RETARDANT 3 SETS 4x1C 240mm2 XLPE/SWA/PVC
CU. CABLE + 300mm2 LSOH EARTH ON CABLE TRAY CU. CABLE + 120mm2 LSOH EARTH ON CABLE TRAY Designed By : MALCOLM
(BY SUB - CONTRACTOR) (BY SUB - CONTRACTOR)
Drawn By : MARIAM
Checked By : NADZIRAH
Approved By : CHANDRAN MOORTHY
CAD file no : KVLRT3-APEX-GS05-STN14-ELEC-MSB-SLD-300102_H00
Scale : N.T.S
Date : SEPT 2021
Drawing Title :
T.C.L = 1kW
T.C.L = 1kW
T.C.L = 0.5kW
T.C.L = 0.5kW
T.C.L = 0.5kW
T.C.L = 0.5kW
M.D = 2.20kW
M.D = 1kW
M.D = 0.5kW
M.D = 0.5kW
M.D = 0.5kW
M.D = 0.5kW
T.C.L = 1kW
M.D = 1kW
M.D = 13.5 kW
M.D = 13.5 kW
C.L = 18 kW
C.L = 18 kW
C.L = 18 kW
KERAJAAN MALAYSIA
+ E IN TRUNKING/CONDUIT
+ E IN TRUNKING/CONDUIT
T.C.L = 2.89kW
+ E IN TRUNKING/CONDUIT
TRANSIT LINE 3 (LRT3) FROM
T.C.L = 2.10kW
M.D = 2.75kW
M.D = 1.89kW
BANDAR UTAMA TO JOHAN SETIA
FM200 PANEL 1
FM200 PANEL 2
FM200 PANEL 3
FM200 PANEL 4
ISOLATOR (L14 - 01)
AT MSB ROOM
AT SCR ROOM
AT UPS ROOM
AT EER ROOM
AT SER ROOM
PROJECT PACKAGE:
PL - UPS/L
CL - UPS/L
(RFAP -1)
(RFAP -2)
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
EASTERN CORRIDOR
SUPERVISING AGENCY :
4 x 1C 16mm² LSOH FLAME RETARDANT CU. CABLE 4 x 1C 10mm² LSOH FLAME RETARDANT CU. CABLE
+ E IN TRUNKING + E IN TRUNKING
4 x 1C 35mm² LSOH FLAME RETARDANT CU. CABLE (CABLING BY SUB-CONTRACTOR)
+ E IN TRUNKING
FROM MSB-UiTM SHAH ALAM FROM UPS ISOLATOR SWITCH (ISOLATOR SWITCH BY SYSTEM SUB-CONTRACTOR)
(LOCATED AT DB ROOM)
MRCB GEORGE KENT SDN BHD
FROM MSB-UiTM SHAH ALAM
LEVEL 3, MENARA BANK RAKYAT SHAH ALAM
NO. 1, JALAN INDAH 14/8, SEKSYEN 14,
40000, SHAH ALAM,
SELANGOR DARUL EHSAN.
M.D = 11.25kW
C.L = 15kW
C.L = 15kW
M.D = 16.5 kW
M.D = 16.5 kW
M.D = 16.5 kW
M.D = 16.5 kW
LEAD CONSULTANT :
C.L = 22 kW
C.L = 22 kW
C.L = 22 kW
C.L = 22 kW
MINCONSULT SDN. BHD.
4 x 1C 10mm² FIRE RATED CU. CABLE
Minconsult
ISOLATOR (FOR ESCALATOR 5)
SUBCONTRACTOR :
100/5A 150/5A
CLASS 1.0 CLASS 1.0
CT PF CT
5A PF
5A
3x5A SPD CLASS II (7-MODE) SPD CLASS II (7-MODE)
R Y B
In/Imax (L-N & N-PE) = 40/80kA (8/20µs) 3x5A In/Imax (L-N & N-PE) = 40/80kA (8/20µs)
R Y B
Iimp (N-PE) = 12kA (10/350µs) Spark-Gap Iimp (N-PE) = 12kA (10/350µs) Spark-Gap
ZCT Isccr = 25kA rms ZCT Isccr = 25kA rms
UP @ Imax ≤ 1.5kV UP @ Imax ≤ 1.5kV
ELR FUSE UP @ Uoc/Isc ≤ 1.5kV ELR FUSE UP @ Uoc/Isc ≤ 1.5kV
SPD
(FUSE RATING
UOC/ISC ≥ 10kV (1.2/50µs) / 5kA (8/20µs) SPD
UOC/ISC ≥ 10kV (1.2/50µs) / 5kA (8/20µs) Designed By : MALCOLM
100A AS RECOMMENDED 150A
(FUSE RATING
AS RECOMMENDED Drawn By :
S/T TPN BY MANUFACTURER) S/T TPN BY MANUFACTURER)
MARIAM
MCCB MCCB
Checked By : NADZIRAH
IP31 IP31
SSB-ESCALATOR (P)
SWITCHBOARD EARTHING BAR 25mm x SWITCHBOARD EARTHING BAR 25mm x Approved By : CHANDRAN MOORTHY
3x5A 3mm TINNED COPPER BAR WITH MS BOLTS SSB-ESCALATOR (U) 3x5A 3mm TINNED COPPER BAR WITH MS BOLTS
T.C.L = 30.0kW R Y B & NUTS T.C.L = 88.0 kW R Y B
M.D = 22.5kW
& NUTS CAD file no : KVLRT3-APEX-GS05-STN14-ELEC-SSB-SLD-300103
M.D = 66.0 kW
(LOCATED AT MSB ROOM) (LOCATED AT MSB ROOM) Scale : N.T.S
Date : SEPT 2021
4 x 1C 35mm² LSOH FLAME RETARDANT CU. CABLE Drawing Title :
+ E IN TRUNKING 4 x 1C 70mm² LSOH FLAME RETARDANT CU. CABLE
+ E IN TRUNKING
KVLRT3 BUJS PKG GS05
FROM MSB-UiTM SHAH ALAM FROM MSB-UiTM SHAH ALAM STATION 14 UiTM SHAH ALAM
SINGLE LINE DIAGRAM
SUB-SWITCHBOARD
Drawing No :
*PLEASE REFER IFC DRAWING NO : KVLRT3-MRCBGK-GS05-STN14-ELEC-SSB-SLD-250103_WW01
SHOP DRAWING KVLRT3-APEX-GS05-STN14-ELEC-SSB-SLD-300103
Rev
H00
ENTRANCE LINK POB
BICYCLE PARKING
BICYCLE PARKING
STATION ACCESS
STATION ACCESS
STATION ACCESS
ENTRANCE 1
ENTRANCE 1
ENTRANCE 1
TEL RISER &
STAIRCASE
LIFT SHAFT
LIFT LOBBY
LIFT LOBBY
LIFT LOBBY
LIFT LOBBY
LIFT SHAFT
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
KERAJAAN MALAYSIA
SPARE
SPARE
SPARE
SPARE
AGENSI PENGANGKUTAN AWAM DARAT ( APAD )
Aras G, M dan 20 Menara Tun Ismail Mohamed Ali,
No. 25 Jalan Raja Laut,
50350 Kuala Lumpur Tel : 03 - 2603 6600
Laman Web : www.apad.gov.my
PROJECT OWNER :
10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A
SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN 10A 10A 10A 10A 10A 10A 10A 10A 10A
MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB SPN SPN SPN SPN SPN SPN SPN SPN SPN
415V, 30A, 3 PHASE, MCB MCB MCB MCB MCB MCB MCB MCB MCB
415V, 30A, 3 PHASE,
4 WIRE, 30kA, 3 SEC. R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 R4 Y4 B4 R5 Y5 B5 R6 Y6 B6
4 WIRE, 30kA, 3 SEC. R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 PRASARANA MALAYSIA BERHAD (467220-U)
RCCB 30A 4P (100 mA)
SPD CLASS II (7-MODE) RCCB 30A 4P (100 mA) SPD CLASS II (7-MODE) B-20-1, LEVEL 20, MENARA UOA BANGSAR,
3x5A In/Imax (L-N & N-PE) = 40/80kA (8/20µs) In/Imax (L-N & N-PE) = 40/80kA (8/20µs)
NO. 5 JALAN BANGSAR UTAMA 1,
R Y B Iimp (N-PE) = 12kA (10/350µs) Spark-Gap 3 x 5A Iimp (N-PE) = 12kA (10/350µs) Spark-Gap
Isccr = 25kA rms
R Y B Isccr = 25kA rms 59000 KUALA LUMPUR.
