Professional Documents
Culture Documents
S.No Checkpoint
1 Organisation size
a) No. of employees
2 Site to be certified
3 Supporting locations
5 Certification scope
6 Quality manual
a) Scope of the QMS including exclusion and justifications
b) Documented procedures or reference to them
c) description of interaction between processes of QMS
7 Internal audit
a) Audit schedules
b) Audit logs / reports
c) One full cycle before on-site audit
d) from previous 12 months
e) Customer requirements included in internal audit
f) Mfg. process audits and product audits conducted
g) All NCR's closed