Professional Documents
Culture Documents
TEST DESCRIPTION
Identification of WPS followed 004-GTAW ERCuNi Test Coupon Production Weld
Specification and type/grade or UNS Number of base metal(s) SB-111 UNS C70600 Thickness 1,65 mm
TESTING VARIABLES AND QUALIFICATION LIMITS
Welding Variables (QW-350) Actual Values Range Qualified
Welding process(es) GTAW GTAW
Type (i.e.; manual, semi-automatic) used Manual Manual
Backing (with/without) None With / Without
Plate Pipe (enter diameter if pipe or tube) Ø 25,4 mm Ø 25 mm - Unlimited
Base metal P-Number to P-Number 34 to 34 34
Filler metal or electrode specification(s) (SFA) (info only) 5.7 5.7
Fliler metal or electrode specification(s) (info only) ER-CuNi ER-CuNi
Filler metal F-Number(s) 34 34
Consumable insert (GTAW or PAW) Not Used Without
Filler Metal Product Form (solid/metal or flux cored/powder) (GTAW or PAW) Solid Solid
Deposit thickness for each process
Process 1 GTAW 3 layers minimum Yes No 1,65 mm 3,3 mm
Process 2 ---- 3 layers minimum Yes No ----- -----
Position qualified (2G, 6G, 3F, etc.) 6G All
Vertical progression (uphill or downhill) Uphill Uphill
Type of fuel gas (OFW) ----- -----
Inert gas backing (GTAW, PAW, GMAW) With With
Transfer mode (spray/globular or pulse to short circuit - GMAW) ----- -----
GTAW current type/polarity (AC, DCEP, DCEN) DCSP DCSP
RESULTS
Visual examination of completed weld (QW-302.4) OK
Transverse face and root bends [QW-462.3(a)] Longitudinal bends [QW-462.3(b)] Side bends (QW-462.2)
Pipe bend specimen, corrosion-resistant weld metal overlay [QW-462.5(c)]
Plate bend specimen, corrosion-resistant weld metal overlay [QW-462.5(d)]
Pipe specimen, macro test for fusion [QW-462.5(b)] Plate specimen, macro test for fusion [QW-462.5(e)]
We certify that the statements in this record are correct and that the test coupons were prepared, welded and tested in accordance with the requirements of
Section IX of the ASME BOILER AND PRESSURE VESSEL CODE.
Page 1of 1
Laboratorio de Ensayos INFORME DE ENSAYOS/ ■<-
Metrológicos y de
Materiales CERTIFICADO DE
LEMAT CALIBRACIÓN FIMCP
Edición: 4
Cliente
Cliente • Conforme
14-0505 T-1 23/09/2014 ■ LEMAT 0 23/09/2014
Otros
No aplica
i—i
1-1
No conforme E
Cliente •
Cliente Conforme .1
14-0506 T-2 23/09/2014 ■ LEMAT E 23/09/2014
Otros p
No aplica P
No conforme E
Cliente
Cliente gil Conforme
14-0507 DC-1 23/09/2014 LEMAT E 23/09/2014
Otros II r--1 No conforme p
No aplica 1-1
Cliente 111
14-0508 DC•2 23/09/2014
Cliente
LEMAT E
Conforme El 23/09/2014
Otros p mi No conforme •
No aplica 1-1
Cliente •
Cliente Conforme
14-0509 DR-1 23/09/2014 LEMAT E 23/09/2014
Otros 11/ No conforme •
No aplica 0
Cliente •
Cliente IR Conforme a
14-0510 DR-2 23/09/2014 LEMAT E 23/09/2014
Otros E No aplica P
No conforme p
MC2203-01
LOS RESULTADOS DECLARADOS EN ESTE INFORME SE REFIEREN ÚNICAMENTE A LOS OBJETOS ENSAYADOS.
Se prohibe la reproducción total o parcial del presente informe, salvo aprobación escrita del LEMAT
Guayaquil: Campus "Gustavo Galindo" Km. 30.5 vía perimetral, contiguo a la Cdla. Santa Cecilia.
Fax: (593-4)2269293 - Teléfono: 2269375
E-mail: lemat®espoiedu.cc
MC2201 -04
Laboratorio de Ensayos INFORME DE ENSAYOS/ N„
Metrológicos y de
Materiales CERTIFICADO DE
LEMAT CALIBRACIÓN FIMCP
Edición: 4
OBSERVACIONES:
Las muestras y lo información de las mismas fueron proporcionadas por el cliente.
La roturo de los probetas 14-0505 y 14-0506 ocurrió fuera de la soldadura.
El ancho y espesor reportados corresponden a las dimensiones de la probeta antes del ensayo.
LOS RESULTADOS DECLARADOS EN ESTE INFORME SE REFIEREN ÚNICAMENTE A LOS OBJETOS ENSAYADOS.
Se prohibe la reproducción total o parcial del presente informe, salvo aprobación escrita del LEMAT
Guayaquil; Campus "Gustavo Galindo" Km. 30.5 vía perimetral, contiguo a la Cdla. Santa Cecilia.
Fax: (593-4)2269293 - Telefono: 2269375
E-mail. lemat@espoLedu.ec
MC2201 -04
Laboratorio de Ensayos INFORME DE ENSAYOS/ N.
Metrológicos y de
Materiales CERTIFICADO DE
LEMAT CALIBRACIÓN F1MCP.
Edición: 4
ENSAYOS DE DOBLADO
Código de
Posición Resultado
muestra
OBSERVACIONES:
Las muestras ensayadas y la información de las mismas fueron proporcionadas por el cliente.
LOS RESULTADOS DECLARADOS EN ESTE INFORME SE REFIEREN ÚNICAMENTE A LOS OBJETOS ENSAYADOS.
Se prohibe la reproducción total o parcial del presente informe, salvo aprobación escrita del LEMAT
Guayaquil; Campus "Gustavo Galindo" Km. 30.5 vía perimetral, contiguo a la Cdla. Santa Cecilia.
Fax: (593-9)2269293 - Teléfono: 2269375
E-mail: lemai@espoLedu.ec
MC2201 -04
WELDER PERFORMANCE QUALIFICATION (WPQ)
(CALIFICACIÓN DE DESEMPEÑO DEL SOLDADOR)
TEST DESCRIPTION
Identification of WPS followed 003-GTAW/SMAW Test Coupon Production Weld
Specification and type/grade or UNS Number of base metal(s) SA-312 TP 316/316L Thickness 6 mm
TESTING VARIABLES AND QUALIFICATION LIMITS
Welding Variables (QW-350) Actual Values Range Qualified
Welding process(es) GTAW SMAW GTAW SMAW
Type (i.e.; manual, semi-automatic) used Manual Manual Manual Manual
Backing (with/without) Without Weld Metal With or Without Weld Metal
Plate Pipe (enter diameter if pipe or tube) 114.3 mm 114.3 mm Ø ≥ 73 mm F, H & V
P-No. 1 through P-No. 15F, P-No. 34, and
Base metal P-Number to P-Number 8 to 8 8 to 8 P-No. 41 through P-No. 49
Filler metal or electrode specification(s) (SFA) (info only) 5,9 5,4 ---- ----
Fliler metal or electrode specification(s) (info only) ER-316L E-316L ---- ----
Filler metal F-Number(s) 6 4 6 4
Consumable insert (GTAW or PAW) ---- ---- ---- ----
Filler Metal Product Form (solid/metal or flux cored/powder) (GTAW or PAW) ---- ---- ---- ----
Deposit thickness for each process
Process 1 GTAW 3 layers minimum Yes No 4 mm ---- Up to 8 mm ----
Process 2 SMAW 3 layers minimum Yes No ---- 2 mm ---- Up to 4 mm
Position qualified (2G, 6G, 3F, etc.) 5G 5G Groove F, H, V; Fillet All
Vertical progression (uphill or downhill) Uphill Uphill Uphill & Donwhill
Type of fuel gas (OFW) ---- ---- ---- ----
Inert gas backing (GTAW, PAW, GMAW) Ar ---- With ----
Transfer mode (spray/globular or pulse to short circuit - GMAW) ---- ---- ---- ----
GTAW current type/polarity (AC, DCEP, DCEN) DCEN ---- DCEN-DCEP ----
RESULTS
Visual examination of completed weld (QW-302.4) OK
Transverse face and root bends [QW-462.3(a)] Longitudinal bends [QW-462.3(b)] Side bends (QW-462.2)
Pipe bend specimen, corrosion-resistant weld metal overlay [QW-462.5(c)]
Plate bend specimen, corrosion-resistant weld metal overlay [QW-462.5(d)]
Pipe specimen, macro test for fusion [QW-462.5(b)] Plate specimen, macro test for fusion [QW-462.5(e)]
We certify that the statements in this record are correct and that the test coupons were prepared, welded and tested in accordance with the requirements of
Section IX of the ASME BOILER AND PRESSURE VESSEL CODE.
Page 1of 1
Laboratorio de Ensayos INFORME DE ENSAYOS/ N.
Metrológicos y de
Materiales CERTIFICADO DE
LEMAT CALIBRACIÓN FIMCP
Edición: 4
DATOS DE LA MUESTRA
Fecha de Muestreo Condiciones de la Fecha de
Código de Muestra Descripción de la muestra
Recepción realizado por muestra Ensayo
Cliente I. Conforme al
14-0310 Tracción 1 19/02/2014 25/02/2014
Otros o No conforme El
Cliente Conforme
14-0313 Doblado Raíz 2 19/02/2014 25/02/2014
Otros o No conforme MI
Cliente E Conforme a
14-0315 Doblado Cara 2 19/02/2014 25/02/2014
Otros O No conforme MI
Cliente Conforme a
14-0827 Tracción 3 08/05/2014 20/05/2014
Otros O No conforme N
MC2203-01
LOS RESULTADOS DECLARADOS EN ESTE INFORME SE REFIEREN ÚNICAMENTE A LOS OBJETOS ENSAYADOS.
Se prohibe la reproducción total o parcial del presente informe, salvo aprobación escrita del LEMAT
Guayaquil: Campus "Gustavo Galindo" Km. 30.5 vio perimetraI contiguo a la Cdla. Santa Cecilia.
Fax: (593-4)2269293 - Teléfono: 2269375
E-mail: lemat@espoLedu.ec
MC2201 -04
Laboratorio de Ensayos INFORME DE ENSAYOS/ %,
Metrológicos y de
Materiales CERTIFICADO DE
LEMAT CALIBRACIÓN FIMCP
Edición: 4
ESFUERZO
CÓDIGO DE ANCHO ESPESOR ÁREA DESIGNACIÓN
MUESTRA (mm) (mm) (mm2) PROBETA
(N/mm2)
14-0310 12,26 5,64 69,15 Tracción 1 515,157
14-0311 12,51 5,66 70,81 Tracción 1 504,137
14-0827 14,07 5,69 80,06 Tracción 3 554,362
Tabla I. Ensayos de tensión. Resultados.
OBSERVACIONES:
Las muestras y la información de las mismas fueron proporcionadas por el cliente.
El "Espesor nominal" corresponde al espesor de la tubería.
El 'ANCHO" y "ESPESOR" corresponden a las dimensiones de la probeta ensayada.
La rotura de la probeta 14-0310 ocurrió fuera de la soldadura.
La rotura de las probetas 14-0311 y 14-0827 ocurrió dentro de la soldadura.
LOS RESULTADOS DECLARADOS EN ESTE INFORME SE REFIEREN ÚNICAMENTE A LOS OBJETOS ENSAYADOS.
