Owner has a single point of responsibility for design The D-B contractor has the incentive to complete
and construction. projects faster and less expensively which can mean
Potential for better design and construction reduced quality of materials and workmanship.
coordination because the A/E is working for the The owner has less involvement and control of the
contractor. design because the A/E represents the D-B
Owner does not have to arbitrate disputes between contractor’s best interests, not the owner’s. Not only
the A/E and contractor. is this a disadvantage for the owner, but it creates a
Owner reduces their risk because the D/B contractor difficult conflict of interest for the A/E.
is responsible for errors or omissions in the design The owner does not benefit from independent
documents. advice and input from the A/E and contractor.
Could be less administrative burden on the owner. Greater definition of the project is required up front
Potential for accelerated schedule because the to define goals, objectives, and minimum
contractor is onboard at the beginning and because requirements for project function, appearance,
of the overlapping of design and construction work. quality, materials, operation, etc. prior to bidding to
Potential for lower costs due to the contractor being D-B teams.
in greater control of the project and due to the More risk for D-B teams, which can negate the
accelerated schedule. potential cost saving opportunities.
Costs are well defined earlier in the process