Calibration of Concrete Mixer

Replacement of two Old dilapidated Bailey Bridge at Km 122.25 with Unibridge Box Type Steel Grider with
Project - concrete decking ( Permanent Bridge positive camber) without footpath on NH 202 (old NH 150),
Churachandpur- Tipaimukh Road in the State of manipur

Client- National Highways and Infrastructure Development Corporation Limited (NHDCL)


Contractor- Titagarh Bridges And International Pvt. Ltd
Mode of mixer: Model No: Capacity : Per Batch : Date:

Total Weight : 300.00 kGs


Mateials Name: Cement

Increament Load (In Kgs) Decreament Load (In Kgs) Remarks


Div. of Weight In
SL Nos. Actual Observed Indv. Actual (In Observed Indv.
KGs)
(In Kgs) (In KGs) Variation % Kgs) (In KGs) Variation %
1 50.00 50.00 300.00

2 50.00 100.00 250.00

3 50.00 150.00 200.00

4 50.00 200.00 150.00

5 50.00 250.00 100.00

6 50.00 300.00 50.00

Name :

Signature :
TBIPL Representative NHIDCL Representative