Se prohibe la reproducción total o parcial del presente informe, salvo aprobación escrita del LEMAT.
Guayaquil; Campus "Gustavo Galindo" Km. 30.5 vía perin7etral, contiguo a la Cdla. Santa Cecilia.
Fax: (593-4)2269293 - Teléfono: 2269375
E-mail: lemat@espoledu.ec
MC2201 -04
Laboratorio de Ensayos INFORME DE ENSAYOS/ N.
Metrológicos y de
Materiales CERTIFICADO DE
LEMAT CALIBRACIÓN FIMCP
Edición: 4
CÓDIGO DE RESULTADO
POSICIÓN
MUESTRA
14-0312 RAÍZ No se observan fisuras ni discontinuidades.
14-0313 RAÍZ No se observan fisuras ni discontinuidades.
14-0314 CARA No se observan fisuras ni discontinuidades.
14-0315 CARA No se observan fisuras ni discontinuidades.
Tabla 2. Ensayo de doblado. Resultados.
OBSERVACIONES:
- Las probetas ensayadas y la información de las mismas fueron proporcionadas por el cliente.
LOS RESULTADOS DECLARADOS EN ESTE INFORME SE REFIEREN ÚNICAMENTE A LOS OBJETOS ENSAYADOS.
Se prohibe la reproducción total o parcial del presente informe, salvo aprobación escrita del LEMAT
Guayaquil; Campus "Gustavo Galindo" Km. 30.5 vía perimetral, contiguo a la Cdla. Santa Cecilia.
Fax: (593-4)2269293 - Teléfono: 2269375
E-mail: lemat@espol.edu.ec
MC2201 -04
WELDER PERFORMANCE QUALIFICATION (WPQ)
(CALIFICACIÓN DE DESEMPEÑO DEL SOLDADOR)
TEST DESCRIPTION
Identification of WPS followed 002-GTAW ER70S6 Test Coupon Production Weld
Specification and type/grade or UNS Number of base metal(s) SA-53 Gr. B Thickness 9/32"
TESTING VARIABLES AND QUALIFICATION LIMITS
Welding Variables (QW-350) Actual Values Range Qualified
Welding process(es) GTAW GTAW
Type (i.e.; manual, semi-automatic) used Manual Manual
Backing (with/without) None With / Without
Plate Pipe (enter diameter if pipe or tube) Ø 6" Ø 2-7/8" - Unlimited
P-No. 1 through P-No. 15F, P-No. 34,
Base metal P-Number to P-Number 1 to 1 and P-No. 41 through P-No. 49
Filler metal or electrode specification(s) (SFA) (info only) 5.18 5.18
Fliler metal or electrode specification(s) (info only) ER70S6 ER70S6
Filler metal F-Number(s) 6 All F-No. 6
Consumable insert (GTAW or PAW) Not Used Without
Filler Metal Product Form (solid/metal or flux cored/powder) (GTAW or PAW) Solid Solid
Deposit thickness for each process
Process 1 GTAW 3 layers minimum Yes No 9/32" 9/16"
Process 2 ---- 3 layers minimum Yes No ----- -----
Position qualified (2G, 6G, 3F, etc.) 6G All
Vertical progression (uphill or downhill) Uphill Uphill
Type of fuel gas (OFW) ----- -----
Inert gas backing (GTAW, PAW, GMAW) ----- -----
Transfer mode (spray/globular or pulse to short circuit - GMAW) ----- -----
GTAW current type/polarity (AC, DCEP, DCEN) DCEN DCEN
RESULTS
Visual examination of completed weld (QW-302.4) OK
Transverse face and root bends [QW-462.3(a)] Longitudinal bends [QW-462.3(b)] Side bends (QW-462.2)
Pipe bend specimen, corrosion-resistant weld metal overlay [QW-462.5(c)]
Plate bend specimen, corrosion-resistant weld metal overlay [QW-462.5(d)]
Pipe specimen, macro test for fusion [QW-462.5(b)] Plate specimen, macro test for fusion [QW-462.5(e)]
We certify that the statements in this record are correct and that the test coupons were prepared, welded and tested in accordance with the requirements of
Section IX of the ASME BOILER AND PRESSURE VESSEL CODE.
Page 1of 1
Laboratorio de Ensayos \*¿{,f
l\{etrológicos v de
Materiales
Edición 3
DATOS Dg LA MUESTRA
Muestreo
Fecha de Condiciones de Fecha de
Cédigo de Muestra Descripción de Ia muestra re¡lizado
Recepcién Ia muestra Ensayo
DOr
LÚS RESLILTAüAS DECLARAilOS EN ESTE TNFORME SE REFIEREN UNICAMENTE A LOS OBJETOS ENSAYADOS.
SeTrrobibe ln rvprodwcciriw totsl o parcinl áel pres€ntc iufanrua salao ,tprabedów esu4ta áel LEMAT
l"i(,220f
Laboratcrio de Ensayos
Metrológicos y de
Materiales
Edigién 3
Hoja: 2 de 3 Fecha de emisión: 08/as/2ot2
Ne lnforme: t2-t43 Número de Orden: oT-305-12
ELONGACIÓN
ESFUERZO ESF''TTERZO
ANCHO ESPESOR ÁRe.q DESIGNACIÓN DESPUÉS DE LA
PROBETA N{ÁXIMO FLT]ENCIA-
(mm) (mm) (mm2) PROBETA ROTtiRd
(Nlmm') (N/mm')
(%)
12-0205 12,15 6,48 78,73 No.7 485"59 320.6'l 24,64
OBSERII4CIONES:
fiuestras y la información de las mismas fueron proporcionadas por el cliente.
rotura de las probetas ocurrió -fuera de la soldadura.
.*El esfwerzo cle fluencia reportado corresponde al esfuetzo calculada con el 0,2%o de elongacién en l,a muestra ] 2-0205
LOS RES(ILTADOS DECUIRADOS EN ESTE INFORME SE REFTEREN UNICAMENTE A LOS OBJETOS ENSAYADOS.
Se prohibe ln reproducúón tatal o parcial del preseTrte inforwe, salva aprobación escrita del LEMAT
L)at4,aqui!: Catnltas "Ciustaz'o C¿4in¡lo I'.", K,z i!.-j ún Pnin:ehwt, ¡onlfuito a la Crlla. ,l¿¡tlu Ceri/ia.
Fax: (59)-4) 22692t)] -Telifbna: ?.?69 j7t
tsi - t¡ ai i: /e t¡t ¡ ¡{ii ¿.tl' o /. ¿ rh¡. e ¡
I,rc?201
Laboratorio de Ensayos
Meuológicos y de
Materiales
Edición 3
CONDICIÓN: OK
INFORMACIÓI¡,EUCrcX¿I: N/C
OBSERVACIONES:
- Las probetas ensayadas y la información de las mismas fueron proporcionadas por el cliente.
T-OS RESULTADOS DECLARADOS EN ESTE INFAAWE SE REFIERET{ UNICAMENTE A LOS OBJETOS ENSAYADOS.
Se fut rcprodacúón total a parcinl del presente informe, saluo aprobañón escrita lel LEMAT
proltibe
Caayaqúl: ilantpus "Custara Cslintlo T'.", I{¡,"s J{}.5 t'1¡t Pni¡¡¿etru/, conrt..gtttt a t'a i'rJk. Saata Ces.lia.
Fex: (59)-4)'22ú929i - Teléfono: 226rj75
E E¿a i /: lnna {a), es¡ c /. etla. c r
Atc?20t
WELDER PERFORMANCE QUALIFICATION (WPQ)
(CALIFICACIÓN DE DESEMPEÑO DEL SOLDADOR)
TEST DESCRIPTION
Identification of WPS followed 001-SMAW E7018/FCAW E71T1C Test Coupon Production Weld
Specification and type/grade or UNS Number of base metal(s) SA-36 Thickness 0.708"
TESTING VARIABLES AND QUALIFICATION LIMITS
Welding Variables (QW-350) Actual Values Range Qualified
Welding process(es) SMAW FCAW SMAW FCAW
Type (i.e.; manual, semi-automatic) used Manual Semiautomatic Manual Semiautomatic
Backing (with/without) Weld Metal Weld Metal With
Plate Pipe (enter diameter if pipe or tube) 0,708" 0,708" Ø ≥ 2-7/8 F ; Ø > 24 V
P-No. 1 through P-No. 15F, P-No. 34,
Base metal P-Number to P-Number 1 to 1 1 to 1 and P-No. 41 through P-No. 49
Filler metal or electrode specification(s) (SFA) (info only) 5.1 5.20 ---- ----
Fliler metal or electrode specification(s) (info only) E-7018 E-71T1C ---- ----
Filler metal F-Number(s) 4 6 4, 3, 2, 1 6
Consumable insert (GTAW or PAW) ---- ---- ---- ----
Filler Metal Product Form (solid/metal or flux cored/powder) (GTAW or PAW) ---- ---- ---- ----
Deposit thickness for each process
Process 1 SMAW 3 layers minimum Yes No 0,354" ---- Up to 0,708" ----
Process 2 FCAW 3 layers minimum Yes No ---- 0,354" ---- Up to 0,708"
Position qualified (2G, 6G, 3F, etc.) 3G 3G Groove F, V ; Fillet F, V, H
Vertical progression (uphill or downhill) Uphill Uphill Uphill
Type of fuel gas (OFW) ---- ---- ---- ----
Inert gas backing (GTAW, PAW, GMAW) ---- None ---- With/Without
Transfer mode (spray/globular or pulse to short circuit - GMAW) ---- Spray Arc ---- Spray; Globular
GTAW current type/polarity (AC, DCEP, DCEN) ---- ---- ---- ----
RESULTS
Visual examination of completed weld (QW-302.4) OK
Transverse face and root bends [QW-462.3(a)] Longitudinal bends [QW-462.3(b)] Side bends (QW-462.2)
Pipe bend specimen, corrosion-resistant weld metal overlay [QW-462.5(c)]
Plate bend specimen, corrosion-resistant weld metal overlay [QW-462.5(d)]
Pipe specimen, macro test for fusion [QW-462.5(b)] Plate specimen, macro test for fusion [QW-462.5(e)]
We certify that the statements in this record are correct and that the test coupons were prepared, welded and tested in accordance with the requirements of
Section IX of the ASME BOILER AND PRESSURE VESSEL CODE.
Page 1of 1
EDICIÓN No. 1
CONTROL DE SOLDADURA SECCIÓN: 12 REV. 0
MANUAL DE CONTROL DE CALIDAD ASME PÁGINA 1 OF 9
12.1 GENERAL
12.2.1 Los WPS son elabarados por el QCC, quien debe incluir la siguiente
información para cada proceso:
12.2.1.1 Variables esenciales
12.2.1.2 Variables suplementarias esenciales (cuando sean
aplicables requerimientos de pruebas de impacto)
12.2.1.3 Variables no esenciales
12.2.2 El QCI debe dar seguimiento y registrar todas las variables reales
esenciales y suplementarias esenciales (si aplican), durante la
soldadura de las probetas de prueba. El Jefe de Producción debe
proporcionar total supervisión y control de los soldadores durante la
producción de estas probetas de prueba.
12.2.3 El QCC es responsable de asegurar que la preparación y ensayo de
las muestras requeridas se llevará a cabo por un laboratorio bajo los
requisitos de la Sección IX.
12.2.4 El QCC debe revisar el reporte de pruebas presentado por el
laboratorio y si es aceptable, elabora y certifica el Procedure
Qualification Record (PQR), el cual debe incluir todas las variables
esenciales y suplementaarias esenciales (si aplican) para cada
proceso, y los resultados de las pruebas.