UP @ Imax ≤ 1.5kV UP @ Imax ≤ 1.5kV
FUSE UP @ Uoc/Isc ≤ 1.5kV FUSE UP @ Uoc/Isc ≤ 1.5kV
SPD SPD
UOC/ISC ≥ 10kV (1.2/50µs) / 5kA (8/20µs) UOC/ISC ≥ 10kV (1.2/50µs) / 5kA (8/20µs)
(FUSE RATING (FUSE RATING
AS RECOMMENDED AS RECOMMENDED Tel: 603-22991999 Fax: 603-22991919
BY MANUFACTURER) BY MANUFACTURER)
STATION ACCESS 1
STATION ACCESS 1
ENTRANCE 2
ENTRANCE 2
MINCONSULT SDN. BHD.
STAIRCASE
LIFT SHAFT
LIFT LOBBY
LIFT LOBBY
LIFT LOBBY
LIFT LOBBY
LIFT LOBBY
LIFT LOBBY
LIFT SHAFT
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A
SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A
MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN
415V, 30A, 3 PHASE, MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB
415V, 30A, 3 PHASE,
4 WIRE, 30kA, 3 SEC. R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 R4 Y4 B4 R5 Y5 B5 R6 Y6 B6 R7 Y7 B7
4 WIRE, 30kA, 3 SEC. R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 R4 Y4 B4
RCCB 30A 4P (100 mA) Designed By : MALCOLM
SPD CLASS II (7-MODE) RCCB 30A 4P (100 mA) SPD CLASS II (7-MODE)
Drawn By : MARIAM
In/Imax (L-N & N-PE) = 40/80kA (8/20µs) In/Imax (L-N & N-PE) = 40/80kA (8/20µs)
3x5A
R Y B Iimp (N-PE) = 12kA (10/350µs) Spark-Gap 3 x 5A Iimp (N-PE) = 12kA (10/350µs) Spark-Gap
Checked By : HIDAYAH
Isccr = 25kA rms R Y B Isccr = 25kA rms
UP @ Imax ≤ 1.5kV UP @ Imax ≤ 1.5kV
FUSE UP @ Uoc /Isc ≤ 1.5kV FUSE UP @ Uoc/Isc ≤ 1.5kV
Approved By : CHANDRAN MOORTHY
SPD SPD
UOC/ISC ≥ 10kV (1.2/50µs) / 5kA (8/20µs) UOC/ISC ≥ 10kV (1.2/50µs) / 5kA (8/20µs)
(FUSE RATING (FUSE RATING CAD file no : KVLRT3-APEX-GS05-STN14-ELEC-LPS-SLD-300104_H00
AS RECOMMENDED AS RECOMMENDED
BY MANUFACTURER) BY MANUFACTURER) Scale : N.T.S
IP-31 30A IP-31 30A Date : SEPT 2021
DB-GL2/L TPN SWITCHBOARD EARTHING BAR 25mm x DB-EL2/L TPN SWITCHBOARD EARTHING BAR 25mm x
MCCB 3mm TINNED COPPER BAR WITH MS BOLTS
T.C.L. = 1.36 kW MCCB 3mm TINNED COPPER BAR WITH MS BOLTS Drawing Title :
T.C.L. = 4.02 kW & NUTS & NUTS
M.D. = 3.61 kW M.D. = 1.22 kW
(LOCATED IN SERVICE CORRIDOR) (LOCATED AT ENTRANCE LINK 2) KVLRT3 BUJS PKG GS05
4 x 1C 6mm2 PVC/PVC CU. CABLE
+ E IN CABLE TRAY / TRUNKING 4 x 1C 6mm2 LSOH FLAME RETARDANT CU. CABLE STATION 14 UiTM SHAH ALAM
+ E IN CABLE TRAY / TRUNKING
SINGLE LINE DIAGRAM
FROM MSB - UiTM SHAH ALAM FROM MSB - UiTM SHAH ALAM
LIGHTING FOR GROUND & ENTRANCE LINK
Drawing No : Rev
*PLEASE REFER IFC DRAWING NO :KVLRT3-MRCBGK-GS05-STN14-ELEC-LPS-SLD-250104_WW01
SHOP DRAWING KVLRT3-APEX-GS05-STN14-ELEC-LPS-SLD-300104 H00
FROM
SCADAPH
IP-31
(N)
IP-31
TIME
24 hrs
DB-CL/BOH/L
M.D. = 1.94 kW
T.C.L. = 2.16 kW
DB-CL/FOH/L
N
SWITCH TS
M.D. = 2.96 kW
T.C.L. = 3.29kW
(LOCATED IN DB ROOM)
2 x 1C 1.5mm² LSOH FLAME RETARDANT
(LOCATED IN DB ROOM)
CU CABLE + E IN CONDUIT / TRUNKING
SWITCH
4 - 2 x 23W LED BATTEN FITTING
BY PASSN
R1
2 x 1C 1.5mm² LSOH FLAME RETARDANT 2 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT EER ROOM
10A
SPN
10A
MCB
CU CABLE + E IN CONDUIT / TRUNKING 8 - 1 x 38W LED BATTEN FITTING (W/PROOF) DCW &
FUSE
Y1
3 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT RWH TANK + PUMP
10A
SPN
MCB
2 - 1 x 23W LED BATTEN FITTING CHR ROOM 4 - 2 x 23W LED BATTEN FITTING
R1
B1
1 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT 2 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT SER ROOM
10A
SPN
MCB
10A
SPN
2 - 1 x 23W LED BATTEN FITTING
MCB
JANITOR ROOM 5 - 2 x 23W LED BATTEN FITTING
Y1
1 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT BOH CORRIDOR
R2
3 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT
10A
SPN
MCB
10A
SPN
MCB
6 - 15W LED RECESSED DOWNLIGHT TOILET (M)
B1
2 - 1 X 8W SURFACE MOUNTED EMERGENCY LIGHT 5 - 1 x 38W LED BATTEN SUSPENDED FITTING ACU 3 ROOM
Y2
10A
SPN
MCB
10A
SPN
MCB
1 - 1 x 38W LED BATTEN FITTING (W/PROOF) SERVICE CORRIDOR 4 -1 x 38W LED BATTEN FITTING W/PROOF
R2
(ANTI CORROSIVE) UPS ROOM
B2
2 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT
10A
SPN
MCB
10A
SPN
MCB
7 - 15W LED RECESSED DOWNLIGHT 2 -1 x 38W LED BATTEN FITTING W/PROOF
TOILET (F)
Y2
2 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT (ANTI CORROSIVE) GAS ROOM
R3
1 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT
10A
SPN
MCB
10A
SPN
MCB
3 - 15W LED RECESSED DOWNLIGHT
DISABLE TOILET 4 - 1 x 23W LED BATTEN FITTING
B2
2 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT ENGINEER ROOM
Y3
1 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT
10A
SPN
MCB
10A
SPN
6 - 15W LED RECESSED DOWNLIGHT MCB
SURAU (M) 3 - 1 x 23W LED BATTEN FITTING
R3
2 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT BOH CORRIDOR 2
B3
2 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT
10A
SPN
MCB
10A
SPN
MCB
6 - 15W LED RECESSED DOWNLIGHT SURAU (F) 5 - 1 x 23W LED BATTEN FITTING
Y3
30A
2 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT BOH CORRIDOR 2
TPN
R4
MCCB
10A
SPN
3x5A
MCB
10A
SPN
MCB
B3
1 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT STAFF ROOM
Y4
R
1 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT
10A
SPN
MCB
10A
SPN
MCB
FUSE
SMO ROOM 4 - 1 x 23W LED BATTEN FITTING
R4
(FUSE RATING
RCCB 30A 4P (100 mA)
AS RECOMMENDED
1 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT
10A
BY MANUFACTURER)
B
SPN
MCB
10A
SPN
MCB
2 - 35W LED RECESSED FLAT PANEL SCR ROOM 6 - 2 x 23W LED BATTEN FITTING
Y4
1 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT MSB ROOM
R5
10A
SPN
MCB
10A
SPN
MCB
B4
2 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT 4 - LED ILLUMINATED 'KELUAR' SIGN UPS ROOM & EER ROOM
Y5
10A
+ E IN CABLE TRAY / TRUNKING
SPN
MCB
10A
SPN
MCB
R5
1 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT 4 - LED ILLUMINATED 'KELUAR' SIGN
B5
10A
SPN
MCB
10A
SPN