12.2.5 Los originales de los WPS y PQR calificados, y los reportes de
pruebas de laboratorio son conservados por el QCC. Copias de los
WPS se proporcionan al Jefe de Producción para su uso por los
soldadores y operadores de soldadura.
12.2.6 Los WPS se revisan cunado hay un cambio en una variable no
esencial. Cuando hay un cambio en una variable esencial o
complementaria esencial, el WPS necesita ser re-calificado o un
nuevo WPS debe ser calificado.
12.2.7 Los WPS y PQR se presentan al AI para su revisión. El AI puede
solicitar re-calificación de un WPS en cualquier momento.
EDICIÓN No. 1
CONTROL DE SOLDADURA SECCIÓN: 12 REV. 0
MANUAL DE CONTROL DE CALIDAD ASME PÁGINA 2 OF 9
El QCC asigna a cada soldador calificado una estampa única con la cual
identifican cada soldadura que hagan a intervalos de no más de 36” (1
metro). Cuando las condiciones requieran dichos estampes el soldador debe
colocar su identificación junto a cada una de sus soldaduras, con pintura. El
QCI de Planta/Campo debe registrar la identificación del soldador en el Mapa
de Soldaduras.
12.9 REGISTROS
12.10 EXHIBITS
EXHIBIT 12.1a
EXHIBIT 12.1a
WELDER CONTROL LIST REV. 0
(CONTROL DE SOLDADORES) PAGE 1 OF 1
(PÁGINA) (DE)
(MODO DE TRANSFERENCIA)
CONSUMMABLE INSERTS
(CORRIENTE / POLARIDAD)
(INSERTO CONSUMIBLE)
CURRENT / POLARITY
(DIÁMETRO TUBERÍA)
(GAS DE RESPALDO)
TRANSFER MODE
(TIPO DE APORTE)
INERT BACKING
PIPE DIAMETER
PROGRESSION
(PROGRESIÓN)
FILLER TYPE
(RESPALDO)
(NÚMERO P)
(NÚMERO F)
P NUMBER
F NUMBER
PROCESS
(PROCESO)
(POSICIÓN)
BACKING
POSITION
(NOMBRE)
(APORTE)
FILLER
STAMP
NAME
TYPE
(TIPO)
(ID)
LEGEND + With (Con) - Without (Sin) All All (Todos) F Flat (Plano) H Horizontal V Vertical
(Nomenclatura)
O Overhead (Sobrecabeza) SP Special (Especial) U Uphill (Ascendente) D Downhill (Descendente)
SC Short circuit (Corto circuito) FC Flux cored (Tubular) S Solid (Sólido) G/S Globular / Spray (Globular / Rociado)
* P-No. 1 through P-No. 15F, P-No. 34, and P-No. 41 through P-No. 49
EXHIBIT 12.1b
EXHIBIT 12.1b
WELDING OPERATOR CONTROL LIST REV. 0
(CONTROL DE OPERADORES DE SOLDADORA) PAGE 1 OF 1
(PÁGINA) (DE)
CONSUMMABLE INSERTS
(INSERTO CONSUMIBLE)
VOLTAGE CONTROL
(CONTROL DE VOLTAJE)
VISUAL CONTROL
(RESPALDO)
PROCESS
(PROCESO)
(POSICIÓN)
BACKING
POSITION
(NOMBRE)
STAMP
NAME
TYPE
(TIPO)
(ID)
LEGEND + With (Con) - Without (Sin) All All (Todos) F Flat (Plano) H Horizontal V Vertical
(Nomenclatura)
O Overhead (Sobrecabeza) SP Special (Especial) U Uphill (Ascendente) D Downhill (Descendente)
SC Short circuit (Corto circuito) FC Flux cored (Tubular) S Solid (Sólido) G/S Globular / Spray (Globular / Rociado)
EXHIBIT 12.2
EXHIBIT 12.2
WELDER LOG REV. 0
(CONTINUIDAD SOLDADORES) PAGE 1 OF 1
(PÁGINA) (DE)
QCI SIGNATURE
DATE
CONTROL DE SOLDADURA EDICIÓN No. 1
SECCIÓN: 12 REV. 0
MANUAL DE CONTROL DE CALIDAD ASME
PÁGINA 9 OF 9
EXHIBIT 12.3
PROCEDURE QUALIFICATION RECORD (PQR)
(REGISTRO DE CALIFICACIÓN DE PROCEDIMIENTO)
JOINTS (QW-402)
Page 1 of 2
PROCEDURE QUALIFICATION RECORD (PQR)
(REGISTRO DE CALIFICACIÓN DE PROCEDIMIENTO)
OTHER TEST
Type of Test -----
Deposit Analysis -----
Other -----
Welder's Name Ángel Morocho Clock No. 0602975104 Stamp No. S17
Tests Conducted by ESPOL - LEMAT Laboratory Test No. 14-341
We certify that the statements in this record are correct and that the test welds were prepared, welded and tested in accordance with the requirements of
Section IX of the ASME Boiler and Pressure Vessel Code.
(Detail of record of tests are illustrative only and may be modified to conform to the type and number of tests requiered by the Code.)
Page 2 of 2
Laboratorio de Ensayos INFORME DE ENSAYOS/ ■<-
Metrológicos y de
Materiales CERTIFICADO DE
LEMAT CALIBRACIÓN FIMCP
Edición: 4
Cliente
Cliente • Conforme
14-0505 T-1 23/09/2014 ■ LEMAT 0 23/09/2014
Otros
No aplica
i—i
1-1
No conforme E
Cliente •
Cliente Conforme .1
14-0506 T-2 23/09/2014 ■ LEMAT E 23/09/2014
Otros p
No aplica P
No conforme E
Cliente
Cliente gil Conforme
14-0507 DC-1 23/09/2014 LEMAT E 23/09/2014
Otros II r--1 No conforme p
No aplica 1-1
Cliente 111
14-0508 DC•2 23/09/2014
Cliente
LEMAT E
Conforme El 23/09/2014
Otros p mi No conforme •
No aplica 1-1
Cliente •
Cliente Conforme
14-0509 DR-1 23/09/2014 LEMAT E 23/09/2014
Otros 11/ No conforme •
No aplica 0
Cliente •
Cliente IR Conforme a
14-0510 DR-2 23/09/2014 LEMAT E 23/09/2014
Otros E No aplica P
No conforme p
MC2203-01
LOS RESULTADOS DECLARADOS EN ESTE INFORME SE REFIEREN ÚNICAMENTE A LOS OBJETOS ENSAYADOS.
Se prohibe la reproducción total o parcial del presente informe, salvo aprobación escrita del LEMAT
Guayaquil: Campus "Gustavo Galindo" Km. 30.5 vía perimetral, contiguo a la Cdla. Santa Cecilia.
Fax: (593-4)2269293 - Teléfono: 2269375
E-mail: lemat®espoiedu.cc
MC2201 -04
Laboratorio de Ensayos INFORME DE ENSAYOS/ N„
Metrológicos y de
Materiales CERTIFICADO DE
LEMAT CALIBRACIÓN FIMCP
Edición: 4
OBSERVACIONES:
Las muestras y lo información de las mismas fueron proporcionadas por el cliente.
La roturo de los probetas 14-0505 y 14-0506 ocurrió fuera de la soldadura.
El ancho y espesor reportados corresponden a las dimensiones de la probeta antes del ensayo.
LOS RESULTADOS DECLARADOS EN ESTE INFORME SE REFIEREN ÚNICAMENTE A LOS OBJETOS ENSAYADOS.
Se prohibe la reproducción total o parcial del presente informe, salvo aprobación escrita del LEMAT
Guayaquil; Campus "Gustavo Galindo" Km. 30.5 vía perimetral, contiguo a la Cdla. Santa Cecilia.
Fax: (593-4)2269293 - Telefono: 2269375
E-mail. lemat@espoLedu.ec
MC2201 -04
Laboratorio de Ensayos INFORME DE ENSAYOS/ N.
Metrológicos y de
Materiales CERTIFICADO DE
LEMAT CALIBRACIÓN F1MCP.
Edición: 4
ENSAYOS DE DOBLADO
Código de
Posición Resultado
muestra
OBSERVACIONES:
Las muestras ensayadas y la información de las mismas fueron proporcionadas por el cliente.
LOS RESULTADOS DECLARADOS EN ESTE INFORME SE REFIEREN ÚNICAMENTE A LOS OBJETOS ENSAYADOS.
Se prohibe la reproducción total o parcial del presente informe, salvo aprobación escrita del LEMAT
Guayaquil; Campus "Gustavo Galindo" Km. 30.5 vía perimetral, contiguo a la Cdla. Santa Cecilia.
Fax: (593-9)2269293 - Teléfono: 2269375
E-mail: lemai@espoLedu.ec
MC2201 -04
PROCEDURE QUALIFICATION RECORD (PQR)
(REGISTRO DE CALIFICACIÓN DE PROCEDIMIENTO)
JOINTS (QW-402)
Page 1 of 2
PROCEDURE QUALIFICATION RECORD (PQR)
(REGISTRO DE CALIFICACIÓN DE PROCEDIMIENTO)
OTHER TEST
Type of Test -----
Deposit Analysis -----
Other -----
Welder's Name Rivera Pluas Emilio Guillermo Clock No. 0919723130 Stamp No. S-16
Tests Conducted by ESPOL - LEMAT Laboratory Test No. 14-1304
We certify that the statements in this record are correct and that the test welds were prepared, welded and tested in accordance with the requirements of
Section IX of the ASME Boiler and Pressure Vessel Code.
(Detail of record of tests are illustrative only and may be modified to conform to the type and number of tests requiered by the Code.)
Page 2 of 2
Laboratorio de Ensayos INFORME DE ENSAYOS/ N.
Metrológicos y de
Materiales CERTIFICADO DE
LEMAT CALIBRACIÓN FIMCP
Edición: 4
DATOS DE LA MUESTRA
Fecha de Muestreo Condiciones de la Fecha de
Código de Muestra Descripción de la muestra
Recepción realizado por muestra Ensayo
Cliente I. Conforme al
14-0310 Tracción 1 19/02/2014 25/02/2014
Otros o No conforme El
Cliente Conforme
14-0313 Doblado Raíz 2 19/02/2014 25/02/2014
Otros o No conforme MI
Cliente E Conforme a
14-0315 Doblado Cara 2 19/02/2014 25/02/2014
Otros O No conforme MI
Cliente Conforme a
14-0827 Tracción 3 08/05/2014 20/05/2014
Otros O No conforme N
MC2203-01
LOS RESULTADOS DECLARADOS EN ESTE INFORME SE REFIEREN ÚNICAMENTE A LOS OBJETOS ENSAYADOS.
Se prohibe la reproducción total o parcial del presente informe, salvo aprobación escrita del LEMAT
Guayaquil: Campus "Gustavo Galindo" Km. 30.5 vio perimetraI contiguo a la Cdla. Santa Cecilia.
Fax: (593-4)2269293 - Teléfono: 2269375
E-mail: lemat@espoLedu.ec
MC2201 -04
Laboratorio de Ensayos INFORME DE ENSAYOS/ %,
Metrológicos y de
Materiales CERTIFICADO DE
LEMAT CALIBRACIÓN FIMCP
Edición: 4
ESFUERZO
CÓDIGO DE ANCHO ESPESOR ÁREA DESIGNACIÓN
MUESTRA (mm) (mm) (mm2) PROBETA
(N/mm2)
14-0310 12,26 5,64 69,15 Tracción 1 515,157
14-0311 12,51 5,66 70,81 Tracción 1 504,137
14-0827 14,07 5,69 80,06 Tracción 3 554,362
Tabla I. Ensayos de tensión. Resultados.
OBSERVACIONES:
Las muestras y la información de las mismas fueron proporcionadas por el cliente.
El "Espesor nominal" corresponde al espesor de la tubería.
El 'ANCHO" y "ESPESOR" corresponden a las dimensiones de la probeta ensayada.
La rotura de la probeta 14-0310 ocurrió fuera de la soldadura.
La rotura de las probetas 14-0311 y 14-0827 ocurrió dentro de la soldadura.
LOS RESULTADOS DECLARADOS EN ESTE INFORME SE REFIEREN ÚNICAMENTE A LOS OBJETOS ENSAYADOS.
Se prohibe la reproducción total o parcial del presente informe, salvo aprobación escrita del LEMAT.
Guayaquil; Campus "Gustavo Galindo" Km. 30.5 vía perin7etral, contiguo a la Cdla. Santa Cecilia.
Fax: (593-4)2269293 - Teléfono: 2269375
E-mail: lemat@espoledu.ec
MC2201 -04
Laboratorio de Ensayos INFORME DE ENSAYOS/ N.
Metrológicos y de
Materiales CERTIFICADO DE
LEMAT CALIBRACIÓN FIMCP
Edición: 4
CÓDIGO DE RESULTADO
POSICIÓN
MUESTRA
14-0312 RAÍZ No se observan fisuras ni discontinuidades.
14-0313 RAÍZ No se observan fisuras ni discontinuidades.
14-0314 CARA No se observan fisuras ni discontinuidades.
14-0315 CARA No se observan fisuras ni discontinuidades.
Tabla 2. Ensayo de doblado. Resultados.
OBSERVACIONES:
- Las probetas ensayadas y la información de las mismas fueron proporcionadas por el cliente.
LOS RESULTADOS DECLARADOS EN ESTE INFORME SE REFIEREN ÚNICAMENTE A LOS OBJETOS ENSAYADOS.
Se prohibe la reproducción total o parcial del presente informe, salvo aprobación escrita del LEMAT
Guayaquil; Campus "Gustavo Galindo" Km. 30.5 vía perimetral, contiguo a la Cdla. Santa Cecilia.
Fax: (593-4)2269293 - Teléfono: 2269375
E-mail: lemat@espol.edu.ec
MC2201 -04
PROCEDURE QUALIFICATION RECORD (PQR)
(REGISTRO DE CALIFICACIÓN DE PROCEDIMIENTO)
JOINTS (QW-402)
Page 1 of 2
PROCEDURE QUALIFICATION RECORD (PQR)
(REGISTRO DE CALIFICACIÓN DE PROCEDIMIENTO)
OTHER TEST
Type of Test -----
Deposit Analysis -----
Other -----
Welder's Name Daniel Ramos Clock No. 0921090437 Stamp No. S12
Tests Conducted by ESPOL - LEMAT Laboratory Test No. 12-143
We certify that the statements in this record are correct and that the test welds were prepared, welded and tested in accordance with the requirements of
Section IX of the ASME Boiler and Pressure Vessel Code.
(Detail of record of tests are illustrative only and may be modified to conform to the type and number of tests requiered by the Code.)
Page 2 of 2
Laboratorio de Ensayos \*¿{,f
l\{etrológicos v de
Materiales
Edición 3
DATOS Dg LA MUESTRA
Muestreo
Fecha de Condiciones de Fecha de
Cédigo de Muestra Descripción de Ia muestra re¡lizado
Recepcién Ia muestra Ensayo
DOr
LÚS RESLILTAüAS DECLARAilOS EN ESTE TNFORME SE REFIEREN UNICAMENTE A LOS OBJETOS ENSAYADOS.
SeTrrobibe ln rvprodwcciriw totsl o parcinl áel pres€ntc iufanrua salao ,tprabedów esu4ta áel LEMAT
l"i(,220f
Laboratcrio de Ensayos
Metrológicos y de
Materiales
Edigién 3
Hoja: 2 de 3 Fecha de emisión: 08/as/2ot2
Ne lnforme: t2-t43 Número de Orden: oT-305-12
ELONGACIÓN
ESFUERZO ESF''TTERZO
ANCHO ESPESOR ÁRe.q DESIGNACIÓN DESPUÉS DE LA
PROBETA N{ÁXIMO FLT]ENCIA-
(mm) (mm) (mm2) PROBETA ROTtiRd
(Nlmm') (N/mm')
(%)
12-0205 12,15 6,48 78,73 No.7 485"59 320.6'l 24,64
OBSERII4CIONES:
fiuestras y la información de las mismas fueron proporcionadas por el cliente.
rotura de las probetas ocurrió -fuera de la soldadura.
.*El esfwerzo cle fluencia reportado corresponde al esfuetzo calculada con el 0,2%o de elongacién en l,a muestra ] 2-0205
LOS RES(ILTADOS DECUIRADOS EN ESTE INFORME SE REFTEREN UNICAMENTE A LOS OBJETOS ENSAYADOS.
Se prohibe ln reproducúón tatal o parcial del preseTrte inforwe, salva aprobación escrita del LEMAT
L)at4,aqui!: Catnltas "Ciustaz'o C¿4in¡lo I'.", K,z i!.-j ún Pnin:ehwt, ¡onlfuito a la Crlla. ,l¿¡tlu Ceri/ia.
Fax: (59)-4) 22692t)] -Telifbna: ?.?69 j7t
tsi - t¡ ai i: /e t¡t ¡ ¡{ii ¿.tl' o /. ¿ rh¡. e ¡
I,rc?201
Laboratorio de Ensayos
Meuológicos y de
Materiales
Edición 3
CONDICIÓN: OK
INFORMACIÓI¡,EUCrcX¿I: N/C
OBSERVACIONES:
- Las probetas ensayadas y la información de las mismas fueron proporcionadas por el cliente.
T-OS RESULTADOS DECLARADOS EN ESTE INFAAWE SE REFIERET{ UNICAMENTE A LOS OBJETOS ENSAYADOS.
Se fut rcprodacúón total a parcinl del presente informe, saluo aprobañón escrita lel LEMAT
proltibe
Caayaqúl: ilantpus "Custara Cslintlo T'.", I{¡,"s J{}.5 t'1¡t Pni¡¡¿etru/, conrt..gtttt a t'a i'rJk. Saata Ces.lia.
Fex: (59)-4)'22ú929i - Teléfono: 226rj75
E E¿a i /: lnna {a), es¡ c /. etla. c r
Atc?20t
PROCEDURE QUALIFICATION RECORD (PQR)
(REGISTRO DE CALIFICACIÓN DE PROCEDIMIENTO)
JOINTS (QW-402)
Page 1 of 2
PROCEDURE QUALIFICATION RECORD (PQR)
(REGISTRO DE CALIFICACIÓN DE PROCEDIMIENTO)
OTHER TEST
Type of Test -----
Deposit Analysis -----
Other -----
Welder's Name William Alfredo Menoscal Pinto Clock No. 0919592055 Stamp No. S11
Tests Conducted by ESPOL - LEMAT Laboratory Test No. 12-133
We certify that the statements in this record are correct and that the test welds were prepared, welded and tested in accordance with the requirements of
Section IX of the ASME Boiler and Pressure Vessel Code.
(Detail of record of tests are illustrative only and may be modified to conform to the type and number of tests requiered by the Code.)
Page 2 of 2
WELDING PROCEDURE SPECIFICATIONS (WPS)
(ESPECIFICACIONES DE PROCEDIMIENTO DE SOLDADURA)
1-n GTAW ERCuNi 1,6mm DCSP 40-60 ---- ---- 9-11 ---- ----
Amps and volts, or power or energy range, should be recorded for each electrode size, position, and thickness, etc.
TECHNIQUE (QW-410)
String or Weave Bead Both
Orifice, Nozzle, or Gas Cup Size 12mm - 19mm
Initial and Interpass Cleaninig (Brushing, Griding, etc.) Brushing
---------
Method of Back Gouging Griding
Oscilation -----
Contact Tube to Work Distance -----
Multiple or Single Pass (Per Side) Both
Multiple or Single Electrodes Single
Electrode Spacing -----
Peening Not Allowed
Other Thermal process: any ; Out chamber
Page 2 of 2
WELDING PROCEDURE SPECIFICATIONS (WPS)
(ESPECIFICACIONES DE PROCEDIMIENTO DE SOLDADURA)
1-n GTAW ER-308L 2.4 mm DCRP 85-130 ---- ---- 13-17 ---- ----
1-n SMAW E308L-16 2.4 mm DCRP 50-65 ---- ---- 25-30 ---- ----
Amps and volts, or power or energy range, should be recorded for each electrode size, position, and thickness, etc.
TECHNIQUE (QW-410)
String or Weave Bead Both
Orifice, Nozzle, or Gas Cup Size 12.7 mm - 19.05 mm
Initial and Interpass Cleaninig (Brushing, Griding, etc.) Griding & Brushing
---------
Method of Back Gouging Griding
Oscilation -----
Contact Tube to Work Distance As required
Multiple or Single Pass (Per Side) Both
Multiple or Single Electrodes Single
Electrode Spacing -----
Peening Not Allowed
Other Thermal process: any
1-n GTAW ER70S6 3/32" DCSP 100-160 ---- ---- 10 - 20 ---- ----
Amps and volts, or power or energy range, should be recorded for each electrode size, position, and thickness, etc.
TECHNIQUE (QW-410)
String or Weave Bead Both
Orifice, Nozzle, or Gas Cup Size 1/2" - 3/4"
Initial and Interpass Cleaninig (Brushing, Griding, etc.) Brushing
---------
Method of Back Gouging Griding
Oscilation -----
Contact Tube to Work Distance -----
Multiple or Single Pass (Per Side) Both
Multiple or Single Electrodes Single
Electrode Spacing -----
Peening Not Allowed
Other Thermal process: any ; Out chamber
Page 2 of 2
WELDING PROCEDURE SPECIFICATIONS (WPS)
(ESPECIFICACIONES DE PROCEDIMIENTO DE SOLDADURA)
WPS No. 001-SMAW E7018/FCAW E71T1C Rev. 0 Date. April 09, 2012
(Fecha)
Prepared By: Darío Sánchez Supporting PQR No. 001-SMAW/FCAW
(Elaborado Por) (Soportado Por PQR No.)
Welding Process(es): SMAW / FCAW Type(s) Manual / Semiautomatic
(Proceso de Soldadura) (Tipo) Automatic, Manual, Machine or Semi-Automatic)
1-n SMAW E-7018 1/8" DCRP 90-135 ---- ---- 18-25 ---- ----
200-400
1-n FCAW E-71T1C 0.045" DCRP 130-250 ---- 20-30 ---- ----
IPM
Amps and volts, or power or energy range, should be recorded for each electrode size, position, and thickness, etc.