MCB
PAID AREA
Y5
2 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT 2 - 1 x 38W LED BATTEN SUSPENDED FITTING ACU 2 ROOM
R6
10A
SPN
MCB
10A
SPN
MCB
B5
4 x 1C 10mm2 LSOH FLAME RETARDANT CU. CABLE
& NUTS
10A
SPN
MCB
10A
SPN
MCB
R6
2 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT SPARE
B6
10A
UP @ Uoc/Isc ≤ 1.5kV
SPN
MCB
10A
Y6
1 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT
10A
SPN
MCB
5 - 15W LED RECESSED DOWNLIGHT
SWITCHBOARD EARTHING BAR 25mm x
3mm TINNED COPPER BAR WITH MS BOLTS
PAID AREA
Iimp (N-PE) = 12kA (10/350µs) Spark-Gap
B6
In/Imax (L-N & N-PE) = 40/80kA (8/20µs)
10A
SPN
MCB
6 - 15W LED RECESSED DOWNLIGHT PAID AREA
R7
2 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT
10A
SPN
MCB
1 - LED ILLUMINATED 'KELUAR' SIGN STAIRCASE 1
Y7
10A
SPN
MCB
6 - 15W LED RECESSED DOWNLIGHT CORRIDOR
B7
2 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT
10A
SPN
MCB
1 - 1 x 23W LED BATTEN FITTING ELV RISER
R8
10A
SPN
MCB
1 - 1 x 38W LED BATTEN FITTING (W/PROOF) LIFT 1
Y8
10A
SPN
MCB
1 - 1 x 23W LED BATTEN FITTING LV RISER
B8
10A
SPN
MCB
IP-31
R9
2 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT 2 x 1C 1.5mm² LSOH FLAME RETARDANT
10A
SPN
MCB
DB-CL-UPS/L
PAID AREA
Y9
240V, 30A, 1 PHASE,
10A
SPN
MCB
2 - 2 x 23W LED BATTEN FITTING EER ROOM
R1
B9
(LOCATED IN DB ROOM)
10A
Y1
SPN
MCB
6 - 15W LED RECESSED DOWNLIGHT
30A
TPN
PAID AREA 3 -1 x 38W LED BATTEN FITTING W/PROOF
1 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT
R10
MCCB
UPS ROOM
B1
3x5A
(ANTI CORROSIVE)
10A
SPN
MCB
5 - 15W LED RECESSED DOWNLIGHT PAID AREA 3 - 15W LED RECESSED DOWNLIGHT
R
CORRIDOR
R2
Y10
10A
SPN
MCB
FUSE
RCCB 30A 4P (100 mA)
PAID AREA
(FUSE RATING
Y2
6 - 15W LED RECESSED DOWNLIGHT PAID AREA 6 - 15W LED RECESSED DOWNLIGHT
B10
1 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT
AS RECOMMENDED
BY MANUFACTURER)
B
10A
6 - 15W LED RECESSED DOWNLIGHT PAID AREA
SPN
B2
MCB
5 - 15W LED RECESSED DOWNLIGHT PAID AREA
2 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT
R11
6 - 15W LED RECESSED DOWNLIGHT PAID AREA
R3
10A
SPN
MCB
5 - 15W LED RECESSED DOWNLIGHT
ACCESS 1 STATION 2 - 15W LED RECESSED DOWNLIGHT PAID AREA
Y3
5 - 15W LED RECESSED DOWNLIGHT 5 - 15W LED RECESSED DOWNLIGHT PAID AREA
B3
ACCESS 1 STATION
3 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT
B11
10A
SPN
MCB
SPD
8 - 15W LED RECESSED DOWNLIGHT PAID AREA
R4
SPN
MCB
& NUTS
1 - 1 x 38W LED BATTEN FITTING (W/PROOF)
Y12
SPN
FROM UPS
10A
SPN
MCB
MCCB
CORRIDOR
Isccr = 25kA rms
B12
UP @ Imax ≤ 1.5kV
2 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT 1 - 35W (600x600)mm LED FLAT PANEL CSO
R5
UP @ Uoc/Isc ≤ 1.5kV
10A
SPN
MCB
2 - LED ILLUMINATED 'KELUAR' SIGN UNPAID AREA 1 - 35W (600x600)mm LED FLAT PANEL SCR
Y5
R13
Y
FUSE
(FUSE RATING
RCCB 30A 4P (100 mA)
10A
SPN
MCB
1 - 1 x 38W LED BATTEN FITTING (W/PROOF) ACU 5 1 - 35W (600x600)mm LED FLAT PANEL SMO
B5
Y13
10A
SPN
MCB
STAIRCASE 2
R14
PAID AREA
MCB
SPARE
R7
10A
SPN
MCB
SPARE
B14
SPARE
2 x 1C 6mm2 LSOH FLAME RETARDANT CU. CABLE
Y7
10A
& NUTS
SPN
MCB
SPARE SPARE
B7
R15
10A
SPN
Isccr = 25kA rms
MCB
10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A
UP @ Imax ≤ 1.5kV
SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN
MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB
UP @ Uoc/Isc ≤ 1.5kV
SPARE
SPD CLASS II (7-MODE)
Y15
R8
B15
SWITCHBOARD EARTHING BAR 25mm x
3mm TINNED COPPER BAR WITH MS BOLTS
Iimp (N-PE) = 12kA (10/350µs) Spark-Gap
R9
SPARE
SPARE
Y9
10A 10A
SPN SPN
MCB MCB
SPARE
B9
Date :
Scale :
Minconsult
Drawn By :
Drawing No :
PROJECT TITLE:
CONTRACTOR :
Drawing Title :
Date
21/09/21
SUBCONTRACTOR :
N.T.S
PROJECT OWNER :
PROJECT PACKAGE:
LEAD CONSULTANT :
SEPT 2021
MARIAM
Checked By : HIDAYAH
SUPERVISING AGENCY :
Designed By : MALCOLM
Tel: 603-22991999
Tel: 603-50336888
No. 25 Jalan Raja Laut,
FIRST SUBMISSION
Description
LIGHTING FOR
EASTERN CORRIDOR
CONCOURSE LEVEL
12th Floor, Menara Hap Seng
187475-V
TRANSIT LINE 3 (LRT3) FROM
Desg
Jalan P Ramlee 50250 Kuala Lumpur
NO. 5 JALAN BANGSAR UTAMA 1,
KVLRT3-APEX-GS05-STN14-ELEC-LPS-SLD-300105
Aras G, M dan 20 Menara Tun Ismail Mohamed Ali,
N
Fax: 603-22991919
Check
Fax: 603-50336999
CONSTRUCTION AND COMPLETION OF LIGHT RAIL
KERAJAAN MALAYSIA
H00
Rev
MINCONSULT SDN. BHD.
Laman Web : www.apad.gov.my
CM
AGENSI PENGANGKUTAN AWAM DARAT ( APAD )
Appr
KERAJAAN MALAYSIA
PROJECT TITLE:
PROJECT PACKAGE:
EER ROOM
SER ROOM
UPS ROOM
CORRIDOR
PAID AREA
PAID AREA
PAID AREA
PAID AREA
PAID AREA
PAID AREA
EASTERN CORRIDOR
SPARE
SPARE
SPARE
SPARE
SPARE
PROJECT OWNER :
10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A
SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN
MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB
240V, 30A, 1 PHASE,
2 WIRE, 30kA, 3 SEC. R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 R4 Y4 B4 R5 Y5 B5 PRASARANA MALAYSIA BERHAD (467220-U)
RCCB 30A 2P (100 mA) B-20-1, LEVEL 20, MENARA UOA BANGSAR,
3 x 5A NO. 5 JALAN BANGSAR UTAMA 1,
R Y B SPD CLASS II (7-MODE)
In/Imax (L-N & N-PE) = 40/80kA (8/20µs) 59000 KUALA LUMPUR.
Iimp (N-PE) = 12kA (10/350µs) Spark-Gap
Isccr = 25kA rms
UP @ Imax ≤ 1.5kV
FUSE UP @ Uoc/Isc ≤ 1.5kV
SPD
UOC/ISC ≥ 10kV (1.2/50µs) / 5kA (8/20µs) Tel: 603-22991999 Fax: 603-22991919
(FUSE RATING
AS RECOMMENDED
BY MANUFACTURER)
CONTRACTOR :
IP-31 30A
DB-PL-UPS/L SPN SWITCHBOARD EARTHING BAR 25mm x
T.C.L. = 2.10 kW MCCB 3mm TINNED COPPER BAR WITH MS BOLTS
& NUTS
M.D. = 1.89 kW
(LOCATED IN DB ROOM)
MRCB GEORGE KENT SDN BHD
4 x 1C 6mm2 LSOH FLAME RETARDANT CU. CABLE
+ E IN CABLE TRAY / TRUNKING LEVEL 3, MENARA BANK RAKYAT SHAH ALAM
FROM UPS NO. 1, JALAN INDAH 14/8, SEKSYEN 14,
40000, SHAH ALAM,
SELANGOR DARUL EHSAN.