TECHNIQUE (QW-410)
String or Weave Bead Both
Orifice, Nozzle, or Gas Cup Size 1/2" - 3/4"
Initial and Interpass Cleaninig (Brushing, Griding, etc.) Griding & Brushing
---------
Method of Back Gouging Griding
Oscilation -----
Contact Tube to Work Distance 1/2" - 1"
Multiple or Single Pass (Per Side) Both
Multiple or Single Electrodes Single
Electrode Spacing -----
Peening Not Allowed
Other Thermal process: any
Page 2 of 2
WELDER PERFORMANCE QUALIFICATION (WPQ)
(CALIFICACIÓN DE DESEMPEÑO DEL SOLDADOR)
TEST DESCRIPTION
Identification of WPS followed 004-GTAW ERCuNi Test Coupon Production Weld
Specification and type/grade or UNS Number of base metal(s) SB-111 UNS C70600 Thickness 1,65 mm
TESTING VARIABLES AND QUALIFICATION LIMITS
Welding Variables (QW-350) Actual Values Range Qualified
Welding process(es) GTAW GTAW
Type (i.e.; manual, semi-automatic) used Manual Manual
Backing (with/without) None With / Without
Plate Pipe (enter diameter if pipe or tube) Ø 25,4 mm Ø 25 mm - Unlimited
Base metal P-Number to P-Number 34 to 34 34
Filler metal or electrode specification(s) (SFA) (info only) 5.7 5.7
Fliler metal or electrode specification(s) (info only) ER-CuNi ER-CuNi
Filler metal F-Number(s) 34 34
Consumable insert (GTAW or PAW) Not Used Without
Filler Metal Product Form (solid/metal or flux cored/powder) (GTAW or PAW) Solid Solid
Deposit thickness for each process
Process 1 GTAW 3 layers minimum Yes No 1,65 mm 3,3 mm
Process 2 ---- 3 layers minimum Yes No ----- -----
Position qualified (2G, 6G, 3F, etc.) 6G All
Vertical progression (uphill or downhill) Uphill Uphill
Type of fuel gas (OFW) ----- -----
Inert gas backing (GTAW, PAW, GMAW) With With
Transfer mode (spray/globular or pulse to short circuit - GMAW) ----- -----
GTAW current type/polarity (AC, DCEP, DCEN) DCSP DCSP
RESULTS
Visual examination of completed weld (QW-302.4) OK
Transverse face and root bends [QW-462.3(a)] Longitudinal bends [QW-462.3(b)] Side bends (QW-462.2)
Pipe bend specimen, corrosion-resistant weld metal overlay [QW-462.5(c)]
Plate bend specimen, corrosion-resistant weld metal overlay [QW-462.5(d)]
Pipe specimen, macro test for fusion [QW-462.5(b)] Plate specimen, macro test for fusion [QW-462.5(e)]
We certify that the statements in this record are correct and that the test coupons were prepared, welded and tested in accordance with the requirements of
Section IX of the ASME BOILER AND PRESSURE VESSEL CODE.
Page 1of 1
Laboratorio de Ensayos INFORME DE ENSAYOS/ ■<-
Metrológicos y de
Materiales CERTIFICADO DE
LEMAT CALIBRACIÓN FIMCP
Edición: 4
Cliente
Cliente • Conforme
14-0505 T-1 23/09/2014 ■ LEMAT 0 23/09/2014
Otros
No aplica
i—i
1-1
No conforme E
Cliente •
Cliente Conforme .1
14-0506 T-2 23/09/2014 ■ LEMAT E 23/09/2014
Otros p
No aplica P
No conforme E
Cliente
Cliente gil Conforme
14-0507 DC-1 23/09/2014 LEMAT E 23/09/2014
Otros II r--1 No conforme p
No aplica 1-1
Cliente 111
14-0508 DC•2 23/09/2014
Cliente
LEMAT E
Conforme El 23/09/2014
Otros p mi No conforme •
No aplica 1-1
Cliente •
Cliente Conforme
14-0509 DR-1 23/09/2014 LEMAT E 23/09/2014
Otros 11/ No conforme •
No aplica 0
Cliente •
Cliente IR Conforme a
14-0510 DR-2 23/09/2014 LEMAT E 23/09/2014
Otros E No aplica P
No conforme p
MC2203-01
LOS RESULTADOS DECLARADOS EN ESTE INFORME SE REFIEREN ÚNICAMENTE A LOS OBJETOS ENSAYADOS.
Se prohibe la reproducción total o parcial del presente informe, salvo aprobación escrita del LEMAT
Guayaquil: Campus "Gustavo Galindo" Km. 30.5 vía perimetral, contiguo a la Cdla. Santa Cecilia.
Fax: (593-4)2269293 - Teléfono: 2269375
E-mail: lemat®espoiedu.cc
MC2201 -04
Laboratorio de Ensayos INFORME DE ENSAYOS/ N„
Metrológicos y de
Materiales CERTIFICADO DE
LEMAT CALIBRACIÓN FIMCP
Edición: 4
OBSERVACIONES:
Las muestras y lo información de las mismas fueron proporcionadas por el cliente.
La roturo de los probetas 14-0505 y 14-0506 ocurrió fuera de la soldadura.
El ancho y espesor reportados corresponden a las dimensiones de la probeta antes del ensayo.
LOS RESULTADOS DECLARADOS EN ESTE INFORME SE REFIEREN ÚNICAMENTE A LOS OBJETOS ENSAYADOS.
Se prohibe la reproducción total o parcial del presente informe, salvo aprobación escrita del LEMAT
Guayaquil; Campus "Gustavo Galindo" Km. 30.5 vía perimetral, contiguo a la Cdla. Santa Cecilia.
Fax: (593-4)2269293 - Telefono: 2269375
E-mail. lemat@espoLedu.ec
MC2201 -04
Laboratorio de Ensayos INFORME DE ENSAYOS/ N.
Metrológicos y de
Materiales CERTIFICADO DE
LEMAT CALIBRACIÓN F1MCP.
Edición: 4
ENSAYOS DE DOBLADO
Código de
Posición Resultado
muestra
OBSERVACIONES:
Las muestras ensayadas y la información de las mismas fueron proporcionadas por el cliente.
LOS RESULTADOS DECLARADOS EN ESTE INFORME SE REFIEREN ÚNICAMENTE A LOS OBJETOS ENSAYADOS.
Se prohibe la reproducción total o parcial del presente informe, salvo aprobación escrita del LEMAT
Guayaquil; Campus "Gustavo Galindo" Km. 30.5 vía perimetral, contiguo a la Cdla. Santa Cecilia.
Fax: (593-9)2269293 - Teléfono: 2269375
E-mail: lemai@espoLedu.ec
MC2201 -04
WELDER PERFORMANCE QUALIFICATION (WPQ)
(CALIFICACIÓN DE DESEMPEÑO DEL SOLDADOR)
TEST DESCRIPTION
Identification of WPS followed 003-GTAW/SMAW Test Coupon Production Weld
Specification and type/grade or UNS Number of base metal(s) SA-312 TP 316/316L Thickness 6 mm
TESTING VARIABLES AND QUALIFICATION LIMITS
Welding Variables (QW-350) Actual Values Range Qualified
Welding process(es) GTAW SMAW GTAW SMAW
Type (i.e.; manual, semi-automatic) used Manual Manual Manual Manual
Backing (with/without) Without Weld Metal With or Without Weld Metal
Plate Pipe (enter diameter if pipe or tube) 114.3 mm 114.3 mm Ø ≥ 73 mm F, H & V
P-No. 1 through P-No. 15F, P-No. 34, and
Base metal P-Number to P-Number 8 to 8 8 to 8 P-No. 41 through P-No. 49
Filler metal or electrode specification(s) (SFA) (info only) 5,9 5,4 ---- ----
Fliler metal or electrode specification(s) (info only) ER-316L E-316L ---- ----
Filler metal F-Number(s) 6 4 6 4
Consumable insert (GTAW or PAW) ---- ---- ---- ----
Filler Metal Product Form (solid/metal or flux cored/powder) (GTAW or PAW) ---- ---- ---- ----
Deposit thickness for each process
Process 1 GTAW 3 layers minimum Yes No 4 mm ---- Up to 8 mm ----
Process 2 SMAW 3 layers minimum Yes No ---- 2 mm ---- Up to 4 mm
Position qualified (2G, 6G, 3F, etc.) 5G 5G Groove F, H, V; Fillet All
Vertical progression (uphill or downhill) Uphill Uphill Uphill & Donwhill
Type of fuel gas (OFW) ---- ---- ---- ----
Inert gas backing (GTAW, PAW, GMAW) Ar ---- With ----
Transfer mode (spray/globular or pulse to short circuit - GMAW) ---- ---- ---- ----
GTAW current type/polarity (AC, DCEP, DCEN) DCEN ---- DCEN-DCEP ----
RESULTS
Visual examination of completed weld (QW-302.4) OK
Transverse face and root bends [QW-462.3(a)] Longitudinal bends [QW-462.3(b)] Side bends (QW-462.2)
Pipe bend specimen, corrosion-resistant weld metal overlay [QW-462.5(c)]
Plate bend specimen, corrosion-resistant weld metal overlay [QW-462.5(d)]
Pipe specimen, macro test for fusion [QW-462.5(b)] Plate specimen, macro test for fusion [QW-462.5(e)]
We certify that the statements in this record are correct and that the test coupons were prepared, welded and tested in accordance with the requirements of
Section IX of the ASME BOILER AND PRESSURE VESSEL CODE.
Page 1of 1
Laboratorio de Ensayos INFORME DE ENSAYOS/ N.
Metrológicos y de
Materiales CERTIFICADO DE
LEMAT CALIBRACIÓN FIMCP
Edición: 4
DATOS DE LA MUESTRA
Fecha de Muestreo Condiciones de la Fecha de
Código de Muestra Descripción de la muestra
Recepción realizado por muestra Ensayo
Cliente I. Conforme al
14-0310 Tracción 1 19/02/2014 25/02/2014
Otros o No conforme El
Cliente Conforme
14-0313 Doblado Raíz 2 19/02/2014 25/02/2014
Otros o No conforme MI
Cliente E Conforme a
14-0315 Doblado Cara 2 19/02/2014 25/02/2014
Otros O No conforme MI
Cliente Conforme a
14-0827 Tracción 3 08/05/2014 20/05/2014
Otros O No conforme N
MC2203-01
LOS RESULTADOS DECLARADOS EN ESTE INFORME SE REFIEREN ÚNICAMENTE A LOS OBJETOS ENSAYADOS.
Se prohibe la reproducción total o parcial del presente informe, salvo aprobación escrita del LEMAT
Guayaquil: Campus "Gustavo Galindo" Km. 30.5 vio perimetraI contiguo a la Cdla. Santa Cecilia.
Fax: (593-4)2269293 - Teléfono: 2269375
E-mail: lemat@espoLedu.ec
MC2201 -04
Laboratorio de Ensayos INFORME DE ENSAYOS/ %,
Metrológicos y de
Materiales CERTIFICADO DE
LEMAT CALIBRACIÓN FIMCP
Edición: 4
ESFUERZO
CÓDIGO DE ANCHO ESPESOR ÁREA DESIGNACIÓN
MUESTRA (mm) (mm) (mm2) PROBETA
(N/mm2)
14-0310 12,26 5,64 69,15 Tracción 1 515,157
14-0311 12,51 5,66 70,81 Tracción 1 504,137
14-0827 14,07 5,69 80,06 Tracción 3 554,362
Tabla I. Ensayos de tensión. Resultados.
OBSERVACIONES:
Las muestras y la información de las mismas fueron proporcionadas por el cliente.
El "Espesor nominal" corresponde al espesor de la tubería.
El 'ANCHO" y "ESPESOR" corresponden a las dimensiones de la probeta ensayada.
La rotura de la probeta 14-0310 ocurrió fuera de la soldadura.
La rotura de las probetas 14-0311 y 14-0827 ocurrió dentro de la soldadura.
LOS RESULTADOS DECLARADOS EN ESTE INFORME SE REFIEREN ÚNICAMENTE A LOS OBJETOS ENSAYADOS.
Se prohibe la reproducción total o parcial del presente informe, salvo aprobación escrita del LEMAT.
Guayaquil; Campus "Gustavo Galindo" Km. 30.5 vía perin7etral, contiguo a la Cdla. Santa Cecilia.
Fax: (593-4)2269293 - Teléfono: 2269375
E-mail: lemat@espoledu.ec
MC2201 -04
Laboratorio de Ensayos INFORME DE ENSAYOS/ N.
Metrológicos y de
Materiales CERTIFICADO DE
LEMAT CALIBRACIÓN FIMCP
Edición: 4
CÓDIGO DE RESULTADO
POSICIÓN
MUESTRA
14-0312 RAÍZ No se observan fisuras ni discontinuidades.
14-0313 RAÍZ No se observan fisuras ni discontinuidades.
14-0314 CARA No se observan fisuras ni discontinuidades.
14-0315 CARA No se observan fisuras ni discontinuidades.
Tabla 2. Ensayo de doblado. Resultados.
OBSERVACIONES:
- Las probetas ensayadas y la información de las mismas fueron proporcionadas por el cliente.
LOS RESULTADOS DECLARADOS EN ESTE INFORME SE REFIEREN ÚNICAMENTE A LOS OBJETOS ENSAYADOS.
Se prohibe la reproducción total o parcial del presente informe, salvo aprobación escrita del LEMAT
Guayaquil; Campus "Gustavo Galindo" Km. 30.5 vía perimetral, contiguo a la Cdla. Santa Cecilia.
Fax: (593-4)2269293 - Teléfono: 2269375
E-mail: lemat@espol.edu.ec
MC2201 -04
WELDER PERFORMANCE QUALIFICATION (WPQ)
(CALIFICACIÓN DE DESEMPEÑO DEL SOLDADOR)
TEST DESCRIPTION
Identification of WPS followed 002-GTAW ER70S6 Test Coupon Production Weld
Specification and type/grade or UNS Number of base metal(s) SA-53 Gr. B Thickness 9/32"
TESTING VARIABLES AND QUALIFICATION LIMITS
Welding Variables (QW-350) Actual Values Range Qualified
Welding process(es) GTAW GTAW
Type (i.e.; manual, semi-automatic) used Manual Manual
Backing (with/without) None With / Without
Plate Pipe (enter diameter if pipe or tube) Ø 6" Ø 2-7/8" - Unlimited
P-No. 1 through P-No. 15F, P-No. 34,
Base metal P-Number to P-Number 1 to 1 and P-No. 41 through P-No. 49
Filler metal or electrode specification(s) (SFA) (info only) 5.18 5.18
Fliler metal or electrode specification(s) (info only) ER70S6 ER70S6
Filler metal F-Number(s) 6 All F-No. 6
Consumable insert (GTAW or PAW) Not Used Without
Filler Metal Product Form (solid/metal or flux cored/powder) (GTAW or PAW) Solid Solid
Deposit thickness for each process
Process 1 GTAW 3 layers minimum Yes No 9/32" 9/16"
Process 2 ---- 3 layers minimum Yes No ----- -----
Position qualified (2G, 6G, 3F, etc.) 6G All
Vertical progression (uphill or downhill) Uphill Uphill
Type of fuel gas (OFW) ----- -----
Inert gas backing (GTAW, PAW, GMAW) ----- -----
Transfer mode (spray/globular or pulse to short circuit - GMAW) ----- -----
GTAW current type/polarity (AC, DCEP, DCEN) DCEN DCEN
RESULTS
Visual examination of completed weld (QW-302.4) OK
Transverse face and root bends [QW-462.3(a)] Longitudinal bends [QW-462.3(b)] Side bends (QW-462.2)
Pipe bend specimen, corrosion-resistant weld metal overlay [QW-462.5(c)]
Plate bend specimen, corrosion-resistant weld metal overlay [QW-462.5(d)]
Pipe specimen, macro test for fusion [QW-462.5(b)] Plate specimen, macro test for fusion [QW-462.5(e)]
We certify that the statements in this record are correct and that the test coupons were prepared, welded and tested in accordance with the requirements of
Section IX of the ASME BOILER AND PRESSURE VESSEL CODE.
Page 1of 1
Laboratorio de Ensayos \*¿{,f
l\{etrológicos v de
Materiales
Edición 3
DATOS Dg LA MUESTRA
Muestreo
Fecha de Condiciones de Fecha de
Cédigo de Muestra Descripción de Ia muestra re¡lizado
Recepcién Ia muestra Ensayo
DOr
LÚS RESLILTAüAS DECLARAilOS EN ESTE TNFORME SE REFIEREN UNICAMENTE A LOS OBJETOS ENSAYADOS.
SeTrrobibe ln rvprodwcciriw totsl o parcinl áel pres€ntc iufanrua salao ,tprabedów esu4ta áel LEMAT
l"i(,220f
Laboratcrio de Ensayos
Metrológicos y de
Materiales
Edigién 3
Hoja: 2 de 3 Fecha de emisión: 08/as/2ot2
Ne lnforme: t2-t43 Número de Orden: oT-305-12
ELONGACIÓN
ESFUERZO ESF''TTERZO
ANCHO ESPESOR ÁRe.q DESIGNACIÓN DESPUÉS DE LA
PROBETA N{ÁXIMO FLT]ENCIA-
(mm) (mm) (mm2) PROBETA ROTtiRd
(Nlmm') (N/mm')
(%)
12-0205 12,15 6,48 78,73 No.7 485"59 320.6'l 24,64
OBSERII4CIONES:
fiuestras y la información de las mismas fueron proporcionadas por el cliente.
rotura de las probetas ocurrió -fuera de la soldadura.
.*El esfwerzo cle fluencia reportado corresponde al esfuetzo calculada con el 0,2%o de elongacién en l,a muestra ] 2-0205
LOS RES(ILTADOS DECUIRADOS EN ESTE INFORME SE REFTEREN UNICAMENTE A LOS OBJETOS ENSAYADOS.
Se prohibe ln reproducúón tatal o parcial del preseTrte inforwe, salva aprobación escrita del LEMAT
L)at4,aqui!: Catnltas "Ciustaz'o C¿4in¡lo I'.", K,z i!.-j ún Pnin:ehwt, ¡onlfuito a la Crlla. ,l¿¡tlu Ceri/ia.
Fax: (59)-4) 22692t)] -Telifbna: ?.?69 j7t
tsi - t¡ ai i: /e t¡t ¡ ¡{ii ¿.tl' o /. ¿ rh¡. e ¡
I,rc?201
Laboratorio de Ensayos
Meuológicos y de
Materiales
Edición 3
CONDICIÓN: OK
INFORMACIÓI¡,EUCrcX¿I: N/C
OBSERVACIONES:
- Las probetas ensayadas y la información de las mismas fueron proporcionadas por el cliente.
T-OS RESULTADOS DECLARADOS EN ESTE INFAAWE SE REFIERET{ UNICAMENTE A LOS OBJETOS ENSAYADOS.
Se fut rcprodacúón total a parcinl del presente informe, saluo aprobañón escrita lel LEMAT
proltibe
Caayaqúl: ilantpus "Custara Cslintlo T'.", I{¡,"s J{}.5 t'1¡t Pni¡¡¿etru/, conrt..gtttt a t'a i'rJk. Saata Ces.lia.
Fex: (59)-4)'22ú929i - Teléfono: 226rj75
E E¿a i /: lnna {a), es¡ c /. etla. c r
Atc?20t
WELDER PERFORMANCE QUALIFICATION (WPQ)
(CALIFICACIÓN DE DESEMPEÑO DEL SOLDADOR)
TEST DESCRIPTION
Identification of WPS followed 001-SMAW E7018/FCAW E71T1C Test Coupon Production Weld
Specification and type/grade or UNS Number of base metal(s) SA-36 Thickness 0.708"
TESTING VARIABLES AND QUALIFICATION LIMITS
Welding Variables (QW-350) Actual Values Range Qualified
Welding process(es) SMAW FCAW SMAW FCAW
Type (i.e.; manual, semi-automatic) used Manual Semiautomatic Manual Semiautomatic
Backing (with/without) Weld Metal Weld Metal With
Plate Pipe (enter diameter if pipe or tube) 0,708" 0,708" Ø ≥ 2-7/8 F ; Ø > 24 V
P-No. 1 through P-No. 15F, P-No. 34,
Base metal P-Number to P-Number 1 to 1 1 to 1 and P-No. 41 through P-No. 49
Filler metal or electrode specification(s) (SFA) (info only) 5.1 5.20 ---- ----
Fliler metal or electrode specification(s) (info only) E-7018 E-71T1C ---- ----
Filler metal F-Number(s) 4 6 4, 3, 2, 1 6
Consumable insert (GTAW or PAW) ---- ---- ---- ----
Filler Metal Product Form (solid/metal or flux cored/powder) (GTAW or PAW) ---- ---- ---- ----
Deposit thickness for each process
Process 1 SMAW 3 layers minimum Yes No 0,354" ---- Up to 0,708" ----
Process 2 FCAW 3 layers minimum Yes No ---- 0,354" ---- Up to 0,708"
Position qualified (2G, 6G, 3F, etc.) 3G 3G Groove F, V ; Fillet F, V, H
Vertical progression (uphill or downhill) Uphill Uphill Uphill
Type of fuel gas (OFW) ---- ---- ---- ----
Inert gas backing (GTAW, PAW, GMAW) ---- None ---- With/Without
Transfer mode (spray/globular or pulse to short circuit - GMAW) ---- Spray Arc ---- Spray; Globular
GTAW current type/polarity (AC, DCEP, DCEN) ---- ---- ---- ----
RESULTS
Visual examination of completed weld (QW-302.4) OK
Transverse face and root bends [QW-462.3(a)] Longitudinal bends [QW-462.3(b)] Side bends (QW-462.2)
Pipe bend specimen, corrosion-resistant weld metal overlay [QW-462.5(c)]
Plate bend specimen, corrosion-resistant weld metal overlay [QW-462.5(d)]
Pipe specimen, macro test for fusion [QW-462.5(b)] Plate specimen, macro test for fusion [QW-462.5(e)]
We certify that the statements in this record are correct and that the test coupons were prepared, welded and tested in accordance with the requirements of
Section IX of the ASME BOILER AND PRESSURE VESSEL CODE.
Page 1of 1
EDICIÓN No. 1
CONTROL DE SOLDADURA SECCIÓN: 12 REV. 0
MANUAL DE CONTROL DE CALIDAD ASME PÁGINA 1 OF 9
12.1 GENERAL
12.2.1 Los WPS son elabarados por el QCC, quien debe incluir la siguiente
información para cada proceso:
12.2.1.1 Variables esenciales
12.2.1.2 Variables suplementarias esenciales (cuando sean
aplicables requerimientos de pruebas de impacto)
12.2.1.3 Variables no esenciales
12.2.2 El QCI debe dar seguimiento y registrar todas las variables reales
esenciales y suplementarias esenciales (si aplican), durante la
soldadura de las probetas de prueba. El Jefe de Producción debe
proporcionar total supervisión y control de los soldadores durante la
producción de estas probetas de prueba.
12.2.3 El QCC es responsable de asegurar que la preparación y ensayo de
las muestras requeridas se llevará a cabo por un laboratorio bajo los
requisitos de la Sección IX.
12.2.4 El QCC debe revisar el reporte de pruebas presentado por el
laboratorio y si es aceptable, elabora y certifica el Procedure
Qualification Record (PQR), el cual debe incluir todas las variables
esenciales y suplementaarias esenciales (si aplican) para cada
proceso, y los resultados de las pruebas.