SPARE
SPARE
SPARE
SUBCONTRACTOR :
(N)
N
C
FROM PH
SCADA TIME COMMUNICATIONS SDN BHD
SWITCH TS BY PASS N
24 hrs SWITCH 187475-V
12th Floor, Menara Hap Seng
Jalan P Ramlee 50250 Kuala Lumpur
10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A Tel : 03-2148 8810 Fax : 03-2142 4211
FUSE SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN
MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB
415V, 30A, 3 PHASE,
4 WIRE, 30kA, 3 SEC. R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 R4 Y4 B4 R5 Y5 B5 R6 Y6 B6 R7 Y7 B7 R8 Y8 B8 R9 Y9 B9 R10 Y10 B10 R11 Y11 B11 R12 Y12 B12 R13 Y13 B13 R14 Y14 B14 Rev Date Description Desg Check Appr
30A 4P (100 mA) H00 21/09/21 FIRST SUBMISSION M N CM
RCCB
SPD CLASS II (7-MODE)
3 x 5A In/Imax (L-N & N-PE) = 40/80kA (8/20µs)
R Y B Iimp (N-PE) = 12kA (10/350µs) Spark-Gap
Isccr = 25kA rms
UP @ Imax ≤ 1.5kV
FUSE UP @ Uoc/Isc ≤ 1.5kV
SPD
UOC/ISC ≥ 10kV (1.2/50µs) / 5kA (8/20µs)
(FUSE RATING
AS RECOMMENDED
BY MANUFACTURER)
COVERED WALKWAY
COVERED WALKWAY
COVERED WALKWAY
COVERED WALKWAY
3 - 1 X 38W WEATHERPROOF LED BATTEN FITTING
PROJECT PACKAGE:
EASTERN CORRIDOR
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SUPERVISING AGENCY :
N N
C C
TIME TIME
SWITCH TS BY PASS SWITCH TS BY PASS PROJECT OWNER :
24 hrs SWITCH 24 hrs SWITCH
10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A
FUSE SPN SPN SPN SPN SPN SPN FUSE SPN SPN SPN SPN SPN SPN
MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB
415V, 30A, 3 PHASE, 415V, 30A, 3 PHASE,
4 WIRE, 30kA, 3 SEC. R1 Y1 B1 R2 Y2 B2 4 WIRE, 30kA, 3 SEC. R1 Y1 B1 R2 Y2 B2 PRASARANA MALAYSIA BERHAD (467220-U)
RCCB 30A 4P SPD CLASS II (7-MODE) RCCB 30A 4P SPD CLASS II (7-MODE) B-20-1, LEVEL 20, MENARA UOA BANGSAR,
(100 mA) In/Imax (L-N & N-PE) = 40/80kA (8/20µs)
(100 mA) In/Imax (L-N & N-PE) = 40/80kA (8/20µs)
6A Iimp (N-PE) = 12kA (10/350µs) Spark-Gap 6A Iimp (N-PE) = 12kA (10/350µs) Spark-Gap
NO. 5 JALAN BANGSAR UTAMA 1,
R Y B Isccr = 25kA rms R Y B Isccr = 25kA rms 59000 KUALA LUMPUR.
UP @ Imax ≤ 1.5kV UP @ Imax ≤ 1.5kV
FUSE UP @ Uoc/Isc ≤ 1.5kV FUSE UP @ Uoc/Isc ≤ 1.5kV
SPD SPD
UOC/ISC ≥ 10kV (1.2/50µs) / 5kA (8/20µs) UOC/ISC ≥ 10kV (1.2/50µs) / 5kA (8/20µs)
(FUSE RATING (FUSE RATING
AS RECOMMENDED AS RECOMMENDED
BY MANUFACTURER) BY MANUFACTURER)
Tel: 603-22991999 Fax: 603-22991919
(LOCATED AT (LOCATED AT
COVERED WALKWAY) 4 - 1C x 6mm² LSOH FLAME RETARDANT CU. CABLE SERVICE CORRIDOR) 4 - 1C x 6mm² LSOH FLAME RETARDANT CU. CABLE
+ E IN CABLE TRAY / TRUNKING + E IN CABLE TRAY / TRUNKING
MRCB GEORGE KENT SDN BHD
FROM FEEDER PILLAR 1 ( FP1 ) FROM FEEDER PILLAR 1 ( FP1 ) LEVEL 3, MENARA BANK RAKYAT SHAH ALAM
NO. 1, JALAN INDAH 14/8, SEKSYEN 14,
40000, SHAH ALAM,
COVERED WALKWAY
COVERED WALKWAY
COVERED WALKWAY
COVERED WALKWAY
COVERED WALKWAY
COVERED WALKWAY
COVERED WALKWAY
COVERED WALKWAY
COVERED WALKWAY
COVERED WALKWAY
COVERED WALKWAY
SELANGOR DARUL EHSAN.
LEAD CONSULTANT :
7 - 1 X 38W WEATHERPROOF LED BATTEN FITTING
Minconsult
2 - 1C x 1.5mm² LSOH FLAME RETARDANT
SPARE
SPARE
SPARE
COMMUNICATIONS SDN BHD
187475-V
12th Floor, Menara Hap Seng
Jalan P Ramlee 50250 Kuala Lumpur
Tel : 03-2148 8810 Fax : 03-2142 4211
TIME TIME
SWITCH TS BY PASS SWITCH TS BY PASS
24 hrs SWITCH 24 hrs SWITCH
10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A
FUSE SPN SPN SPN SPN SPN SPN SPN SPN SPN FUSE SPN SPN SPN SPN SPN SPN
MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB
415V, 30A, 3 PHASE, 415V, 30A, 3 PHASE,
4 WIRE, 30kA, 3 SEC. R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 4 WIRE, 30kA, 3 SEC. R1 Y1 B1 R2 Y2 B2
ESCSLSTOR 1 PIT
ESCSLSTOR 2 PIT
TEL & ELEC RISER
ESCSLSTOR 1 PIT
ESCSLSTOR 2 PIT
SUCTION TANK
SUCTION TANK
ENTRANCE 2
LIFT LOBBY
LIFT 1 PIT
RETAIL 1
RETAIL 2
ROOM
ROOM
RISER
ROOM
SECURITY SHUTTER 2
SECURITY SHUTTER 1
SECURITY SHUTTER 2
BANDAR UTAMA TO JOHAN SETIA
MOUNTED S/S/O
MOUNTED S/S/O
MOUNTED S/S/O
MOUNTED S/S/O
MOUNTED S/S/O
MOUNTED S/S/O
MOUNTED S/S/O
MOUNTED S/S/O
(CP-RWHP-601)
PROJECT PACKAGE:
S/S/O (TWIN)
(CP-TP-901)
(VFP-9301)
(VFP-9311)
RETAIL 1
RETAIL 2
SPARE
SPARE
SPARE
SPARE
EASTERN CORRIDOR
SPARE
SPARE
SPARE
SUPERVISING AGENCY :
20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A
SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN
MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB PROJECT OWNER :
400V, 30A, 3 PHASE, 400V, 30A, 3 PHASE,
4 WIRE, 30kA, 3 SEC. R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 R4 Y4 B4 R5 Y5 B5 RYB6 RYB7 RYB8 RYB9 RYB10 RYB11 4 WIRE, 30kA, 3 SEC. R1 Y1 B1 R2 Y2 B2 R3 Y3 B3
4 x 1C 6mm2 LSOH FLAME RETARDANT CU. CABLE 4 x 1C 6mm2 LSOH FLAME RETARDANT CU. CABLE
+ E IN CABLE TRAY / TRUNKING + E IN CABLE TRAY / TRUNKING MRCB GEORGE KENT SDN BHD
LEVEL 3, MENARA BANK RAKYAT SHAH ALAM
NO. 1, JALAN INDAH 14/8, SEKSYEN 14,
FROM MSB - UiTM SHAH ALAM FROM MSB - UiTM SHAH ALAM
40000, SHAH ALAM,
ENTRANCE LINK 1 POB
ENTRANCE LINK 2
ESCALATOR 1 PIT
ESCALATOR 2 PIT
ESCALATOR 3 PIT
ESCALATOR 4 PIT
Tel: 603-50336888 Fax: 603-50336999
LIFT 1 SHAFT
LIFT 2 SHAFT
LEAD CONSULTANT :
2 x 1C 2.5mm² LSOH FLAME RETARDANT
Minconsult
1- 13A METALCLAD SURFACE
SPARE
SPARE
SPARE
SPARE
SPARE
SUBCONTRACTOR :
ESCALATOR 3 PIT
ESCALATOR 4 PIT
ENTRANCE LINK
ENTRANCE LINK
TOILET FEMALE
TOILET MALE
CORRIDOR 2
CORRIDOR 2
CORRIDOR 2
SMO ROOM
SMO ROOM
LIFT SHAFT
CSO ROOM
CSO ROOM
CSO ROOM
CSO ROOM
PAID AREA
PAID AREA
PAID AREA
PAID AREA
PAID AREA
PAID AREA
PAID AREA
PAID AREA
PAID AREA
PAID AREA
PAID AREA
PAID AREA
PAID AREA
PAID AREA
PAID AREA
CHR & JAN
SURAU (M)
ELV RISER
SURAU (F)
SURAU (F)
FA ROOM
FA ROOM
LV RISER
ACU 3
KERAJAAN MALAYSIA
(WEATHERPROOF)
(WEATHERPROOF)
(WEATHERPROOF)
(WEATHERPROOF)
(WEATHERPROOF)
(WEATHERPROOF)
(WEATHERPROOF)
(WEATHERPROOF)
(WEATHERPROOF)
(WEATHERPROOF)
(WEATHERPROOF)
SUPERVISING AGENCY :
SPARE
SPARE
SPARE
AGENSI PENGANGKUTAN AWAM DARAT ( APAD )
Aras G, M dan 20 Menara Tun Ismail Mohamed Ali,
No. 25 Jalan Raja Laut,
50350 Kuala Lumpur Tel : 03 - 2603 6600
Laman Web : www.apad.gov.my
PROJECT OWNER :
20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A
SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN
MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB
400V, 30A, 3 PHASE,
4 WIRE, 30kA, 3 SEC. R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 R4 Y4 B4 R5 Y5 B5 R6 Y6 B6 R7 Y7 B7 R8 Y8 B8 R9 Y9 B9 R10 Y10 B10 R11 Y11 B11 R12 Y12 B12 R13 Y13 B13 R14 Y14 B14 R15 Y15 B15 PRASARANA MALAYSIA BERHAD (467220-U)
RCCB 30A 4P (30mA) SPD CLASS II (7-MODE) B-20-1, LEVEL 20, MENARA UOA BANGSAR,
In/Imax (L-N & N-PE) = 40/80kA (8/20µs)
NO. 5 JALAN BANGSAR UTAMA 1,
3 x 5A R Y B
Iimp (N-PE) = 12kA (10/350µs) Spark-Gap
Isccr = 25kA rms 59000 KUALA LUMPUR.
UP @ Imax ≤ 1.5kV
FUSE UP @ Uoc/Isc ≤ 1.5kV
SPD
UOC/ISC ≥ 10kV (1.2/50µs) / 5kA (8/20µs)
(FUSE RATING
AS RECOMMENDED Tel: 603-22991999 Fax: 603-22991919
BY MANUFACTURER)
IP31 CONTRACTOR :
DB-CL-FOH/P(CONCOURSE LEVEL) 30A SWITCHBOARD EARTHING BAR 25mm x
T.C.L. = 13.75 kW TPN 3mm TINNED COPPER BAR WITH MS BOLTS
& NUTS
M.D. = 7.38 kW MCCB
(LOCATED AT DB ROOM)
ENGINEER ROOM
BOH CORRIDOR
STAFF ROOM
STAFF ROOM
LEAD CONSULTANT :
MSB ROOM
MSB ROOM
GAS ROOM
EER ROOM
EER ROOM
EER ROOM
UPS ROOM
UPS ROOM
UPS ROOM
SER ROOM
SER ROOM
SER ROOM
CORRIDOR
CORRIDOR
DB ROOM
DB ROOM
DCW &
DCW &
DCW &
ACU 1
ACU 2
MINCONSULT SDN. BHD.
(Company No. : 58835-P)
Minconsult
1 - 13A METALCLAD SURFACE MOUNTED S/S/O
(WEATHERPROOF)
(WEATHERPROOF)
(WEATHERPROOF)
(WEATHERPROOF)
SPARE
SPARE
COMMUNICATIONS SDN BHD
187475-V
12th Floor, Menara Hap Seng
Jalan P Ramlee 50250 Kuala Lumpur
Tel : 03-2148 8810 Fax : 03-2142 4211
20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A
SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN
MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB
400V, 30A, 3 PHASE,
4 WIRE, 30kA, 3 SEC. R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 R4 Y4 B4 R5 Y5 B5 R6 Y6 B6 R7 Y7 B7 R8 Y8 B8 R9 Y9 B9
Designed By : MALCOLM
RCCB 30A 4P (30mA) SPD CLASS II (7-MODE) Drawn By : MARIAM
3 x 5A In/Imax (L-N & N-PE) = 40/80kA (8/20µs)
R Y B Iimp (N-PE) = 12kA (10/350µs) Spark-Gap Checked By : NADZIRAH
Isccr = 25kA rms
UP @ Imax ≤ 1.5kV Approved By : CHANDRAN MOORTHY
FUSE UP @ Uoc/Isc ≤ 1.5kV
SPD
UOC/ISC ≥ 10kV (1.2/50µs) / 5kA (8/20µs)
(FUSE RATING CAD file no : KVLRT3-APEX-GS05-STN14-ELEC-LPS-SLD-300109_H00
AS RECOMMENDED
BY MANUFACTURER) Scale : N.T.S
IP31 Date : SEPT 2021
DB-CL-BOH/P(CONCOURSE LEVEL) 30A SWITCHBOARD EARTHING BAR 25mm x
T.C.L. = 10.25 kW TPN 3mm TINNED COPPER BAR WITH MS BOLTS Drawing Title :
& NUTS
M.D. = 5.98 kW MCCB
(LOCATED AT DB ROOM) KVLRT3 BUJS PKG GS05
4 x 1C 6mm2 LSOH FLAME RETARDANT STATION 14 UiTM SHAH ALAM
CU. CABLE + E IN TRUNKING
SINGLE LINE DIAGRAM
SMALL POWER FOR CONCOURSE LEVEL
Drawing No : Rev
FROM MSB - UiTM SHAH ALAM *PLEASE REFER IFC DRAWING NO : KVLRT3-MRCBGK-GS05-STN14-ELEC-LPS-SLD-250109_WW01
SHOP DRAWING KVLRT3-APEX-GS05-STN14-ELEC-LPS-SLD-300109 H00
KERAJAAN MALAYSIA
PROJECT TITLE:
ESCALATOR 3 PIT
ESCALATOR 4 PIT
BANDAR UTAMA TO JOHAN SETIA
PROJECT PACKAGE:
STAIRCASE
PLATFORM
PLATFORM
PLATFORM
PLATFORM
PLATFORM
PLATFORM
PLATFORM
PLATFORM
PLATFORM
PLATFORM
PLATFORM
PLATFORM
PLATFORM
PLATFORM
PLATFORM
PLATFORM
ELV RISER
LV RISER
JC RISER
JC RISER
EASTERN CORRIDOR
RISER
SUPERVISING AGENCY :
(WEATHERPROOF)
(WEATHERPROOF)
(WEATHERPROOF)
(WEATHERPROOF)
PRASARANA MALAYSIA BERHAD (467220-U)
B-20-1, LEVEL 20, MENARA UOA BANGSAR,
NO. 5 JALAN BANGSAR UTAMA 1,
SPARE
SPARE
SPARE
59000 KUALA LUMPUR.
CONTRACTOR :
LEAD CONSULTANT :