12.2.5 Los originales de los WPS y PQR calificados, y los reportes de
pruebas de laboratorio son conservados por el QCC. Copias de los
WPS se proporcionan al Jefe de Producción para su uso por los
soldadores y operadores de soldadura.
12.2.6 Los WPS se revisan cunado hay un cambio en una variable no
esencial. Cuando hay un cambio en una variable esencial o
complementaria esencial, el WPS necesita ser re-calificado o un
nuevo WPS debe ser calificado.
12.2.7 Los WPS y PQR se presentan al AI para su revisión. El AI puede
solicitar re-calificación de un WPS en cualquier momento.
EDICIÓN No. 1
CONTROL DE SOLDADURA SECCIÓN: 12 REV. 0
MANUAL DE CONTROL DE CALIDAD ASME PÁGINA 2 OF 9
El QCC asigna a cada soldador calificado una estampa única con la cual
identifican cada soldadura que hagan a intervalos de no más de 36” (1
metro). Cuando las condiciones requieran dichos estampes el soldador debe
colocar su identificación junto a cada una de sus soldaduras, con pintura. El
QCI de Planta/Campo debe registrar la identificación del soldador en el Mapa
de Soldaduras.
12.9 REGISTROS
12.10 EXHIBITS
EXHIBIT 12.1a
EXHIBIT 12.1a
WELDER CONTROL LIST REV. 0
(CONTROL DE SOLDADORES) PAGE 1 OF 1
(PÁGINA) (DE)
(MODO DE TRANSFERENCIA)
CONSUMMABLE INSERTS
(CORRIENTE / POLARIDAD)
(INSERTO CONSUMIBLE)
CURRENT / POLARITY
(DIÁMETRO TUBERÍA)
(GAS DE RESPALDO)
TRANSFER MODE
(TIPO DE APORTE)
INERT BACKING
PIPE DIAMETER
PROGRESSION
(PROGRESIÓN)
FILLER TYPE
(RESPALDO)
(NÚMERO P)
(NÚMERO F)
P NUMBER
F NUMBER
PROCESS
(PROCESO)
(POSICIÓN)
BACKING
POSITION
(NOMBRE)
(APORTE)
FILLER
STAMP
NAME
TYPE
(TIPO)
(ID)
LEGEND + With (Con) - Without (Sin) All All (Todos) F Flat (Plano) H Horizontal V Vertical
(Nomenclatura)
O Overhead (Sobrecabeza) SP Special (Especial) U Uphill (Ascendente) D Downhill (Descendente)
SC Short circuit (Corto circuito) FC Flux cored (Tubular) S Solid (Sólido) G/S Globular / Spray (Globular / Rociado)
* P-No. 1 through P-No. 15F, P-No. 34, and P-No. 41 through P-No. 49
EXHIBIT 12.1b
EXHIBIT 12.1b
WELDING OPERATOR CONTROL LIST REV. 0
(CONTROL DE OPERADORES DE SOLDADORA) PAGE 1 OF 1
(PÁGINA) (DE)
CONSUMMABLE INSERTS
(INSERTO CONSUMIBLE)
VOLTAGE CONTROL
(CONTROL DE VOLTAJE)
VISUAL CONTROL
(RESPALDO)
PROCESS
(PROCESO)
(POSICIÓN)
BACKING
POSITION
(NOMBRE)
STAMP
NAME
TYPE
(TIPO)
(ID)
LEGEND + With (Con) - Without (Sin) All All (Todos) F Flat (Plano) H Horizontal V Vertical
(Nomenclatura)
O Overhead (Sobrecabeza) SP Special (Especial) U Uphill (Ascendente) D Downhill (Descendente)
SC Short circuit (Corto circuito) FC Flux cored (Tubular) S Solid (Sólido) G/S Globular / Spray (Globular / Rociado)
EXHIBIT 12.2
EXHIBIT 12.2
WELDER LOG REV. 0
(CONTINUIDAD SOLDADORES) PAGE 1 OF 1
(PÁGINA) (DE)
QCI SIGNATURE
DATE
CONTROL DE SOLDADURA EDICIÓN No. 1
SECCIÓN: 12 REV. 0
MANUAL DE CONTROL DE CALIDAD ASME
PÁGINA 9 OF 9
EXHIBIT 12.3
PROCEDURE QUALIFICATION RECORD (PQR)
(REGISTRO DE CALIFICACIÓN DE PROCEDIMIENTO)
JOINTS (QW-402)
Page 1 of 2
PROCEDURE QUALIFICATION RECORD (PQR)
(REGISTRO DE CALIFICACIÓN DE PROCEDIMIENTO)
OTHER TEST
Type of Test -----
Deposit Analysis -----
Other -----
Welder's Name Ángel Morocho Clock No. 0602975104 Stamp No. S17
Tests Conducted by ESPOL - LEMAT Laboratory Test No. 14-341
We certify that the statements in this record are correct and that the test welds were prepared, welded and tested in accordance with the requirements of
Section IX of the ASME Boiler and Pressure Vessel Code.
(Detail of record of tests are illustrative only and may be modified to conform to the type and number of tests requiered by the Code.)
Page 2 of 2
Laboratorio de Ensayos INFORME DE ENSAYOS/ ■<-
Metrológicos y de
Materiales CERTIFICADO DE
LEMAT CALIBRACIÓN FIMCP
Edición: 4
Cliente
Cliente • Conforme
14-0505 T-1 23/09/2014 ■ LEMAT 0 23/09/2014
Otros
No aplica
i—i
1-1
No conforme E
Cliente •
Cliente Conforme .1
14-0506 T-2 23/09/2014 ■ LEMAT E 23/09/2014
Otros p
No aplica P
No conforme E
Cliente
Cliente gil Conforme
14-0507 DC-1 23/09/2014 LEMAT E 23/09/2014
Otros II r--1 No conforme p
No aplica 1-1
Cliente 111
14-0508 DC•2 23/09/2014
Cliente
LEMAT E
Conforme El 23/09/2014
Otros p mi No conforme •
No aplica 1-1
Cliente •
Cliente Conforme
14-0509 DR-1 23/09/2014 LEMAT E 23/09/2014
Otros 11/ No conforme •
No aplica 0
Cliente •
Cliente IR Conforme a
14-0510 DR-2 23/09/2014 LEMAT E 23/09/2014
Otros E No aplica P
No conforme p
MC2203-01
LOS RESULTADOS DECLARADOS EN ESTE INFORME SE REFIEREN ÚNICAMENTE A LOS OBJETOS ENSAYADOS.
Se prohibe la reproducción total o parcial del presente informe, salvo aprobación escrita del LEMAT
Guayaquil: Campus "Gustavo Galindo" Km. 30.5 vía perimetral, contiguo a la Cdla. Santa Cecilia.
Fax: (593-4)2269293 - Teléfono: 2269375
E-mail: lemat®espoiedu.cc
MC2201 -04
Laboratorio de Ensayos INFORME DE ENSAYOS/ N„
Metrológicos y de
Materiales CERTIFICADO DE
LEMAT CALIBRACIÓN FIMCP
Edición: 4
OBSERVACIONES:
Las muestras y lo información de las mismas fueron proporcionadas por el cliente.
La roturo de los probetas 14-0505 y 14-0506 ocurrió fuera de la soldadura.
El ancho y espesor reportados corresponden a las dimensiones de la probeta antes del ensayo.
LOS RESULTADOS DECLARADOS EN ESTE INFORME SE REFIEREN ÚNICAMENTE A LOS OBJETOS ENSAYADOS.
Se prohibe la reproducción total o parcial del presente informe, salvo aprobación escrita del LEMAT
Guayaquil; Campus "Gustavo Galindo" Km. 30.5 vía perimetral, contiguo a la Cdla. Santa Cecilia.
Fax: (593-4)2269293 - Telefono: 2269375
E-mail. lemat@espoLedu.ec
MC2201 -04
Laboratorio de Ensayos INFORME DE ENSAYOS/ N.
Metrológicos y de
Materiales CERTIFICADO DE
LEMAT CALIBRACIÓN F1MCP.
Edición: 4
ENSAYOS DE DOBLADO
Código de
Posición Resultado
muestra
OBSERVACIONES:
Las muestras ensayadas y la información de las mismas fueron proporcionadas por el cliente.
LOS RESULTADOS DECLARADOS EN ESTE INFORME SE REFIEREN ÚNICAMENTE A LOS OBJETOS ENSAYADOS.
Se prohibe la reproducción total o parcial del presente informe, salvo aprobación escrita del LEMAT
Guayaquil; Campus "Gustavo Galindo" Km. 30.5 vía perimetral, contiguo a la Cdla. Santa Cecilia.
Fax: (593-9)2269293 - Teléfono: 2269375
E-mail: lemai@espoLedu.ec
MC2201 -04
PROCEDURE QUALIFICATION RECORD (PQR)
(REGISTRO DE CALIFICACIÓN DE PROCEDIMIENTO)
JOINTS (QW-402)
Page 1 of 2
PROCEDURE QUALIFICATION RECORD (PQR)
(REGISTRO DE CALIFICACIÓN DE PROCEDIMIENTO)
OTHER TEST
Type of Test -----
Deposit Analysis -----
Other -----
Welder's Name Rivera Pluas Emilio Guillermo Clock No. 0919723130 Stamp No. S-16
Tests Conducted by ESPOL - LEMAT Laboratory Test No. 14-1304
We certify that the statements in this record are correct and that the test welds were prepared, welded and tested in accordance with the requirements of
Section IX of the ASME Boiler and Pressure Vessel Code.
(Detail of record of tests are illustrative only and may be modified to conform to the type and number of tests requiered by the Code.)
Page 2 of 2
Laboratorio de Ensayos INFORME DE ENSAYOS/ N.
Metrológicos y de
Materiales CERTIFICADO DE
LEMAT CALIBRACIÓN FIMCP
Edición: 4
DATOS DE LA MUESTRA
Fecha de Muestreo Condiciones de la Fecha de
Código de Muestra Descripción de la muestra
Recepción realizado por muestra Ensayo
Cliente I. Conforme al
14-0310 Tracción 1 19/02/2014 25/02/2014
Otros o No conforme El
Cliente Conforme
14-0313 Doblado Raíz 2 19/02/2014 25/02/2014
Otros o No conforme MI
Cliente E Conforme a
14-0315 Doblado Cara 2 19/02/2014 25/02/2014
Otros O No conforme MI
Cliente Conforme a
14-0827 Tracción 3 08/05/2014 20/05/2014
Otros O No conforme N
MC2203-01
LOS RESULTADOS DECLARADOS EN ESTE INFORME SE REFIEREN ÚNICAMENTE A LOS OBJETOS ENSAYADOS.
Se prohibe la reproducción total o parcial del presente informe, salvo aprobación escrita del LEMAT
Guayaquil: Campus "Gustavo Galindo" Km. 30.5 vio perimetraI contiguo a la Cdla. Santa Cecilia.
Fax: (593-4)2269293 - Teléfono: 2269375
E-mail: lemat@espoLedu.ec
MC2201 -04
Laboratorio de Ensayos INFORME DE ENSAYOS/ %,
Metrológicos y de
Materiales CERTIFICADO DE
LEMAT CALIBRACIÓN FIMCP
Edición: 4
ESFUERZO
CÓDIGO DE ANCHO ESPESOR ÁREA DESIGNACIÓN
MUESTRA (mm) (mm) (mm2) PROBETA
(N/mm2)
14-0310 12,26 5,64 69,15 Tracción 1 515,157
14-0311 12,51 5,66 70,81 Tracción 1 504,137
14-0827 14,07 5,69 80,06 Tracción 3 554,362
Tabla I. Ensayos de tensión. Resultados.