20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A LOT 6, JALAN 51A/223,
46100 PETALING JAYA, SELANGOR, MALAYSIA.
SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN Tel : 603-79545757, 79525757
MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB Fax : 603-79547373, 79547575
M.D. = 4.28 kW
MCCB & NUTS
+ E IN TRUNKING/CONDUIT
+ E IN TRUNKING/CONDUIT
+ E IN TRUNKING/CONDUIT
CONSTRUCTION AND COMPLETION OF LIGHT RAIL
T.C.L = 6.90kW
T.C.L = 0.79kW
T.C.L = 2.34kW
T.C.L = 2.34kW
M.D = 5.18kW
M.D = 0.73kW
M.D = 0.94kW
M.D = 0.94kW
BANDAR UTAMA TO JOHAN SETIA
PROJECT PACKAGE:
DB-CL/VF
DB-CL/AC
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
DB-SP1
DB-SP2
EASTERN CORRIDOR
SUPERVISING AGENCY :
30A 30A 30A 30A 30A 30A 30A 30A 30A 30A 30A 30A 30A 30A 30A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A
TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCCB MCCB MCCB PROJECT OWNER :
415V, 150A, 3 PHASE, 415V, 30A, 3 PHASE,
4 WIRE, 30kA, 3 SEC. RYB1 RYB2 RYB3 RYB4 RYB5 RYB6 RYB7 RYB8 RYB9 RYB10 RYB11 RYB12 RYB13 RYB14 RYB15 4 WIRE, 30kA, 3 SEC. R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 R4
150/5A
CLASS 1.0
CT DPM RCCB 30A 4P (100mA)
5A
SPD CLASS II (7-MODE) SPD CLASS II (7-MODE) PRASARANA MALAYSIA BERHAD (467220-U)
3x5A In/Imax (L-N & N-PE) = 40/80kA (8/20µs) In/Imax (L-N & N-PE) = 40/80kA (8/20µs)
R Y B
Iimp (N-PE) = 12kA (10/350µs) Spark-Gap 3 x 5A Iimp (N-PE) = 12kA (10/350µs) Spark-Gap B-20-1, LEVEL 20, MENARA UOA BANGSAR,
ZCT Isccr = 25kA rms R Y B Isccr = 25kA rms
UP @ Imax ≤ 1.5kV UP @ Imax ≤ 1.5kV NO. 5 JALAN BANGSAR UTAMA 1,
ELR FUSE UP @ Uoc/Isc ≤ 1.5kV FUSE UP @ Uoc/Isc ≤ 1.5kV 59000 KUALA LUMPUR.
SPD SPD
UOC/ISC ≥ 10kV (1.2/50µs) / 5kA (8/20µs) UOC/ISC ≥ 10kV (1.2/50µs) / 5kA (8/20µs)
(FUSE RATING (FUSE RATING
AS RECOMMENDED AS RECOMMENDED
150A BY MANUFACTURER) BY MANUFACTURER)
30A Tel: 603-22991999 Fax: 603-22991919
TPN
MCCB TPN
S/T SWITCHBOARD EARTHING BAR 25mm x MCCB SWITCHBOARD EARTHING BAR 25mm x CONTRACTOR :
SSB-ME (CONCOURSE LEVEL) 3mm TINNED COPPER BAR WITH MS BOLTS DB-AC (CONCOURSE LEVEL) 3mm TINNED COPPER BAR WITH MS BOLTS
T.C.L. = 62.75kW 3x5A & NUTS T.C.L. = 6.90 kW & NUTS
R Y B
M.D. = 25.88 kW M.D. = 5.18 kW
(LOCATED AT MSB ROOM) (LOCATED AT DB ROOM)
4 x 1C 35mm² LSOH FLAME RETARDANT CU. CABLE
+ E IN TRUNKING MRCB GEORGE KENT SDN BHD
FROM MSB-UiTM SHAH ALAM
4 x 1C 6mm² LSOH FLAME RETARDANT CU. CABLE
+ E IN CABLE TRAY/ TRUNKING LEVEL 3, MENARA BANK RAKYAT SHAH ALAM
NO. 1, JALAN INDAH 14/8, SEKSYEN 14,
1 - VENTILATION FAN PANEL (EAF-6271) AT DCW & RWH ROOM
1 - EXHAUST AIR FAN (EAF-6231) AT CLEAN CHEMICAL ROOM
LEAD CONSULTANT :
+ E IN TRUNKING/CONDUIT
+ E IN TRUNKING/CONDUIT
Minconsult
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SUBCONTRACTOR :
20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A Rev Date Description Desg Check Appr
SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN
MCB MCB MCB MCB MCB MCB MCB MCCB MCCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB H00 20/09/21 FIRST SUBMISSION M N CM
415V, 30A, 3 PHASE, 415V, 30A, 3 PHASE, 415V, 30A, 3 PHASE,
4 WIRE, 30kA, 3 SEC. R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 4 WIRE, 30kA, 3 SEC. R1 Y1 B1 R2 Y2 B2 4 WIRE, 30kA, 3 SEC. R1 Y1 B1 R2 Y2 B2
30/5A 30/5A
RCCB 30A 4P (100mA) CLASS 1.0 CLASS 1.0
CT 5A
PF CT 5A
PF
3 x 5A SPD CLASS II (7-MODE) RCCB 30A 4P (100mA) SPD CLASS II (7-MODE) RCCB 30A 4P (100mA) SPD CLASS II (7-MODE)
R Y B In/Imax (L-N & N-PE) = 40/80kA (8/20µs) In/Imax (L-N & N-PE) = 40/80kA (8/20µs) In/Imax (L-N & N-PE) = 40/80kA (8/20µs)
Iimp (N-PE) = 12kA (10/350µs) Spark-Gap 3 x 5A Iimp (N-PE) = 12kA (10/350µs) Spark-Gap 3 x 5A Iimp (N-PE) = 12kA (10/350µs) Spark-Gap
Isccr = 25kA rms R Y B Isccr = 25kA rms R Y B Isccr = 25kA rms
UP @ Imax ≤ 1.5kV UP @ Imax ≤ 1.5kV UP @ Imax ≤ 1.5kV Designed By : MALCOLM
FUSE FUSE UP @ Uoc/Isc ≤ 1.5kV FUSE UP @ Uoc/Isc ≤ 1.5kV
UP @ Uoc/Isc ≤ 1.5kV SPD SPD
SPD
UOC/ISC ≥ 10kV (1.2/50µs) / 5kA (8/20µs) (FUSE RATING
UOC/ISC ≥ 10kV (1.2/50µs) / 5kA (8/20µs)
(FUSE RATING
UOC/ISC ≥ 10kV (1.2/50µs) / 5kA (8/20µs) Drawn By : MARIAM
(FUSE RATING
AS RECOMMENDED AS RECOMMENDED AS RECOMMENDED
BY MANUFACTURER) BY MANUFACTURER) Checked By : NADZIRAH
BY MANUFACTURER)
30A Approved By : CHANDRAN MOORTHY
TPN 30A 30A
MCCB SWITCHBOARD EARTHING BAR 25mm x TPN SWITCHBOARD EARTHING BAR 25mm x TPN SWITCHBOARD EARTHING BAR 25mm x CAD file no : KVLRT3-MRCBGK-GS05-STN14-ELEC-MV-SLD-300111
DB-VF(CONCOURSE LEVEL) 3mm TINNED COPPER BAR WITH MS BOLTS DB-SP1(GROUND LEVEL) MCCB 3mm TINNED COPPER BAR WITH MS BOLTS DB-SP2(GROUND LEVEL) MCCB 3mm TINNED COPPER BAR WITH MS BOLTS
T.C.L. = 0.97 kW T.C.L. = 2.34 kW & NUTS T.C.L. = 2.34 kW & NUTS Scale :
& NUTS N.T.S
M.D. = 0.73 kW M.D. = 0.94 kW M.D. = 0.94 kW
Date : SEPT 2021
(LOCATED AT DB ROOM) (LOCATED AT SERVICE CORRIDOR) (LOCATED AT SERVICE CORRIDOR)
Drawing Title :
Drawing No : Rev
*PLEASE REFER IFC DRAWING NO : KVLRT3-MRCBGK-GS05-STN14-ELEC-MV-SLD-250111_WW01
SHOP DRAWING KVLRT3-APEX-GS05-STN14-ELEC-MV-SLD-300111 H00
2 x 1C 1.5mm² LSOH FLAME RETARDANT PVC CU. CABLE
+ E IN TRUNKING/CONDUIT C/W TERMINATION BOX
ILLUMINATED SIGNBOARD
ILLUMINATED SIGNBOARD
ILLUMINATED SIGNBOARD
ILLUMINATED SIGNBOARD
ILLUMINATED SIGNBOARD
ILLUMINATED SIGNBOARD
ILLUMINATED SIGNBOARD
ILLUMINATED SIGNBOARD
ILLUMINATED SIGNBOARD
(CONCOURSE LEVEL)
(CONCOURSE LEVEL)
(CONCOURSE LEVEL)
(CONCOURSE LEVEL)
(CONCOURSE LEVEL)
FACADE LIGHTING
FACADE LIGHTING
FACADE LIGHTING
FACADE LIGHTING
FACADE LIGHTING
FACADE LIGHTING
FACADE LIGHTING
FACADE LIGHTING
(GROUND LEVEL)
(GROUND LEVEL)
(GROUND LEVEL)
(GROUND LEVEL)
(GROUND LEVEL)
KERAJAAN MALAYSIA
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
PROJECT TITLE:
PROJECT PACKAGE:
10A TP N C4 C7
C1 C2 C3 C5 C6
CONT.
C EASTERN CORRIDOR
10A
TS BY PASS
SWITCH
10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 20A 20A 20A 20A 20A 20A
10A SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SUPERVISING AGENCY :
FUSE MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB
R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 R4 Y4 B4 R5 Y5 B5 R6 Y6 B6 R7 Y7 B7 R8 Y8 B8 R9 Y9 B9 R1 Y1 B1 R2 Y2 B2
30A SWITCHBOARD EARTHING BAR 25mm x 30A SPN SWITCHBOARD EARTHING BAR 25mm x
DB-FC/SG TPN 3mm TINNED COPPER BAR WITH MS BOLTS DB-ATM MCB 3mm TINNED COPPER BAR WITH MS BOLTS
MCCB
T.C.L. = 12.15 kW & NUTS T.C.L.= 1.00 kW & NUTS PROJECT OWNER :
M.D. = 10.94 kW M.D. = 1.00 kW
(LOCATED AT DB ROOM) (LOCATED AT DB ROOM)
+ E IN TRUNKING/CONDUIT
+ E IN TRUNKING/CONDUIT
59000 KUALA LUMPUR.
(DIGITAL SCREEN (TRIPS))
ADVERTISEMENT PANEL
ADVERTISEMENT PANEL
ADVERTISEMENT PANEL
ADVERTISEMENT PANEL
ADVERTISEMENT PANEL
ADVERTISEMENT PANEL
ADVERTISEMENT PANEL
ADVERTISEMENT PANEL
ADVERTISEMENT PANEL
ADVERTISEMENT PANEL
ADVERTISEMENT PANEL
(VERTICAL LIGHTBOX)
(VERTICAL LIGHTBOX)
(VERTICAL LIGHTBOX)
(VERTICAL LIGHTBOX)
(DIGITAL SCREEN)
(DIGITAL SCREEN)
(DIGITAL SCREEN)
(DIGITAL SCREEN)
(DIGITAL SCREEN)
SPARE
SPARE
CONTRACTOR :
SPARE
SPARE
SPARE
DB
DB
DB
DB
MRCB GEORGE KENT SDN BHD
LEVEL 3, MENARA BANK RAKYAT SHAH ALAM
NO. 1, JALAN INDAH 14/8, SEKSYEN 14,
40000, SHAH ALAM,
MCCB MCCB MCCB MCCB MCCB MCCB
SELANGOR DARUL EHSAN.
10A TP N
C1 C2 C3 C4 C5
CONT. RYB1 RYB2 RYB3 RYB4 RYB5 RYB6
C Tel: 603-50336888 Fax: 603-50336999
10A
TS BY PASS
SWITCH
ITB
10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A LEAD CONSULTANT :
10A SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN R Y B
FUSE MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB
ADVERTISEMENT PANEL
ADVERTISEMENT PANEL
ADVERTISEMENT PANEL
ADVERTISEMENT PANEL
ADVERTISEMENT PANEL
ADVERTISEMENT PANEL
ADVERTISEMENT PANEL
(VERTICAL LIGHTBOX)
(VERTICAL LIGHTBOX)
(VERTICAL LIGHTBOX)
(VERTICAL LIGHTBOX)
(DIGITAL SCREEN)
(WALL PANEL)
(WALL PANEL)
SPARE
SPARE
SPARE
10A TP N
C1 C2 C3 C4
CONT.
C
Designed By : MALCOLM
10A Drawn By :
TS BY PASS MARIAM
SWITCH
10A
10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A Checked By : NADZIRAH
SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN
FUSE MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB
Approved By : CHANDRAN MOORTHY
415V, 30A, 3 PHASE,
CAD file no : KVLRT3-APEX-GS05-STN14-ELEC-LPS-SLD-300112
4 WIRE, 30kA, 3 SEC. R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 R4 Y4 B4
Scale : N.T.S
RCCB 30A 4P (100mA)
Date : SEPT 2021
3 x 5A Drawing Title :
R Y B
IP31
DB-CL/ADV
30A
TPN
KVLRT3 BUJS PKG GS05
T.C.L. = 3.00 kW MCCB
EARTH BAR
M.D. = 2.25 kW STATION 14 UiTM SHAH ALAM
(LOCATED IN DB ROOM)
M
SINGLE LINE DIAGRAM
CHECK
METER ADVERTISING, SIGNAGE, FACADE AND ATM
Drawing No : Rev
FROM MSB - DATO' MENTERI
4 x 1C - 6mm² LSOH FLAME RETARDANT CU. CABLE
+ E IN TRUNKING
*PLEASE REFER IFC DRAWING NO : KVLRT3-MRCBGK-GS05-STN14-ELEC-LPS-SLD-250112_WW01
SHOP DRAWING KVLRT3-APEX-GS05-STN14-ELEC-LPS-SLD-300112 H00
2 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
PROJECT TITLE:
PROJECT PACKAGE:
EASTERN CORRIDOR
SUPERVISING AGENCY :
20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A
SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN AGENSI PENGANGKUTAN AWAM DARAT ( APAD )
MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB Aras G, M dan 20 Menara Tun Ismail Mohamed Ali,
No. 25 Jalan Raja Laut,
50350 Kuala Lumpur Tel : 03 - 2603 6600
R1 Y1 B1 R3 Y3 B3 R4 Y4 B4 RYB5 RYB6 R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 RYB4 RYB5 Laman Web : www.apad.gov.my
RCCB 30A 4P (100mA) RCCB 30A 4P (30mA) RCCB 30A 4P (100mA) RCCB 30A 4P (30mA)
PROJECT OWNER :
3 x 5A
SPD CLASS II (7-MODE) R Y B SPD CLASS II (7-MODE)
3 x 5A In/Imax (L-N & N-PE) = 40/80kA (8/20µs) In/Imax (L-N & N-PE) = 40/80kA (8/20µs)
R Y B Iimp (N-PE) = 12kA (10/350µs) Spark-Gap Iimp (N-PE) = 12kA (10/350µs) Spark-Gap
Isccr = 25kA rms Isccr = 25kA rms
UP @ Imax ≤ 1.5kV UP @ Imax ≤ 1.5kV
FUSE
SPD
UP @ Uoc/Isc ≤ 1.5kV FUSE
SPD
UP @ Uoc/Isc ≤ 1.5kV PRASARANA MALAYSIA BERHAD (467220-U)
UOC/ISC ≥ 10kV (1.2/50µs) / 5kA (8/20µs) UOC/ISC ≥ 10kV (1.2/50µs) / 5kA (8/20µs)
(FUSE RATING (FUSE RATING
AS RECOMMENDED AS RECOMMENDED B-20-1, LEVEL 20, MENARA UOA BANGSAR,
BY MANUFACTURER) BY MANUFACTURER) NO. 5 JALAN BANGSAR UTAMA 1,
59000 KUALA LUMPUR.
30A SWITCHBOARD EARTHING BAR 25mm x 30A SWITCHBOARD EARTHING BAR 25mm x
DB-CTER TPN 3mm TINNED COPPER BAR WITH MS BOLTS DB-MDF TPN 3mm TINNED COPPER BAR WITH MS BOLTS
T.C.L.= 6.68 kW & NUTS T.C.L.= 3.36 kW & NUTS Tel: 603-22991999 Fax: 603-22991919
M.D. = 3.96 kW
MCCB M.D. = 2.26 kW
MCCB
(LOCATED AT CTER ROOM) (LOCATED AT MDF ROOM) CONTRACTOR :