OBSERVACIONES:
Las muestras y la información de las mismas fueron proporcionadas por el cliente.
El "Espesor nominal" corresponde al espesor de la tubería.
El 'ANCHO" y "ESPESOR" corresponden a las dimensiones de la probeta ensayada.
La rotura de la probeta 14-0310 ocurrió fuera de la soldadura.
La rotura de las probetas 14-0311 y 14-0827 ocurrió dentro de la soldadura.
LOS RESULTADOS DECLARADOS EN ESTE INFORME SE REFIEREN ÚNICAMENTE A LOS OBJETOS ENSAYADOS.
Se prohibe la reproducción total o parcial del presente informe, salvo aprobación escrita del LEMAT.
Guayaquil; Campus "Gustavo Galindo" Km. 30.5 vía perin7etral, contiguo a la Cdla. Santa Cecilia.
Fax: (593-4)2269293 - Teléfono: 2269375
E-mail: lemat@espoledu.ec
MC2201 -04
Laboratorio de Ensayos INFORME DE ENSAYOS/ N.
Metrológicos y de
Materiales CERTIFICADO DE
LEMAT CALIBRACIÓN FIMCP
Edición: 4
CÓDIGO DE RESULTADO
POSICIÓN
MUESTRA
14-0312 RAÍZ No se observan fisuras ni discontinuidades.
14-0313 RAÍZ No se observan fisuras ni discontinuidades.
14-0314 CARA No se observan fisuras ni discontinuidades.
14-0315 CARA No se observan fisuras ni discontinuidades.
Tabla 2. Ensayo de doblado. Resultados.
OBSERVACIONES:
- Las probetas ensayadas y la información de las mismas fueron proporcionadas por el cliente.
LOS RESULTADOS DECLARADOS EN ESTE INFORME SE REFIEREN ÚNICAMENTE A LOS OBJETOS ENSAYADOS.
Se prohibe la reproducción total o parcial del presente informe, salvo aprobación escrita del LEMAT
Guayaquil; Campus "Gustavo Galindo" Km. 30.5 vía perimetral, contiguo a la Cdla. Santa Cecilia.
Fax: (593-4)2269293 - Teléfono: 2269375
E-mail: lemat@espol.edu.ec
MC2201 -04
PROCEDURE QUALIFICATION RECORD (PQR)
(REGISTRO DE CALIFICACIÓN DE PROCEDIMIENTO)
JOINTS (QW-402)
Page 1 of 2
PROCEDURE QUALIFICATION RECORD (PQR)
(REGISTRO DE CALIFICACIÓN DE PROCEDIMIENTO)
OTHER TEST
Type of Test -----
Deposit Analysis -----
Other -----
Welder's Name Daniel Ramos Clock No. 0921090437 Stamp No. S12
Tests Conducted by ESPOL - LEMAT Laboratory Test No. 12-143
We certify that the statements in this record are correct and that the test welds were prepared, welded and tested in accordance with the requirements of
Section IX of the ASME Boiler and Pressure Vessel Code.
(Detail of record of tests are illustrative only and may be modified to conform to the type and number of tests requiered by the Code.)
Page 2 of 2
Laboratorio de Ensayos \*¿{,f
l\{etrológicos v de
Materiales
Edición 3
DATOS Dg LA MUESTRA
Muestreo
Fecha de Condiciones de Fecha de
Cédigo de Muestra Descripción de Ia muestra re¡lizado
Recepcién Ia muestra Ensayo
DOr
LÚS RESLILTAüAS DECLARAilOS EN ESTE TNFORME SE REFIEREN UNICAMENTE A LOS OBJETOS ENSAYADOS.
SeTrrobibe ln rvprodwcciriw totsl o parcinl áel pres€ntc iufanrua salao ,tprabedów esu4ta áel LEMAT
l"i(,220f
Laboratcrio de Ensayos
Metrológicos y de
Materiales
Edigién 3
Hoja: 2 de 3 Fecha de emisión: 08/as/2ot2
Ne lnforme: t2-t43 Número de Orden: oT-305-12
ELONGACIÓN
ESFUERZO ESF''TTERZO
ANCHO ESPESOR ÁRe.q DESIGNACIÓN DESPUÉS DE LA
PROBETA N{ÁXIMO FLT]ENCIA-
(mm) (mm) (mm2) PROBETA ROTtiRd
(Nlmm') (N/mm')
(%)
12-0205 12,15 6,48 78,73 No.7 485"59 320.6'l 24,64
OBSERII4CIONES:
fiuestras y la información de las mismas fueron proporcionadas por el cliente.
rotura de las probetas ocurrió -fuera de la soldadura.
.*El esfwerzo cle fluencia reportado corresponde al esfuetzo calculada con el 0,2%o de elongacién en l,a muestra ] 2-0205
LOS RES(ILTADOS DECUIRADOS EN ESTE INFORME SE REFTEREN UNICAMENTE A LOS OBJETOS ENSAYADOS.
Se prohibe ln reproducúón tatal o parcial del preseTrte inforwe, salva aprobación escrita del LEMAT
L)at4,aqui!: Catnltas "Ciustaz'o C¿4in¡lo I'.", K,z i!.-j ún Pnin:ehwt, ¡onlfuito a la Crlla. ,l¿¡tlu Ceri/ia.
Fax: (59)-4) 22692t)] -Telifbna: ?.?69 j7t
tsi - t¡ ai i: /e t¡t ¡ ¡{ii ¿.tl' o /. ¿ rh¡. e ¡
I,rc?201
Laboratorio de Ensayos
Meuológicos y de
Materiales
Edición 3
CONDICIÓN: OK
INFORMACIÓI¡,EUCrcX¿I: N/C
OBSERVACIONES:
- Las probetas ensayadas y la información de las mismas fueron proporcionadas por el cliente.
T-OS RESULTADOS DECLARADOS EN ESTE INFAAWE SE REFIERET{ UNICAMENTE A LOS OBJETOS ENSAYADOS.
Se fut rcprodacúón total a parcinl del presente informe, saluo aprobañón escrita lel LEMAT
proltibe
Caayaqúl: ilantpus "Custara Cslintlo T'.", I{¡,"s J{}.5 t'1¡t Pni¡¡¿etru/, conrt..gtttt a t'a i'rJk. Saata Ces.lia.
Fex: (59)-4)'22ú929i - Teléfono: 226rj75
E E¿a i /: lnna {a), es¡ c /. etla. c r
Atc?20t
PROCEDURE QUALIFICATION RECORD (PQR)
(REGISTRO DE CALIFICACIÓN DE PROCEDIMIENTO)
JOINTS (QW-402)
Page 1 of 2
PROCEDURE QUALIFICATION RECORD (PQR)
(REGISTRO DE CALIFICACIÓN DE PROCEDIMIENTO)
OTHER TEST
Type of Test -----
Deposit Analysis -----
Other -----
Welder's Name William Alfredo Menoscal Pinto Clock No. 0919592055 Stamp No. S11
Tests Conducted by ESPOL - LEMAT Laboratory Test No. 12-133
We certify that the statements in this record are correct and that the test welds were prepared, welded and tested in accordance with the requirements of
Section IX of the ASME Boiler and Pressure Vessel Code.
(Detail of record of tests are illustrative only and may be modified to conform to the type and number of tests requiered by the Code.)
Page 2 of 2
WELDING PROCEDURE SPECIFICATIONS (WPS)
(ESPECIFICACIONES DE PROCEDIMIENTO DE SOLDADURA)
1-n GTAW ERCuNi 1,6mm DCSP 40-60 ---- ---- 9-11 ---- ----
Amps and volts, or power or energy range, should be recorded for each electrode size, position, and thickness, etc.
TECHNIQUE (QW-410)
String or Weave Bead Both
Orifice, Nozzle, or Gas Cup Size 12mm - 19mm
Initial and Interpass Cleaninig (Brushing, Griding, etc.) Brushing
---------
Method of Back Gouging Griding
Oscilation -----
Contact Tube to Work Distance -----
Multiple or Single Pass (Per Side) Both
Multiple or Single Electrodes Single
Electrode Spacing -----
Peening Not Allowed
Other Thermal process: any ; Out chamber
Page 2 of 2
WELDING PROCEDURE SPECIFICATIONS (WPS)
(ESPECIFICACIONES DE PROCEDIMIENTO DE SOLDADURA)
1-n GTAW ER-308L 2.4 mm DCRP 85-130 ---- ---- 13-17 ---- ----
1-n SMAW E308L-16 2.4 mm DCRP 50-65 ---- ---- 25-30 ---- ----
Amps and volts, or power or energy range, should be recorded for each electrode size, position, and thickness, etc.
TECHNIQUE (QW-410)
String or Weave Bead Both
Orifice, Nozzle, or Gas Cup Size 12.7 mm - 19.05 mm
Initial and Interpass Cleaninig (Brushing, Griding, etc.) Griding & Brushing
---------
Method of Back Gouging Griding
Oscilation -----
Contact Tube to Work Distance As required
Multiple or Single Pass (Per Side) Both
Multiple or Single Electrodes Single
Electrode Spacing -----
Peening Not Allowed
Other Thermal process: any
1-n GTAW ER70S6 3/32" DCSP 100-160 ---- ---- 10 - 20 ---- ----
Amps and volts, or power or energy range, should be recorded for each electrode size, position, and thickness, etc.
TECHNIQUE (QW-410)
String or Weave Bead Both
Orifice, Nozzle, or Gas Cup Size 1/2" - 3/4"
Initial and Interpass Cleaninig (Brushing, Griding, etc.) Brushing
---------
Method of Back Gouging Griding
Oscilation -----
Contact Tube to Work Distance -----
Multiple or Single Pass (Per Side) Both
Multiple or Single Electrodes Single
Electrode Spacing -----
Peening Not Allowed
Other Thermal process: any ; Out chamber
Page 2 of 2
WELDING PROCEDURE SPECIFICATIONS (WPS)
(ESPECIFICACIONES DE PROCEDIMIENTO DE SOLDADURA)
WPS No. 001-SMAW E7018/FCAW E71T1C Rev. 0 Date. April 09, 2012
(Fecha)
Prepared By: Darío Sánchez Supporting PQR No. 001-SMAW/FCAW
(Elaborado Por) (Soportado Por PQR No.)
Welding Process(es): SMAW / FCAW Type(s) Manual / Semiautomatic
(Proceso de Soldadura) (Tipo) Automatic, Manual, Machine or Semi-Automatic)
1-n SMAW E-7018 1/8" DCRP 90-135 ---- ---- 18-25 ---- ----
200-400
1-n FCAW E-71T1C 0.045" DCRP 130-250 ---- 20-30 ---- ----
IPM
Amps and volts, or power or energy range, should be recorded for each electrode size, position, and thickness, etc.
TECHNIQUE (QW-410)
String or Weave Bead Both
Orifice, Nozzle, or Gas Cup Size 1/2" - 3/4"
Initial and Interpass Cleaninig (Brushing, Griding, etc.) Griding & Brushing
---------
Method of Back Gouging Griding
Oscilation -----
Contact Tube to Work Distance 1/2" - 1"
Multiple or Single Pass (Per Side) Both
Multiple or Single Electrodes Single
Electrode Spacing -----
Peening Not Allowed
Other Thermal process: any
Page 2 of 2