CHECK M CHECK M
METER METER
4 x 1C-10mm² LSOH FLAME RETARDANT CU. CABLE 4 x 1C-10mm² LSOH FLAME RETARDANT CU. CABLE MRCB GEORGE KENT SDN BHD
+ E IN CABLE TRUNKING + E IN CABLE TRUNKING
LEVEL 3, MENARA BANK RAKYAT SHAH ALAM
NO. 1, JALAN INDAH 14/8, SEKSYEN 14,
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
LOT 6, JALAN 51A/223,
46100 PETALING JAYA, SELANGOR, MALAYSIA.
Tel : 603-79545757, 79525757
Fax : 603-79547373, 79547575
SUBCONTRACTOR :
3 x 5A
R Y B SPD CLASS II (7-MODE)
In/Imax (L-N & N-PE) = 40/80kA (8/20µs)
Iimp (N-PE) = 12kA (10/350µs) Spark-Gap
Isccr = 25kA rms
UP @ Imax ≤ 1.5kV
FUSE UP @ Uoc/Isc ≤ 1.5kV
SPD
UOC/ISC ≥ 10kV (1.2/50µs) / 5kA (8/20µs)
(FUSE RATING
AS RECOMMENDED
BY MANUFACTURER) Designed By : MALCOLM
Drawn By : MARIAM
Drawing No :
*PLEASE REFER IFC DRAWING NO : KVLRT3-MRCBGK-GS05-STN14-ELEC-LPS-SLD-250113_WW01
SHOP DRAWING KVLRT3-APEX-GS05-STN14-ELEC-LPS-SLD-300113
Rev
H00
1 - 1 x 8W SURFACE MOUNTED EMERGENCY LIGHT
1 - A/C POINT
1 - A/C POINT
CONSTRUCTION AND COMPLETION OF LIGHT RAIL
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
TRANSIT LINE 3 (LRT3) FROM
BANDAR UTAMA TO JOHAN SETIA
PROJECT PACKAGE:
EASTERN CORRIDOR
SUPERVISING AGENCY :
R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 R4 Y4 B4 R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 R4 Y4 B4
RCCB 40A 4P (100mA) RCCB 40A 4P (30mA) RCCB 40A 4P (100mA) RCCB 40A 4P (30mA)
PROJECT OWNER :
3 x 5A 3 x 5A
R Y B SPD CLASS II (7-MODE) R Y B SPD CLASS II (7-MODE)
In/Imax (L-N & N-PE) = 40/80kA (8/20µs) In/Imax (L-N & N-PE) = 40/80kA (8/20µs)
Iimp (N-PE) = 12kA (10/350µs) Spark-Gap Iimp (N-PE) = 12kA (10/350µs) Spark-Gap PRASARANA MALAYSIA BERHAD (467220-U)
Isccr = 25kA rms Isccr = 25kA rms
UP @ Imax ≤ 1.5kV UP @ Imax ≤ 1.5kV B-20-1, LEVEL 20, MENARA UOA BANGSAR,
FUSE UP @ Uoc/Isc ≤ 1.5kV FUSE UP @ Uoc/Isc ≤ 1.5kV
SPD SPD NO. 5 JALAN BANGSAR UTAMA 1,
UOC/ISC ≥ 10kV (1.2/50µs) / 5kA (8/20µs) UOC/ISC ≥ 10kV (1.2/50µs) / 5kA (8/20µs)
(FUSE RATING (FUSE RATING
AS RECOMMENDED AS RECOMMENDED 59000 KUALA LUMPUR.
BY MANUFACTURER) BY MANUFACTURER)
CHECK M CHECK M
METER METER
MRCB GEORGE KENT SDN BHD
LEVEL 3, MENARA BANK RAKYAT SHAH ALAM
4 x 1C-10mm² LSOH FLAME RETARDANT 4 x 1C-10mm² LSOH FLAME RETARDANT NO. 1, JALAN INDAH 14/8, SEKSYEN 14,
+ E IN TRUNKING + E IN TRUNKING
40000, SHAH ALAM,
SELANGOR DARUL EHSAN.
FROM MSB -UiTM SHAH ALAM FROM MSB -UiTM SHAH ALAM
Tel: 603-50336888 Fax: 603-50336999
TYPICAL RETAIL/ KIOSK DISTRIBUTION BOARD ( PROVISIONAL ) TYPICAL RETAIL/ KIOSK DISTRIBUTION BOARD ( PROVISIONAL )
LEAD CONSULTANT :
SUBCONTRACTOR :
Designed By : MALCOLM
Drawn By : MARIAM
Checked By : NADZIRAH
Approved By : CHANDRAN MOORTHY
CAD file no : KVLRT3-APEX-GS05-STN14-ELEC-LPS-SLD-300114_H00
Scale : N.T.S
Date : SEPT 2021
Drawing Title :
Drawing No :
*PLEASE REFER IFC DRAWING NO : KVLRT3-MRCBGK-GS05-STN14-ELEC-LPS-SLD-250114_WW01
SHOP DRAWING KVLRT3-APEX-GS05-STN14-ELEC-LPS-SLD-300114
Rev
H00
UiTM COVERED WALKWAY
PROJECT PACKAGE:
EASTERN CORRIDOR
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SUPERVISING AGENCY :
N N
C C PROJECT OWNER :
TIME TIME
SWITCH TS BY PASS SWITCH TS BY PASS
24 hrs SWITCH 24 hrs SWITCH
10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A 10A
FUSE SPN SPN SPN SPN SPN SPN SPN SPN SPN FUSE SPN SPN SPN SPN SPN SPN SPN SPN SPN
MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB PRASARANA MALAYSIA BERHAD (467220-U)
415V, 30A, 3 PHASE, 415V, 30A, 3 PHASE,
4 WIRE, 30kA, 3 SEC. R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 4 WIRE, 30kA, 3 SEC. R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 B-20-1, LEVEL 20, MENARA UOA BANGSAR,
NO. 5 JALAN BANGSAR UTAMA 1,
RCCB 30A 4P RCCB 30A 4P 59000 KUALA LUMPUR.
(100 mA) SPD CLASS II (7-MODE) (100 mA) SPD CLASS II (7-MODE)
6A In/Imax (L-N & N-PE) = 40/80kA (8/20µs) 6A In/Imax (L-N & N-PE) = 40/80kA (8/20µs)
R Y B Iimp (N-PE) = 12kA (10/350µs) Spark-Gap R Y B Iimp (N-PE) = 12kA (10/350µs) Spark-Gap
Isccr = 25kA rms Isccr = 25kA rms
UP @ Imax ≤ 1.5kV UP @ Imax ≤ 1.5kV Tel: 603-22991999 Fax: 603-22991919
FUSE UP @ Uoc/Isc ≤ 1.5kV FUSE UP @ Uoc/Isc ≤ 1.5kV
SPD SPD
UOC/ISC ≥ 10kV (1.2/50µs) / 5kA (8/20µs) UOC/ISC ≥ 10kV (1.2/50µs) / 5kA (8/20µs)
(FUSE RATING (FUSE RATING
AS RECOMMENDED AS RECOMMENDED
CONTRACTOR :
BY MANUFACTURER) BY MANUFACTURER)
LEAD CONSULTANT :
SUBCONTRACTOR :
SPARE
SPARE
187475-V
12th Floor, Menara Hap Seng
Jalan P Ramlee 50250 Kuala Lumpur
Tel : 03-2148 8810 Fax : 03-2142 4211
N
C
TIME
SWITCH TS BY PASS
24 hrs SWITCH
10A 10A 10A 10A 10A 10A 10A 10A 10A 10A Designed By : MALCOLM
FUSE SPN SPN SPN SPN SPN SPN SPN SPN SPN
MCB MCB MCB MCB MCB MCB MCB MCB MCB Drawn By : MARIAM
415V, 30A, 3 PHASE,
4 WIRE, 30kA, 3 SEC. R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 Checked By : NADZIRAH
Approved By : CHANDRAN MOORTHY
RCCB 30A 4P
(100 mA) SPD CLASS II (7-MODE)
CAD file no : KVLRT3-APEX-GS05-STN14-ELEC-LPS-SLD-300115_H00
In/Imax (L-N & N-PE) = 40/80kA (8/20µs)
6A Iimp (N-PE) = 12kA (10/350µs) Spark-Gap
R Y B Isccr = 25kA rms Scale : N.T.S
UP @ Imax ≤ 1.5kV
FUSE UP @ Uoc/Isc ≤ 1.5kV Date : SEPT 2021
SPD
UOC/ISC ≥ 10kV (1.2/50µs) / 5kA (8/20µs)
(FUSE RATING
AS RECOMMENDED Drawing Title :
BY MANUFACTURER)
IP-31 30A
TPN
KVLRT3 BUJS PKG GS05
DB-UiTM/L3 SWITCHBOARD EARTHING BAR 25mm x
T.C.L. = 0.97kW MCCB 3mm TINNED COPPER BAR WITH MS BOLTS
& NUTS
STATION 14 UiTM SHAH ALAM
M.D. = 0.87kW
SINGLE LINE DIAGRAM
(LOCATED AT
COVERED WALKWAY) 4 - 1C X 6mm² LSOH FLAME RETARDANT CU. CABLE LIGHTING FOR
+ E IN CABLE TRAY / TRUNKING UiTM COVERED WALKWAY
Drawing No :
FROM DTAC
*PLEASE REFER IFC DRAWING NO : KVLRT3-MRCBGK-GS05-STN14-ELEC-LPS-SLD-250115_WW01
SHOP DRAWING KVLRT3-APEX-GS05-STN14-ELEC-LPS-SLD-300115
Rev
H00